Loading...
HomeMy WebLinkAboutCOMCHECK - 05-00482 - Magic Suds LaundromatOS 0048? Magic Suds COMcheck Software Vers��rr 3.1 Release I ighting Compliance Certifciate 2001 IECC Report Date: 12/21/05 Data fi Penam : -,\Program Fjles\Chec;k\C0Mcheckmagicsuds.cck Section 1: Project Information Project Title: magic suds Construction Sit :402 S. 4th W— Ibu r, 0 83440 Owner/Agent: Section 2: General Information Building Use Description by: Project Type Building TY exPe Other New Construction Section 30. Requirements Checklist Interior Lighting: Floor Area 3000 (i 1. Tota J actual tt must b Pecs than or equal to t watts. Allowed Watts 1 800 Exterior Lighting: Actual 'watts . Efficacy greater than 45 lumens/W. • Exceptions.- Complies Designer/Contractor, Specialized lighting highlighting features of historic uildin ;i ria . , safety or securityIih�t�nT low-voltagel�idp lighting. Controls, Switching, and Wiring: L) 3. Independent controls for each space (switch/occuparcy sensor). Exceptions.- Areas xceptions:Areas that must be continuously illuminated. 4. Master switch at entry to hotel/motel guest room. 5. Each space prodded with a manual control to provide uniform 1i ht reduction capabilitJr. DEC dnly one luminaire in space; An occupant -sensing device can#rail the area; � The area is a corridor, storeroom, restroom, public dobby or guest room; Areas that must 6e continuously illuminated; Areas greater than 250 sq -ft. E) 6. Automaticlighting hutff control ire� i spaces greater than 250 q.ft in buildings larger than 5,000 sq,ft. . Photocell/astronomical Urne switch on exterior lights. Exceptions., Lighting intended for 24 hour a ® magIc suds Page 3 of Tandem wired one -lamp an6-;:=.,,-eedam p ballasted 1-urninaires (No single -lamp ballas-'­'___'_ Exceptions: Electronic high -frequency ballasts- Luminaires not on same switch. la�j Page 4 of 9 0 Permit Cate COMcheck Software Version 3.#1 Release I Li. hting Application Worksheet 2.oni IECC Report Date-, Data filename: C:IPragram FileslChecklCflMcheck\magic suds.cck Section 1: Allowed Lighting Power Calculation 0 C Fluor Area AIIvr►ved Allowed Watts Watts / ft2 Other 300 0.6 1800 Total Allowed Watts = 180 Section 2m. Actual Lighting Power Calculation D E Fixture ID : Description / Lamp / Wattage Per Lary / Ballast Lampsl # of Fixture (C X D) Fixture Fixtures att. Sped I Cornpact Fluorescent 1: Twin Tube 40W / Electronic 4 14 40 560 Linear Fluorescent 1: 48" T1 2 40W / Electronic 2 7 40 280 HID 1: Other/ Electronic 1 40 4 Incandescent 1: Incandescent CSW 1 6 60 360 HID : -- 0 Space Total Actual Watts 140 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Actual Wats is greater than or eqUal tO Zero, thre bUilding. Total Allowed Watts _ 1800 Total Actual netts _ 1240 Project Compliance 560 rr14c suds ...... Page 5 of 9 M Adw A (rte OQ482 6, Magic Suds COMcheck Software Version 3.1 Release I ec M h I Compliance .. anica c 2001 IECC Report Date: 12/21/05 Data filename- C -,\Program Fjles\Check\C0Mcheak\mag!c suds.cck Section 1: Project Information PFOject, Title: magic suds Construction Site, 402 S_ 4th M Rexburg, ID 83440 Owner/Agent: Section 2-1: General Information Building Locaflon (for weather data): Rexbur ,g, Idaho Climate Zone: 16 Heating Degree Days (base 65 degrees F): 8693 Cooling Degree Days (base 65 degrees F)-. 143 Project Type.- New Construction Section I Mechanical Systems List Quan System. Type & Description 0 HVAC System I Heat[ng: Othert Gas / Multiple -Zone w/ Perimeter System I Plant 1: Heating- Hot Water Boller, Capacity >_300 - <600 kBtulh, Gas. 1 Water Heatirg 1 Service Water Heater w/ Circulation Pump Section 4: Requirements Checklist Requirements Specific To: HVAC System Ir-. : LJ 1. Minimum one temnerati ire contmi Anvir-ga nor -7r-% CJ U Designer/Contractor: 4 Exception: System is an independent perimeter system and must have at least one temperature control per building exposure over 5() lineal ft and facing one orientation 2. Systernsserving more than one zone must be VAV systems 3, Controls capable of resetting supply air temp (SAT) by 25% of SAT -room ternp difference Requ-irements Specific To: Plant 1 1. Equipment minimum efficiency. Boiler Thermal Efficiency >- 75% Ft 2, Newsed ly purchaheating equipment meets the efficiency requirements - used equipment must meet 80% Et @ maximum cap city Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. Load calculations per 1997 ASHRAE Fundamentals 2. Plant equipment and system capacity no greater than needed to meet loads Exception: Standby equipment automatically off when prim ary system 'is operating Exceffcn- Multiple units controlled to sequence opration as a function of load 3. Minimum one temperature controldevice per system 4. Minimurn one humidity control device p-er installed hurnidification/dehurnidificaflon system 5. Autornatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7 -day clock, 2 -hour occupant override, backup I 0 -hour Page 1 of 2 Exception'. Continuou _!._peratJngzones Exception- 2 kVV dere r Jess, submit calculations ❑ . Automatic shut-off dampers an exhaust stem anduppf systems airflow fm 7. Outside -air source for ventilation: stemi u . +apahl of reducingto required rT�:�iir�ur-r� f 8. R-5 supplyand return air dint ir-��lator--� in unconditioned . dtioned spaces l - supply and return air duct in uJation outside the building - in ulatIon between ducts and the buildingexteriorwhen dirt are ark of _ w� building abJ Exception: Cruets located within equIpment i Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F. 139. Ductld - longitudinal seams on rigid dot . a transverse seams n all ducts; ; UL 181 A or 181 B tapes and mastics I 0.Mechanical fasteners and sealants used t connect ducts F - � air dltrl��tlor1 equipment 11. Hot water,pipe 'In ul ti n: 1 in. for pipes <=1.5 in. and 2 in. for pipes 1.5 in. Chilled atr/refrJrant/brinpip �nulation: 1 in. for pipes <=1. in. and 1 .5 in. for pipes > 1 .5 in. Steam pipe insulation: 1.5 in. for =1. in. an pipes d 3 in. for pip1, in. Exception: Piping within HVAC equipment Exception: Fluid temperatures between 55 and 105 degrees F+ Exception: Fluid riot heated or cooled Exception: Runouts <4 ft in length 12. Operation and maintenance manual provided to bullding owner CJ_ 13. Balancing devices provided in accordance with IMC 603.1 L) 14. Hot water distribution systerns >=600 I Btuaf h must have on f the following: controls that rt supply water tam.pratur d % f supply/return delta T oohan i al or electrical adjustable -speed pump drive(s) c) two-way valves at .all h: atir7 coils d) multiple -stage pumps other system controls that reduce pump flow by at least % based on load calculations required 15. rawly purchased service water heating equipment meets the efficiency requirements 16. Water Beater temperature centrals: 110 degrees F for dwelling units or 90 degrees E for other occupancies J 17. Hot water distribution systems >=300 I F3tulh must have one of the following,-, a) controls that rt supply water temperature by % of supply/return delta T mechanical r electrical adjustable -speed pump drives two-way valves at all heating coifs d multiple -stage pumps e other system controls that reduce pump flog by at least 0% based on load calculations required 18. Stair and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement Compliance Statement.' The proposed mechanical design represented ire this document is consistent with the buildirg plans, specifications and other calculations submitted with this permit application. The proposed mechanical systerns have been designed to meet the 2001 I ECC, Chapter 8, requirements in COMcheck Version 3.1 Release 1 and to comply with the mardatory requiremerts in the Requirements Ch cl list. Prin ci pal Mechanical Designer -Name i natur e (date Page. 2 of 0� 0.0482 Magic Suds COMcheck Software Version 3.1 Release 1 Envelope Compliance Certificate 2001 IECC Report Date: 12/19105 Data filename: :\Pr gr m Fil \ h f \ 1 1 h 1 \magic ud . c Section 1: Project Information Project Title: magic suds Construction Site: 402 &4th W. Rexburg, ICS 33440 Owner/Agent- Sectio n 2: General Information Building Location for weather data) - Climate Zone: Heating Degree Days abase 65 degrees F): Cooing Degree Days (base 65 degrees F): Project Type: Glazing Area Percentage: Building Click to select building type. Rexburg, Ida 1 693 143 New Construction % Section 3; Requirements Checklist Floor Area 0 D�esig n r/Contractor: DEC 2 0 2005 Climate -Specific Requirements: Component Borne/D ripfl'on Gross Area Cavity Cont. Proposed r -Value -Value U -Factor Perimeter Roof 1: All -Wood Joist/Rafter/Truss �. Exterior Wall I * Wood Framer Any Spacing Window 1: Metal Frame with Thermal Ezra :Double Pare, Clear, SHGC 0.30, PF 0.57 Door I.- Glass, Clear, SHGC 0.30, FF 0.57 Interior Wall 1: Wood Frame, Any SpaGing Basement Mall I : Other., Furring: None, Wall Ht 0, 0, Depth B.G. 0. 0, FSC 0.0 Floor 1: Concrete Floor hover unconditioned space} Budget U -Factor 3000 36.0 40.0 0.014 0.047 2340 19.0 .0 0.04.E 0.067 280 --- 0.350 0.520 189--�0.350 0.520 540 13,0 0.0 0.089 0-112 0 --J --- 0,000 0.091 3000 -y-9.0 0..033 0,040 raj Budget Ll -factors are used for software baseline calculations ONLY, and are not cede requirements. Air Leakage., Certification,, and Vapor Retarder LJ '1. All oints and penetrations are caulked, gasketed, weather-strIpped, or otherwisesealed. El 2. Windows, doors, and skylights certified as meeting leakage requirements, El I Component -values & U -factors labeled as certified. U 4. Stair, elevator shaft vents, and other dampers int r lt t�� building envelope with motorized d dampr. . Cargo doors and loading dock doors are weather sealed. ............ A+a'.'!#:e-e:,':. _.. :_�^....., '... . .. ._< .:-.:--.y�,�d945+tarme..�m*-' ...:..: ��a_—u:rs...,,•,ze+..°%�cr+�ecsvcorosca:•zw,:+,+�K:._. .sa:x:;;,:x:e: rn .. ,; k2Ms4kAtk{..: e.o-vsrtvr�=.a•:.++mo-aeo- --- .., magic suds Page 1 of 7 LI 6. Recessed lighting fixtures ire'�.-- Type IC rated and seated OT g ' t; or Ii lnstall-";I�side ar appropriate air4ight assembly iit lr from i materials and itinchesl ifrom�l�t�� material, - . Vapor retarder installed. Project Nates: project is In the proceSSr of being approved magic suds �-=.r„��vtae.,F."&•rss �f�aatt0'A�dIF•rcra ,�r Page 2 of