Loading...
HomeMy WebLinkAboutTRUSS PLAN - 05-00421 - 78 Star View Dr - New SFRT�.u�� list is based on plans andlor information provoked. Thisbsano tumn, reviewed by It Weye h....or engineer Yourbutder, design prohssbnal, and came, restummkoh paltlas most revhw mh Informed.. to assure that a be appropriate, accurate, and compiles with kppkcable bullet,., it... A Weyerhaeuser WebrtrffaArrs 8°diameter nloxitmm hale far required each 1174". W' deep blocking ponds: side at ElIV 6° dianRrer I. for bIadd pmrJs 9V' deep or i� Shorter than 12e long. y \.. D¢_nwt_ort_fkugas. 1 �True; Jsist rim board OE7w I'll. block: Athol with ten i6a (3a) box nal clinthed. ilea tesi6d (34t°) box tulle from each side with 3Vpe Tir joist flmge widths. UN fifhk¢ mill with TJPjoist gmkarblmk:Latdl depth, grmter then 16', fi (Hthit �botff cam ghtflmgt with fw.e Mount haggis} Attach with TIT 10d Of) box roils, clinched wh. possible. WARNING Joists are unstable until bracedate lrally Bracing include.: • Boma • fine Beep DO NOT and. workers'ar,aml allard .ole, . am, Ind 00 NOT stook bu i iry IV walk on joints materials on unsheathed sniff bracket. joists. Stack only over ,WURYMAY RESULT. beams or walls. WARNMIG NOTES: Lack of con am for proper bracing during construction can result in serious accidents. Under normal conditions if me following guidelines are observed, accidents will be avoided. °ox, three=. —come am,m, pu m.v-1 weuwthusw - vuv rank mat-11eq�lsnr—b..- rnai wwo.mm.. an illMr Th. • s.v ce..,a..,,vni+.r i.1, dame it=w Iw minineml ­d.taus¢ a van9 wnJ✓W o 1-1. aegis ma1muterrearel- ill Wmnymemeam„u,vra,I' vbonleran esgene or me hewn. avnvo,iv,mwm ewrs.. emery chin m run- ompew—m, me, e. Tn.Crary.--.emnneued—c—wr-ord x"rta.,, o-"e.rwment rc NAILING REQUIREMENTS TJI6 joists at bearings: Two Ild (2)1") box nits (1 each.0.), 1Y,' mlmmum mom and. Bl.ekinp wnele elm joist or rim boom to tearing plate: TJI® blocking panels or der,mrs! lOd (Y') box nails at 6" o c. Trus Joist nth board: Toenail with 1W (W) box nails WV- o.c, or 16d (3$") box nails at 12" oc Shear pewter. Connections equivalent W decking nail schedule. Rim bo and rim lolst or dlowre W TJI6Joist: India. Po or/ass: Tvm 1od (3") box nails, one each at lop and ottom mange. W hT12"widths: Two I (3)J') tax nailer one each at top and momftango, aiideotowidth. Toenail joist to rim joist with one tad (3") Mx wit Sell of load lop flange. g 4 minimum scream disbar. Two I (X) box nails, one each at top and tortoni Large. .n. np.e.... ..,-- Sao Tms Joist Framer's Packet Guide for Product Trademark Inbrma min Flat CTupprt. JOIST AND BEAM LIST Pled, 0 Length Product Pa. any AI 42- 11 TIT" TJI 110 Joist 3 18 A2 42' 11 7/8^ TJI 110 joist 1 II A3 40- 11 Too- TJI 1101.1st 1 1 A4 3e' 11 T/e' TJI 110Iout 2 a AS 3W 11 The- TJI 110 joist 2 2 Aa 22- 11 TIB"TJI 1101oiet 2 12 AT 20' 117IT' TJI 110 joist 1 28 A¢ 18' 11 T/0^ TJI 1101o1st t a AS 14' 11 T/6"TJ11101a1st 1 3 A10 12' 11 T/8^TJI 1101o1st 1 8 A11 6' H ]/e" LI NOloist 1 1 Al2 p' 11 T/8" TJI 1101o1et 2 2 A13 2' 11 T(8"TJI I101o1ot 1 1 HANGER LIST -Simpson Simng-TN Compars, Inc.® PIm ID Qb Panama Label Top Nails Face Nails summer Nails Nobel x1 3 gu i1 10N10 2-1110 (SI xang.rNeNe: f+'1GaeksrRbeksR.qulM 'Ir. plant to Length pnx pia Bill 1' AV or v4^ Backs. Blocks I 5 Sol To. 11W a 11 T/e` 1.3E Timberserand LSL 1 i5 Bkl 1.1/2" 11 Tla- TJI ig mocking Panels 1 I Bkt' 51/2" 11T/8^TJI110 Blocking Panels 1 1 no 101.- 1111.-TJI11p kirmemng Panels 1 13 B12' 3 US- 11 7/0"TJI 11. Blocking Panels 1 1 S., 4' x 8' 23132" Sbualummod Edge (24' Span Rating) 1 74 feandOm lams., Mackin pwM cuts LEVEL NOTES Film Name: Stock amusing -Krum Smith Res (05-OTT30195).JOB Laael Nam.: Mal. Floor Fmming Placed: 111=0051646 paste. Shies: M.In Flop F.nming...t 1 W200516:42 NOTE: Level design times indicated above pmNds, aesumnm fail proper level stackenB Design Matbotlology: ASO Flop Area Loading is: Ippsf Live Lead and 15 at Dead Lmtl Maximum J... t Degecpan: V36g Live Load LO40 ToGI Load TJ>m Rating bri rmatimi WelghRd Average 40 Lowest Rening: 35 Highest Rnlnp: 55 Glued a Nailed Decking Is Required mrop Applied ceiling is Not Required Flop Decking: 23132" Sbuctimemad Edge f24" Span Ranng) Normal O.C. spacing =16— 'unteas r med labeled — Layout Scale:1/4" = 1' JOB COMMENTS NMnBRyCi08mmr Re6 � sunmtlt ConenMrg Servims C<: Stack p6-Reiburg. ip , CREATEp 6Y Weyetmaeneer-6LC - . 2fi00 South fi0p West Sett 1_ake Cib. LIT 64115 f800)283-9663 FAX: (ep1)9Tb-0p66 gYYNOL LE N0 Penn Lwtl Lone Load Atha Lead Detail canoutLabel (Sae FrameYe Pocket Guoue) 1 Of 1 FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE Preliminary Layout for Review and Approval I..rt. m2 dai Mai 0642..2 pai