Loading...
HomeMy WebLinkAboutMULT DOCS - 04-00156 - 104 Star View Dr - New SFRDesIntelligence, 9n LLC Structural Engineering 3685 W Hwy 33 Rexburg, Idaho 83440 Date: June 2, 2004 To: City of Rexburg BuiIdin.� Department Subject: Rave Construction —Hidden. Valley Home Dear Sir or Madam, Call: (208) 359-1467 FAX.• (208),359-0740 Please attach the following requirements to the construction documents for the subject home. Holddowns as A own and specified on sheet 2 of the construction c1rawings shall b2,nt-ovided at the bay windows and garage. Shear walls as shown on the same drawing shall be constructed as specified. Please call me if you have any questions. Respectfully, Scott A Sp dinj, P Design Intelligence, L Design Intelligence, LLC 3685 W Hwy 33 Rexburg, Idaho 83440 let.. vvaii Ana.iysis -Short Wall Wind Load = --- - 22 psf - Roof Height = 9 ft Wall Height = — — � 9 ft Length of Long Wall = I J 25 k Area at Mid Height of Wall = � 338 ftA 2 Wind Force 742 lbs Shear Wall Length - — 43 ft Shear/ft in Wall @ Mid Height 173, lbs/ft. Provide 112"APA rated sheathing with 8d nails at 5-11 O.C. at panel edges and X12" ox. in the fiefd. Blocking is req ui red , r! _F_ { Seismic Analysis _ Seismic Mult'plier 0.127 iWidth Length Load 'Weight Roof Dead Load 28 45 24 -- �-- 3'0'240,''lbs � (includes snow) r FLong Wall Length 25 ft Short Wall Length 43 ft — IHeight — — I:Weight- gt� Wall Dead Load 136 159180IIbs Seismic Force @Mid Height of Wall -- _ 5006Ibs - -, Shear Wall Length 43 ft Shear per ftiln Wall @Mid Height 116 lbs/ft OK Provide 1 'SAPrated th i twith 8d o ails at 5"' o.c. __ at panel edges aid 12119 „ in field. i isrequired. � I' ___T_ Page 1 6/2/2004 or-fe C'k ITY OF 0 f EXBU J AMEKICNS Review Action June 4, 2004 Permit Number; 04 00156 Project Name: SFR for Brett Patterson Project Type: Single Family Residential Review Item Building Department Review Exiting Review Height and Area Review Interior Environment Mechanical Review Complies with approved Site Plan Review Energy Conservation Compliance Review Structural Review Parcel #'s RPRHDVY7010050 Ac—tions Fie wired for AoDroval Lots of existing notes as well as new ones regarding building codes. Pay close attention to them. Mechanical room is toward the front of the house. If you plan to gent those appliances to the back pari of roof, know that the off set on gas appliance venting cannot be more than 751/c of the vertical rise of vent. Site plan not to scale. Dimesions should work. Be sure to have the LAYOUT INSPECTION done BEFORE DIGGING. Floor on submitted compliance report is dor over unconditioned space i.e. crawl space, garage). Floor quer outside air is to meet requirements of attic insulation. REScheck stili passes but any changes will require a new REScheck report. Pay attention to the several hold downs on plans. Also be sure to fallow engineering nates. Truss details had some errors. Correct details will be needed for framing inspection. Missing sheet 7 on one of the copied plans. Review notes placed on sheet 7 of original red stamped drawings. P.0 Box 280 19 F. lire St, Rexburg, Idaho 83440 Phone (208) 359-3020 fax (208) 359-3422 --- Ar)orove-d 05/19/2004 05/19/2004 05/19/2004 05/19/2004 05/20/2004 05/21/2004 06/04/2004 Energy Certifications International Elaeroy C1111!!. OnseiNatiolli ,.Ode (I CC) As per sectionl D2.5 (IE -CC) all Msulation �.nsta.11ed shah have a certificate issued. The cerb.ncate shaE be siped and dated 116stin themaz�.ufacturur of the, insulation znstalled. The installer shali also pro-�Tide the 'tial install-4�Ld. thicicness:) the settled thicimess. tie ca-vera�� area and the number of fags installtd for bloNN71 or sprayed insulation_ 'Whez-o blo-w-n-in or sprayed iiisulation is irtsialled M Ovalis. Boors. and cathedral ccilingS, the installer shall pTo 'de a certification of the �n.sialled den-sitv and R - value. T -his ccriifcate shall be,-oostedinacoTi-q-nl-P.Ilnilc,'n]nPca ryn f-k�:1 TrNh c;+a0.. Roof/cellma jusulat*on Ro-of/celling.1'*nsulation that is blown -m- or sprayed shall be, identified by, thickness ma.rk�rs that are labelre-ld in inches or mfflzmeters installed at least one for �very '00 square feet throughout. the attic. The markers shall face the a�.c access, be affLxed to the trusses, or joists and marked �N-Tfth the,-n'��i�nu��. inial ns-�alled thickness aid m"rmur.�z settled thickness wzth ambers a m�nzm�.m of I" In height NA,Iadows, doors and sk�r��ght�s WindoiNrs and doors and sB71i�hts shall be araded iz�. accvrdance w�.th NF`RC I OQ by an accredited, ffidependr­nt labara�c�ry, and Iab�led. and certified bv the manufacturer. Sola- meat Gam' Coeffic ient (SHGC af�laz�d fenestration productS ('SAIIndo�rs, glazed doors, and sk�rllihts) shall be determ'g%d aW NFRC 200 .The babel shall he affixed to the item shmNqna the ZT factor.. Where the label i5 not of ed and the U factor -cannot be detcnm'ned Table 10.2.-.f 5.2(l) or 102.5.2(Z) (IECC) shall be used as a default. ducts Duct insulation when �nstal.led in uiconditioned attics or outside shall have at a m.immum R-1 1 for supply and R--6 (R2 in unconditioned areas for z-eturns as per Table _50-3.3-1.3. All ducts must be sealed. mater Heaters Heat traps are r%.,,qw',rcd and or insulation Hot NV_'Recirculatin Er Svstems Hot 'Water Rec' .. 4 - -As stem ICCOTdanc., pJ, an ySectjDn I . ct with TaOle y2 anci ai shut Oir i r when seat ems. Is not Lu. use. -1 Lightm*q All commercial lightinc)r must comply With the LECC. A11 rooms i-rn rooms with2amore Ex�ures �us� be s�w%�c�e�. fir �i Ievel lighting, Summary Certi'fications fam i�staller pas -fed vnjab site and mush meet enern- calculations tum -ed M vath plans. U --factor mist be on door-MICa�; and s�ryli�.i at Mme of Inspection.Duct ftisulat-on � acco�r�.a� �e With Table 50---t . -1 Outside R I I supply R6 return Inside unconditioned space RI I supply �2 r��ur�a:. Duc�fs mint be sealers. Water heat�rs �o use head traps or Insu�a�an. Recirculatin2 �ys���.s must have a CO it shut off and be Msulated. 4 I& IE Y lmdp� ie 19 allo mop �i 1 ■w • ,• -•--P 3 IL 1 A � n• a� 1 �F y r a ■ I F` ..kfloar� yqstircJ From S;j!+ iv back oF 1 •� pr Ma 1 ' al i a ■ c T ' A r A r r s - ,r i •i T 4rk1 Y �� ya • _ - T a ° l � r af Iy, • - -� �! i - 1 - i a Awi L- - ■• MIT i t �e f L AWWPFP i��� Y i r 1 e f S r r J L Is■ �; •ems_ • _ � 1 • l�V7' Rc a 11 f �Ull-r New uat v I %wr F R-3 Ali 0.35 acre -OPS � `� ,y�� 1, @LK 1-10T 4 �� 0.34 ()C:rn LAWS OF � � f 9 � �p �' �i/ / fAll�4+ E 4104a 4q� 04 T .. -V *ICA AAA 4114 'alo NS�T P, \ 9 7e.or qVW 24VM gag V R-4 � 1 � t 1 � � ti \. a'38 LJ � . e �J N N �' � �* ��BLfC 1--LO7 5 ,poi / 1tt;CESS�� ` t � 0.3� y� do Uil 1 IT M-\ ,V - \ Ir - �, EASEMENT ap C4 �g -4b 5 8Uf 1—L0T 5• Moe'�. ky y9-hyh s'� fl.38 40C r4a � .�0� ��• 5 0 � ciL — --_ � � � .,fly P, Z).r'U(3 �V- 1.5� L0 40-W OQ S �gLK 1---LO-..T 7 #A 00019 --LK 3 ow6m � ��— 30,00-11 0.34 x.33 c UTTUTY ;op 0.34 ecrsa .t1 � / i �. !a g X fl S ..�0 I S1 � �.�` 2S_tt0' '� � '. ' �': �lK 3 -LOT 1. i- 46tA.-T IMN M& 15.00' _.� � C16 . — a PON" .40 BLK', t--LDT I [l.4s9 OCr404S da 1 97-w-,06-6 BLK 9—LOT t1 Q.71 octan 1-97miDC NB9'46"as'E I vr- Ole c V orare's / �QG" ��Q,3� 0.43 -� �' Js SLK 3—LOT 2 'op - 0-33 ccre,,j `� A, . gL,}( 3—LOT��61 0.36 acaes 1 x 5 IN4 ns > t2.3.fl6 ;� r4, 589'Ss'S8"E -9k I mft-w . Pei a"W4 1 60.;7' FL�a T. -4!S SU9�IVIS X" FLOOD 0 - FL OM PANFL RL'--XE3uF?G ANO 1 may �9 58'"E • � z E � --89.87-- LP n3 W - Ln.: N� -4%6 0- �'', APE& 0 2—L07 � � f in �? 0.30 C)Cres r^„ o } N O Mir ry 34.00 q.00 ' 1,10.00 37S.Q4' 2625.72' 90UTNEAS7 CORNER 1/2. NE SEC11ON Zg SET 5/8" REBAR ,_,_ � t 585. 080 Mao. � LARDS OF 51PNERQ,ET AL tm 246585---87.b k.C_R �• L A DrawinQc rp. iiirpd f,,,- (to S tale and legible) �. Site p with dimensions (lot layout) ,2. Floor plan 3. Founda /4. All b tion plan ding elevations ��ection showing construction details and stairs 6. Truss details and calculations s a. 35# snow load lir^ b. calculated for 85 m.p.h. howing C. must be approved before framing inspection can be accomplished 7. Floor joist details 8. Energy Calculations from IECC 2000 Web aenergycodes.gov Computer programs.- res check for residential com check for commerical V t Y' �, Y•� � �` '� T • sem+• 3 . - r �t �� z - • , ° - • � � - - - ." q s L2Y r , qo Y r L "r k r _ ti. � - •r , 1T ■ Y a r fI5 ` 1 _ P. s L2Y r , qo Y r L "r k r _ ti. � - •r , 1T ■ Y a r fI5 ` 1 i t � r :Dtjt - r,-.3 ti rL • 4 i'ab i k } LL�� yam'_`_ Lmay,+•,, � � �TT� � t F ..LfLf pr� y'__ i I i- Y it 4 � •J�' �' S� �+n� f a* � r 7it r „ •�`ir - + It P'L. i } .f J F a _ L51f • 1 � �,� � C i JJJJjjII •� r r �, y a -<, 'v Cr s f f a �- ` -�-- _¢ .; t f "AAJ . J r s r L A J L 16 �a r -46 Z ' �7 * t _,� ti a 47 221 a � "—�" � �� 1 Cdr �r•��x,�t�`�— '+ r -� l' T } CITY QF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building official � an notification from the permit balder or his went, shall make or case to be made an necessary inspections and shall either approve that p�r�ion of the construction as completed p� shall essary the hermit holder or his agent wherein the same fails to comply with this cods. notify 1. LAYOUT-. Lot comers staked, staking �n place for building,2• FC3�D71NG: Commonly made atter pops or piers are set or trenches ex��`Vatior�: or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cit and on job site or tied �n place. 3. FOUNDATION INSPECTION: The foundation �nspection shall incl de� excavations for thickened slabs for the support of bearing wails, partitions, structural supports, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in place. 4• P�UMBl�G, IVIECHq,N1CAL ANLLn..1 ELECTR fCAL: Rough inspection: Commonly made prior to capering or concealment, before fixtures are set, and prior to f ra mi n g inspection. 5. TRUSS INSPECTION: Inspections of trusses.. 6. FRAME INSPECTION: Commonly mads after the roof, all framing, firestmopping, draftstopping and bracing are in place and after the plumbing, mechanical and eleetricaE rough inspections are appra�ed. Electrical ins,pection performed through State of Idaho Electrical Bureau) 7• LATH ANDIC�Ft WALLBOARD INSPECTION.- Commonly made atter all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING WSPECTION: All systems in place,lixtures set, ready for occupancy 9- SIDEWALK INSPECTIONS.It After forms are set, prior to placing concrete., 10. FINSPECTION.- Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final' inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other Paws enforced by the building department. The permit holder or his agent shall INSPECTION CARIB � the inspection retard on the fob site in an accessible and conspicuous place to allow the building official to make the required entries. The record shill be. maintained- b --'Y' the permit holder until the final inspection has been made and a roped. have read the above and will comply in my -requests for inspections by 24 ppNOTICE prior for inspections to be made. �QUR Electrical: 356-4jB30 Building: 359-3020 ex 341 or 313 Plumbing: 359--kO2O e �341;or 3'I 3 or 359-3Q34 Signature: Date :