Loading...
HomeMy WebLinkAboutDOCS - 04-00162 - 775 Pinehaven St - New SFR0 aD CD 0 �. CL 0 0 rn CD i - c + rn F t + + - + + z i �li cn 0 rel L -j c W"*. 0 =MEdh 'Mom=, l l C - 70 r� m 02m m m m m D m r M co ti M m CO M C7 m mo m �t i` m kAm n O Z A X CD 0 CD 0 0 - CL CD0 0 p DO r-' C) m m 07 CD CD 0 f CD {Z C m m 07 CD CD 0 f CITY OF REXBURG e"n nwr_ iucoerril,. --.—••.•••••o .+�vr �v � �v1Y ti7Cl+lUtlYC:t Type of inspections: For on-site construction, from time to time the building official, upon notification from, the permit holder or his agent, shall snake or cause to be made any necessary inspections and shall either approve that portion of the constructi,on as completed or shill notify permit holder or his agent wherein the same fails tO comply with this code. y LAYOUT.- Lot c�rners naked, staking in place for building, prior to excavation: 2. FOOTING: Commonly made after doles or niers ars± �At �,r trnn�ha� „r �,,,,.......,.�. 3. 4. - r -- � �. -- �....• +• ...v�.7 vi i.JGIJGI #ICE it areas are excavated. Farms and horizon'al reinforcing tied in place, vertical reinforcing cut and on job site or tied in place, FOUNDATION INSPECTION: The foundation inSDection�shall included excavations for thickened slabsintended for the support of bearing wads, partitions, structural supports, or equipment and Special requirements for wood fo�undations. ASI farms and reinforcing steel, etc., snalt be in place PLUMBINGv MECHANICAL AND ELECTRICAL: Rough inspection: Gomrr�only made prior to covering or concealment, before fixtures are set, and prior to framing inspection_ 5. TRUSS INSPECTION. Inspections of trusses. 6.41 FRAME INSPECTION.s Commonly made after the root, all framing, firestopping, draftstoppt' ing and T -&&v,- ,, bracing are in place and after the plumbing, mechanical and electrical rough inspection, are approved. (Electrical inspection performed through State of Idaho Electrical Bureau), 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION- All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS- 0 After forms are sed, prior to placing concrete. 1(]. FINAL INSPECTION.0 11. Commonly made after the building is cor��pleted and ready for occupancy. C7CCUPAhICY PERMITO Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: in addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this cede and other haws enforced by the building department. The permit holder or h41 is agent shall a5���ECTIQh1 CARD pinspection record en the fob site in an accessible and conspicuous place to allow the building vfficial to make the required entries. The record shaft be maintained by the permit holder until the final inspection has been made and approved. I have. read the above and will comply in my requests for inspections by iWing24 HOURNOTICE prior forinspections #o be made. 9 Electrical: 356-4830 P1359-3020Building: 359-302D ex 341 or 3'1 rr�bing: e 41 or 3�r�9-3034 Signature: Date: