HomeMy WebLinkAboutSITE TESTING - Palmer, Gene - Hidden Valley SubdivisionR U R
G
G R O U P ,.�
ENGINEERING• PLANNING• MANAGEMENT
October 2, 2001
Ryan Urbanec
Idaho Department of Environmental Quality
900 North Skyline, Suite B
Idaho Falls, Idaho 83402-1718
Re: Hidden Valley Subdivision, Phases 3 and 4, City of Rexburg, Madison County
DEQ #: 01-05-33
Certification of As -Constructed Condition
Dear Ryan:
Gene Palmer, the developer of the subject subdivisions, retained The Dyer Group, LLC to
perform construction observation services and testing on them and to certify to all agencies and
the City of Rexburg as to their as -constructed condition.
Attached is a copy of the as -constructed drawing for the subdivision improvements, along with
copies of bacteriological tests certifying the absence of bacteria in the completed water system
piping both for Phase 3 and Phase 4.
You may recall the original design was prepared under the professional seal of Brent Harris with
drawings prepared by Boyd Cardon. We came into the project during initial construction and were
asked to help modify the design and assume the role of construction observation. Based on a
request by the developer, we contacted Willie Teuscher of your office concerning a modification
of the sewer design to be able to connect it at Marigold Street rather than Lilac Street. This
westerly extension of the sewer line will facilitate future development, and the deeper depth of the
existing sewer line in Marigold Street provided improved slope through much of the system.
Additionally, Phase 4 of the development was approved by the City which required a simple
extension of existing water and sewer lines for approximately 300 feet to serve the additional four
lots that were created. Again, conversations with your office indicated that documenting this on
the As-Builts would suffice.
We hereby certify as to the as -constructed condition of these two phases of the Hidden Valley
Subdivision addition to the City of Rexburg and that all improvements have been constructed,
tested, and accepted in accordance with prevailing public works and health standards of both the
State of Idaho and the City of Rexburg.
Upon review and approval of this record, the developer respectfully requests that you contact
Cindy Johnson of the District 7 Health Department in Rexburg (356-3239) so that she will be in a
position to sign the final plats for these two phases of development.
THE DYER GROUP, LLC • 310 N 2NG EAST, SUITE 153 • REXBURG, ID 83440- 1 607
208.656.8800 (voice) • 877.721 .5025 (TOLL FREE) • 208.656.8808 (FAX) • 208.390.9700 (CELL)
Thank you for your assistance on this project. Should there be any further questions or need of
information regarding the foregoing, please advise.
Sincerely,
The Dyer Group, LLC
Winston R. Dyer, PE
Manager
cc: Gene Palmer,
John Millar, City of Rexburg Engineer
h
Z
U
o
Z
o
O
W
v
u
Q
W M p
N
U
2
C)O
p W N
J
_
U m
c C m
N p
'
S
cn
Q J
Z mM
r
Z
no
w ro
N N
Y
I
O
Q
#
C
N O
N
=
O
h
Z
:
(n
�
�
D
(f)
W
cc
|!
]!
Z- 63zov- 0 7-
([:/:
\
/
\2
2C,
::
!
w
Q
\
\
))
»
s
f
)!
!
4
a
:
(n
�
�
D
(f)
W
cc
|!
]!
Z- 63zov- 0 7-
.. KC;LL, NCE
TESTING &
INSPECTION
❑ Geotechnical
❑ Construction Materials
310 N. 2nd East, Suite 153
Rexburg, Idaho
83440
Attn: City of Rexburg, Building Department
Project: Hidden Valley Sub -Division
Inspector: Eric Brown
Inspection Date: 08-02-01
MOISTURE DENSITY TEST REPORT
E
0010E
818101
As requested, RTI performed on-site density testing in accordance with current applicable standards. The results
obtained were as follows:
Note:
Test Location Percent Dry Proctor Percent Pass/
# Moisture Density Number Compaction Fail
(pcf)
1
Center line of trench starting point North
24
101.2
1005
97%
Pass
West End working west the moving
south. One One -minute test, 12" mode
Sewer line final lift.
2
Same as above.
22.9
100.3
1005
96%
Pass
3
Same as above.
25.7
101.1
1005
97%
Pass
4
Same as above.
21.6
101.3
1005
97%
Pass
5
Same as above.
19.9
100.7
1005
96%
Pass
6
Same as above.
22.2
99.7
1005
96%
Pass
7
Same as above.
19.3
99.8
1005
96%
Pass
8
Same as above.
19.6
101.2
1005
97%
Pass
9
Center Line of waterline, 1-1 minute
18.0
103.2
1005
99%
Pass
test, 12" mode.
10
Same as above.
16.5
103.1
1005
99%
Pass
11
Same as above.
23.3
102.9
1005
99%
Pass
12
Same as above.
25.5
99.7
1005
96%
Pass
Required
Compaction: 95% Proctor Number:
1005= 104.0
pcf @ 17.2%
moisture.
If you
have any questions concerning this report, please call us
at (208) 552-6240.
Respectfully submitted,
RELIANCE TESTING &
Reviewed by Jon D.
General Manager
JDK/jmt
(208) 5526240 P. O. Bax 1604 Fax (208) 5524928
520 V. 15� St.
Idaho Falls, ID 83403
RELL4NCE
TESTING &
INSPECTION
❑ Geotechnical Engineering ❑ Construction Materials Testing ❑ Special Inspections
Dick Dyer
The Dyer Group, LLC
310 N. 2nd East, Suite 153
Rexburg, Idaho 83440
ATTN: CITY OF REXBURG
Project: Hidden Valley Sub -Division
Inspector: Eric Brown
Inspection Date: August 2, 2001
MOISTURE DENSITY TEST REPORT
001DEA
818101
As requested, RTI performed on-site density testing in accordance with current applicable standards.
The results obtained were as follows:
Test
Location
Density
Maximum
Percent
#
(pcf)
Density
Of
Compaction
Right
Roadway 3' offset of center line joint line,
111.1
1
Stagger left to right, turn 90 degrees. AC setting
on nuclear gauge.
1A
107.1
Left
118.6
2
2A
120.7
Right
118.3
3
3A
119.5
Required Compaction:
Marshall supplied by contractor.
If you have any questions concerning this report, please call us at (208) 552-6240.
Respectfully submitted,
RELIANCE TESTING & INSPECTION
Reviewed by: Jon D. Kishiyama
General Manager
Signed I stamped original document sent to Client and appropriate agency.
JDK/jmt