HomeMy WebLinkAboutINSPECTION TICKETS - 04-00104 - Wilcox & Sons - Warehouse AdditionINSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By NJ Date
Req. By K,to rL Phone No.
Project Permit No.
Address
Inspection Type
Day /Time Req. I � I t J C,4
Inspector's Report ❑ Res. x Comm.
17�.idy�iNG S.
INSPECTED ITEMS CONFORM TO APPROVED DINGS
INSPECTOR'S ACTION
APPROVED ❑ DISAPPROVED
❑ C.O. (FINAL) ❑ NOT APPLICABLE
ACI19N REQUIRED:
❑Y ❑N ❑NIA
[] FINAL
0 DID NOT INSPECT
Rec'I Acknowledged
While - Oltim Copy Yellow - Job Copy Pink - Inspector's Copy
F-FIR-CO03
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By KU Date 3
Req. By'' `�C DK— Phone No. 521-0 13-7
W Project ( l CG 116 Permit No. i2-b�—O3
Address
Inspecti(
Day/Time Req.
Inspector's Report
❑ Res.
Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
540PROVED ❑ DISAPPROVED
❑ C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Rec't Acknowle�(t
wide - 011ice Copy Yellow -
F-FIR C000
❑Y ❑N El N/A
❑ FINAL
❑ DID NOT INSPECT
Pink - InspeclorY Copy
INSPECTION TICKET n4 W1 [A -
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By nd Date 3 o I M
Req. By Scoff Phone No. 1521— 9 15-1
Project W �y c L x. Permit No.
Address
Inspectic
Day /Time Req.
Inspector's Report ❑ Res. La Comm.
eA-5T #jL111 i 1, stN , 6,, e2
INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A
INSPECTOR'S ACTION
I&PPROVED ❑ DISAPPROVED u FINAL
[7 C.O. (FINAL) ❑ NOT APPLICABLE [I DID NOT INSPECT
ACTION REQUIRED:
ReCt Acknowledged
while - Office Copy bi Yellow - Job Co Pink - Inspector's Copy
F-FIR-COD3
INSPECTION TICKET
Ok Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By Iyy Date �
Req. By Phone No. ) --q ( Sl
Projccl N 1yc,"DY Permit No. g UA-6�5
Address 6LDC
Inspection Type
Day /Time Req. -3 j f J'01 a a�
Inspector's Report ❑ Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
APPROVED [I DISAPPROVED
0 C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed
Rec't Acknowledged
White - 011ice Copy
F-FIR-CO03
L1Y El [I NIA
Ll FINAL
❑ DID NOT INSPECT
Yellow - Job Copy \ I "Pink - Inspector's Copy
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By Date 7
Qdc-
Req. By cJGDtt Phone No. ` I—�I 13-1
Project w � l E/0%( Permit No. R-CA- ' -Ds
Address � (--aoden 12)mct.0 2L
Inspection Type ' ' l(I
Day [time Req. LM)2• V) . 51 k-1 1 04-
Inspector's Report ❑' Res. 4 Comm
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
APPROVED ❑ DISAPPROVED
❑ C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
❑Y ❑N El N/A
FINAL
❑ DID NOT INSPECT
Rec'I Acknolui ledged
weae - Office Copy yello J Copy Pink - Inspeclof s Copy
F-FIR-CG03
INSPECTION TICKET
k Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fine
Inspection Request: Rec'd By Date 7 _20
Req. By Phone No.
Projee(WIlLose as Permit No. a �— wz
Address I D goe
Inspection Type t%j A t
Day /Time Req.
Inspector's Report ❑ Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
FI APPROVED 0 DISAPPROVED
(] C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed =----
ReefAcknowh
White - Office copy
F-FIR-CO03
D Y ❑ N 0 NIA
0 FINAL
❑ DID NOT INSPECT
Yellow - Job Copy \ 1 Pink - Inspectors Copy
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on -site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspection record on the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 356-4830 Building: 359-3020 ex 341 or 313
Plumbing: 359-3029jex 3+1,or 313 or 359-3034
Date: 3 - / 0 - D L/