Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 04-00148 - Woody Smith Ford & Mercury - RemodelCITY OF REXBURG BUILDING INSPECTION SEQUENCE hype of Inspections: For on-site construction, from time to time the building official, japan notification from the permit holder or hes agent, shah make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this cods. 1. LAYOUT: Lot Garners staked, staking in place for building, prior to excavation: 2. FOOTING: Commonly made after poles or piers are set or trenc4es or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended #ar the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All farms and reinforcing s#gel, etc,, shall be in place. 4. PLUMBING, MECHANICAL ASD ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION-. Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. {Electrical inspection performed through State of Idaho electrical bureau} 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped. and finished. 8. FINAL. PLUMBING AND HEATING INSPECTION: All systemsin place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS. After forms are set, prior to placing concrete. fid. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on. final inspection, buildingis reedy to occupy. 12. OTHER INSPECTIONSO In addition to the called inspections above, the building department may make or require any ether inspections to ascertain compliance with this Code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall post the inspection record an the job site in an accessible and conspicuous place to allow the building of#icial to make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. I have read the above and �l-c-omply in my requests for inspections by giving 24 HOUR NOTICE prior forinspect ns to be made. Elec#�icai: 35�-4830 ! -�. �.,:��:��..��►, Plumbing: 359-302 Signature: o�J11U1111J.. Jp�j-3VLV CX J'+I V1 J iJ Dater Z�'"