Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SHORT FORM - 05-00401 - 1115 Arctic Willow Dr - New SFR
1Wrightsoft For: Scott Jacobson Job: Spec I Date: Oct 20, 206 1115 Artie VV"i11ow Dr Outside db (T)%**.IV _� $g Inside db (°F) 70 75 Design TQ (OF) 7'fi 14 Daily range H inside humidity (°fo) _ 66 Moisture difference (grllb) - -31 Make � Trade ` Model Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Stafic pressure Space thermostat ROOM NAME Room Room3 Room4 Room5 Rooms RooM7 Room9 Roomy Q Room 19 Room8 �OFMATIff,Fm 0 0 886 0.019 0.00 Area (W) Btuh Btuh OF cfrn cfm/Btuh in H2O 195 65 182 180 264 517 399 264 285 232 223 Htg load (Blah) Inf'11tration Method Construction quality Fireplaces Make � Trade � Cord Coil - - Simplified Average 0 MENT Efficiency Sensible coming 4 Btuh Latent coling 0 Btuh Total cooling 0 Btuh Actual air flow 88fi c#m Air flow factor O.Q49 cfmlBtuh Stafic pressure 1.n Q Load sensible heat rano 1.00 3693 610 3571 1504 3704 7806 7309 4082 5768 4975 4607 CIg load (Blah) 893 114 1325 283 1354 1442 3786 1792 2031 2129 2954 Htg AVF (Cfm) Printout certified by ACCA to meet all requirements of Manual J 8th Ed. ..*LWr7g h tSC)ft Right -Suite Residential 6.0.22 RSR40897 AGS Projectl.rrp Chic = MJ8 Orienfa#ion = iV Clg AVF (Cfm) 69 44 �1 6 66 65 28 74 69 66 145 71 136 185 76 gg 107 99. 93 104 86 145 005-t 0 1416: Page I t i Entire House ether equip loads Equip. @ 0.94 Latent cooling TOTALS RSM 52621 18103 920 17882 0 17882 �:o Printout certified by ACCA to meet all requirements of Manual .] 8th Ed. rte: VIIrIgh'CSCjft Right-Sui#e Residential 6.0.22 RSR40897 ACC;KPr0jectI.rrp Calc = MJ8 Orientation w N 2005-oct-20 1416;06 Page 2 I P6 Rexburg, ID 83440 P r ple L Summary Entire House Scott Jacobson Job; Spec i Date Oct 20, 2006 For: Scott Jacobson Notes.- Winter otes: Weather: Idaho Falls, ID, US Winter Design Conditions Outside db -6 a F Inside db 70 OF Design Tib 76 OF Heating Summary Structure Ducts Central vent (71 Humidification Piping Equipment load Method Constructon Fireplaces infiltration quality Area (ft2) Volume (ftp) Air changes/hour Equiv. AVF (cfm) 37901 Btuh 9727 cfm 4993 Btuh 0 Btuh 0 13tuh, 52621 Bt�h Heati 806 22448 0.32 120 Simplified Average 0 Cooling 22448 0.16 60 Heating Equipment Summary Make Trade Model Effi-cienev Heabn,g input Heating output Temperature rise Actual air how Air- flow factor Static pressure Space thermostat 80 AFUE Q B#uh v Btur, Q OF 886 cfm 0.019 cfm/Btuh 0.00 in H20 Summer Design Conditions C)utsi 89 4F Inside db 75 OF Design 7D 14 0F Daily range Relative humidity 50 % Moisture difference -31 r/lb Sensible Coaling Equipment Load Sizing Structure Ducts 11408 Btuh 6G96 Btuh Central ►►ent {T1 cfm} 924 Btuh Blower 0 Btuh Use manufacturer's data n Rate/sWng multiplier 0--94 Equipment sensible load' 178 82 Btuh Latent Cooling Equipment Lead sizing Structure Ducts Central vent (71 cfm) Equipment latent toad - Ur i oiun -1 54 Btuh -1278 Btuh 0 Btuh Equipment total load 17882 Btu Reg. total capacity at 0.70 SHR 2.1 tan Cooling Equipment Summary Mike Trade Coad Coil Efficiency fl EER Sensible cooling p gfuh Latent cooling 0 Btuh Total cooling a Btuh Actual air flow 886 cfm Air ow factor 0.049 cfm/Btuh Static pressure 0.00 in H20 Load sensible heat rano 1.00 Printout eetfified by ACCA to meet all requirements of Manual ,! 8th Ed. Ri ht- uitu lcfnt[aI 5.0,22 RSR40897 JCCK Project 1. rrp Ca 10 = M A 0 rie marl on .N 2005-t- 14,16-106 Rexburg, I D 83440 f�0 Duct System Summary Entire House Scott Jacobson Jo b; Spec I !ate; Oct 20, 2005 By: - ���zW W"W%.#"BVI 1 Externa! static Pressure Pressure losses Available static pressure Supply f return available pressure Lowest friction rate Actual airflow Total effective length {TEL.} Heating 0.00 in H20 0.00 ire R2. 0 0.00 4 0.0010-00 in H20 0.000 inl100ft 886 elm 7 ShMt 0.0 0 0)(0 ShMt 0.0 Rexburg, I D 83440 f�0 Duct System Summary Entire House Scott Jacobson Jo b; Spec I !ate; Oct 20, 2005 By: - ���zW W"W%.#"BVI 1 Externa! static Pressure Pressure losses Available static pressure Supply f return available pressure Lowest friction rate Actual airflow Total effective length {TEL.} Heating 0.00 in H20 0.00 ire R2. 0 0.00 in H20 0.0010-00 in H20 0.000 inl100ft 886 elm Cooling 0.00 in H20 0.U0 in H20 0.00 in H2O 0.00/0,00 in H20 0.000 in/1 aQft 886 cfmr Ox 0 dame Design (Btuh) Htg C19 Design Diam Rect Duct (Cfm) d.. WM) F R (in) Size (in) Matl Room1 Ih 8931 691 44 0.000 om Roz h 114 11 6 0.000 R°°"a h 13251 66 65 0.000 Room4 h 283 28 14 0.000 RODf"' h 1354 69 66 0.000 R°°"'6 h 1442 145 71 0.000 Room7 c 3786 136 185 0.000 R°°"'s c 1792 76 $8 0.000 R°°'"io h 2031 107 99 0.000 R°°`"'� G 2729 93 104 O.000 Roome c 2954 86 145 0.000 Actual Ln (ft) 0 Ox 0 ShMt 0.0 0 0x0 ShMt 0.0 0 Ox 0 ShMt 0.0 0 Ox 0 ShMt 0.0 0 0)(0 ShMt 0.0 0 Ox 0 ShMt 0.0 0 Ox 0 ShMt 0.0 0 0x 0 ShMt 0.0 0 Ox ShMt 0.0 0 Ox 0 ShMt 0.0 0 Ox 0 ShMt 0.0 Ftg.Eqv Ln (ft) Trunk, _r. . � V1i:lghtSC3ft R[ ght-suite Residential 5.0.22 RSR40897 ACCK Projectl, rrp Cali = MJ8 Orientation = N 2005 -Oct -20 14:16'07 Page I it Form No. 1068_2 Plain Language Comment FIRST COMMITMENT SCHEDULE A 1- Commitment Date : September 21, 2005 at 7:30 A.M. 2. Policy OC Policies to be t55i1ed: Owner's Policy Standard [owner's Policy (ID/17j92) conn 3.402-92. with applied credit of Proposed Insured: Development Group, LLC Loan Policy Loan Policy (10-17-92) Farm 1056-92 with applied credit of Proposed Insured: Endorsements: I Commitment No.: iL349D9-RX PORCY Amount Page 2 of Premium Amount $601250 � done 3. A fee simple interest in the land described in this Commitment is owned, at the Comm�ment Dade by: Willow Brook Partners L.L.C., an Idaho limited Liability Company 4.. The land referred toin this CGMMitment is described as follows- qr fto Lois Sr 71 8, Block 2, WillOW Brook Estates DivisiOrtt No. 3jr Madison County, Idaho, as shown on the pkat recorded July 28. 2045, as instrument No. 321429. Commonly known as; unable, to ver-Ifjr Rexburg, ID 83440