Magic Suds
COMcheck Software Vers��rr 3.1 Release I
ighting Compliance Certifciate
2001 IECC
Report Date: 12/21/05
Data fi Penam : -,\Program Fjles\Chec;k\C0Mcheckmagicsuds.cck
Section 1: Project Information
Project Title: magic suds
Construction Sit :402 S. 4th W—
Ibu r, 0 83440
Owner/Agent:
Section 2: General Information
Building Use Description by:
Project Type
Building TY exPe
Other
New Construction
Section 30. Requirements Checklist
Interior Lighting:
Floor Area
3000
(i 1. Tota J actual tt must b Pecs than or equal to t watts.
Allowed Watts
1 800
Exterior Lighting:
Actual 'watts
. Efficacy greater than 45 lumens/W.
•
Exceptions.-
Complies
Designer/Contractor,
Specialized lighting highlighting features of historic uildin ;i ria . , safety or
securityIih�t�nT low-voltagel�idp
lighting.
Controls, Switching, and Wiring:
L) 3. Independent controls for each space (switch/occuparcy sensor).
Exceptions.-
Areas
xceptions:Areas that must be continuously illuminated.
4. Master switch at entry to hotel/motel guest room.
5. Each space prodded with a manual control to provide uniform 1i ht reduction capabilitJr. DEC
dnly one luminaire in space;
An occupant -sensing device can#rail the area; �
The area is a corridor, storeroom, restroom, public dobby or guest room;
Areas that must 6e continuously illuminated;
Areas greater than 250 sq -ft.
E) 6. Automaticlighting hutff control ire� i
spaces greater than 250 q.ft in buildings larger than 5,000 sq,ft.
. Photocell/astronomical Urne switch on exterior lights.
Exceptions.,
Lighting intended for 24 hour a ®
magIc suds
Page 3 of
Tandem wired one -lamp an6-;:=.,,-eedam p ballasted 1-urninaires (No single -lamp ballas-''___'_
Exceptions:
Electronic high -frequency ballasts- Luminaires not on same switch.
la�j Page 4 of 9
0
Permit Cate
COMcheck Software Version 3.#1 Release I
Li. hting Application Worksheet
2.oni IECC
Report Date-,
Data filename: C:IPragram FileslChecklCflMcheck\magic suds.cck
Section 1: Allowed Lighting Power Calculation
0
C
Fluor Area AIIvr►ved Allowed Watts
Watts / ft2
Other 300 0.6 1800
Total Allowed Watts = 180
Section 2m. Actual Lighting Power Calculation
D E
Fixture ID : Description / Lamp / Wattage Per Lary / Ballast Lampsl # of Fixture (C X D)
Fixture Fixtures att.
Sped I
Cornpact Fluorescent 1: Twin Tube 40W / Electronic 4
14 40 560
Linear Fluorescent 1: 48" T1 2 40W / Electronic 2 7 40 280
HID 1: Other/ Electronic
1 40 4
Incandescent 1: Incandescent CSW 1
6 60 360
HID : -- 0
Space
Total Actual Watts 140
Section 3: Compliance Calculation
If the Total Allowed Watts minus the Total Actual Wats is greater than or eqUal tO Zero, thre bUilding.
Total Allowed Watts _ 1800
Total Actual netts _ 1240
Project Compliance 560
rr14c suds ......
Page 5 of 9
M
Adw
A
(rte OQ482
6,
Magic Suds
COMcheck Software Version 3.1 Release I
ec
M h I Compliance
.. anica c
2001 IECC
Report Date: 12/21/05
Data filename- C -,\Program Fjles\Check\C0Mcheak\mag!c suds.cck
Section 1: Project Information
PFOject, Title: magic suds
Construction Site,
402 S_ 4th M
Rexburg, ID 83440
Owner/Agent:
Section 2-1: General Information
Building Locaflon (for weather data): Rexbur ,g, Idaho
Climate Zone: 16
Heating Degree Days (base 65 degrees F): 8693
Cooling Degree Days (base 65 degrees F)-. 143
Project Type.- New Construction
Section I Mechanical Systems List
Quan System. Type & Description
0 HVAC System I Heat[ng: Othert Gas / Multiple -Zone w/ Perimeter System
I Plant 1: Heating- Hot Water Boller, Capacity >_300 - <600 kBtulh, Gas.
1 Water Heatirg 1 Service Water Heater w/ Circulation Pump
Section 4: Requirements Checklist
Requirements Specific To: HVAC System Ir-.
:
LJ 1. Minimum one temnerati ire contmi Anvir-ga nor -7r-%
CJ
U
Designer/Contractor:
4
Exception: System is an independent perimeter system and must have at least one temperature control per building
exposure over 5() lineal ft and facing one orientation
2. Systernsserving more than one zone must be VAV systems
3, Controls capable of resetting supply air temp (SAT) by 25% of SAT -room ternp difference
Requ-irements Specific To: Plant 1
1. Equipment minimum efficiency. Boiler Thermal Efficiency >- 75% Ft
2, Newsed ly purchaheating equipment meets the efficiency requirements - used equipment must meet 80% Et @ maximum
cap city
Generic Requirements: Must be met by all systems to which the requirement is applicable:
1. Load calculations per 1997 ASHRAE Fundamentals
2. Plant equipment and system capacity no greater than needed to meet loads
Exception: Standby equipment automatically off when prim ary system 'is operating
Exceffcn- Multiple units controlled to sequence opration as a function of load
3. Minimum one temperature controldevice per system
4. Minimurn one humidity control device p-er installed hurnidification/dehurnidificaflon system
5. Autornatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7 -day clock, 2 -hour occupant override,
backup
I 0 -hour
Page 1 of 2
Exception'. Continuou _!._peratJngzones
Exception- 2 kVV dere r Jess, submit calculations
❑ . Automatic shut-off dampers an exhaust stem anduppf systems airflow fm
7. Outside -air source for ventilation: stemi
u .
+apahl of reducingto required rT�:�iir�ur-r�
f
8. R-5 supplyand return air dint ir-��lator--� in unconditioned .
dtioned spaces l - supply and return air duct in uJation outside the
building - in ulatIon between ducts and the buildingexteriorwhen dirt are ark of
_ w� building abJ
Exception: Cruets located within equIpment
i Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F.
139. Ductld - longitudinal seams on rigid dot .
a transverse seams n all ducts; ; UL 181 A or 181 B tapes and mastics
I 0.Mechanical fasteners and sealants used t connect ducts F
- � air dltrl��tlor1 equipment
11. Hot water,pipe 'In ul ti n: 1 in. for pipes <=1.5 in. and 2 in. for pipes 1.5 in. Chilled atr/refrJrant/brinpip �nulation: 1
in. for pipes <=1. in. and 1 .5 in. for pipes > 1 .5 in. Steam pipe insulation: 1.5 in. for =1. in. an
pipes d 3 in. for pip1,
in.
Exception: Piping within HVAC equipment
Exception: Fluid temperatures between 55 and 105 degrees F+
Exception: Fluid riot heated or cooled
Exception: Runouts <4 ft in length
12. Operation and maintenance manual provided to bullding owner
CJ_ 13. Balancing devices provided in accordance with IMC 603.1
L) 14. Hot water distribution systerns >=600 I Btuaf h must have on f the following: controls that rt supply water tam.pratur
d % f supply/return delta T oohan i al or electrical adjustable -speed pump drive(s) c) two-way valves at .all h: atir7
coils d) multiple -stage pumps other system controls that reduce pump flow by at least % based on load calculations
required
15. rawly purchased service water heating equipment meets the efficiency requirements
16. Water Beater temperature centrals: 110 degrees F for dwelling units or 90 degrees
E for other occupancies
J 17. Hot water distribution systems >=300 I F3tulh must have one of the following,-, a)
controls that rt supply water temperature
by % of supply/return delta T mechanical r electrical adjustable -speed pump drives two-way valves at all heating
coifs d multiple -stage pumps e other system controls that reduce pump flog by at least 0% based on load calculations
required
18. Stair and elevator shaft vents are equipped with motorized dampers
Section 5: Compliance Statement
Compliance Statement.' The proposed mechanical design represented ire this document is consistent with the buildirg plans,
specifications and other calculations submitted with this permit application. The proposed mechanical systerns have been designed
to meet the 2001 I ECC, Chapter 8, requirements in COMcheck Version 3.1 Release 1 and to comply with the mardatory
requiremerts in the Requirements Ch cl list.
Prin ci pal Mechanical Designer -Name i natur e
(date
Page. 2 of
0� 0.0482
Magic Suds
COMcheck Software Version 3.1 Release 1
Envelope Compliance Certificate
2001 IECC
Report Date: 12/19105
Data filename: :\Pr gr m Fil \ h f \ 1 1 h 1 \magic ud . c
Section 1: Project Information
Project Title: magic suds
Construction Site:
402 &4th W.
Rexburg, ICS 33440
Owner/Agent-
Sectio
n 2: General Information
Building Location for weather data) -
Climate Zone:
Heating Degree Days abase 65 degrees F):
Cooing Degree Days (base 65 degrees F):
Project Type:
Glazing Area Percentage:
Building
Click to select building type.
Rexburg, Ida
1
693
143
New Construction
%
Section 3; Requirements Checklist
Floor Area
0
D�esig n r/Contractor:
DEC 2 0 2005
Climate -Specific Requirements:
Component Borne/D ripfl'on Gross Area Cavity Cont. Proposed
r -Value -Value U -Factor
Perimeter
Roof 1: All -Wood Joist/Rafter/Truss
�.
Exterior Wall I * Wood Framer Any Spacing
Window 1: Metal Frame with Thermal Ezra :Double Pare, Clear,
SHGC 0.30, PF 0.57
Door I.- Glass, Clear, SHGC 0.30, FF 0.57
Interior Wall 1: Wood Frame, Any SpaGing
Basement Mall I : Other., Furring: None, Wall Ht 0, 0, Depth B.G. 0. 0,
FSC 0.0
Floor 1: Concrete Floor hover unconditioned space}
Budget
U -Factor
3000 36.0 40.0 0.014 0.047
2340 19.0 .0 0.04.E 0.067
280 --- 0.350 0.520
189--�0.350 0.520
540 13,0 0.0 0.089 0-112
0 --J --- 0,000 0.091
3000 -y-9.0 0..033 0,040
raj Budget Ll -factors are used for software baseline calculations ONLY, and are not cede requirements.
Air Leakage., Certification,, and Vapor Retarder
LJ '1. All oints and penetrations are caulked, gasketed, weather-strIpped, or otherwisesealed.
El 2. Windows, doors, and skylights certified as meeting leakage requirements,
El I Component -values & U -factors labeled as certified.
U 4. Stair, elevator shaft vents, and other dampers int r lt t�� building envelope with motorized d dampr.
. Cargo doors and loading dock doors are weather sealed.
............ A+a'.'!#:e-e:,':. _.. :_�^....., '... . .. ._< .:-.:--.y�,�d945+tarme..�m*-' ...:..: ��a_—u:rs...,,•,ze+..°%�cr+�ecsvcorosca:•zw,:+,+�K:._. .sa:x:;;,:x:e: rn ..
,; k2Ms4kAtk{..: e.o-vsrtvr�=.a•:.++mo-aeo- --- ..,
magic suds
Page 1 of 7
LI 6. Recessed
lighting fixtures ire'�.-- Type IC rated and seated OT g ' t; or Ii lnstall-";I�side ar appropriate air4ight
assembly
iit lr from i materials and itinchesl ifrom�l�t�� material, - . Vapor retarder installed.