Loading...
HomeMy WebLinkAboutTRUSS PLAN - 05-00422 - 347 Eagle Summit St - New SFRThis layoal and material Ihit is based on plane and/or Intimation provided. This has not been reviewed by 8 Weyerhaeuser engineer. Your builder. design professional, and oMer responsible parties ..at review thus luMmotlon to assure Mat it u appmpeater incomes, and comply s with applicable budding codes. n Weyerhaeuser TMspit rim board 8 Load bearing or shear wall above (must I mchsidear BtW O B1W Filler black Attach with ten IOd(P box roils, clinched, tlseten I6d(3Y, )boxroils from each side with Nj* T,TP joist flange widths. Use fifteen nails with TT1-gist gai block natal depths greater than 16". tightto top flange (tight to botian flaigs with foes mount )Mgeesl Attach with ten IOd (3") box roils, devoted ted when passible. !�I"Backer block bath aides of webwithsirgle TJI-Joist WARNING a Joists are unstable until braced laterally Bracing • Includes: • pip slyalryie9 DO NOT allow workers . mri • Pomx:x 00 NOT stack building to walk on Jolam materials on unsheathed until braced. joists. Stack only over INJURY MAY RESULT. beams or walls. WARNING NOTES: Lack of concern for proper bracing during construction can result in serious accidents. under normal condigons if the following guidelines are observed, accidents will be avoided. elmYrq.rangers. Nn NaNs eM @n,btrseltMma a�9mv olmelJl cpaymuxl oe mmpmlyirsleXnO mgorearyrNka. .n.eam, I� + mane as wow m m aa.wg aemu awn Se ewam,m a. m0 man m u.6w. m. � Pen e..�mwmaa sY o mnwa,+y m P.na,am sea lwoml�Nl bw.aa m mean a met m hoc n Ire e"e w u< eaY a�smaN.� ^Pwmx m Iv.Iminmwmlmuele. Palm ma wrea.raw.um uwm+e.eaanm mre2 a,e ma.mlwm. wmoal ma eysNneys ardbrels ymywdmdeuexlgemnnrunon mea� n4+vwxm rime myaM immmm nlmm"o. ♦. 51eaM5 muu ecnmvry wra „wire-rahiemaznx b m bcolo me rep ant wwom ur^ire Ma. WA4c Is i un ecyaye en iMaYvum eleN igzs BThelienannmGnnvunaosgl,lwimmebrtmed A'fimn elan AguneM. NAILING REQUIREMENTS TJI& State at bearings: Two Rd j2Y,") box nails (1 each side), 1Y" minimum from end, Biockingpanele,_ In joist or rim board to bearing Plate: T,fic blocking panels or dmirost10d (3") box Pads al 6" ad. Tors JPist rim board: Toenail with 10d (3") box nails at 6" q.G. or 16d (3Y2') box nails at 12" a Shear transfer. Connections equivalent to decking nail schedule. Rim board, rim joist or closure to TJI®joist: i$'a" witlih or less: Two 10d (3) box nails, one each at top and bottom flange. 29e"duu 2Y2"ghdj he: Two 16d (3Pz") box nails, one each at top and bottom flange. 3Y2" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 21t4 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. A3' 12" e.c. A5 A complete TJ-Xpert framing plan requires the Thus Joist Frami Pookel Guide See True, Jews Framers Packet Guide for Product Tmaemark Iffmand on Rm1 M 05 004272 347 EAGLE SUMMIT ST TJAxPgrtld 1�Vo V 61, L JOIST AND BEAM LIBT Plot ro Length PeoNCe. vlb oty At W 11 L8" TJI I Is )met 1 T A2 21• 11 n8" TJI 110 joist 1 1e A3 20' 11 ?Is- NB joist 1 23 A4 U. War TA 110 joist 1 fi AS Is' 11T/8"TJI1fiO=: 1 12' AS 14' 11 T/8"TJ11tOfolst 1 1T AT 10' 11TB"TJINOIoist 1 2 AS S• 11 T18" T.11110 joist 1 3 A9 a- 11171111 Jots[ S Y Mt 18- 1 3µ^ x 14•' 1.9E Micrallam LK 9 1 HANGER LIST-&mpeon Stroal carousels laces Plot Rl Oty Pmdst Labl Tap Na Face Negs Nembd Name HI 5 IUTN 10-NIO 2-1410 (5)(6) Hangs Notes: 15) Backer Blacks RagNrea (6) Fear Bbcka Required AGOES60RIES LIST Par IG Length Product PINS Oty B61 1' SA" or 314- Backer Blacks 1 5 Fbt W 2it6FlIMBlould 1 1 Rm1 16' 11/4" x 11 T/a" 1.3E Timb alitrnnd LSL 1 13 Bkt 1- 2114" 11 TIg" TJI 110 Blocking Panels 1 15 Bk1' Via 11 TI0" TJ1110 Blacking Panels 1 1 B. m V4" 11 TI8"TJI 10 BIorXing Panels 1 3T BkY T 512" tt T18" TJI 110 Blocking Panels 1 1 S I W x W 23132" Structurwood Edge (24" Span Rating) 1 62 RV, Random length binaking panel cuts BR BbM1ro IMei: Ren, min Boom LEVEL NOTES I File Name: Stock IF- Sainsbury Comm Eaglew rds (o5-UT730-284).JOB LwN Name: Main Floor Framing Plothi 10/2712005 09:42 Design Status: Main Floor Framing..d0127120O5 09.03 NOTE: Level align times indicated have provide aswranee for proper level sucking. Design Methodology: ASO Floor Anew Loading Is: 40pef Live Load and 15 pet Dead Load Maximum Joist correction: 1-I480 Live Load U240 Total Load TJAro Rating Information: walgnmd Average. 43 Lowest Rating: 38 Highest Rating: 67 Glued 8 NaiW Decking is Required Direct Applied ceiling is Not Required Pinar Ded'Jng: 23bur Stnncturwood FAga (leP span Rating) Normal O.C. Spacing =16-• 'Unisex mtad otherwise Layout Scale: 1/4" = 1• Nov n 1 2005 JOB COMMENTS ot #13 Block #, 9adva Gan m" Lot EakeSummtRoad mars, More e344o CRFAhT18Y wayerhawaer-SLC 2go0 soam eoa west AHn: Je%Harrop Salt Lab City, UT 04115 (Bog) 2g}9gg; FAX: 1B9t19TSOB5B 1 SYMBOL LEOF310 r Note frem operator Pam Laos Line LOW Area Lard BeGu caBON La9el (bee Fmmare Pocket Guide) Page 1 of 1 FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE Preliminary Layout for Review and Approval TJ Xmm 8d2 (exam C6,42 DS42 36.42 PS6