HomeMy WebLinkAboutINSPECTION TICKETS - 05-00488 - 358 Oaktrail Dr - New SFRINSPECTION TICKET
Idg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By Date Z3
Req. Byjj�- Phone Na!: 1 1 �-33
ProjectkQ��A,�, Permit N06—�
A' e�
Address
Inspection Type
Day /Time Req.
r `F'r in o crla c j 512- /4 0 1 o A
Inspector's Report Z Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑ Y ❑ N 0 N/A
I7AP
R'S ACTION
VED ❑ DISAPPROVED ❑ FINAL
. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT
ACTION REQUIRED:
Signed Inspector
Rec't Acknowledged
White - Office Copy Yellow - Job Copy Pink - tnspedor's Copy
F-FIR-CO03
INSPECTION TICKET
❑ Bldg. Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Re d By �_I11 Date
Req. By O Phone No. �510 - iTj
elb
Project Permit No. -488
Address
Inspection Type
Day /Time Req.
Inspector's Report URes. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTO ACTION
PROVED ❑ DISAPPROVED
❑ C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed
Rec't h
white - Office Copy
F-FIR-CO03
❑Y ❑N ❑N/A
❑ FINAL
❑ DID NOT INSPECT
,lob Copy Pink - Inspector's Copy
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By �C,"A Date 5 a�
Req. By_ic4 Phone No.
Project Permit No.
Address 35' C�E%'z•r�
Inspection Type ly`d,,L,, lk
Day /Time Req. 5b -?- Lo
Inspector's Report Res. ❑ Comm
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSR'S ACTION
X7OVED
O C.O. (FINAL)
ACTION REQUIRED:
❑ DISAPPROVED
❑ NOT APPLICABLE
❑Y ❑N El N/A
U FINAL
❑ DID NOT INSPECT
Rec't Acknowledged
Wade - Mrs Copy Yellow Job Copy Pink - Inspector's Copy
FFFIR C000
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
t
Inspection RTL
uest; Rec'd By Date 3/�0&0�0—
Req. ByPhone No. o
Project Pennit No.
Address
Inspection Type
Day /Time Req.
( - Ya 11
�sG
o T. Q
Inspector's Report
Pe Po
0"'Res.
❑ Comm.
CY=
PC �j
(�-Gi'l��
IL
L ji I C-a
6L,
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPE 'S ACTION
APPROVED [j DISAPPROVED
C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
(] Y ❑ N 0 N/A
(] FINAL
❑ DID NOT INSPECT
Signed4it;f�Inspector
ReCt Acknowledged
Whke • OfGce Copy
F-FIR-CW3
*mw - Job Copy
Pm. kv*ocbft copy
INSPECTION TICKET
kg. ■ Plumb. ■ Elect. IJ Mec ■ Fw
Inspection ' Date
Req. By n Phone NO.
�L
Address
Inspection Type
1
UU"6
`!�"/�(O
Inspector's Report Res. I Comm. cp
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
APPROVED [j DISAPPROVED
(] C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed,_
Rec't Acknowh
Whke . Ottice Copy
F•FIR•CO03
1reftw • Job
D Y p N [] N/A
Ll FINAL
❑ DID NOT INSPECT
Pink . MspeCIO tIS Capin
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By ).A�_ Date � I r�
Req. By MD_ L—b n Phone No. tpo II —7 09C
Project Permit No. I O
Address "c�sO.s—�
Inspection Type
Day /Time Req.
Inspector's Report O Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPE ACTION
APPRO VEDD
❑ C.O. (FINAL)
ACTION REQUIRED:
❑DISAPPROVED
❑ NOT APPLICABLE
❑Y [jN El N/A
Ll FINAL
❑ DID NOT INSPECT
Rec't Acknowledged
WM e - 01ke Copy *kw - Job Copy Pink-1 % I '$ COPY
F-FIR C003
INSPECTION 'PICKET
`Bldg. Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By �e=T_Date
Req. By F>r- S6 c e i - Phone No. 75 7 -193 �!"1'5'AoT
Project Permit No. !°JS - Ono-1RR
Address 3 G S 0c X+rc, 1 1) a.
Inspection Type 0^cU-F ,,rov�A �Iv.,..61
Day /rime Req. -rk--n . o2I) 6I n6 6? a �O� •
Inspector's Report Res. ❑ Comm
- OK -TO LtVf2 -
INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A
I7PER*SACTION
OVED ❑ DISAPPROVED ❑ FINAL
�] C.O. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT
ACTION REQUIRED:
WAee • OIFce Copy 1Yeow - Job copy Ph* - Y ee0y
F-FIR C003
INSPECTION TICKET
Bldg. ❑ Plumb. U Elect. ❑ Mech. ❑ Fine
Inspection Request: Rec'd By'_Date
G��zP �D
Req. By Phone No. c� —i
Project Permit No. !qsa
Address
ari71.1>l�! 'his:!
Day / Time Req.
Inspector's Report to Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO OVED DWGS
INSPECTOR'S ACTION
04 BOVED
I]C.O.(FINAL) OTAPPLICABLE
ACTION REQUIRED:
Y ❑ N [] N/A
0 FINAL
❑ DID NOT INSPECT
Rec't AcknoWledgo(!
WIMe - Ofte Cwv Mellow - Job cop Pki Impoew s Co"
F-FIP C003 ki
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection (Request: Rec'd By Date 3�31
Req. By l..CLU Phone No. I(P- J0 ,J
PI0jccl i V-1 Permit No. Ot'
Address d r ��lf A,
Inspection Type
DayffimeReq. �Acy) 1-3/oto 1 :to
Inspector's Report x Res. ❑ Comm.
wn-
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
OPPROVED
t] C.O. (FINAL)
ACTION REQUIRED:
/DISAPPROVED
❑ NOT APPLICABLE
❑Y QN ❑N/A
FINAL
❑ DID NOT INSPECT
ReCt Acknowledged
White - puce Copy
F FIR C000
**" - Job Copy PM Irapedm'3 Cory
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ FIM
Inspection Request: Rec'd By Zje,1 Date
Req. By Phone No.I' 5�5
r
P1-0jCC1 Pennit No. Os qbF
Address
Inspection Type
Day Time Req.
Inspector's Report Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
Ll APPROVED ZfISAPPROVED
0 C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed !l/
Rec't Acknowledged
WMe - Oflice Copy
F-FIR-0003
D Y ❑ N El NIA
L] FINAL
❑ DID NOT INSPECT
- ,roe copy Pk* - m5ped" coat►
INSPECTIbN TICKET
Bldg. ❑ Plumb. ❑ Elect. "A Mech. ❑ Fire
Inspection Request: Rec'd By Date 51A-k�11-)
Req. By ff0a"— Phone No. � "w
Projcct Pennit No. a 8
Address
Inspector's Report A Res. ❑ Comm.
, alp /&C=� A,U ,t zZ->SA-/- _ /,/"
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
LI APPROVED
JO DISAPPROVED
0 C.O. (FINAL)
❑ NOT APPLICABLE
ACTION REQUIRED:
Signed 14
ReCt Acknowledged
Whke - Ofte Copy
F-FIR-CO03
ors
o Y ❑ N [] N/A
L] FINAL
❑ DID NOT INSPECT
Yeftw - Job Copy Pk* - b>s M*ft copy
FINAL INSPECTION CHECKLIST
Date: 5- 2 3 -o4
Project:
Job Address: • " s--g 0,,2,kA-wt 1
Building Permit Number: C75-_ vo ygg
The following comments based on the 2000 edition of the Intemational Residential Code should be
resolved before an occupancy permit is issued. This correction list is not a building permit. The approval
of plans and specifications does not permit the violation of any section of the International Residential
Code or any federal, state or local regulation.
OUTSIDE
use Numbers (visible from the street)
Z.Grade (yard is sloped away from foundation)
Zsidewalk & Landscape Strip 5' wide (W/ 6" of granular borrow (hill 12")) --7' LS strip
_ZFront Setback Coverage 60% min green
�indows - Covers and Screens (shall be releasable or removable from the inside for egress
_zwlndow Wells min. 24" clear (out and above) well
%Exterior Steps (7 3/4 to
max. rise & 10" min. tread)
y
9IA �tairway Handrails 4 or more risers or over 30" (<4" max. spacing uprights)
P 9 of
guardrails (provide if over 30" above floor/grade & 4" max sphere spacing for uprights)
Landings (36" x 36" min., (not req. at the top of the stair if a door does not swing over stairs)
Z
Thresholds 1 1/2"
max. above floor or landing (7 3/411max if door does not swing over landing)
Posts (required to be treated, redwood or cedar if in contact of concrete / earth)
Roofing (no apparent leaks, installed properly and roofing as per plans)
_,:gAlasonry (lintels as per table 703.7. 1)
ZRoof Ventilation (as per plans)
INSIDE
,/ Egress Doors (all egress doors must be able to open from inside without use of keys or tools)
)
,Z Safety Glazing provided in all doors, within 24" of door arc and below 60", & in tub enclosure
ZBathroorn Ventilation (either operable window or fan that vents directly to outside)
,Sinks, Bathtubs and Showers (check for caulking, operation and leaks)
Stairway Illumination (switch at top and bottom)
Stairs (7 3/4"max. riser, 10"' min. tread, (nosing 3/4"to 1 1/4" with solid risers)
Handrails Cont (34" to 38", 1 1/2" to wall, and grip 1 1/4" to 2" dia. upright < 4",triangular space 6" max)
Guardrails 36" high and continuous, Re 'd 30" or more above grade or floor uprights 4" s here max
9 q 9 {�P
spacing, triangular space 6" sphere max spacing)
ZGarage (Dry walled and taped, firewall penetrations and electrical boxes, door to house 20 min. rated,
ducts penetrating firewall must be 26 gauge min. & not open to garage)
Zgress Windows (clear 20" width and 24" height, 5.7 sf min. opening with 44" max. sill height)
Smoke Detectors (in each sleeping room, outside in immediate vicinity and on each story/basement-
split levels (w/o doors), only on upper floor --all interconnected without a disconnecting switch)
Foam Plastic (meets requirement of R318)
�ater Heater Anchorage over 4' with flex water conn. shall be anchored r r in g (gas _ e o strapped to building)
Water Heater Vent (check air flow with return in finished basement)
Clothes Dryer Ducts (solid metal ducts, no screws in duct & vent directly to outside)
Duct Supports (metal ducts supported 10' min spacing & non metal as per manuf. installation instr.)
/Duct Insulation (duct in non conditioned areas shall be insulated)
,AGas Line Supports spacing 10' for up to 3/4117 12' for over 1" and 6' for tubing up to 1 1/2"
FRAMING/MECH. CHECKLIST
Date:
Project: 4-�-a,t ,ie.,or-
Job Address: 35-y C aA�Ul
Building Permit Number: as oo OS
The following comments .based on the 2003 edition of the International Residential Code should be
resolved before an occupancy permit is issued. This correction list is not a building permit. The approval
of plans and specifications does not permit the violation of any section of the International Residential
Code or any federal, state or local regulations.
Exterior
0 Concrete Slabs 3 1/2 " min. thickness & 4" gravel base min. R506.1
,ZBraced Wall Panels (sheathing) (nail or staple - 6" o. c. at edges & 12" o. c. in field) Table 602.3(1 )
r Adequate uplift control at floor line (sheathing split on plate or 1 Y2 X 36" straps 4' o. c. mudsill to studs)
Seismic hold-downs at garage panels <4' wide (APA narrow panel design if <2'8"), hold-downs must be on
double stud or 3X with all nail holes filled. R602.10.4
Foundation waterproofing to finish gradeR406.1
-Crawl space ventilation 1 sf per 150sf (w/ vapor barrier 1 sf per 1500sf) within 3' of corner R408.1-2
Cripple Walls (over 4' sized as 2 story, under 14" must be solidly sheathed one side) R602.9
/ Mud Sill (bolts in proper location, nuts tightened, 2"x2"x3/16" washers (conditional), pressure treated or
redwood, joints blocked or under studs at wall and gaps grouted or shimmed) R403.1.6.1 / R602.11.1
Frame
ZFloor Sheathing and nailing Typ. 3/4" T&G - 6" on edges & 12" in field (perpendicular to joist)
Joist Spacing and .Size (as per plans)
Bearing (1-1/2" min:) & Lapping (3" min. where joists lap over wall or beam)
ZNotching (depth-1/6 max., length-1/3 depth max., not in middle 113, ends-1/4 depth max.) TJI-NO
Boring (1/3 "d" max, >2" of top or bottom or another hole or notch) TJI see chart
l Cantilevers- Blocking, reinforcement span and spacing as per plans.
Joists Under Load Bearing Partitions (shall be doubled as � plumbing P per Section 502.3.3 if lumbin space needed
P
the joists shall be blocked 4' o. c.)
.Girders and Beams (as per plans, nailed or mechanically connected to frame and bearing)
proper 9)
�oist Hangers (check location & nailed properly)
-Draft Stop (required for over 1000 sq ft. of unusable space at floor/ceiling)
.Z asement Walls (pressure treated or redwood sill plate properly fastened to slab)
ZStair Opening (as per plan & properly supported with hangers or walls)
Stairs (check rise- 7 3/4" max., run-10" min., vari.- 3/8" max, width-3' min. & headroom- 6-8")
,,Wall Layout (as per plans)
,Interior Wall Stud Spacing (load bearing is same as exterior), 24" o.c. max.)
Bearing Wall Window and Door Headers Nailing (edge /ends)
/ Exterior Bearing Wall Stud Spacing - walls carrying roof load only; 2x4-16" o.c. 12' max
2x4-24" o.c. 10' max,- 2x6-16" o.c. 18' max,- 2x6-24" o.c. 16' max, one floor & roof: - 2x4 16" o.c.
10'max., two.floors & fOOf; 2x4-12" max 10' (Fig 602.3.2.(1-3))
Double Top Plate Qoints lapped min. 2') or Single Top Plate (bearing w/in 1" & adequately tied :at joints by
3"x6" steel plates w/ 6 8d on nails each side, R602.3.2
Stud Notching (bearing 25% max.) Borin4 40% max, 5/8" min. to edges (60% if doubled)
.,,Fire Blocking (roof space line at wall, concealed spaces &. at studs over 10')
/""Firewalls (between duplexes & garage/home) , firewall penetrations - elec. boxes- rated, ducts —
26 gauge & not open to garage, door —20 minute rated min.
Of
R
Truss details (35# snow load and 90 mph winds) See truss. details
Roof Trusses (spaced and braced as per manufacturer)
ZRafter'and Truss Tie -Downs and hangers
-- -Rafters Lateral Support (block at bearing when exceeding 6 to 1 rule (2xl2)
Roof Sheathing: Nailing ("H" clips w/ 7/16"), edges-6" o.c., field-12" o.c.
;;-Attic Access (provide 22" x 30" min. access where clear height > 30")
Roof Ventilation (standard 1 /150 or 1 /300 if 50 - 80% is 3' above eaves)
Mechanical (Rough Plumbing Insp. Done?
Manufacturer's installation instructions are with the appliance (IRC 106.1.21M1307.1)
Equipment gas shutoff valves in same room (FP exception) and within 6' of appliance (IFGC 409.5)
diment Traps (if not built into appliance) at Furnace & W.H. (IFGC 408.4)
Duct Supports and sealed metal - < 10' spacing & Flexible — < 4' max — (2" sag in 4')
othes Dryer Ducts (solid metal ducts, no screws extending into duct & vent directly to outside)
u Di ct insulation (insulation in non -conditioned Space)
Room access 24" min width / Attic access clear opening 20x30 min (Under floor is 22x30)(IMC 306)
Pressure Regulators (access, vented, tee fitting each side) (IFGC 410)
Gas pipes not in ventilating or circulating air duct (IFGC 404.1)
Metallic gas pipe bends are smooth & free from buckling, cracks, or other damage (IFGC 405.2)
Pressure Test: _psi min duration
Gas Pipe Material:
Branch Lines: Length
CSST Sch40 MP Copper
ft
ft
ft
ft
ft
ft
ft
To POD
ft
ft
ft
ft
ft
ft
ft
Diameter
lb pressure drop
Main Line ft Diameter
Appliance/BTU's (if known)