HomeMy WebLinkAboutAPPLICATIONS - 04-00146 - Tuscany Place Apartments - Bldg 1 & 2U.
If
'4 r v 0 3�
co o
rA
w�
0
z
m
m
cn
S -
■
'-
■
■
a
t �
f ■
�
4
ipsF
'
rA
w�
0
z
m
m
cn
S -
■
cm
_V)
r
r- 111 r-. X -0 ,
C) 0 0
ZZ
2) o 0 C) - z o mCD
JW 0 ZD
rn
+ r
c -
rn m
Z- M "
.,
0 CQ co
rn
z 'i
GO
C)
co MZ.Z 8 f 3
m 0 0
x, +
i'��Zf -V
0
ZZ D bo
0 C7
a
r
Maw
. 0 CO
' u
r— -77 `'
0 �'
Q au
ZD
co k�- CZ
MD
CD-•
7-1
(D -::� 9 , M
0--f 0 X
-'
.q z
-- 0.
M zu
_�
rn
rrl
rry
r- 111 r-. X -0 ,
C) 0 0
ZZ
2) o 0 C) - z o mCD
JW 0 ZD
rn
+ r
c -
rn m
Z- M "
.,
0 CQ co
rn
z 'i
GO
C)
co MZ.Z 8 f 3
m 0 0
x, +
i'��Zf -V
0
ZZ D bo
0 C7
a
r
Maw
. 0 CO
' u
r— -77 `'
0 �'
Q au
ZD
co k�- CZ
MD
CD-•
7-1
(D -::� 9 , M
0--f 0 X
-'
.q z
-- 0.
M zu
_�
rn
nu
3
m
r-
0
ON
z
CD
v
0
FA
A
per
i
KI
4
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building officiaf, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
10
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this coda.
1. LAYOUT: Lot corners slaked, staking in place for building, pr ior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas ars excavated. Firms and horizontal reinfar6ing tied in place,
vertical reinforcing cut and on jib site or tied in place.
3. FOUNDATION INSPECTION.
The foundation inspection slE inclined excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All. forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS, INSPECTION:
inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the root, all framing, firestopping, draftstopp4ing and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
Stade of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION.
Commonly made after all lathing and/or wallboard interior is 'in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION.
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10- FINAL INSPECTION:
Commonly m,ade after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, an final inspection, betiding is ready to occupy.
12. OTHtr-ZR INSPECTIONS:
In addition to the cabled inspections above, the building department may
make or require any ether inspections to ascertain compliance with this
cede and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspection record an the job site in an accessible
and conspicuous place to allow the building official to make the required entries. the retard
shadl be maintained by the permit harder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 FOUR
NOTICE prior for inspections to be made.
Electric;
Plumber
Signatu
Building: 359-3020 ex 341 or 313
Date: