Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 04-00166 - 374 Mariah Ave - New SFRCITY OF REXBURG BUILDING INSPECTION SEQUENCE 0 Type of Inspections: dor on-site Ganstruction, from time to time the building fl�ficF a , upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or, his agent wherein the same fails to comply with this code. � - LAYOUT,: Lot canners staked, staking in place for building, prior to eXGavation, 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: 5. 6. 7. M 9. 10. The foundation inspect0 ion shall included excavations for thickened slabs intended for the support of bearing wails, partitions, structural supports, or equipment and special requirements for wood foundations. All firms and reinforcing steel, etc., shad be in place. PLUMBING, MECHANICAL APUD ELECTRICAL: Rough inspection: Commonly made prior to cowering or concealment, before fixtures are set, and prior to framing inspection. TRUSS INSPECTION: Inspections of trusses. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping,VI draftstopping and bracing ars in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through Stade of Idaho Electrical bureau) LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard points and fasteners are taped and finished,, FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection,- building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shah post the inspection record on the job site in an accessible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit hoiden until the final inspection has been made and appVed. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 356-4830 Plumbing: 359-3020 ex ,�q or34-aor,,359-3034 Building: 359-3020 ex 341 0. 313 rl pF' MW A WF .13 -40