HomeMy WebLinkAboutRESCHECK - 04-00143 - 790 Poplar Cir - New SFRI
.r r i t Number
REScheck Com
2000 IECC
F�ES check Software Version 3.5 Release le
.Data filename: Untitled.rck
CITY: Rexburg
STATE: Nebo
fIDD: 8693
CONSTRUCTION TYPE: Single Family
DATE
COMPLIANCES Passes
Maximum i 29.E
Your Homy UA = 21190
.", Batten Than Code (UA)
Gross Glazj
Area or Cavity coflt. or LOOT
Perimeter ,.- Tal u e - ales U -Factor
Ceiling 1; Flat Ceiling oir Scissor- Truss 1179 40.0}.0 34
Wall 1; Wood Frame,16" o.c. 1332 21.0 0.0 64
Window 1 Vinyl Frame. -Double Pane 145 0.500
Door 1: Solid 38 0.350 1
Doer : Glass 18 0.500 9
Basement Wall 1: Solid Concrete or Masonry 1168 0.0 .
Wall height: .'
Depth below grade: .
Insulation deft% : 8.0"
Window : Vinyl Frame:Double Pane 64 0.500 32
Floor 3., All -Wood Joist/Truss #Deer Outside Air 14 40.O 0.0
Furnas I. Forced Hot Air, 90 AFUE
COMPLIANCE STATEMENT.- The proposed building des i n described ears i sn si stent with the building plans,
and other calculations submitted withthe permitapplication, The proposedbuilding has been designed tmeet the IECC
requirements in
RESeheckVersion 3.5Release l (formerly MECche and t comply with the rnand t �r �
� � � requirements listed inthe RES eckI asp tip Checklist. 1 ist.
Builder/Designer date
REScheck Compliance Certificate
2000 IECC
Pernut Number
Checked BY/Date,
REScheckSoftware Version,3-5Reiease le
Data filename: C-0ocuments and SettingslAdlninistratorlMy DocumentslRESchecklBurlington.rck
CITY: Rexburg
STATE: Idaho
H D D: 8 6 93
CaNSTRUCTIQN TYPE, Single Family
DATE: 04/22/04
DATE OF PLANS: April 1 9, 204
PROJECT DESCRIPTION:
Kade & Deldra Smith
Oakbrook Subdivision
Lot: _3
Rexburg, ID 8340
DESIGNER/CONTRACTOR-
Kartchner
Hames
P.Q. Boa 748
Rexburg, ID 8,3440
COMPLIANCE.- Passes
Maximum UA = 2'72
Your Hams UA =x.67
1.8%Better Than Code (UA)
Gross Glazing
Area or Cavity Cont. or Door
Perimeter - Val ue U�Factof TSA
Ceiling 1} Flat Ceiling or Scissor Truss� Ilir
1179 40.0 ,
Wall 1 - Wood Fra m,, 16 ove. 1174 21.0 0'() 56
Window 1 Vinv1 Frame + r u 1 an145)
0.450 65
Door 1: Glass
Door 2.- Solid 0.450 15
16 0.160
Floor IR ll. -W Joi t/Tru : Over Outside Air 1
0 0
innt.Concrete ll I: Solidr -� aso F _0 s
W,all height:
Depth below grade.- 7+0
Insulation depth: 8.0
Window,2.- Vinyl Firame+Double Pane
4 0.450 29
Fern 1 Force. Hot Air, 90 AFUE
CaMPLIANCE STATENMNT- The proposed building design described here is consistent with the btiflding plans, specifications,
and other calculations submitted with the permit application. The proposed building has been designed to meet the 2000IE C
requirements in REScheckVersion �.5 Release l e (formerly ;MECchech) and to conlply with the mandatory- requirements listed in
the REScheckInspection Checklist.
Dai
RESeheek Inspection Checklist
2000 IECC
UScheckSoftware Version 3.5 Release le
DATE: 04/22/04
Bldg.
Dept,
Use
ceilbigs*0
L ' l ' 1: Flat Ceilingr Scissor Truss'. - N r . 1 ti r�
Conu-nents:
Above -Grade Walls,
1. Wall l: Wood Fnatne,, 1600 O.C.-21.0 cavity insulation
Comments-
Basement
Wall
1. Basement Wall 1: Solid Concrete or Masonry,, . ' t . ' . ! i
R- 13 - 0 cavity insulation
comnlellts:.
Windows:
L Window 1: Vin -0 Framc:Double Pane, U -factor: 0_450
For windows without labeled U -factors, describe features:
# Panes Frarne Type Therinal Break'? j ] Yes Na
Comments.-
2.
Window 2: Vinyl Frame. -Double Paye. U -factor.- 0.450
For windmvs without labeled U -factors, describe feattires.-
#
Panes Frame Type Thermal Break`.? [ ]Yes [ J N0
Comments:
Doors
I. Door 1. : Glass, -factor: 0. 450
Comments..
.. Door : Solid, U -factor.- 0. 160
lu t
Floors,
1. Floor I - All -Wood JOi t 'r . F r Outside Air, R-40.0 fl�.-- insulationT
Comments:
Heating and Cooling Equipment:
J _ Furnace 1: Forced Hot Air, 90 AFUE or higher
Make and Madel Number
F Leakage:
Air
] � Joints, penetrations!, and all other such openings in the building envelope that are sources of air
� leakage must be sealed.
Recessed lights must be 1 } Type IC rated, or 2) installed inside an appropriate air -tight assembly
� with a 0.5" clearance from combustible rnateri�is. If non -IC raked, the future must be installed with a
� 3'" clearance from insulation.
1
Vapor Retardeir,
] � Required on the w:arilin"111-winter side of all non -vented framed ceilings, wads, and floors.
f
� Materials Identification:
Materials and equipment must be installed in accordance with the manufacturer's installation instructions,
[ ] � Materials and equipment must be identified so that compliance can be determined.
[ j �
Manufacturer manuals for all installed beating and cooling equipment and service iN-ater heating-,,,
f equipment must be provided.
[ ] � Insulation R -values, glaring U -factors, and heating equipment pment efficiency must be clearly marked on
j the building ,plans or specifications..
I
I
Duct Insulation:
� ] � Ducts in unconditioned spates must. be insulated 1.4 R -S.
j Ducts outside the building must be insulated to R-8.0.
f Duct Construction:
[ ] � All joints, seams, and connections must be securer- fastened with welds, gaskets, mastics
� (adhesives), mastic-talus-cmbedded-fabric, or tapes. Duct tape is not permitted.
�
Exception.-- Continuously welded and locking -type longitudinal joints and seams an ducts
� operating at. Tess than 2 in. w.g. (COQ Pa).
[ ] J Ducts shall be supported eN�er_y- IO feet or in accordance with the manufacturer's instructions.
� ] � Cooling ducts with exterior insulation must be covered with a vapor retarder.
[ J �
Air filters are required in the return air wstem.
[ ] � The HVAC systeYn mint provide a ineans for balancing sir and water systems.
�
Temperature Controls,,
j
J I Thermostats are required for each separate HVAC system. A manual or automatic means to
�
partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided.
� Service Water Heating;
C ] I Nater heaters with vertical pipe risers must have a hest crap on both the inlet and outlet unless the
� water heater has an integral heat trap or is part of a circulating sYstem.
� 1 I Insulate circulating hit water pipes to the levels in Table 1.
f
J Circulating Hot Water Systems:
[ ] N
Insulate circulating riot i�ivater pipes to the levels in Table 1.
J
Swimming Faals:
_f I All heated swimimng pools must have an on/off heater s'"'itch and require a cover unless over 20%
� of the heating energy is fromnon-depletablc sources. Pool pumps require a time clack.
1
�
Heating and Cooling Piping Insulation:
[ ] J HVAC piping conveying fluids above 105 °F or chilled fluids below SS T must be insulated to the
� levels in Table 2.
Table 1: Minimum Insulation Th i ck n ess for Circulating .Plot Nater Pipes.
Heated eater
Tcnierature F
170-180
140-16(l
100-131O
Insulatial7 Thickness in finches b -v Pipe sizes
Non-Circulatiu Runouts
U12 to X41 Up to, 1.0
. 1.
0
0.5 0.5
0.5 0.
Tab : Minimum Insulation es or I
Fluid Temp.
Piping Systern T j- des Rau ' F
Heating Systems
Love- Pressure/Temperature 201-250
Low Temperature 1e0-240
Steam Condensate (for feed eater} Any
Cooing Systems
Chilled Water, Refrigerant,, 40-55
and Bnine Below 4()
NOTES TO FIELD (Building Department Use Only)
Circulating Mains and Runouts
Insulation Thickness in Inch4 Pipe S1-ZCS
9M C%
" Runouts V and Less 1.25" to 2" 2.5"' to V
1.0
1.
1,
.
1+0
1.0
1.5
1..
1.0
1.0
1.
0.5
0.5
0.
1+
1+0
1.0
1.5
1..