Loading...
HomeMy WebLinkAboutMULT DOCS - 04-00144 - 785 Pinehaven St - New SFR■ 4 ■ 3 F ■ ■ f ■0 0 0 ;F z a tj �2 m m 5 m rn 61 ,Z) CD A SO CD 0— • & 0 - i r CL 0 z 0 s _—TI - r�} CD 3 CD CD CD r-+ RAN 0 CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building off'rciai, upon notification from the permit holier or his agent, shad mike or cause to be made any necessary inspections and shill either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: - 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are exeavated. Forms and horizontal reinforcing died in place 1 vertical reinforcing cut and on fob site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection., Commonly made prior to covering or conceafinent, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. fi. at, FRANCE INSPECTION: � 6 1;t5&e,,r�� Commonly mads after the roof, all framIV ing, firestopping, draftstopping andbracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION.0 Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING ANLL HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other, inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shafl post the inspection record on the job site in an �ccassible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspec#ions to be made. Electrical.- 35G -483a Plumbing.- 35-g.-,3020 Signature.- -3034 Building: 359-3020 ex 341 or 313 Date: 10 " � 4 y � r City Of Rexbufg Per-Mits and Licenses din( Q., Permit Thb s=xT — .� -acr BuEdincr Pcrmj-�- ---d oiit -IcL au Lt squ i� t c cy. -p e it L�..� are TO ` .�.c phim Wag Pcr_aut for 'I)Commercial . .e oxthfflz. UP at r -Nf t t j,"r an d P aTt al cula-ttd by thc s P%. J Frontacyc F,,,,.,S -�. { ;-- . the - �- anLi-r, -C` .2$1 0,00 k ti Contractors License Cltv af Rexburo;- ReafAred 0 E ��11JJ ask'Ul J� - Garb Cullr R -.. LIE.fidtia-� ,l r _ _q f 9.0 C--, OM :C-aT-blagt cc)j,-1,..c4LiO C- Pa-rchase a z -, . lor Water and elvF City of RexbuTzp- ` - rand, S " r � L _ a k • f J Roof. Floor- I Ceiling Jo sts: Cabinels-w- L't'!�-ic)r Trim: 1 SUBCONTRACTOR LIST P E C rAL ",ONSTRUCTIOIV (ManuTlacturer or Supplier) 0 {