HomeMy WebLinkAboutSHORT FORM - 05-00413 - 1079 Arctic Willow Dr - New SFRRexburg, rid 83440
Short tmorm
Entire House
Scott Jacobson
For: Scott Jacobson
Job: Spec I
Date:
B:
05 004'13
1071) Artic Willow -Jacobsen -SFR
HEATING EQUIPMENT
Infiltration
Method
Construction quality
Fireplaces
Simplified
Average
0
COOLING EQUIPMENT
Make
Htg
Clg
Outside db (°F)
-fi
89
Inside d6 (°F)
70
75
Design TD (°F)
76
14
Daily range
T
H
Inside humidify
50
Moisture difference (gr[lb)
-
-31
HEATING EQUIPMENT
Infiltration
Method
Construction quality
Fireplaces
Simplified
Average
0
COOLING EQUIPMENT
Make
Make
Trade
Trade
Madel
Cand
Coil
Efficiency
80 AFUE
Efficiency
DEER
Heating input
Q
Btuh
Sensible cooling
0
Btuh
Heating output
D
Btuh
Latent cooing
U
Btuh
temperature rise
0
"F
Total cooling
+D
Btuh
Actual air flaw
874
cfm
Actual air how
874
cpm
Air flow factor
0.419
cfmlB#uh
Air flow factor
0.049
cfmlBtuh
Static pressure
0.00
in H20
Static pressure
0.00
in H20
Space thermostat
Load sensible heat ratio
1.00
ROOM NAME
Area
7Htg load
Clg food
Htg AVF
Cog AVF
(ft2)
(Btuh)
(Btuh)
(cfm)
(Cfm)
Rooml
Roomy
Roorn.3
Roorn4
Roorn5
Roam
Room7
Ravm9
Room 10
Rooml 1
RoamB
195
65
182
180
228
517
399
azs
285
232
223
3719
615
3596
1515
3061
78-66
7359
3389
5807
5010
4638
898
115
1331
284
1237
1450
3802
1617
2039
2139
2966
70
MAI
6
65
14
60
71
186
79
100
105
145
Printout certified by ACCA to meet all requirements of Manual J 8th Ed,. R
vvi 1q`)fti9ht- k.!!k dential 6,0,22 RSR -10897
ACCK GAMY DocurnentsWrightsoft HV\Te Plate\Scott Jacobson\Spec 2, rrt Cato = MJ8 Orientation =
Pace 1
Enfire House
Other equip loads
Equip. @ d.94 RSM
Latent cooling
TOTALS
2734
2734
46575
4865
51440
Printout certified by BCCA to meet all requirements of Manual J 8th fid.
jg$�� VVf1 Right -Suite Residential ,0. 40 -97
ACM CAMY DocumentskWrIghtsoft HVACkT9rnpIateXSCL0tt Ja c b onk pec 2.rrt Calc= MJ8 orientation
I
20CS-Oct-20 14:37,46
wrightsoft-40
a *` A
IMF
M. i AMLrj 3
Job: Spec 1
Dat
By:
For.
Notes:
Scott Jacobson
Weather:,
Winter Design Conditions
outside db -6 ° F
Inside db 70 OF
Design TD 75 ° F
Heating Summary
Structure
Ducts
Central vent (69
Humidification
Piping
Equipment load
Idaho Falls, ID, US
Summer Design Conditions
Outside db 89 OF
Inside db 75 OF
design TD 14 OF
Daily range H
Relative humidity 50 %
Moisture difference -31 9r11b
Sensible Cooling Equipment Lead Sizing
36888
Btuh
Structure
11213
Btuh
9688
cfm
Ducts
6665
Btuh
cfm) 48,65
Btuh
Centra! gent (69 cfm)
896
Btuh
o
Btuh
Blower
o
Stun
0
Btuh
51440
Btuh
Use manufacturer's data
n
Ratelswing multiplier
x.94
Infiltration
Equipment sensible load
17648
Btuh
Method
Construction quality
Fireplaces
Heati n
Area (W) 273
Volume (f':1) 2182
Air change our 0.32
Equi. AVF (cfm) 117
Simplif�ed
Average
0
Cool ?3h
21872
0.16
58
Heating Equipment Summary
Make
Trade
Model
Efficiency 80 AFUE
Heatsng finput 0 Btuh
Heating output D Btuh
Temperature ripe 0 OF
Actual air flow- S74 cfm
Air flow factor 0.01 9 cfm/Btuh
Static pressure 0.00 in H20
Space thermostat
Latent Coaling Equipment Load Sizing
Structure
Ducts
Central vent (69 cfm)
Equipment latent load
-1049 Btuh
-153 Btuh
-1246 Btuh
0 Btuh
equipment total load 17648 Btuh
Req., total capacity at 0.70 SHR 2.1 ton
Cooling Equipment Summary
Make
Trade
Cand
Goll
Efficiency 0 EER
Sensible cooling 0 Btuh
Latent cooling 0 Btuh
Total cooing 0 Btuh
Actual air flow 874 cfm
Air how factor 0.049 cfm/Btuh
Static Pressure 0.00 in N20
Load sensible heat ratio 1,00
Printout certified by ACCA to meet all requirements of Manual J 8th Ed.
.4� vvr-ioghtSC3ft Rlght-Su�e Residential 6.0.22 RSR40897
A M Y Dow r n =ri g htsoft i VAC\Tetiplate\Scott �acobson\S pec 2. rrt Cal c = M J8 orientatisn
2005-t_0 1437:46
Page I
Sheet 1
Job #.N Spec 1
Performed for.
Scott Jacobson
Scott Jacobson
Scale: 1
Page 1
Right -Baits Residential
6.0.22 F89
2005 -Oct -20 _37,5
40
w
tsoft-
w .
EMIR" #U::ff
Scott Jacobson
job. Spec 1.
Date
B.
Far: Scott Jacobson
Extemal static pressure
Pressure dosses
Available static pressure
Supply f return available pressure
Lowest friefion rate
Actual air flow
Total effective length (TEL)
Heating
0.40 in H20
0.00 in H20
0.00 in H20
0.00 ! 0.00 in H20
o.000
in/1 00ft
874 cfm
off
Cooling
0,00 in H20
0.00 in H20
x.00 in H20
0.0010.Q0 in H2(]
0.000 in/1 00ft
874 cfm
V0:�� V Re ht -Suite Residential 6.0,22 R
CAMY Documentsmrightsoft HVAC\Te rnp f te,\Qott Jacobson Sp rr t Calc;-- MJ8 Orientation =
2005 -Oct -0 14;37;46
Design
Htg
Clg
Design
Diam
Rect
dict
Actual
Ftg,Eqv
Duct
Name
(Btuh)
(Cfrn)
(CfM)
FIR
(in)
Size (ire)
Matl
Ln (ft)
Ln (ft)
Trunk
Roaml
h 898
70
44
0.000
Q
N Q
ShMt
0.0
0.0
Ox 01
Ro=z
h 115
12'
6
0.000
0
0)(0
ShMt
U.0
U.0
Roorn3
h 1331
fib
65
0.000
0
Ox 0
ShMt
0.0
0.0
Rwm4
h 284
28
14
0,000
0
Ox d
ShMt
4.Q
0.0.
Rorn5
c 1X37
57
60
O.000
0
Ox 0
ShMt
0.0
0.0
rooms
h 145D
148
71
0.040
0
ox 0
ShMt
0.0
0.0
Roum7
c 3802
138
186
0.000
D
Ox D
ShMt
0.D
0.(3
Ro=9
C 1617
64
79
0.000
o
Ox o
snit
0.0
0.0
Roo►n 10
n 2039
109
100
o_aoo
0
oxo
ShMt
0,0
0.0
Room 11
c 2139
94
105
0.000
0
4x Q
ShMt
0.0
0.0
Ra=s
c 2966
87
145
0.000
d
ox 0
ShMt
0.0
0.0
V0:�� V Re ht -Suite Residential 6.0,22 R
CAMY Documentsmrightsoft HVAC\Te rnp f te,\Qott Jacobson Sp rr t Calc;-- MJ8 Orientation =
2005 -Oct -0 14;37;46
Grill
Htg
Cig
TEL
Design
Veloc
Diarn
RectSize
Stud/Joist
Duct
ame
Size (in)
(cfm)
(cfm)
(ft)
FR
(fpm)
(in)
(in)
Opening (in)
Mat[
Trunk
rb1
ox 0
874
874
0.0
0.000
01
01
Ox 01
1 ShMt
V0:�� V Re ht -Suite Residential 6.0,22 R
CAMY Documentsmrightsoft HVAC\Te rnp f te,\Qott Jacobson Sp rr t Calc;-- MJ8 Orientation =
2005 -Oct -0 14;37;46
0
ia
09
SUBCONTRACTOR LIST
Excavation & Earthwork: Kauer Excavation
Concrete: K&C Concrete
Masonry:
Mickel
161
Roofing: Smith hoofing Rigby
Insulation: BMC West Insulation
Drywall; Gary Sears Drywall
Pal*nfing: Banta Painting
Floor
Coverings: Gundersen Carpet The Tile Stare
Plumbing.: Hyde Plumbing Blackfoot
Heating;
Electrical:
Rexburg dumbing and Heatin
Darnell Weekes Electric
Special Construction
(Manufacturer or Supplier)
Roof Trusses. BMC West Truss Plant
Floor/Ceiling Joists: BMC West
Siding/Exterl*or Trim: Heartland Vinyl siding
Other:
10
WEI
Permit
Permit Date
OS 00413
Compliance Ce 1()79 Artl'c W1*11oxv-Jacobsen-SFR
Project Title: The Development Group Willow Brook Block 2 Lot 7
Report oats: 10121105
Energy Code:
Location
Construction Type:
Glazing Area Percentage -
Heating
r e to
2000 IECC
Rexburg, Idaho
Single aril
15%
8693
n trFut o Site:
Block Lot 7 'Willow Brook Division
Rexburg, ID 83440
Owner/Agent:
Scott Jacobson
The Development Group LLC
4330 W. 3800 S.
Rexburg, ID 83440
208-390-0230
developmen.tgroupli.c@h.otmaiI.com.
Des'lgner/Contractor:
Scott Jacobson
The Development Group LLC
4330 W. 3800 S.
Rexburg, l 83440
208-390-023
developmentg-roupllc@hotma*ll.com
Ceiling 1: Flat Ceiling gar it Truss:
Fall 1: Wood Frame, 16" O.G.:
161T O.G. :
Window 1:
Vinyl
Frame:Double
Pane with Low -E:
'window :
Vinyl
Nr e�
Pane with Low -E:
Window .
Vinyl
Frame:Double
Fane with Low -E!
Window 4:
Vinyl
Fir :Double
Pane with Lo -Ea
Window :
Vinyl
Frame -.Double
Pare with Low -E:
Window 60
10
WEI
Permit
Permit Date
OS 00413
Compliance Ce 1()79 Artl'c W1*11oxv-Jacobsen-SFR
Project Title: The Development Group Willow Brook Block 2 Lot 7
Report oats: 10121105
Energy Code:
Location
Construction Type:
Glazing Area Percentage -
Heating
r e to
2000 IECC
Rexburg, Idaho
Single aril
15%
8693
n trFut o Site:
Block Lot 7 'Willow Brook Division
Rexburg, ID 83440
Owner/Agent:
Scott Jacobson
The Development Group LLC
4330 W. 3800 S.
Rexburg, ID 83440
208-390-0230
developmen.tgroupli.c@h.otmaiI.com.
Des'lgner/Contractor:
Scott Jacobson
The Development Group LLC
4330 W. 3800 S.
Rexburg, l 83440
208-390-023
developmentg-roupllc@hotma*ll.com
Ceiling 1: Flat Ceiling gar it Truss:
Fall 1: Wood Frame, 16" O.G.:
161T O.G. :
Window 1:
Vinyl
Frame:Double
Pane with Low -E:
'window :
Vinyl
Framed.Double
Pane with Low -E:
Window .
Vinyl
Frame:Double
Fane with Low -E!
Window 4:
Vinyl
Fir :Double
Pane with Lo -Ea
Window :
Vinyl
Frame -.Double
Pare with Low -E:
Window 60
Vinyl
Frame.wDouble
Pane with Low -E:
Door 1: Solid-.
Wall 2.
Wood Frame,
161T O.G. :
Door :
Solid:
Wall .
Wood Frage,
164F . .
Window , Vinyl Fr me:Do ble Fane with Low -E.
Window . Vinyl Frame,. -Double Pane with Low -E:
''all 4+
Wood Frame,
161' O. . ,
Fall 54.
Wood Frame,
1 " o. ..
Door .
iS.
Wall .
Wood Frame.,
16w o...
Wall 7- Wood Frame, 1610
0,C.:
Window : 'vinyl Frame: Double Fane with Low -E:
Wall . Wood Frame, 1FI 0-c"
.
Wall : Wood Frame, 1611 0 .:
Wind: 10.- Vinyl Fran : Double Pane with Low -E:
a I I 10: Wood Framer 1,619 0..:
Window 11: Vinyl Fra m . Double Pane with Low -E.
Basement mall 1: Solid Concrete or Masonry-
Window
I ori .Window 12- Vinyl Frame -.Double lane with Low -E:
Window 13-, Vinyl Frame"Double Fane with Lover E.
Basement Fall i Solid Concrete or I ori .
Tl DeveiMnent Group WiMw Brook Block 2 Lot
1 540
414
1
1
6
1
1
1
1
252
1
144
co
1
4
36
1
126
108
1
7
126
1
297
0.0 3&0 39
23.0
23.0
23.0
23.0
23.0
L� �
00
0.350
0.350
0.350
0.350
0.35E
_350
0.350
0.50
0.350
0.350
0.350
0.350
0_,50
17
5
6
K
1
7
6
7
4
2
1
7
7
6
5
1
15 0.350
5
320 13.0 0.0
1
16 0-350
4 0.350
J
. — - _-- - 1
Page I of
01
Compliance Statement., rot. Statement of Compliance: The proposed building design describes here is consistent with the building
plans* specifications, and other calculations submitted with the permit appl Gabon. The proposed building has been designed to meet
the 20001 ECC req ui ment in RES check Vembn 3.7Release 1 and to comply with the mandatGry requirements fisted i n the
RES.check Inspection Check.list.
_ _
Builder/Designer
(e, �'jT
Date'
0
NQ
The D 1OPM nt GTOUP WHIOW brOOK BIUGK Z Lot T Fagez Of
Basement Wait .
Solid
Concrete or
Masonry:
128
13.0
0-0
Basement Wall 4.
Solid
Concrete or
Masonry:
40
13.0
.0
Basement Wall w
Solid
Concrete or
Masonry-,
32
13.0
0.0
Basement Wall :
Solid
Concrete or
Masonry►:
112
13-0
.0
Window 144. VinylFrarneDouble
Pan dhL r :
16
0.350
Basement Wall :mid
Concrete or
Masonry:
24
13.0
1
Basement Wall :
Solid
Concrete or
Masonry.
128
110
7
Window 15, Vinyl
Frame. -Double Pane with Low -E.,
16
0.350
Basement 'fall :
Solid
Concrete or
Masonry.
264
13.0
. 0
1
Compliance Statement., rot. Statement of Compliance: The proposed building design describes here is consistent with the building
plans* specifications, and other calculations submitted with the permit appl Gabon. The proposed building has been designed to meet
the 20001 ECC req ui ment in RES check Vembn 3.7Release 1 and to comply with the mandatGry requirements fisted i n the
RES.check Inspection Check.list.
_ _
Builder/Designer
(e, �'jT
Date'
0
NQ
The D 1OPM nt GTOUP WHIOW brOOK BIUGK Z Lot T Fagez Of