Loading...
HomeMy WebLinkAboutEXCAVATION PERMIT - 21-00462 - 535 S YELLOWSTONE HWY - DUE TO DAMAGED VENT Revised 7/19/2018 Excavation Permit Application Public Works 35 North 1st East Rexburg, ID 83440 keithd@rexburg.org www.rexburg.org Phone: 208.359.3020 x2320 Fax: 208.359.3022 Application Date: _____________________ Applicant / Contractor Name: ___________________________________________________________________________ Mailing Address: __________________________________ City: __________________ State: _____ Zip: ______________ Primary Phone (☐ Home ☐ Work ☐ Cell): ____________________ Email: ______________________________________ Alternate Phone (☐ Home ☐ Work ☐ Cell):__________________________ Approximate address of excavation: _________________________________________________________________ Describe area of excavation in right of way: ___________________________________________________________ _______________________________________________________________________________________________ Purpose of excavation: ____________________________________________________________________________ Location of excavation: ☐ Street ☐ Alley ☐ Sidewalk ☐ Undeveloped/Landscape Area Date to begin planned excavation: ______________________________________________________________ Refund Name (if different from above): _________________________ Phone Number: ______________________ Refund Mailing Address (if different from above): _____________________________________________________ CONDITIONS OF PERMIT: 1. No excavation shall be made in any city street or right of way without first obtaining an excavation permit and paying the required fees. 2. This permit is good for 30 calendar days after issuance. 3. Contractor is to carry a minimum of $500,000 in general liability insurance to cover possible damages that may be caused by the excavation or any accident caused by the work. 4. The permit fee within the public right of way is $1000 for any excavation that will disturb less than 30 square yards of asphalt surfacing. A fee of $100 will be retained from the permit fee to cover city inspection costs. 5. For excavations that will disturb more than 30 square yards of asphalt surfacing, the permit fee will be determined by the city on an individual basis. 6. The contractor is to notify the city prior to placing backfill material and final asphalt placement. If these conditions are acceptable to the city engineer, $900 of the permit fee will be refunded within 30 calendar days of completion. 7. If stated conditions are not met, the city may hold the permit fee for one year from final asphalt placement. In the event repairs are needed, the contractor will be responsible for the repairs. If contractor fails to make the repairs within 7 days, the city may do the repairs and retain the permit fee and permit holder is responsible for any cost overruns. 8. The contractor is to notify Dig Line at 1-800-342-1585, at least two (2) business days in advance of an excavation. 9. The contractor shall furnish and maintain all barricades, signs, and flagmen as required by the Manual on Uniform Traffic Control Devices (MUTCD). 10. Existing asphalt pavement shall be saw cut to provide a vertical surface. 11. Excavation and backfill work shall be completed in accordance with the requirements of Sections 300 and 800 of the ISPWC (Idaho Standards for Public Works Construction). See summary attached. 12. All excavated material shall be stockpiled for re-use or immediately removed from the site if it is unacceptable for re-use as backfill. Keep excavated material safely away from the trench and from the traveled roadway. 13. Excavations made in all streets shall be backfilled with 3 feet of flowable fill, 4 inches of 3/4 inch crushed aggregate road base, and 2 ½- inch minimum thickness of plant mix pavement surface or equal to the existing material thickness, whichever is greater, unless otherwise approved by the city public works director. 14. Existing asphalt pavement shall be “tacked” prior to new asphalt placement. 15. Final repair of asphalt surfaces is to be completed within 10 calendar days of the initial excavation. 16. In the winter months (Nov 1-Mar 31), no excavation permits will be approved, except in the case of emergency as deemed necessary by the city public works director. If winter excavation allowed, a temporary cold mix paving must be placed and maintained by the contractor until final paving is completed as soon as weather permits in the spring. In making application for this permit, I hereby agree to the above conditions of the permit and applicable City Ordinances. Signature: _______________________________________ Print Name: _______________________________________ Signed Date: _____________________________________ *Applicant will be notified of permit application approval and request for deposit to be submitted before excavation can begin. Revised 7/19/2018 Backfill Material Requirements 3" Minus 3/4" crushed Road Base (Type I) 3 in. 100 1 in. 100 3/4 in. 90-100 3/8 in. No. 4 25-60 40-65 No. 8 30-50 No. 200 0-12 3-9 Backfill material shall met the above gradation requirements and be placed in 12 inch maximum loose lifts and compacted to 95% of maximum density in accordance with AASHTO T 99. 1/2 inch Class III Plant Mix Pavement shall be compacted to between 92% and 95% of maximum density in accordance with mix design. Asphalt surfacing must extend 1 foot beyond the trench sides in all directions or a minimum of 4 feet in width, whichever is greater. Minimum asphalt thickness shall be 2 ½ inches or equal to the existing material thickness, whichever is greater Final surface deviation must be within +/- ½” or less of surrounding surface conditions unless approved by City of Rexburg Engineer. Damages caused by the excavation must also be repaired at contractors’ expense. Excavation Permit Summary  ☐ Obtain Permit prior to starting excavation  ☐ Notify Dig-line at 1-800-342-1585  ☐ Provide Insurance  ☐ Backfilled with flow able fill  ☐ Notify city prior to backfilling, or loose refund  ☐ Compact all backfill- see attached specifications  ☐ Fill and compact tip of trench with approved gravel  ☐ Notify city prior to paving, or loose refund  ☐ Paving surface to be completed within 10 days, or city will complete  ☐ Paving to be done according to attached specifications  ☐ Fix surface repair if it fails or the trench settles