Loading...
HomeMy WebLinkAboutCOMCHECK - 05-00183 - Cedar Ridge Animal HospitalLighting Compliance Certificate 20Q1 ETIVA',oc COMcheck-EZ Software Version 2.4 Release 2b Data filename.- untitied Secti""on I: ProJe�# Informat"vn Projela XMeq Designer/Contractor: Docment Author: Notes: Section 2: genera] Information Building Use Description by. Activitv Tvne(q) Medicaj and cjinic�a Cedar Ridgy Animal Hospital Payne Engineering Ing. Mike Payne Juni 2, 20Q5 Aefivity Type Per�nit NumbeT Checked By/Date Floor Area 7118 Piro ect Description (check ane): New Construction � Addition � Alteration � Unconditioned Shell (File Affidavit) Section & Re quirements Checklist InEterior Lighting I Tntni nr-tivui . • •••.� ,.a..�ut,.. rvuuS iausi oe 3.eSS man or cqUBl t{? tOtc'Ll allowed watts Allowed watts Actual. Watts CoMplies(YIN) 11389 11187 YES Exterior Lighting Z. Efficacy gmte-r than 45 lumensAV exceptions: SPecialized lighting hjgWIgjjtijjg features of historic bvdIdings; signage; safety o� s�cur�i�y fightinlowvol#age lantis�pe lighting. � COntrOls, S.d Wiring 3 Indepeiadent contjrols fo]r each space (SNIvtelVoccupancy -Exception: Areas that must be c0ntinuOustY 4. Master Witch r to hotel/m . Ote, guest ou 5- TWO �-w4 c r • Exceptions I 1l . Only one luminaire "I space; An occupant -sensing The area is a corridor, 9. storage-, restroon'. Or 10bbY. Areas that must Areas greater �continuously 6. Photocell/astronouncal tiflIc switch On CXtefior lights.Er xceptions: Areas reqwn*ng lighting dun*ng davii-2h hour i IM IV -1 n� IAO"IN [ � j 7. Tandem wired one-iamp and three-1amp ballasted lum-na��-es. Excepfions.- Electroinic high-frcquency ballasts; Lwmnajres not on same switch Section 41e, Compli- iance Statement The proposed lighting design represented in �s �,o��arn��t is cvns�sten� with the buildina�a�ether eacuta�io�s �ubmit�ea with this permit appiica�.0n. Thi proposed l�gh�n rste�n� � S' �peca�frcat�ons and the 2001 IECc requirerr�.en�s i� COMcheck.,F7 V��sian �.4 Release 2b and to co� � with the desigiled to meet requirements in the Requirements Checkh-St. P Y mandatory lop%1Oki 4 - Principal Lighting Designer -Name 0 Lighting Application Worksheet 2401 IECC COMcheck-EZ softw"are Version 2.; Release 2b Section 1 : Atiowed Lighting Power Calculation B C D Total Floor Allowed Allowed Area Caie2,ory Area Watts Watts � Lwa—tt�i�2 � C Medical and Clinical Care 7115 1.6 I1389 Total Allowed Watts = 113 89 Sect"on 2: Actual Lighting Power Calculation Fire Fixture Description f ID Larnn Descri rion I Wattaae Pyr Lang I Ballast F1 z damp surface fluor. 1 4g" T8 32W I Electronic F3 21amp lav fluor. l 48" T:8'�32�4�' f Electroluc F� � damp Iay-in fluor. i 48" 8 32i7L� f Electronic F5 � damp lixnear fluor. t 48" T8 32W 1 Elwromc F7 21amp industtat fl�tar.1` �S" T8 32W I Electronic F13 i lamp open strip fluor. 48" T:9 32W l Elect-ro nic F15 Dark r€�vrn safe �� t � 14�efial Halide 154W ! MagneticF17 3 damp recessed fluor. 1 4S" T8 32W 1 Electroinic F18I lamp QuWz f ljucandescent 25OW ��9 I damp wall mount i Incandescent 1.00W C D E F Lai-nps/ # of hxtam EM�—we fixtures Watt. ax E 2 2 61 122 2 6 61 3l5 3 47 95 44b� 3 22 95 209Q 2 38 61 23 8 � g 37 296 � 2 1ST 300 3 4 95 380 1 3 250 750 1 1 100 1(3n Total Actual Watts = 11x.87 Section 31*0 Compimnce Cakulafivn If the TotalAllowd watt's x�un�s the T'otal 14 ctual Watt S is greater than or equal to Derv, the buildingcvm ' gees. Lighting PASSES,: Design 2% better than code Total Allowed Watts = 113 8 Total Actut Watts – 11187 Project compliance = 202 Envelope Compliance Certificate 2003 IECC COMeheck-EZ So$ware Version 3. 4 Release 2a Data filename: Untitled,cek Section 1: Project Information rot W Name; Desi .tractr} Document .uta: Cedar Ridgy Animal Hospital JRW & Associates 1152 Bond Ave. Rexburg, Idaho nary Richardson Section 24: General 1hforma Building Location (fDr weather data): Climate done: Heating Degree Days (base 65 degrees F): Cooing Degree Days abase 65 degrees F): Project Type: Window 1 Wall Ratio: ildina TvDe Section 3: Requirements Checklist 0500183 Cedar Ridge Animal Hospital Rexbwrg, raanQ 16 8693 143 New Construction 0.15 5525 Bldg. � Dept. Use � � Air Leakage Component Certification, and Vapor Retarder Requirements 1 . All joints and penetrations are caulked, Basketed, weather-stripped, or oihexwise sealed. 2. Windows, doors, and skylights certifel' as meeting leakage requirements. � 1 1 3. Component R -values & U-�actars labeled as certified. [ � � 4. Stair, elevator shad vents, and other dampen integral to the building envelope are equipped 4 i with raotonzed darnpee�-ss. p [ I 1 5. Cargo doors and loading dock doors are weather sealed. [ ] j 6. Recessed lighting fixtures are; {i} Type IC rated and sealed or Basketed; or (iii installed inside � app�rapnate air -tight assemlaly with a �.5 inch clearance from combustible matEria�s and � j with 3 inches cleat�ance from in�ulatior� material. [ ] ( 7. Building entrance doors have a vestibule and equipped with closing devices. � Exceptions: � Building entrances With revolving chars. I Doors that open directly from a space less than 3000, sq. 1. in. axes. Climate -Specific Requirements 0 Gross Com Area car Cavity Cont. Proposed Budget onent Name/Descrintion Per�eter R-Vali& R -Value actor -F actor Roof I* All -Wood Joist/Raffer/Truss 6 32.a a.o o.a�� 0.047 Exterior Wall 1: Wood Frame, Any Spacing 3240 19. Q 0. Q 0.068 0.067 Window 1: Metal Frame with Thmnal Bi-eak:Double Pane with Lava -E Tinted, SHGC 0.58 340.5 Door 1: solid -- 4a 0.520 --- Door 2; Glass, TZnted, S GC x}.59 55 0.700 4.112 I39 - --- Door 3: Overhead '� --- 0.924 0.520 --- --- Floor 1: S l�.b-On -Grade: Unheated.,,Vertical 2 ff.. 45 1.450 0.112 60 (a) budget U-factars are used �r soff ware baseline calculations ONLY, and are not code requ�rernents. Eu Ve 1 ope PASSES : Design 8°fa better than code Section 4,0 Commiance Statement The Proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application, The prt�pased envelope system has been desig-ned to meet the 2003 IECC requirements in CpMcheckEZ Version 3.0 Release 2a and to caraaply with the mandato r uiretn Requirements Checklist, _—r���-.�Y �l ends in the Principal. nvelape Designer-Nw