HomeMy WebLinkAboutINSPECTION SEQUENCE - 04-00098 - G & K Ventures - Tenant Finishr�'�f•�r ,� �}�,�,���•.' ��,. ��W, �," 4�•.i�:,.. '" gar ��+�. � � �"'�.� r,�.,. �. ��s�:.®,� s-..� n..e��_ ..��.� ,.�._ + ��__ _...__�_ .._. _.___ ....,._��r.�,.'. ,�.,�_. — �., �o,��,--.�_���_.__�e,.. _
CITY OF REXBURG
-� # � �• � �
BUILDING INSPECTION SEQUENCE
Type
of 1n'Specfi*bns':'eFor an -site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be mads any necessary
inspections and shah either approve that portion--bf the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
� . LAYOUT. - � �- La# corners staked, staking in place for building, prior to excavation:
2. FOOTING:_ Commonly rade after pales or piers are set or trenches or basement
`areas are excavated. Forms and horizontal reinforcing tied in place,
� �e�ti�al reinforcing cut and on job site or tied in place.
3. FUt�NaATION INSPECTION:
The foundation inspection shalt included excavations for Yhickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms. and
reinforcing steel, etc,, shall be in place.
4. PLUMBINGI MECHANICAL AND ELECTRICAL:
5.
6.
7.
Rough inspection. Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
TRUSS INSPECTION:
inspections of trusses.
FRAME INSPECTION:
Commonly made after We' roof, all framing, firestopping, d raftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections ars approved., (Electrical inspection performed through
_ � _
Mate or iaano tiectricai Bureau)
LATH AND/OR WALLBOARD INSPECTION
Commonly made after all lathing and/or wallboard interior is in place, but
�.
before -any plaster is applied, or before wallboard joints and fasteners are
taped and finished. --- -
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
1.0. FINAL 1,NS,
PECTION:
Commonly made after the building,__is completed and ready for occupancy11JG i OCCUPANCY PERMIT:�._
12.
Issued when, on final inspection,"�bu�jld�in'a is r
UHEK INSPECTIQN,S
i
early to occupy.
A/ " In addition to the called inspections above, the building department may
made or require any other 'inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post, the inspection record on the job site ire an accessible
and conspicuous place to allow the building official #o maks the required 6n"tries- The record
shall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE pr�ior for inspoctiions t o be made.
Electrical: 356'...4830 Building: 35g -3p20 ex 341 or 313
Plumbing: 359-302aex 341 or 313 or 359-3034
Signature':
Date: E-0