HomeMy WebLinkAboutAPPLICATION - CUP - Wilson George - 355 W 2nd S - Rezone from MDR to MDR2 - Denied41
APPLICATION FOR CONDITIONAL USE PERMIT
CITY OF REXBURG
APPLICANT:
Name Gc�.e r- O a_ �u W %'I s o h
Address C30 7"g v r u S br.
City 1'j&x J, � r -t, State T- O Phone Z0?' - 3 SC _ % 1 t
OWNER: (Complete if owner not applicant)
Name
Address
State
Phone
PROPERTY COVERED BY PERNUT:
Address 355 w Z ".5 Re bvfj 2r1 83 lya Zone M0/R L
Legal Description (Lot, Block, Addition, Division Number)
NATURE OF REQUEST: Briefly explain the proposed use:
We b&mac b�k+wg proper4r Wt wavl.+o Irx-e<
lal„cLl L24kI o� 73 Lkvx,15, IVIOt$ 2 vnty ce�fows
22 'PC c/�lvy[.I uv.les5 �.•I.�t, /'t+aQe rt ci�� dii-1uw0./
—Le- 11rcC "/hij t.t N,l1 'f" c UN't ✓'"10`-t on,4-
Existing use of property:
Will this have an impact on
Formal notice will be sent to applicant after approval of a Conditional Use Permit.
Notice will state the conditions of the permit. If conditions are violated or not met there
will be a 90 day period to cure the problem. Failure to comply with the terms may result
in revocation of the Conditional Use Permit
REQUIREMENTS FOR GRANTING CONDITIONAL USE PERMIT:
The following information will assist the Commission and/or City Council to determine if your
proposal will meet the requirements under the zoning ordinance.
1. What is the estimated water usage per month? Are the existing mains adequate to provide fire
protection? ljd Ajj, lioHa 1 •(e.t&,, I <c or IS foledy t s
2. What is the estimated sewer usage per month? Will pretreatment be necessary? 16 b dd k«v'A I
3. What is the estimated daily traffic to be generated? Will the traffic be primarily private
vehicles or commercial trucks?
4. If commercial, industrial, or a home occupation, what will be the hours of operation?
5. Will storm water drainage be retained on site? Is an existing storm drain available? Is it at
capacity? If so, will new facilities be constructed?__�c,r. _ S.
6. If proposed use is residential, describe number and type of dwelling units. Will this be
student housing: multi-fami IlIy for/young families, singles and col uples, or elderly? 14 N a w
Q1,- ZJ 7V 1a1 W"t.ki I ft, t.I Ix Loy, VUVVhq rlw,^"e1
7. What provision has been made for fire protection? Where is the nearest fire hydrant? Is any
point of the building further than 150 feet from access sufficient in width for fire fighting
equipment? *( bu1Id��fj.s will leave sor.KWe,.r, rl[ /AH, 1
p If ,1 YANJ /S AJ 4(wc CGY {�e
W iJ'AW 0L d 2 F .T VA' NU/
8. How much parking is being provided on-site? Do the aisle widths and access points comply
with the ordinance requirements? Has landscaping been provided in accordance with the
ordinance? Al r r 0.s; H6 SPU 5 ye s
9. Where will solid waste generated be stored? Is access adequate for the City collection?
10. What is the type of noise that will be generated by the use? What are the hours of noise
generation? i e• fY yva �s /v u vim. E� I ��_ �� y !�� ay
11. What type of equipment will be used in the conduct of the business? N " e
12. What are the surrounding land uses? Has buffering been provided as required byithe
ordinance? 7u k t s+ is T's.doslvit(�I a Ge Nur4#a+e .iov,,i I r.�•/WI
`jo At Sow44*, �.W.I Iw eq s, 4,, is � %o %µ°4. ba%P t6l J.O.NsL Rd N YI Is i
13. Are any air quality permits required? Is dirt or other dust creating materials moved by open
trucks or boxcars? NU o
14. Will the parking lots or other outdoor areas have lighting? y c,
15. Are passenger loading zones for such uses as daycare centers and schools provided? How is
busing routed? For commercial uses, where are the loading docks? Is there sufficient space for
truck parking?
16. If a commercial, multi -family, or public assembly use, where is the nearest collector street?
Arterial street?
17. What, if any, signage is anticipated in connection with the proposed usage?
The Commission or Council may address other points than those discussed above, but a
narrative addressing at least those applicable points will assist in processing your application.
ATTACH A PLOT PLAN AS REQUESTED BY SECTION 6-9.
A"� 1/5/05
81jdature of Applicant Date
.. .. .. . . .... ... .
FOR OFFICE USE ONLY:
ree: Date
Paid By: Check Cash
Date of Notice:
Other
Hearing:. P&Z
Council
CONDITIONAL USE PERMIT PROCEDURES
The City of Rexburg Zoning Ordinance designates certain land uses in each Zoning District
which are allowed. These are listed in the Zoning Ordinance for each zone. The City Clerk or
City engineer should be consulted if you have questions about whether your proposal will need a
Conditional Use Permit.
If a C.U.P. is needed, you will need to get an application from the City Clerk and fill it out for a
C.U.P. You will then need to return the application and request that the City Clerk put you on
the Planning Commission agenda one week prior to the meeting. The Planning & Zoning
Meetings are held on the 2nd and 4' Wednesday of every month at 7:00 p.m.
The City Clerk will then mail to the Planning Commission the application for them to review
prior to the meeting. At the meeting the board will discuss your request with you and set it for
Public Hearing. You will need to pay $200.00 to the City Clerk prior to any advertising for the
hearing. Prior to granting a conditional use, at least one Public Hearing shall be held to give
persons an opportunity to be heard.
The City Clerk will put the notice for the hearing in the paper 15 days prior to each hearing, mail
a copy to all the property owners within 300 feet and post a notice on the property. After the
Planning Board holds their hearing they will make a recommendation to the City Council. The
City Council will take the Planning Board recommendation into consideration. If a hearing is
required before the City Council they will then take into consideration oral and written
testimony as well as the recommendation from the Planning Board. A decision will be made by
the City Council within the time frame allowed by Section 67-6511, Idaho Code.