HomeMy WebLinkAboutAPPLICATIONS - 04-00091 - 32 Mill Race Road - New SFRAPPLICATION FOR REXBURG CITY SERVICE
ADDRESS
PLUMBER i # VI N K,L
PROPERTY OWNER � N
WATER SERVICE: Ty
Water Connect......
$
Water Meter .......
$
Meter Box .........
$
Ring & Lid .........
$
Curb Stop .........
$
Setter ..............
$
Sewer Connect .....
$
TOTAL ............
$
Size
In City
Y Form Drains — $
i
MAR 1 1 2004
PAID CASH $ _ APPROVED BY
CHECK $ --__ — _:
Out of City
BUIL`G PERMIT APPLICAT9`N REXBURG, ID DATE NO. -
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT FOR THE WORK HEREIN INDICATED
OR AS SHOWN AND APPROVED IN THE ACCOMPANYING PLANS AND SPECIFICATIONS.
OWNER '�k 1. `11N �'1L'�� JOB ADDRESS �1%� Y�.L� 6U PHONE
STRUCTURE: Q,NEW ❑ REMODEL Q ADDITION ❑ REPAIR ❑ RENEWAL ❑ FIRE DAMAGE
RESIDENCE ❑ COMM. ❑ EDUCATIONAL ❑ GOV'T ❑ RELIGIOUS Q FENCE ❑ PATIO ❑ CARPORT ❑ GARAGE ❑ AWNING
FOOTINGS
FOUNDATION
BASEMENT
FLOORS
I ExT. WALLS
I INT. WALLS
I CEILING
ROOF
HEAT
INSULATED
CONCRETE
dCONCRETE
Q PARTIAL
❑ WOOD
❑ WOOD
❑ WOOD
❑ WOOD
❑ BUILT UP.
GAS
®.WALLS
Q MASONRY
❑ MASONRY
QkFULL
Q CONCRETE
❑ MASONRY
❑ MASONRY
f?J,DRYWALL
❑ WOOD SH.
❑ OIL
E(CEILING
❑ OTHER
❑ OTHER
U NO
❑ OTHER
QCONCRETE
❑ CONCRETE
❑ PLASTER
0 COMP. SH.
Q COAL
❑ FLOORS
®VENEER
k DRYWALL
❑TILE
'QTILE
El FIREPLACE
QPERIMETER
❑ METAL
❑ PLASTER
❑ ACOUSTIC
❑ ROLL ROOF.
❑ ELECTRIC
Q STUCCO
❑ TILE
Q OPEN
❑ METAL
This permit is issued subject to the regulations contained in the Uniform Building Code and Zoning Regulations of Rexburg, and it is hereby agreed
that the work to be done as shown in the plans and specifications will be completed in accordance with the regulations
pertaining and applicable thereto: The issuance of the permit doac not waivit;V71miq �ts
J
REMARKS:
DEPARTMENT OF BUILDING &
VALUE
FEE PAID
WHITE -Owners Copy CANARY -Building Depe wvs Copy PINK -Assessors Copy GOLDENROD-Inspe or
CITY OF REXBURG
APPLICATION FOR PLUMBING PERMIT
OWNER FEES
Name
AddressTel.
Lot Blk. Add.
PLUMBER
Name
Address Tel.
NATURE OF INSTALLATION
Use
Rough Plumbing
Septic Tank
Fixtures
Water Piping
Complete
Sewer
DESCRIPTION OF WORK
Bath Tubs
Urinal
Showers
Sink Trap
Laundry Trays
Water Heater
i / 1
Wash Basin
Other
Toilet
Slop Sinks
i
Kitchen Sinks
A
,.0
Floor Drain
Drinking Fountains
Lawn Sprinklers
Water Softeners
Dish Washing Mach.
Clothes Washer
�
I
Plumbing Permit . . . . . . . . . . . . . . . . • • • $
Sewer Inspection ....• ..............$
Inspection of Pipe ...................$
Inspection of Fixtures ................$
$
Received: Date
By —
_ W
'OFF.
H$_
KS_
Rough Plumbing
Sewer
Other
Finish Plumbing
TOTAL $
INSPECTOR'S RECORD
N
S
INSP. NAME
E
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on -site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job.site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspection record on the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 356-4830 Building: 359-3020 ex 341 or 313
Plumbing: 359-3020 exr 313 or 359-3034
Signature:Date: 2 11
r