Loading...
HomeMy WebLinkAboutJOIST DESIGN - 05-00269 - 367 Talon Dr - New SFREngineered Wood Products IMPORTANT NOTES: These instructions are offered as a guide to good practice in the handling, storage and installation of LPI Joists and Gang -Lam LVL beams. They are, however, solely general recom- mendations and, in some instances, other or additional precautions In all cases the procedures used should be as may be desirable. specified by the architect/engineer responsible for the entire building. This is not intended as a manual for selecting products and assumes that components and details have been specified correctly. Consult the LPI Joist and Gang -Lam LVL brochures or contact your LP Engineered Wood Products distributor for assistance. All rim joists, blocking, connections and temporary bracing must be installed before erectors are allowed on the structure. No loads other than the weight of the erectors are to be imposed on the structure before it is permanently sheathed. After sheathing, do not overload joists with construction materials exceeding design loads. t LPI Joists and Gang -Lam LVL beams most be useda^�^ under dry, well -ventilated conditions. • For complete listing of available floor details, refer to LP's Engineered Wood Products Installation Guide. SOME TYPICAL FLOOR DETAILS Verify capacity and fastening of hangers and connections. • Some wind or seismic loads may require different or additional details and connections. LP Solid Start' Rim Board LPI Blocking at Exterior Wall Joist End Nailing Squash Blocks Fasten rim hoard to each floor Ijaist using one 8d nail or 1 Od (All series) Use two Bd nails or two 1 Od box nails (one on each side) g panels may Use double squash blacks as ired with specified. Squash blocks must 7shheatall 4 heat 1 boz nail per flange ;' s ,.. n Italler than Ijaist, 2x4 minimum.me depth os lioist Ra . - . eJ F �. Stagger dorlOd / box -1/2' min. from nails to ovoid Bearing wall < -i- splitting lOd nails at 6 cc toe nailed from outside of budding Bd nulls of 6" oc -- (when used for shro r donsf re Run todearinq--.. end of IHoistta nail' - ,�- fill tied under/"' 9 wall above Toe nail Bd or 1 Ud plum with some nailing schedule for decking) box Moil to p ride - Cantilever DetaEl' Stair Stringer Hanger Detail Hanger Detail 3/4' OSB (or equal) Reinforcement Both Sides *Detail C2 is similar to C3 with reinf rming on Verily capacity and Web filler Be sure to mark C , one side only.�„ APAmrod 3/4" USB (m equal) reinforcement, Atrach web fillers 4 0 and tiller blocks wrth fastening requirements of �: forgers and connecrors r 11 web filler requirements for hangers - APA-mied 3/4" OSB both sides, (or equal) dasum, 4'-0" long 2 rows of 8d nulls 1 'en filler 6 : - -` or as required minimum by code ,\ .� staggered at cc from each side 1Od nails for LPI 66° series Foists. _ ,� • i\ �. ?:0, \ \� Ib - roved Connection � / J/ Be sure to check + I Web filler Ohm LPI blocking filler A Filler block Filler block web requirementsfar Verify capacity and Attach reinforcement to cop and Londonflanges with Bell calls Sae Hoist Filler Schedule for hangers fastening requirements See I -joist Filler Schedule for at 6° cc (when bo$ sides - stagger nails to avoid splitting) filler block and web filler sizes of hangers and concerns filler black and web filler sizes GANG -LAM LVL DETAILS Connections and fastenings shown below are typical for top loaded beams (where framing is applied on top of beam so that each ply carries an equal load). Additional nails and/or bolts may be required for other load conditions. Top Loaded Beam -Nailed Connection Top Loaded Beam -Bolted Connection Steel Column Im Wood Column ' . Floor Beam (Flush ceiling) (3-Ply Maximum) (4-Ply Maximum) Top mount hangers recommended Framing is applied to top of the boom so that Framing is applied to top of the beam so that Fanning details such as joists and sheathing must be ro each ply carries an equal load each ply carries an equal land 9 provided prevent beam from v..a t"X Standard nail sizes:r:My.: 13/4 LVL 16d (3.1/7') nails Nails ore permissible „ .;. o heisting or rotating of support r 1 1/T LVL lOd (3") nails but NOT required. - < yy 5.�; .,r '�h� c+u,.•q A g Provide specified f 12" oc 3" bearing length L „tar m Simpson CCU, lisp (CS, Provide ss Simpson PC or{C, US? PCM or CC, Check stiffener/filler LPI rim joist, rim board, Two rows for depths up to 12 ASTM grade A 307 Tun" specified MGA CCU or Three rows for depths up to 18 (or better) 1/2" bolts. gearing length equal column cap MCA PC or CC or equal post or requirements depending on load and hanger type blacking panels or equal to prevent beam from rorofing Four rows for depths a to 24" P P Use washers on both faces. column cap WARNING: The following conditions are NOT permitted Do not use visually damaged products without first checking with your local LP Engineered Wood Products distributor or sales office. For a complete listing of "don't" details, refer to LP's EWP Installation Guide. DON'T put holes too DON'T overcut hole close to supports. and damage flange. f f I y� a s Refer to he e k i chart for correct locations' DON'T make hole with DON'T cut or notch flange. hammer unless knock -out is provided. fill�+ I A drill ' d II DON'T �t flange. hammer on flanges and damage joist. 1 DON'T cut flange , Refer to Joist End Nailing detail for pipes A5, for correct sizes.,, and location � 1 r,� � � ✓ 1 1' i i DON'T use 16d nails. r � DON'T cut beyond DON'T notch Gang -Lam inside edge of LVL beams. bearing. _ r J. ,.a DON'T notch beam at support. Refer to hale chat or signals"specifications for proper size and localism of holes WEB HOLE DETAILS Warning: Eir cut or notch flanges. NOTES: 1. CUT HOLES CAREFULLY! DO NOT OVERCUT HOLES! DO NOT CUT JOIST FLANGES! 2. Square and rectangular holes must be centered at mid - height of the web. Round the corners where possible. 3. Round holes need not he placed at mid -height. A minimum 1/2" clear distance is required between the hole and the flange. 4. Round holes up to 1-1/2" diameter, including the peri rated 'knockouts," may be cut anywhere in the web. 5. Holes larger than 1.1/2" are not permitted in cantilevers. 6. Multiple holes must have a clear separation along the length of the joist of at least twice the largest dimension of the adjacent hl or a minimum of 12" center -to- center whichever is greater. 7. Multiple holes may be spaced closer provided they fit within the boundary of an acceptable larger hole. Example: two 3" round holes may be spaced 2" apart (clear distance) provided that a 3" high by B" long rectangular hole, or an 8" diameter round hole are acceptable for the joist depth at that location. Up to a 1-1/2" diameter hole Unwt length of web between odjacero allowed anywhere in the web. Mies must be twice the length of the Closest spacing 1'-0" or larger hole dimension FROM EITHER BEARING 8. These web hole tables are valid for simple and continuous spun joists with uniform loads only, as sized from the tables contained in H"s current (joist product guides. Larger holes, non -uniform loading conditions and/or closer proximity to supports may be possible, but require further analysis using LP's design software. Please contact your local LP Engineered Wood Products distributor for more details. CLOSEST DISTANCE (X) - (FT - IN) 8,,,..f _. t1...a'1 +"32". LPI 26", (CTR) 150 _ 1 0 1`-G 1 9-1/v";LPI'30°;200,'2TS','(CTR)2S0 LPI300 i, 0 1 i 0, 2 Y 'FI26 DUI Ic., 1 2-^ r - 1 ° '��'f 6 3 --- - _.--. _PI 30,20c 22:T)25C 11 1 1 2 8 r 4 50 - - 11-7L8 Laksc 3.1 i -'3 1 lU 5 V 7 .3 In o a2 5 r 3 _ 3-J 10"5.9 4 3 _. - +-i v 3 5 Ilr1 6 6 '- 14 LPI 20,32 0" TO 3-0" 4'-0 YO S'S 6' 0 8-0" LP! 56 r 10 14 4 6 E'-7 G' 6 6-. b' II-"-7 S _ _ LPI IT, (ITR)25r 7 p 4-3 q 5'v s 11 6'5 rl 7_6,8, 7r, 9 [' 16 IN 6,300 3 r 4'-4 1 '10 e 7, '''' a 8'10 97 107 123" L-82 7 0 a'-C 4.0 .5'n0 '1.C, t+'0 7 U 8, Cyr, 8-0. 8 0 9 0' LPI S6" 3 / H'-4 S' I" 5'-10 6-7' 7'-4' 8'-1" 8 10" 9'-7" 10 7 12,3" LPI blocking oa6Squash blocks WARNING: Hoists Temporary construction bracing Is \ required for eted. support hefereal deck- ing Is completed failure to use hmcing could result In serious injury of deadin Hanger connections Cantilever details Hanger comawfans Customer Service and Product Technical Support: 1.800.999.9105 E-mail: customer.support@lpcorp.com Visit our web site at: www.lpcorp.com 0500 /'� \ ® incur Louisiana-Pacac Co,PoraFT '■i/J■ G/ `/', AII2004 rgservea. Printed In USA. tc 60M EW6110SU 3/04 Rammell 367 Talon Dr PH( LU ------------- Connector List ------------- ID# Qty Model Number Note Carrying mbr nailing (top/face) Carried mbr nailing (hip/jack) Skew Slope Top --------------------------------------------------------------------------------------------------------------------------- H1 34 ITT11.68 S 2 10d 2 10dx1.5" 4 ___________________________________________________________________________________________________________________________ S -- Not in Inventory -- Special Order R10 0 v v 28' 0" R11 13 v v 24' 0" R12 10 v v 20' 0" Nis 5 v v 15' 0" R14 1 v v 14' 0" R15 2 v v 13' 0" R16 1 v v 12' 0" R17 1 v v 4' 0" RES 1 v v 2' 0" R19 9 v v 1' 0" Total length: 1761' 0" R20 4 1 3/4" G-LAM 11 7/8" 2650 1.9. IS' 0" R21 2 v v 10' 0" Total length: 92' 0" R22 6 11 7/8" RIM BOARD 16' 0" R23 2 v v 16' 0" Total length: 160' 0" R24 121 11 7/8" LPI-225 1' 0" Total length: 121' 0" ------- Blocking Materials ------- Type Qty. Product Length ____ ------- ______ F1 2 11 7/0" LPI-225 16' 0" Total length: 32' 0" All product names are trademarks of their respective owners V LP DESIGN ASSUMPTIONS Loads: T/C Live: 40 psf B/C Live: 0 Psf T/C Dead: 15 pef B/C Dead: 0 psf Duration Inc role e: 1008 ,.Election Criteria: L/400 Live L/240 Total Building Code: ❑BC (Allowable Strays Desig M Cl C u N W m0 CM ixN xn M C 00 L 04000 0 00 Q 00 OM Mm o Z Job Name: CUSTOMER REX RAMMELL Shipping Address: Customer#: Salesman#: Loads: T/C Live: 40 psf B//CC rve: 0 sf T/C Dead: 15 psf B/C�ead: 8 psf Duration Increase: 00% Total Load: 55 psf License Name: Date; 07/29/05 Time: 11:29 AM Ff1amme: C:\KMW\TOSS\ramme11.L05 Phoenix Lumber Pa9ec1 11