HomeMy WebLinkAboutMULT DOCS - 04-00143 - 790 Poplar Cir - New SFRDrawings re
uired for permit
to scale and legible)
1. Site plan with dimensions (lot layout)
2. Floor plan
3. Foundation plan
4. All building elevations
5. Section showing construction details and sta1*rs.i"f any
6. Truss details and calculations showing
nd
35# snow load
b. calculated for 85 m.p.h.
c. must be approved before framing inspection can be
accomplished
7. Floor joist details
8,. Energy Calculations from IECC 2000
Web address: energycodes.gov
Computer programs: res check for residential
com check for commerical
11
PI
!
L�
i_
i
+ -
I x
•. %
h
a
• • _
y a
- • a+ • T
a
#
�
q
1
-
ra
' 46
`,- - " —
— r
a
I-
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall made or cause to be made any necessary
inspections and shad either approve that portion of the construction as completed or shall notify
the permit folder or his went wherein the sane fails to comply with this code.
1. LAYOUT: Lai comers staked, staking in place for building, prior to excavation:
2. FOOTING-. Commonly made after poles or piers are set or drenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on jib site or tied in place,
3. FOUNDATION INSPECTION.
The foundation inspection shall included excavations for thickened slab
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wand foundations. All firms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior is framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6.4 FRAME INSPECTION:
(01P-4 Commonly made after the roof, all framing, fi'restopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or be -fore wallboard joints and fasteners are
typed and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to. occupy.
12. OTHER INSPECTIONS:
In addition to the cabled inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shah past the inspection record on the job site in an accessible
and conspicuous Glace to allow the building afficial to make the required entries. The record
shall be mamintained by the permit holder until the final inspection has been made and approved.
1 have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 356-4830 Building: 359-3D20 ex 341 -or 313
Plumbing: 359-302
u ex A4� or 3� 3 or 359-3�34
Signature,:
Date-.
5
Citv of Rexburg
Permits and LICIenses
P
Buildina Permit
D L[ 1� _ -
_, mat t
Buildina
i-zrc of thuff dincyc bN,squarct
PjUMb' C T Iom-L, C L,-�L d -
usL Luz
'. -� _ r
. u.
}
VV.! -Iter .. �.c, � � a��P yew �
Calculby
r 4° of o f-
`* cup
h4l of tht -�
Watc�,rdMttc,:-i- a7id Palt-
w. atter Iffit,
s calmdlak:d by- t -LZ4,.e
ut
��
f -,
`anmuaj, with.
Y
Con-ft-ractors L'
S20.00
}
Cl,w
i
ORexb �Requiredi :E,,
Service
r r W
} n si }
Sllpp-U--r;-sT. 0 ZaIJL
r%c Vfdr-,
G- a T -b a, - Er, c -T F
-L- ctiom T-ar k-,o=c--�-rcial - Purc--h l
sc�nllce meter and sewyer
� Of R'CXDIJT9 TO S-1 cm r P
for a 7 1
N a
4
+ d
i
r
f
d
d
N
SUBCONTRACTOR LIST
Excavaticn &
EaTthwork:
Concrete.:
M2sanry:
Rooflng:
i n s u latio n.-
Painting:
Floor C
P 1 m, big:
Heating:
Efe�trical: -
SPECIAL CONSTRUCTION
(Manufacturer or Supplier)
Roof TFusses-
Floor
Cabinets:—.
Siding/Exterior Trim:-