HomeMy WebLinkAboutCOMCHECK - 05-00183 - Cedar Ridge Animal HospitalLighting Compliance Certificate
20Q1 ETIVA',oc
COMcheck-EZ Software Version 2.4 Release 2b
Data filename.- untitied
Secti""on I: ProJe�# Informat"vn
Projela XMeq
Designer/Contractor:
Docment Author:
Notes:
Section 2: genera] Information
Building Use Description by.
Activitv Tvne(q)
Medicaj and cjinic�a
Cedar Ridgy Animal Hospital
Payne Engineering Ing.
Mike Payne
Juni 2, 20Q5
Aefivity Type
Per�nit NumbeT
Checked By/Date
Floor Area
7118
Piro ect Description (check ane):
New Construction � Addition � Alteration � Unconditioned Shell (File Affidavit)
Section & Re
quirements Checklist
InEterior Lighting
I Tntni nr-tivui
. • •••.� ,.a..�ut,.. rvuuS iausi oe 3.eSS man or cqUBl t{? tOtc'Ll allowed watts
Allowed watts Actual. Watts CoMplies(YIN)
11389 11187 YES
Exterior Lighting
Z. Efficacy gmte-r than 45 lumensAV
exceptions:
SPecialized lighting hjgWIgjjtijjg features of historic bvdIdings; signage; safety o� s�cur�i�y fightinlowvol#age lantis�pe lighting. �
COntrOls, S.d Wiring
3 Indepeiadent contjrols fo]r each space (SNIvtelVoccupancy
-Exception: Areas that must be c0ntinuOustY
4. Master Witch r to hotel/m
. Ote, guest ou
5- TWO �-w4 c r •
Exceptions I 1l .
Only one luminaire "I space; An occupant -sensing
The area is a corridor, 9.
storage-, restroon'. Or 10bbY. Areas that must Areas greater �continuously 6. Photocell/astronouncal tiflIc switch On CXtefior lights.Er xceptions: Areas reqwn*ng lighting dun*ng davii-2h hour
i
IM
IV -1 n� IAO"IN
[ � j 7. Tandem wired one-iamp and three-1amp ballasted lum-na��-es.
Excepfions.-
Electroinic
high-frcquency ballasts; Lwmnajres not on same switch
Section 41e, Compli-
iance Statement
The proposed lighting design represented in �s �,o��arn��t is cvns�sten� with the buildina�a�ether eacuta�io�s �ubmit�ea with this permit appiica�.0n. Thi proposed l�gh�n rste�n� � S' �peca�frcat�ons and
the 2001 IECc requirerr�.en�s i� COMcheck.,F7 V��sian �.4 Release 2b and to co� � with the
desigiled to meet
requirements in the Requirements Checkh-St. P Y mandatory
lop%1Oki
4 -
Principal Lighting Designer -Name
0
Lighting Application Worksheet
2401 IECC
COMcheck-EZ softw"are Version 2.; Release 2b
Section 1 : Atiowed Lighting Power Calculation
B C D
Total
Floor Allowed Allowed
Area Caie2,ory Area Watts Watts
�
Lwa—tt�i�2 � C
Medical and Clinical Care
7115 1.6 I1389
Total Allowed Watts = 113 89
Sect"on 2: Actual Lighting Power Calculation
Fire Fixture Description f
ID Larnn Descri rion I Wattaae Pyr Lang I Ballast
F1 z damp surface fluor. 1 4g" T8 32W I Electronic
F3 21amp lav fluor. l 48" T:8'�32�4�' f Electroluc
F� � damp Iay-in fluor. i 48" 8 32i7L� f Electronic
F5 � damp lixnear fluor. t 48" T8 32W 1 Elwromc
F7 21amp industtat fl�tar.1` �S" T8 32W I Electronic
F13 i lamp open strip fluor. 48" T:9 32W l Elect-ro nic
F15 Dark r€�vrn safe �� t � 14�efial Halide 154W ! MagneticF17 3 damp recessed fluor. 1 4S" T8 32W 1 Electroinic
F18I lamp QuWz f ljucandescent 25OW
��9 I damp wall mount i Incandescent 1.00W
C D E F
Lai-nps/ # of hxtam
EM�—we fixtures Watt. ax E
2 2 61 122
2 6 61 3l5
3 47 95 44b�
3 22 95 209Q
2 38 61 23 8
� g 37 296
� 2 1ST 300
3 4 95 380
1 3 250 750
1 1 100 1(3n
Total Actual Watts = 11x.87
Section 31*0 Compimnce Cakulafivn
If the TotalAllowd watt's x�un�s the T'otal 14 ctual Watt
S is greater than or equal to Derv, the buildingcvm ' gees.
Lighting PASSES,: Design 2% better than code
Total Allowed Watts = 113 8
Total Actut Watts – 11187
Project compliance = 202
Envelope Compliance Certificate
2003 IECC
COMeheck-EZ So$ware Version 3. 4 Release 2a
Data filename: Untitled,cek
Section 1: Project Information
rot W Name;
Desi
.tractr}
Document .uta:
Cedar Ridgy Animal Hospital
JRW & Associates
1152 Bond Ave.
Rexburg, Idaho
nary Richardson
Section 24: General 1hforma
Building Location (fDr weather data):
Climate done:
Heating Degree Days (base 65 degrees F):
Cooing Degree Days abase 65 degrees F):
Project Type:
Window 1 Wall Ratio:
ildina TvDe
Section 3: Requirements Checklist
0500183
Cedar Ridge Animal Hospital
Rexbwrg, raanQ
16
8693
143
New Construction
0.15
5525
Bldg. �
Dept.
Use �
� Air Leakage Component Certification, and Vapor Retarder Requirements
1 . All joints and penetrations are caulked, Basketed, weather-stripped, or oihexwise sealed.
2. Windows, doors, and skylights certifel' as meeting leakage requirements.
� 1 1 3. Component R -values & U-�actars labeled as certified.
[ � � 4. Stair, elevator shad vents, and other dampen integral to the building envelope are equipped
4
i with raotonzed darnpee�-ss. p
[ I 1 5. Cargo doors and loading dock doors are weather sealed.
[ ] j 6. Recessed lighting fixtures are; {i} Type IC rated and sealed or Basketed; or (iii installed inside
� app�rapnate air -tight assemlaly with a �.5 inch clearance from combustible matEria�s and �
j with 3 inches cleat�ance from in�ulatior� material.
[ ] ( 7. Building entrance doors have a vestibule and equipped with closing devices.
�
Exceptions:
�
Building entrances With revolving chars.
I Doors that open directly from a space less than 3000, sq. 1. in. axes.
Climate -Specific Requirements
0
Gross
Com
Area car Cavity Cont. Proposed Budget
onent Name/Descrintion Per�eter R-Vali& R -Value actor -F
actor
Roof I* All -Wood Joist/Raffer/Truss 6 32.a a.o o.a�� 0.047
Exterior Wall 1: Wood Frame, Any Spacing 3240 19. Q 0. Q 0.068 0.067
Window 1:
Metal Frame with Thmnal Bi-eak:Double Pane with Lava -E
Tinted, SHGC 0.58 340.5
Door 1: solid -- 4a 0.520
---
Door 2; Glass, TZnted, S GC x}.59 55 0.700 4.112
I39 - ---
Door 3: Overhead '� --- 0.924 0.520
--- ---
Floor 1: S l�.b-On -Grade: Unheated.,,Vertical 2 ff.. 45 1.450 0.112 60
(a) budget U-factars are used �r soff ware baseline calculations ONLY, and are not code requ�rernents.
Eu Ve 1 ope PASSES : Design 8°fa better than code
Section 4,0 Commiance Statement
The Proposed envelope design represented in this document is consistent with the building plans, specifications and other
calculations submitted with this permit application, The prt�pased envelope system has been desig-ned to meet the 2003
IECC requirements in CpMcheckEZ Version 3.0 Release 2a and to caraaply with the mandato r uiretn
Requirements Checklist, _—r���-.�Y �l ends in the
Principal. nvelape Designer-Nw