Loading...
HomeMy WebLinkAboutCORRESPONDENCE - 05-00207 - Clean Spot - Tenant FinishDe![ng n telligence, LLC Structural Engineering 3685 W Hwy 33 Rexburg, Idaho 83440 Date: August 8, 2005 To: City of Rexburg Building Department Subject: Harris Clean Spot — Washing Machine Support Dear Sir or Madam: 0500207 Clean Spot Call: (208) 359-1461 FAX: (208) 359-0740 Based on information provided, five washing machines are to be supported above the floor on a platform of framed construction less than 24" off the floor. The washers have an average volume of 4.67 cf with a conservative loaded weight of 3001bs and an average weight of 550 lbs. Vertical vibration loads are estimated to be approximately 1/3 the total operating weight or 1450 lbs per washer and 7100 lbs for the entire platform. Ten stud posts are provided in the platform framing front and back spaced at 16" o.c.. The top of the platform is 3/4" plywood over a 2x4 plate that sits on the 2x4 stud posts which sit on a 2x4 plate that bears on the floor. Recommendations A stud grade 2x4 can carry approximately 4200 lbs in compression. Total capacity of vertical studs is approximately 42000 lbs. Assure that each washing machine connection point is thru the single top plate and attached per the manufacturer's requirements. It is recommended that these connections have a rubber mount to minimize the vibration transmitted to the support platform and floor below. Provide full height support from the basement up to the platform that supports the washing machines. Block between floors such that vertical loads are transmitted continuously to the foundation. The sides of the platform and the framing below shall be sheathed with %" 4SB with 8d nails at 4" o.c. and 12" o.c. in the field. Blocking at panel edges is required. Respec fully, Scott A Spaulding, E. Design Intelligence, L Des gn , ntelligence, LLC Structural Engineering 3685 W Hwy 33 Rexburg, Idaho 83440 Date: August 8, 2005 To: City of Rexburg Building Department Subject: Harris Clean Spot — Washing Machine Support Dear Sir or Madam: Call. (208) 359-1461 FAX. (208) 359-0740 0500207 Clean Spot Based on information provided, five washing machines are to be supported above the floor on a platform of framed construction less than 24" off the floor. The washers have an average volume of 4.67 cf with a conservative loaded weight of 300 lbs and an average weight of 550 lbs. Vertical vibration loads are estimated to be approximately 1/3 the total operating weight or 1450 lbs per washer and 71001bs for the entire platform. Ten stud posts are provided in the platform framing front and back spaced at 16" o.c.. The top of the platform is 3/4" plywood over a 2x4 plate that sits on the 2x4 stud posts which sit on a 2x4 plate that bears on the floor. Recommendations A stud grade 2x4 can carry approximately 4200 lbs in compression. Total capacity of vertical studs is approximately 42000 lbs. Assure that each washing machine connection point is thru the single top plate and attached per the manufacturer's requirements. It is recommended that these connections have a rubber mount to minimize the vibration transmitted to the support platform and floor below. Provide full height support from the basement up to the platform that supports the washing machines. Block between floors such that vertical loads are transmitted continuously to the foundation. The sides of the platform and the framing below shall be sheathed with %z" OSB with 8d nails at 4" o.c. and 12" o.c. in the field. Blocking at panel edges is required. Respec fully, Scott A Spaulding, E. Design Intelligence, L i mm rKvNrcn4 i UtWin- STEMS Aqwd 208-233-0529 T-043 P-001/001 F-743 Yy ENGINEERED SYSTEMS ASSOCIATES, INC. FAX TRANSAUTTAL STET Date: July 15, 2005 From: Pon Rice, RE. To: Steve Company: Superior Boiler Project: Pry Gleaning Facility Location: Rexburg, Idaho Reference: steam 4 Condensate Kequirements All my design manuals say the following: Low Pressure (0-15 pe ig) Steals - 5cheawle 40 Carbon Steel Condensate schedule W Carbon Steel Medium Pressure (16-loo paig) Steam - schedule So Carbon Steel Condensate schedule So Carbon Steel high Pressure noi-Boo p51g) Stearn - schedule 80 Carbon steel Condensate schedule ao Carbon steel 0500207 Clean Spot anY ut these fax copies are illegible, or You Number of Sheets Including this one receive the same number of pages as stated above, please contact us at: (208) 233-0501 315 West Center St., #407 (208) 233-0529 Fax D.vw.J4a11,. I.J..6... esAr t