CITE CSF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections. For ori -side con$#ruction, dram time to timethe building official, upon
notifi"'cation from the permit holder or his agent, hall mike or cause to be made any��ecess��insp�etions a nd shall either approve that potion of the construction as campleted r shah notify
the permit holder or his agent wherein the same fails to comply with this code. �
1. LAYOUT.- Lot corners s#abed, staking in pace for building, prior to excavation:
2- FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excoriated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place,
�. rVulvUH ! jU[V lIVSi-'LU HC
The foundation inspection shall included excavations for thickened scabs
intended for the support of bearing wails, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Comm -only made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
inspections of trusses.
6. FRAME INSPECTION.1
Commonly made after the roof, all framing, firestopp"ng, draftstopp"ng and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
02
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before. wallboard joints and fasteners are
taped and finished.
FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
SIDEWALK IPJSPECTIONS:
After forms are set,
FINAL INSPECTION:
prior to placing concrete.
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require. any other inspections to ascertain campliance with this
cede and other laves enforced by the building department.
INSPECTION CARD
The permit holder or his agent shallpost the inspectian record on the jab site in an accessible
and conspicuous place to allow the uilding of#ieial to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approrred.
have read the above and wild comply in my requests for inspections by givina 24 HOUR
NOTICE prior forinspections to be made,
Electrical: 356-483D Building: 359-3x20 ex 341 or 313
Plumbing: 359-3020 ex 347 or 313 or 359-3p34
Signature:. --