Loading...
HomeMy WebLinkAboutRESCHECK - 05-00452 - 626 Autumn Ct - New SFRRJEScheck Compliance Certificate 2000 IECC RESch.eck So$ware Version 3.6 Release 2 Data filename: C:1Frogram F1'ies\Check\REScheck\Hammond.rek PROJECT TITLE: Spec Hammond CITE: Rexburg STATE: Idaho HDD: 8693 C',ONSTRLTCTI4N TYPE: Single Family tiV INDOW 1 WALL RATIO: 0.09 DAT z / DATE OF PLANS: 11-7-0511-07-05 PROJECT DESCRIPTION: Frond load 3 car 626 Autom CT. DESIGN-ER/CONTRACTOR: Brett Jensen Construction COMPLIANCE.- Pass Maximum UA — 600 Your Home UA = 554 7.7% Better Than Code (UA) Grass Area or Permit Nun-lr Checked By/Date Cavity ont. Glazing or Door k- ,,.eter -Val .-Value -F actor UA Ceiling 1: Flat Ceiling or Scissoz` 'truss 2379 0.(} 48-d 4$ Wall 1: Woad Frame, 16" O.C. 2448 21.E 0-4 Wlldow ] :Vinyl Frame:Double Pane with Low -E 332 0.340 113 Door 1: Solid 48 0.340 16 Door 2: Glass 122 Q.340 �L 1 Wall 2: Solid Concrete or Masc�nry:Interiar insulation 2448 � � .D [].p 225 Pomace 1: Forced Hot Air, 78 AFUE Air C;onditianer I: Eiectnc Centra1 Air, 10 SEED 0 REScheck Inspection Checklist novo IECC REScheck Software Version 3.6 Release 2 DATE: 11/08/05 PROJECT TITLE: Spec Hammond Bldgs Dept. Use Ceilings - 0 1. Ceiling 1: Flat Ceill"ng or Scissor Truss -1. R-48-0 continuous insulation Comments: Above -Grade `all 1. Wall I: Wood Fac, 16" o. ., R-2-1.0 a it insulanon Comments: . Wall : Solid or Masonry:lntedor Insulation, -11. 0 cavity insul at on Comments: Windows: 1. Window 1: Vinyl Frame -.Double Fane with Low -E, U -factor: 0.340 For windows without libeled U -factors, describe natures_ ## Panes Frame Type Thermal Break? [ ] Yes L ] N0 Comments: Doors.0 1. Door 1: Solid, -fact o r: 0.340 Comments: . Door ; Glass, -factor: 0.340 Comments: Heating and Cooling Equipment* 1. Fuma 1: Forced Hot Air, 78 AFLIE or hi h Make and Model Number . Air Conditioner 1: Eleevic Central Air, 10 SEERor higher Make and Model Number Air age Joints, penetrations, an -id all other such opening- in the ui1 ' -ig envelopethat are sources of all' leakage rust be sealed - Recessed lights must be 1. Type IC rated, or installed inside an aper- pri .te air -tight assembly with a 0. " 1. mnce :kom combustib] e matefials. Ifnon-IC rated, the fixture must be instal l ed 10VI th a 311 c1carance frominsulation. Vapor Retard r ZRequired on the warm -in -winter side of all non -vented framcd ceilings, walls, and Iloors. Maten'als Identification: Materials and equipment must be installed in accordance with the manuftcturer's installation instructions, ] j Materials and equipment must be identified so that compliance can be determined. ] � Mariu&luer manuals for all installed heating and coofing equipment and service wader hating � equipment must be provided. Insulation R -values anti glazing U -factors must be clearly marked an the building plans or specifications. Duct Insulation, � Ducts in unconditioned spaces must be insulated to R-5, � Ducts outside the building must be insulated to R-$.0. � Duct Constmedon., J All joints, seams, and connections mast be securely fistened with welds, baskets, mastics (adhesives), � mastic -plus -embedded -uric, or tapes. Tapes and mastics trust be rated UL 181A or UL 1$1B. Exception: Continuously welded and locking -type longitudinal joints mid searxts on ducts J operating at less than 2 in. w.g. (500 Pa). � The HVAC system must provide a means for balancing air and water systems. � Temperature Controls: � Thermostats are required for eacli separate HVAC system. A manual or automatic means to partially restrict or shut of the heating and/or cooling input to each zone or floor shall be providcd. Service Water :tin Water heatm With vertical pipe risers must have a feat trap on. both the inlet and outlet -unless the water heater has an intiheatp �.1 tri �- �� t of a circulating system. Insulate circulafing hot water pipes to the levels in Table 1. � Circulating Hot Water Systems: j Insulate 6rculating hot water pipes to the levels in Table 1. j Swimming Pools: All heated swimming pools must have an anlo$'heater switch and require a cover unless over 24°10 � of the heating energy is from non-depletable sources. Pool pumps require a time clack. � Heating and Cooling Piping Insulation - HVAC piping conveying quids above 105 °F or chilled quids below SS T must be insulated to the J levels in Table 2. Table 1: Min im u in In su lation Thickness for Circu lating Hot Water Pipes. Insulation Thickness in Inches bv Pine Sizes Ideated Water Tem erature F iso -18o 14Q-159 100-13-9 i y . RnClrculatM2 Mains and R ,X to 1.25 1.5" to 2.0" Qxer 2" 1.0 Y i 0.5 Lo 1.5 0.5 0.51.0 Fable Minimunz Insulatiott Thickness for HVA C Pipe. Fluid Temp. Pining SystemT RanF -) Heating Systems. Low Pressure/T empmture Low T emp crature Steam Condensat (for keAl water). Cooling Systems Chilled Water, Refrigerant, an.. Bfine Insulation Tht'&-ness in 1 " outs V and Less iD Sl* 1-2571-to.P1 .1v t L 201-250 1.0 1.5 1.5 2.0 120-200 0.5 1.0 Lo 1. Any 1.0 1. 1-5 2.0 - _ 1.0 Below 1. -1..0 L5 L NOTES TO FIEI,:D (Building Department Use Only) CaMPLIANCE STATEMENT: The proposed budding design described hereis consi�t�n� with the build"ng plans, specifca�ions, and other calculations submitted with the permit application. The proposed building has, been designed t0 meet the 2000 JECC requirements in REScheck Version 3.6 Release 2 (formerly 1VIECcheck) and to comply with the mandatary requirement listed in the RE check Inspection Checklist. Builder/Designer Date RIEScheck Compliance Certificate 2000 IECC RESclzeck Software Version 3.6 Release 2 Data #filename: C:\Prourann FilesiCheGkIRESchecklHammon.d.rck PROJECT TITLE: Spec Hammond CITY: Rexburg TATE. Idaho HDD: 8693 CONSTRUCTTON TYPE: Single Family WIr1DOW±' WALL RATIO: O.09 DATE: 12r20/05 DATE OF PLAITS: 11-7-0511-07-05 PROJECT ESCTION: .front load 3 car 626 Autom CT. DESIGNER/CONTRACTOR: Brett Jensen Constreictinn COMPLIANCE: Fasces Maximum UA = 617 Your Horne UA = 569 7.8% Better Than Cede (UA) Glass Lvi Checked By/Date DEC 2 2 20o D By Glaziug Axea or s Cavity Cont. or. Doa.r Perimeter R- ah -Value . F z . Ceiling i : Fiat Ceiling or S cissor Truss 2379 0.0 48.0 �8 4�o � f kali 1: Wood Fr�.me, 16" a.c. 2445 21.0 0.0 j Window 1: Vinyl Frame:Double Pane with Low -E 332 0.340 ] l3 door 1: Solid 4$ [).340 16 Doer 2: Glass 0.340 41 Wall 2: Solid Concrete or Masanxy:T.nteiiflr Insulation 2448 11.0 0.0 225 '�M, Floar I :All-Waod Joist/Truss: Over Unconditioned Space 34D 21.0 �. � � � Furnace 1: Fared Hoy A.i AFUE � � REScheek- Inspection Checklist 2000 IECC REScdreck S offware Verson 3.6 Release 2 DATE: 12/12-f0/05 PROJECT TITLE; Spec,Hammond Ii Dept. Use Ceilings: 1. Ceiling I. Flt Ceifin,g or, Scissor TrLt R-48.0 continuous F insulatioii . Corni-netits: Above -Grade Walls: L Wale : Wood Fr , 1 tT . . ! R-21.0 cavi ty insul at o n Comments: f Wall .2: Solid Concrete or Masonry -,- Intn r Insulation, - i 1. 0 cavityI"nsul a Comments: Windows: L, Wino 1: Vinyl Frame. -Double Pane with Low -E, 0.340 For windows without labeled - t r s rri .trines : Panes Frame Type heal Break Comments: Doors: 1 Door* I.- Solid, U-fictor: 0._34 con -111 -lents. j j 2. : r : Glass, -factor,. 0.340 Comments: I floor: 1. F1 oor 1: ] I -Wood Joist/ rm.: Over Unconditioned ion_ Comments-. Heating and Cooling Equipment: 1. Fumace 1 Fred Hot Air 78 A'UE or higher M- mid Model Number 2. Air Condicioncr I. Electric Central Air 10 SEER or higher Mak,e and.model Number Air Leakage: I J flits, penetrations.rLnd all otber such openings in the building leakage must be scaled.. f Recessed I iglus must 1 IC rated -or . insta . � i � ro ate 1 r-tl h with a . lar from b Usti I t l . If n -I rat ed, th e i x tu re mu st b e i ns t al I ed With a 3fl l etrane insulation.om Table I. - Min it" m Insulation A ickn ess fog Circit lating Hot Wrztet• Pipes, j-psulati hicknQss in Inches bv Fine S Heated Water T em�tzttuxe F 170-180 140-169 100-139 0.5 0.5 * a a t Lein ad, Riniouts Over " 2,0 1. 1.0 Table 2.-, Minimum Insulation ThicknessPr HVAC Fluid Temp. Insulation Inchesby.--Pll)c 1.r -DM9.5ys.tcm Tynes RanZ� 271 Rvinouts I" aiid--Less 1.25r' to 2" 2 -SP1 to 411 Heating Systems Low= : gybes surer i tu r Lour T n -i peratur Steam condensate (for ied water} Cooling Systems Chilled Water, Refrigerant, and :Brim 40-55 Below 40 NOTES TO FIELD (Building Departmerit Use, Oniv-) 40. 1.0 0.5 1.0 0.75 1.5 � ti'ap or Retarder: [ ] � Required on the warm -in -winter side oi'all roan -vented famed ceilings, walls, and ff oors. f � N11aterials Identification: [ ] � Materials and equipment must be installed in accordance NVith the manu�acturel's in.stallation xnstiuctioils. j ) f Materials and equipment must be ident.1fied so that compliance can be determil2ei. [ ) � Manufacturer a�1anu�.�1s (6r Ali installed heating end ct�o�inb equipment and service water heating � equipment must. be provided. � ] Insulation R -values and glazing U -factors must be clearly masked on the building plans of specifications. � Duct Insulation* [ � � ducts in unconditioned spaces must be insulated to R-5. � Ducts outside the building must be insulated to R-8.4, Duct Con pori .. All jomts, nems, and connections must be securelyMeed %vith welds, gmskets,mastics (adhesives), masti -plus-embedded--fabfi, or tapes. Tapes and mastics east c .p- Continuously Welded and locking -type longitudinal Jducts operating at less than 2 in, xv. . BOO Pa). The HVAC system must provide means for balancing air and water systems. Temp =eat iv Controls. Thermostats are required tbr each separate HVAC system. A manual or auto-matic mens to and/orpartially restrict or shut offthe heating caoting Input tO each zone or floor shall be provided.. j Senice WaterHeating: Water heaters With vertical pipeusers must hrwe a heat tri p on both the inIct atid outlet uniess the water heater has an integral heat trap r i -of a circulating Insulate circulating hot waterp1pes to the levels 'M Table 1. Circulating Hot WaterSystems. hisulate circulating hot water pipes to the I evel s in T abi e L i Swimming Pools., [ All heat ed swimming pools t � 1 n- • _ 20% meter 1 t and ' eq it cover unless over of the heating n r is fom no-n-depletable sources. Pool pumps require ti I me clock. JHeating andlin Piping Insulation HV AC piping conveying fluids above 105 T or chilled ffulds below 55 T must be insulated to the' levels in Table 2. ka G1 ioneriRect 'c Centrael Aii� 10 S F..,-E.R COMPLIANCE STATEMENT: The proposed buildimy desian described here is consistent W' -(h the bullding plans, and other caicutations subr� t�t�d with the pertx�it application. Tie proposed building has been designed to meet the 2{300 fECC requirements in REScheck Version 3.6 Release 2 (fonnuly Nf.ECcheck} ani to c0mD1v Frith the matz(latory requirements fisted in the REScheck Inspection Checklist. 'Builder/Designer' ' z-� Date / ) ' ( P Q ;