Daily Field Report
Project Name:
The Grove
Start Time:
08:30 AM
Client:
Stillwater Equity Partners
Contractor:
Hill and Sons Excavation
End Time:
11:30 AM
Inspection Type(s):
Earthwork Inspection
Location(s):
I tested compaction over the valley gutter for
buildings: Hickory, Blackoak, and Hazelwood.
Observations/ Remarks:
I arrived on site at approximately 9 a.m. I talked to Isreal about the condition of the gravel. They had
compacted it the previous week. I tested it to see where they were at, and I got 80% compaction
using a back scatter. They added water and rolled it. With the extra effort they achieved compaction.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
06/14/2021
File Name:
20001
Inspector's Signature:Inspector's Name:
Alan Schiess
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/15/2021
88e4e71eb0d121c0-1623690701296 2