HomeMy WebLinkAboutSITE TESTING - Palmer, Gene - Hidden Valley SubdivisionR U R G G R O U P ,.� ENGINEERING• PLANNING• MANAGEMENT October 2, 2001 Ryan Urbanec Idaho Department of Environmental Quality 900 North Skyline, Suite B Idaho Falls, Idaho 83402-1718 Re: Hidden Valley Subdivision, Phases 3 and 4, City of Rexburg, Madison County DEQ #: 01-05-33 Certification of As -Constructed Condition Dear Ryan: Gene Palmer, the developer of the subject subdivisions, retained The Dyer Group, LLC to perform construction observation services and testing on them and to certify to all agencies and the City of Rexburg as to their as -constructed condition. Attached is a copy of the as -constructed drawing for the subdivision improvements, along with copies of bacteriological tests certifying the absence of bacteria in the completed water system piping both for Phase 3 and Phase 4. You may recall the original design was prepared under the professional seal of Brent Harris with drawings prepared by Boyd Cardon. We came into the project during initial construction and were asked to help modify the design and assume the role of construction observation. Based on a request by the developer, we contacted Willie Teuscher of your office concerning a modification of the sewer design to be able to connect it at Marigold Street rather than Lilac Street. This westerly extension of the sewer line will facilitate future development, and the deeper depth of the existing sewer line in Marigold Street provided improved slope through much of the system. Additionally, Phase 4 of the development was approved by the City which required a simple extension of existing water and sewer lines for approximately 300 feet to serve the additional four lots that were created. Again, conversations with your office indicated that documenting this on the As-Builts would suffice. We hereby certify as to the as -constructed condition of these two phases of the Hidden Valley Subdivision addition to the City of Rexburg and that all improvements have been constructed, tested, and accepted in accordance with prevailing public works and health standards of both the State of Idaho and the City of Rexburg. Upon review and approval of this record, the developer respectfully requests that you contact Cindy Johnson of the District 7 Health Department in Rexburg (356-3239) so that she will be in a position to sign the final plats for these two phases of development. THE DYER GROUP, LLC • 310 N 2NG EAST, SUITE 153 • REXBURG, ID 83440- 1 607 208.656.8800 (voice) • 877.721 .5025 (TOLL FREE) • 208.656.8808 (FAX) • 208.390.9700 (CELL) Thank you for your assistance on this project. Should there be any further questions or need of information regarding the foregoing, please advise. Sincerely, The Dyer Group, LLC Winston R. Dyer, PE Manager cc: Gene Palmer, John Millar, City of Rexburg Engineer h Z U o Z o O W v u Q W M p N U 2 C)O p W N J _ U m c C m N p ' S cn Q J Z mM r Z no w ro N N Y I O Q # C N O N = O h Z : (n � � D (f) W cc |! ]! Z- 63zov- 0 7- ([:/: \ / \2 2C, :: ! w Q \ \ )) » s f )! ! 4 a : (n � � D (f) W cc |! ]! Z- 63zov- 0 7- .. KC;LL, NCE TESTING & INSPECTION ❑ Geotechnical ❑ Construction Materials 310 N. 2nd East, Suite 153 Rexburg, Idaho 83440 Attn: City of Rexburg, Building Department Project: Hidden Valley Sub -Division Inspector: Eric Brown Inspection Date: 08-02-01 MOISTURE DENSITY TEST REPORT E 0010E 818101 As requested, RTI performed on-site density testing in accordance with current applicable standards. The results obtained were as follows: Note: Test Location Percent Dry Proctor Percent Pass/ # Moisture Density Number Compaction Fail (pcf) 1 Center line of trench starting point North 24 101.2 1005 97% Pass West End working west the moving south. One One -minute test, 12" mode Sewer line final lift. 2 Same as above. 22.9 100.3 1005 96% Pass 3 Same as above. 25.7 101.1 1005 97% Pass 4 Same as above. 21.6 101.3 1005 97% Pass 5 Same as above. 19.9 100.7 1005 96% Pass 6 Same as above. 22.2 99.7 1005 96% Pass 7 Same as above. 19.3 99.8 1005 96% Pass 8 Same as above. 19.6 101.2 1005 97% Pass 9 Center Line of waterline, 1-1 minute 18.0 103.2 1005 99% Pass test, 12" mode. 10 Same as above. 16.5 103.1 1005 99% Pass 11 Same as above. 23.3 102.9 1005 99% Pass 12 Same as above. 25.5 99.7 1005 96% Pass Required Compaction: 95% Proctor Number: 1005= 104.0 pcf @ 17.2% moisture. If you have any questions concerning this report, please call us at (208) 552-6240. Respectfully submitted, RELIANCE TESTING & Reviewed by Jon D. General Manager JDK/jmt (208) 5526240 P. O. Bax 1604 Fax (208) 5524928 520 V. 15� St. Idaho Falls, ID 83403 RELL4NCE TESTING & INSPECTION ❑ Geotechnical Engineering ❑ Construction Materials Testing ❑ Special Inspections Dick Dyer The Dyer Group, LLC 310 N. 2nd East, Suite 153 Rexburg, Idaho 83440 ATTN: CITY OF REXBURG Project: Hidden Valley Sub -Division Inspector: Eric Brown Inspection Date: August 2, 2001 MOISTURE DENSITY TEST REPORT 001DEA 818101 As requested, RTI performed on-site density testing in accordance with current applicable standards. The results obtained were as follows: Test Location Density Maximum Percent # (pcf) Density Of Compaction Right Roadway 3' offset of center line joint line, 111.1 1 Stagger left to right, turn 90 degrees. AC setting on nuclear gauge. 1A 107.1 Left 118.6 2 2A 120.7 Right 118.3 3 3A 119.5 Required Compaction: Marshall supplied by contractor. If you have any questions concerning this report, please call us at (208) 552-6240. Respectfully submitted, RELIANCE TESTING & INSPECTION Reviewed by: Jon D. Kishiyama General Manager Signed I stamped original document sent to Client and appropriate agency. JDK/jmt (208) 5526240 1 . U. Dox 70U4 + u^ (""v "--u 520 V 15� St. Idaho Falls, ID 83403 ,� �; U'3 C "� 1 � ' �, r-�.--.- ,r..