Loading...
HomeMy WebLinkAboutEARTHWORK INSPECTION 5 - The Grove at Thomson Farms - Hickory, Blackoak, HazelwoodInspection Date: 06/14/2021 File Name: 20001 Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/15/2021 88e4e71eb0d121c0-1623690701296 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: The Grove Start Time: 08:30 AM Client: Stillwater Equity Partners Contractor: Hill and Sons Excavation End Time: 11:30 AM Inspection Type(s): Earthwork Inspection Location(s): I tested compaction over the valley gutter for buildings: Hickory, Blackoak, and Hazelwood. Observations/ Remarks: I arrived on site at approximately 9 a.m. I talked to Isreal about the condition of the gravel. They had compacted it the previous week. I tested it to see where they were at, and I got 80% compaction using a back scatter. They added water and rolled it. With the extra effort they achieved compaction. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/14/2021 File Name: 20001 Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/15/2021 88e4e71eb0d121c0-1623690701296 2