HomeMy WebLinkAboutRESCHECK - 04-00168 - 322 & 326 Eagle Summit St - New TwinhomeRESeheck Compliance Certificate
2000 IECC
RES checkSoftware Version 3.5 Release 1 a
Data filename: Untitled.rck
TITLE: EAGLEW+DOD TOWNHUMES
CITY: Rexbur�
STAT: Idaho
HDD: 8693
CONSTRUCTION TYPE: Single Family
DATE; 04/29104
DATE OF PLANS: 08/15/03
PROJECT INFORMATION:
EAGLEWQdD TQWNHC]MES
EAGLEWDOD SUSDIVXSI4N
REXBURG, IDAHO
COMPANY INFORMATION.
SAINSBURY CONSTRUCTION INC.
4697 1-fARQLD5EN DRI'V'E
IDAHO BALLS, IDAHO 83401
529-4510
COMPLIANCE: Passes
Maximum UA = 73 8
Your Home UA = 634
14.1 % Better Than bode (UA)
Permit Number
Checked By/Date
Furnace 1: Forced Hot Ain, 90 AFUE
.lair Conditioner 1: Electric Central Air., 10 SEER
CDMPLIANCE STATEMENT:
Gross
proposed
building design -described hers is consistent with the building plans, specifications,,
Glazing
with
the permit
Area or
Cavity
Cont.
or Tr
Perimeter
- .1
R - Value
U- `actor
U
Ceiling 1. Flat Ceiling or -Scissor Truss
3480
40.E
101
Wall : Wood Frame., ''0 C.
4070
19.0
199
Basement Wall 1
Solid Concrete or Masonry
1472
11.
Wall heicnt.; :.
Depth below ,grade. .'f
Insulation dept . .
Window I: Vinyl Frame. -Double Pane with L _E
444
0.340
151
Door ; Solid
42
0.350
l
Door I -a Glass
'1440.35-0
50
moor : Glass
70
0.350
2
Furnace 1: Forced Hot Ain, 90 AFUE
.lair Conditioner 1: Electric Central Air., 10 SEER
CDMPLIANCE STATEMENT:
The
proposed
building design -described hers is consistent with the building plans, specifications,,
and ether calculations submitted
with
the permit
application. The proposed building has been designed. to meet the 2000 JECC
requirements in RES checkVe-rsion 3.5 Release I a (formerly AIECchecA) and to comply with the mandatory requirements iisted in
the RES checklms
Builder/Designer
RIEScheck Inspection Checklist
2000 IECC
RES checkSoftware Version 3.5 Release 1 a
DATE: 04/29/04
BIdgm
Dept. �
Use J
l
�
Ceilings:
] �
1. Oiling 1: Flat Ceiling or Scissor Truss, R-40.0 cavity insulation
�
Comments:
�
Above -Grade Walls:
[ ] �
1. Wall 1: Wood Frame, 241Fo .e., R-19.0 cavity insulation
i.
1
Comments:
3
�
Basement Walls.
� ] �
1. Basement Wall 1: Solid Concrete or Masonry, 8.0'ht/7.0'bg/8.0'insu1,
R- 11,.4 cavity insulation
I
Comments:
�
Windows:
[ � (
i. Window 3: Vinyl Frarr�e:Doubfe Pani with Love -E, U -factor: �D.340
j
For windows without labeled U -factors, describe features:
# Panes� Frame Type ThermalBreak.? Yes [ ] No
J
Comments:
�
Doors:
� ] �
1_ Door.2.: Solid, U -factor: 0_3.54
�
Comments;
[ l �
2. Door ] : Glassy U -factor: 0,350
Comments:
[ � �
3• Dour 3: Mass, U -factor: 0.350
�
Comments:
�
Heating and Cooling equipment:
1 _ Furnace 1: Fared -Hot Air, 90 AFUE or.higber
j
Make and Model Number
2. A_r' Conditiojoer L. electric Central Air-, .10 SEER of higher
�
Make and Madel Number
� Air Leakage.
Joinis, penetrations, md all other such openings in the building enveJope that are sources of .air
C leakage must be sealed.
Recessed lights must be 1) Type IC rated, or 2) installed inside an appropriate air -tight assembly
� with a 0.5" clearance from combustible materials. If non -IC rated, the fixtuxe must be installed with a
� 3" clearance from insulation.
{
Vapor Retarder.-
Required
etarder.Required on the warm -in -winter side of all non -vented framed ceilings, walls, and floors.
Materials Identiffication,
Materials and equipment must be installed 1n accordance with the manufacturerjs installation tructions.
Materials and equipment mush be identifiedthat comp] in.ce can be d t r - in d
+t
[ ] � Manufacturer manuals for all installed heating and cooling equipment and service water heating
� equipment must be provided.
Ilencymu.Insulation R-vaIu�es, gIazing U-#'��ctors, �d heating equpment effisbe clearly marked on
� the building plans or specifications.
I
J Duct Insulation:
� ] j Dints in -unconditioned spaces must be insulated to R -S.
� Ducts. outside the building must be insulated to R-8.0.
Duct Construction:
[ ] � All joints, suns, -and connections must be securely fastened With welds, gaskets, mastics
� (adhesives), mastic -plus -embedded -fabric, or tapes. Duct tape is not permitted.
�
Exception.- Continuously welded and locking -type langitudi-nal joints and sums on ducts
� operating at less than 2 in. w.g. (54Q Fa).
[ � I Ducts sh:afl be.supported every .10 feet Qr iD accordance w tea the manufacturer's �nstruetjans..
[ ] � Cooling ducts with exterior insulation must be covered with a vapor retarder.
� J � Au filters are required in the return air system.
[ ] � The HVAC system must provide a means for balancing air and water systems.
J Temperature Controls:
� ] � Thermostats are required for each separate HVAC system. A manual or automatic means to
� partially restrict or shut off the heating an, dlor cooling input to each zone or floor shall be provided.
J Service Water Heating:
[ ] � Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the
� water heater has an integral heat trap or is part of a circulating system.
[ � � InsuIate cu+culating hot water pipes to the levels in Table l .
�
Circulating Hot Water Systems:
] � Insulate circulating hat water pipes to the bevels in Table 1.
� Swimming Pools:
[ ] j All heated swimming pools must have an on/off heater etch and requite a ever unless over 20%
� of the heating energy is fromnon-depletable sources. Foolpumps require a time cock.
j Heating and Cooling Piping Insulation:
[ � I HVAC piping Conveying fluids above 105 T or chilled fluids below 55 must be insulated to the
levels in Table 2.
nn
T,al�le 1: Minimum Insulation Thickness, for Circulating Hot Water Pipes.
Insulation Thickness in Inches by Pipe
Heated Water
Tem erature F
170-18a
140-160
100-13"10
Table
Non-Circuflati
Up to 1„
0.5
0.5
0.5
Up to 1.25"
1.0
0.5
0.5
Minimum -Insulation ThieknessforH''VACPipes-
Fluid Temp.
Piping
Systems Types Ran e k`)
Heating Systems
Low PressurelTemperature
Low Temperature
Steam Condensate {far feed water}
Coaling Systems
C 4
:irculat
e
Sizs
Mam's .: Rmouts
1.511 2.01,
1.
1.0
!.
Insulation Tbickness
in Inches by
Pipe
SlZimo %ja
" u I " and
Less 125"
0.5
Tv 2.511 -to 4tt
201-250
1.0
1.5
1.5
.2.0
120-200
0.5
1.0
1.0
1.
Any
tr-0 1 r-0
1
1.5
10
Chine Water, Refrigerant,
-55
0-5
0.5
0.75
Lo
and Bye
Below 40
1.0
1.0
1.5
1.
NOTES TO FIELD (Buildi,ng Department(Build,Use Orly)