HomeMy WebLinkAboutMULT DOCS - 05-00166 - Beehive Credit Union/) IN 101
lldc'.
General Contractors,
Commercial • industrial • Residential
May 3 V`, 2005
HVAC
Lewis Corporation
Commercial Metalworks, Inc.
Mountain West Mechanical
Rexburg Plumbing & Heating
Plumbing
Bingham Mechanical, Inc.
Housley Pumps, Inc.
Mountain West Mechanical
Rexburg Plumbing &Heat00
ing
Reference: Beehive, Federal Credit Union
Rexburg, Idaho
Dear Contractors-,
a
Please be advised that you haeme been invited to submit �, bid- for the above mentioned
project.
If you are a company that does both HVAC and plumbing., please note your bid needs to
be separated.
did ODemM:
Fax fio (fur Office B
2:00
.M.
Wednesda
June -8"'. 2005
Please schedule with our office to review the drawings &specifications.
0.
to bid, please fax a note to our office.
Sincer
�nika Shook' '
�ontract Administrator
Cc: Engineered Systems Associates
If you elect not
3219 East 81st North • Idaho Falls, Idaho 83401 • (208) 529-4038 • Fax (208) 524-0734
4
� �? {�t f�} '- �} ► � �� t 1 c ' l 1 {�y 1w? f . {�� 1�1�1 i' cel 1� � 1�r� c ' .
General Contractors
Commercial -a industrial • Residential
May 3 1;`, 2005
Arca Electric, Inc.
Lon Ricks Electric,, Inc.
Darnell Weekes Electric,. Inc.
Reference: Beehive Federal Credit Union
Rexburg,ldaho
Dear Electn*cal Contractors,,
Please be advised that you have been invited to submit a bid for the above mentioned
project.
Bid Opening;
Fax To Our Office By: 2-000
.m.. Wednesda
June 8'. 2065
1
Drawings and specifications will be distributed to your office today.
bold, Please fax a note to our office.
Sincerely
yr
1
406 �a Shoo,
Cont�act Administrator
51
If you elect not to
3219 East 81st North • Idaho Falls, Idaho 83401 9 (208) 529-4038 • Fax (208) 524-0734
i0a
Des gn
Intelligence, LLC
Structural Engineering
3 685 W Hwy 33
Re ring, Idaho 8344
Date: August 23, 2005
To: City of Rexburg Falls Bldg Department
Rex,hU-r,9,-'Idaho
Call,; (208) 359-1461
FAX,h,, (208) 359-0740
Subject: True Value Hardware Basement Access Support at Main Floar
Dear Sir or Madam:
The followmg comments refer to the house plan referenced above. Attached details appy.
1. Provide T5 3x3x 1/4 ca�.meX beam for voided slab and TS 3x3x 1/4 posts. Welded top and bottom to
a 12xl2xl,/2 plate. Use 4 Y2" wedge anchors.
Please call me if you have any questions.
Respectfully,
Scott A Spauldin9P.E., Design Intelfigence, LLC
A U G 2 4 2 0 05a
U.
=.
By -
9
0OF
�A. sePV�'�
J? zno, �a s
l/
91
D
June 30, 2005
City Of Rexburg
19 E. Main
P.O. Box 280
P�exbjyg�-Idaho 83440
iW
1105 IONA ROAD • P.O. BOX 2620
IDAHO FALLS, ID 83403.2620
vCFERENCE'. New Building
Beelfive Federal Credit Union
1087 Erikson
lkexburg, Idaho 83440
Gentlemen:
Gem State Fire Protection has been notified bv Shook Cons�-r�uc�.an C....mpany, Inc. of their
intent tO award Gem State Fire Protec�.on a. cc�nt�ac� cin the above reference project. This
system tO be desigied per NI.F.P.A. 13 for light hazard occupancies.
At this time Gem State Fire Pr
vEion is prepaying shop drawmgsand will submit diem tothe City of Rexburg as soon as they are complete,
ups Very
ne C. Morg,
State Fi
F,
Bew,,.hiv d CU
CITY OF COMM RCIA N �V
R-.,EXBUP�.,G- City of Rexburg
Department of Community Development
19 E. Main St,1 Rexburg, ID. 83440
Project Information
Permit Type
Site Address
Cor=crcial New
1087 ERJKSON DR
Project Des�� i
Beehive
FeFeInformation
Project Valuation
Building Permit Fee
Plan Check ]Fee
Commercial Plumbing Permit Fee
Water Meter & Parts
Hookup Fee/Water
Hook-up Fee/Sewer
Police Impact Fee
Fire Impact
Print Name
Signature
Total Fees Paid
8,386.40
838.64
.
00
37.00
15334.00
905.00
11890.60
821.79
$14,523.43
Phone (208) 359-3020 I Fax {2D$} 359-3022
Permit
Project Name
Parcel #
0016
Beehive C
RPRVLYV'VO030020
Project Details
Banks - Type V - 1 flour
Decks -Wood Frame (Covered}
]swellings - Basements - Unfinished
161150 SQFT
432 SQFT
G,236 SOFT
Date Issued:
Issued Bye
10 --
COMMERCIAL NEW
City of Rexburg
Department of Community Development
19 E. Main St. / Rexburg, ID. 83440
Phone (208) 359-3a201 Fax (2U8) 359-3022
Ma y. 3 1. 2.005 9:12AM
CITY OF
RF1
X-BLI.P
FOWIL "UNC
Site Plan Checklist
Application Information
Applicant'. _
No. 074h
19 E. Main (PO Box 280)
Rexbufg, Idaho 83440
Applicant's Address: T70 day-li 404 -VU ?-Ar�x
Project Address: 1007E91v_._soAi 7e,i
Recorded 0%vner:
Recorded Uwner Address:
-Pe it NUMInber:
�A. Phone: 9*- 5V - S-7 71r FAX: 521 - 8785
City: 506 ST: _(D Zip: 8:!5LO
v 4!��f 7- CA/u4j
Phone: 20s -�256 - i Gado FAX:
-City: ST: i D Zip: 634q0
7
Q 1. Site pt n. must be drawn to scale, bc legible and also be submitted electronically if possible.
Q 2. Adjoining streets labeled.
C� 3 � Right-of-way location and width, curb to curb widffis and sidewa�i.�c location.
Ef Mi
�J 4. Building locat-ion, sq footage and dimensions, with distance to property lines and distances
between buildings.
M 5. ,thaw existing and proposed easements.
U 6. Existing utilities (waterlines, sanitary sewer Im"es, manholes, sto &ains),
El 7. Proposed utilities iu�cluding tie in. location to existing seryices and new easements,
El S. Proposedsto drain and samtary sewer elevadons (forPIP e inverts at manholes and catch basins}.
LJ 9. Sto drainage plan for parking 10t and roof areas, with calculations.,
Ll 10. Fhydrants and fire suppression lines (MC1uding tie tv City Imes),
ZI Spn' nkl ed C] Not SpHnkled
C7 IT. Indicate Fire apparatus access.
Q 12. Parzap (including parking lad, drainage arrows, dimension of lot, distance between sows, and total
numbers).
Ll i 3. Landscaping (type and total area, including dimensions)-
014. Trash facilities.
1315. North Arrow
El 16M, �aw3ng to Scale, including a graphic scale (I 1 V2x 17" paper if possible).
0 IT Proposed street improvements(curb, gutter, sidewalk, pavement, etc.)
❑ 18. Legal descrip�,on of proposed building site �ncluded.
Q 19. Percent of lot covered b y building or paving calGulatet�.
U 2a. Show 10% snow storaore area.
❑ 21 . Distance of entrances from street corner indica.ted.
Ll 22. Current Vicinity 1Map. (S �1� x 1 I "� at I'� = 3 0 0' sale, showing location of the propeny,
NOTE: SITE PLAINS MUSS' 13E COMPLETE AND SUMN=D FOR REVIEW BEFORE THE PROJECT WILL BE
84. 6 MaNNUM
Nielson
Date,.-
r
r
IP
0
Bodily Associates pa
)Architects
990 John Adams ark -my 0 P. 0. Box 2212 * Idaho Falk, ID 83403- 1 i
May 3 1, 2005
Subject.- Beehive Fed. Credit Urian
New Branch & Offices
TRANSMITTED HEREWITH:
bw
TRANSMITTAL
Telephone 2081522.8779 . Fax 2081522-8785
TOO., City Rexburg
City of Rexburg
19 E. Main
Rexburg, Idaho 83440
Remarks:
Construction.
Please add these items to the 3 sets of building plans submitted on 5 -27 -OS by Shook
Nielson Bodily & Associates PA
Cory R t
Nielson � l Bodily& Associates PA
�') Architects
Date.
Suhject:
TRANSMITTAL
990 Jobe Adamv Park-vay 0 P. 0. Box 2 212 6 Idaho Falls, I 83403-2212 * Telephone
May 27, 2005
Beehive Credit Union
TRANSMITTED HEREWITH:
Tod* City of Rexburg, Planning & Zoning
12 North Center Street
Rexburg, Idaho 83440
Remarks.-,
Alielson Bodily & Associates PA
ruse
J uL-0(-200t> 11 ' 41
r -7�
R ■ I`r� � 1
ESA
■ � II
Ib tiOMENti Jr■
WWI ", rma'60M %,
sHaC� CONSTRUCT I ON
E,,n�IlIIaeeICeA S glemn
MECHANICAL
P. 02/02
A 0 1nc,,
ELECTRICAL ENC--71NJF�R1N1r,-
R
Y�ri�l■!1
Ai.
a �ew.
Mr. Cury Rabetris
Niel-snil Bodl1y & As-sociates
P,O. Box 2-2-1?
9g0 Jobn Adams PaTkway
Idaho Falls., Ic3al10 93403-?? I2
.Re: BCCh1'1'C ]Federal Credit Un'lon,
Dear Cory i
-31 w. (,kNTER, POCATELLO,
TELEPHONE -
FAX -
D. S
IDAHO 837.0G
208-233-0501
208-2}3-0529
U DWEEKS F PE.
R. RICE. RE.
a eDI)y ot" tile Cit), of kexbur-g r(,Ivlc D .tiBts "01Ti Monica.Shnok - ,
msporise_s- Is week-- jlt�re arc,2, n1v
ari d air YransFe,r Openings rnusl be pro vic�ecl with rire c1�mPc:r;� ��I��;ri�
a floortl�e� �r roof assem�s:�y as per 71C�.G of the JBC, �
11-- .SBC 716.5.2 axlawS f!xCeption #3 where Fire darripers ars not reyuirGd if P flffraTjC)jjS
ai'e thru 1 hour assemblies or lassp iii Erca,� Utter tla�,n GrOuP i ,end arc: in btj'ld'nb�
equipped chr�.t-out with autam�tz� springer and a1-�� c:nntinuD�s dtticr a�' `� , g.,cjgcA)� these requirGmen�s apply [a this p��j�c��,—( []�icki��ss_
Scwltge CjecCiOns re4u�r�c� td h� 3: discharge minimaum ,..,
A- This itern has been deleted with tlz� i ew reviseaserne.nt. The fulurQ Toilet Roomc
laavc bf!&11 deleted. We have onlya ca»dez;sire still -1p PUITIJ� nov►F ro I-0jriovff ccir,dGnsare
J'1 -0m ftiftlacos and coollrig coils.
3-Q. :'BeOr) I Or e , -
c draw'ugs
A- kCV13Cd Water h Ls uIldursizcd.
"'Ll, qjzes on -Mwiscd drawing to reFlaict
1A0Pcft111Y this will clear up all dna !Viechamcal questions from the City.
Since-rCIVII
h-NGLNEFRj:-4D SYSTEMS ASSOCLATES, NC_
Dwayrie- SudwFILCL, k- S
k- I
Ej3dosurc:s-,
cc ' Shook Cnr��`nlctian
MEM8EACEC
RL
TOTAL P,02
MAR -2 1-2006 05:35pm FROM -ENGINEERED
a
ir
July ], ?005,
MT,Cory Roberts
Nielson Bodily &r Associates
P.Q. Box -2112
99Q 1ahn Adauis Parkw ay
1daLho Falls, Idaho 83403-2*'212
208-233wO529
T-9 12
P. 002/002 F-814
r
JlnffQIle(e no eLLll Systems Ansoe'3
IIaLLesy Ine"
MECHANICAL -ELECTRICAL - ENGINEERING
ate : Beehive Federal Cr -edit Unj-onw
Dear
Coryq
315 W CENTER, POCATELLO, IDAHO 832()Aq
TELEPHONE - 208-2.33-0501
FAX - 208-233-0529
D. S,LJDWEFKS,, P.E.
R. RICE, PE.
� received a ropy of the City of Fexburg revzew commznrs frorn Manlvca Shook rhzs week. Here are my
esp onses
� -Q. Diacts and za�r transfer opellings must be provLdftd with fare dampers where they pQiactrarn
a floor or roof assembly as per 71G_6 of ih� TBC.
A- EBC 716.51 allows exception #3 where fire damers�ars not required if the penevadons
are thru 1 hour assemhlYes or less, in areas other than Group I3 and arein buildin��
equipped rhru-out with automatic spnn1der, and are con�inua�� duct of �b dale t.�iick�e�s.
All these requirEments apply to this project-
?-Q. Sewagre ejections required to be 3; discharge nunirnum ..,.
14.- This item has been deleted with the new revised bascmenj. Th� future Toilet baa
ms
haus been delew4w We have only a candensaw 5amg purnnow torema�� co�d�n�at�
from fumaces and cooling coils.
3-Q. Water lin a to dTaw-ners'is
si d
A- Revi-sed water 11 sizes oa revised drawl'ag to relll2cl chanaes.
vb�ffl
Hopefu I I y
thxs wiil cIeax up all the Mech am cal quesTion s from rhe pity.
Sincerely,
ENOLNEERED SYSTEMS ASSOCIATES, INC.
Uwayne Sudweeks
kl
Enclosures:
CG= Shook Construction
MEMSFR acEc
July ], ?005,
MT,Cory Roberts
Nielson Bodily &r Associates
P.Q. Box -2112
99Q 1ahn Adauis Parkw ay
1daLho Falls, Idaho 83403-2*'212
208-233wO529
T-9 12
P. 002/002 F-814
r
JlnffQIle(e no eLLll Systems Ansoe'3
IIaLLesy Ine"
MECHANICAL -ELECTRICAL - ENGINEERING
ate : Beehive Federal Cr -edit Unj-onw
Dear
Coryq
315 W CENTER, POCATELLO, IDAHO 832()Aq
TELEPHONE - 208-2.33-0501
FAX - 208-233-0529
D. S,LJDWEFKS,, P.E.
R. RICE, PE.
� received a ropy of the City of Fexburg revzew commznrs frorn Manlvca Shook rhzs week. Here are my
esp onses
� -Q. Diacts and za�r transfer opellings must be provLdftd with fare dampers where they pQiactrarn
a floor or roof assembly as per 71G_6 of ih� TBC.
A- EBC 716.51 allows exception #3 where fire damers�ars not required if the penevadons
are thru 1 hour assemhlYes or less, in areas other than Group I3 and arein buildin��
equipped rhru-out with automatic spnn1der, and are con�inua�� duct of �b dale t.�iick�e�s.
All these requirEments apply to this project-
?-Q. Sewagre ejections required to be 3; discharge nunirnum ..,.
14.- This item has been deleted with the new revised bascmenj. Th� future Toilet baa
ms
haus been delew4w We have only a candensaw 5amg purnnow torema�� co�d�n�at�
from fumaces and cooling coils.
3-Q. Water lin a to dTaw-ners'is
si d
A- Revi-sed water 11 sizes oa revised drawl'ag to relll2cl chanaes.
vb�ffl
Hopefu I I y
thxs wiil cIeax up all the Mech am cal quesTion s from rhe pity.
Sincerely,
ENOLNEERED SYSTEMS ASSOCIATES, INC.
Uwayne Sudweeks
kl
Enclosures:
CG= Shook Construction
MEMSFR acEc
41
SNoD< CONSTRUCT loH
Shook Construction Company, Inc.
3 2 19 East 81st North
Idaho Falls, Idaho 83401
(208)529-4038 - office
(208)524-0734 - fax
Facsimile 'Transmittal Cover Sheet
Date: 7-7-05
To: Cathy winters
Fax #: 35 9-3024
From: Monika Shook
Pages;(Including Cover Sheet): 2
Memo:
Mec,hanjibal
f�
Tank you.
Permt POr�se�
If any pages were not received or if you have any questions or
concerns, Please call our ffC s soon as possimble,
Thank you.
Pm10
MAR -21-2006 05:35pM FROM -ENGINEERED S""'MS
208-233-0529
T-9 12
s�zs slog
EYGgYEEREDSYS'fE1Ig�p�W� IN
3I5
WMCFNTM
POCATELLO, ID 83204
To •
(208)2330501
FAXmw (208) 233 0529
A
P. 0 0 1/0 02
Date; 3121 (fl%
Pages: Q...I"Ucludivrnthis cover sheet
Subjectt 1moms,
Fromb
COMMENT'S:
F-814 \
at E
ng'nOer�d Systems Associatm
Ir
14c�s o uti �I.ea P&*t.4Q, �v�►n -]-!.2 Ci �q QW, innnn�-5
�u,,1� 2cx�5. I d�dn'�-- h.e�. bo.ck
ro �D� 6M5 � sp � aS9 a"d o w.
CAII � 4+ 22t -gWL4�
5o2
in
ti
ff
r
�rtdK,
a�-ravl
b
w
a
e
m
w
a
MAR -22-270E 21:37 SHOOK Cf_1NSTRUCTION P. 01/01
COnStMCtI012 Cozapow%� 1ln�o
General Contractors
Commercial IndustrIal • R idential
Date: March 22, 2006
To: City -of Rexburg Building Dept,
From: Monika Shook
Ref: Beehive Federal Credit Un'1onr..Pr0JeQt
Dear Val,, Brad, Jon, Cathy & Staff,
Thank you for all of your help during the design and
construction phase of the new Beeiaive Federal Credit
Union Project located at 1087 Erikson Drive in Rexburg.
Ir
We appreciated your professionalism.
l
0:
3219 East 81St North Idaho Falls, Idaho 834 01 (208) 529-
(208) 524 -0734
TOTRL P.01
1
U a
49 PM N o
a
{& Assl)cI a�.
Nielson ` I Boaav XT Q cCnPintnr nn
iw)Archttects
July 1 1, 2005
P1 p —� No, 2606 P, i/1
990 t Adams Parkway * P. O. Box 2212 -# Idaho Fail M $1403-2212
Val Christensen
City of Rexburg
P.O. Box 280
Rexburg, ID 83440
Proiect:Be�h�ve Fed��a1 CrediE Union
Rexburg, Idaho
Dear Va13
Response to City Rcview Commelits
The following ars our responses to Baur review comments for the above referenced proj'ect,,
Slate Plat.
I . An additional handicapped parking space will be added to the easy parking lot for the
third required space. See Sketch SK -1.
2• An accessible path w-YII be provided to the public right-of-way from the main entry to
die north sidewalk. See Sketch SK -2.
3. Dumpster pad to be relocated as shown ars Sketch SIS. -1.
4. Sidewalk will connect to street comers at Summit Drive. dee SK -2.
Architectural Plans
1. Sign read�ig "Maximum Occupancy � 48 persons"' shall be placed next to door in
Call Center 112,
2, enclosed Stainvays. Section 10,19.1, exception 9 of the 2003 IBC allows stairways to
be open if they only serve first and second stories of buf�d�.5 ng equipped with an
automatic sprinkler system. The basement level stairwav 11c �-n01fWPA PIT rtf.af„� �,�.,,1,
3.
4.,
be equipped throughout with an automatic sprinkler systern.
Fire separation bet�veen a 13 occupancy and a S�l occupancy. See Table 302.3.2.
Footnote b.2 of the. IBC. occupancy separation need not be provided for storage
areas within Group D if area is provided with an automatic fire -extinguishing system
and is Less than 3,000 square feed. our building meets bosh requirert�.ent�.
Table 6-1 pf the IBC, Footnote d. An approved automatic sprinkler stem shall be
allowed -to be substitu.ted for I -hour fire-resistanc d construction.
T t R
Sett L. Meison, A.LA Kevin RP Bodily, AJA Members c The Arrt@41Wan InsiiWteof Architacta
Jul. ll. 2005 3 : 4 9 ° M an Bodily A 3 3 o c I a t e s P,A -- No. 2606 P. 2/l
51, Canopy to receive an approved automatic sprinkler system,
Sincerely,
Nielson Bodily & Associates,, P.A.
Cory Roberts
CIR/kw
Shook Construction
Shane Berger, Beehive Federal Credit Union
Attachments
Sketches SK, -J, SK -2
Mechanical Comments
Special hispections
2
2 is �• ' f � �I
1 � � o i' e' 3 I 7 I � � �y`n Bo d i I s s o /'.
I a t e s
TOTAL 53 SPACES
LANDSCAPE CURBING
LIP DOWN CURB
' � P
RELO
TEL
-+ �®A�
� s
Iii
TE
X
s
> DUMPSTER PAD
rt3'X9'
SEE DETAIL
x 97r.a � � L! 1 eDUARDs
TrLEP�ONE STUB
27 -0
REMOVE AND REPLACE
CURB AND GUTTER
AT DRIVEWAY CUT (TYP.)
�I
m
_-!- 0, 2606
let
TRANSFORMER PAD
SEE DETAIL
SIDEWALK
m
Q
3/I
r-
..jL.%�
167-4"
mc ru=
ro
9-7-.3-9
8 7. 8 9
/ "97.55 ELEV C
93.05 STORM
32 LIN.. FEET 12"' STORM PIPE
SITE PLAN
20059 PM
1I I 1
. �7
I�j=�n o '1 0
r
1 I
i I I !
OR,
LI
m
L. WE
0
If
V)
P. A
I
;21.
W
t/?
F�—
rNo,
1
cnt
WL
Lo
L4
r
i�
T
LjJ
I
- e
{
101
_ Jr
0
0
0
IL
z
4/7
.5
r
`j
N1dM301S
09' 19 6 =
N
01
I
;21.
W
t/?
F�—
rNo,
1
cnt
WL
Lo
L4
r
i�
T
LjJ
I
- e
{
101
_ Jr
0
0
0
IL
z
4/7
.5
r
`j
N1dM301S
09' 19 6 =
N
01
F
a�L,
L; �. 2 0 0 5m 3:4 0, 'MNG INEIN ieon Bodily & Associates, P. A—nzq —�-.
.Tiny ], 2005
Mr. Cory Robem
Nielson Bodily &. Associates
P.0. fox 2212,
990 Jobn AdamsPa.rkway
Idaho Falls; Idaho 83403-2212
Re: H eehive federal Ci -edit Union.
Dear Cory,
T-O'NG,
1 2 6 0 6/oul P.
42,
Ine,
OT MECHANICAL ELECTRICAL - ENGINEERING.'
315 W. CENTER, POCATELLOIDAHO 83204
TELEPHONE - 208-233-0501
FAX- 208-233-052-9
D. SUDWEEK.S. P.E.
R. RICE. PE.
I received a cagy of the City of Rexbui-grev LL
lew comments f"OTT, M0112".ca Shank this week_
re��onse�_
r�1
2-Q.
A-
3 -Q.
A -
Here are my
ducts and sir transfer openings rust be provided with fire,dampers wbere they penetrate'
a floor or roof assembly as per 716_6 of the SSC.
IB C 716.5.2 allows exception #3 where Mire dampers are not requixed if the penetrations
are thru 1 hour assemblies or fess, in areas other than Group H Land are in bnfldings
equipped thru-OUT with auto=tic sprinkler and are continuous duct of 26 gage tliickness_
Ali these requirements qply to this project.
Sewage ejections required to be 3-- discharge
This item has been deleted with the new revised basemenL The future Toilet Rooms
bave been deleted. We have only a condensate sump pump now to 'rernoye conder�sate
from furnaces and cooling coils.
Water line, on isometric drawings its undersized_
Revised water ling sues an revised drawing to reflect change_
Hopefully this w1o11 clear up all the Mechanical questions fro� the city,
Siacerely,
ENGINEERED SYSTEMS ASSOCIATES, INC.
Dwayne Sudweek!;
kl
cc Shook Construction
MEMBER ACEC
5
"'Jul. 11.
2405_ 3:50PM' N I e 1;,,o n Bodily & A s s o c a t e s
I P P
MATERIALS
TESTING Fs
INSPECTION
d Environmental Sarvierm
D Geoi9ehnic-al Enain+aerin
SCOTT N SON
NIULSON BODILY & ASSOCIATES, P.A.
990 Jobn Adams Parkway
Idsho Fallsq Idaho 83403
A-
208529G:BlNo. 2606
P. E/7 p . 1
PAGE 0 1 DF
TIE 715IC5
PF P 0 AL,5\E0kBTE91q IDAMOIPSD64 - i3E Hier,
FED GRE[W7 umiz,. REX8U .D0
0 ConstTudion Matarials Tasti
Re:
Tesdng and Inspexfiori Services for fie
Proposed Proj=t,- Beehive Fed Credit Unian - Rexburg, Idaho
Df,xar fix. Nielson,,
0 SPBGtF3l i f'fSQeCtiOn S
PHONE; 22-8779
FAX:522-8785
7`he enclosed cast proposal has been prepared for your review and evaluation, Materials Testing & Inspection,,
appr�cia�te� the opportunity to submit this estimate tc) provide matcrials eting and inspection
services on tfaQ above referenced project.
�timztt is based on vur review of p1mis and specif capons, similar pr oJects, and Citi of Rexburg
reqiijternerits, The estimate is also based va a presumed construction schedule. If the cont
.st��ion schedule
cues not follow MT1's estimated produc6on rates and schedule, the quantities and number of tarps required will
vary, Please review tie number of trips and quantities to ftisu-re fiat each �tem follows yo -Ur cvnstructioA
schedule/pxoduction rams. Variances from our estimate and your schedule/production rates will be billed at the
indicated unit rakes. The result may be a dwroase or increase in the tiot�l test-
og and Mspeetian COL . Scope ofservices for th� project have b�exi outlined below:
�8,G40 square foot tJ�pe o,� structure � '�"he Scope of Services �c�ud�s; I, � sods #e�tulg and inspection, 2)
concrete testing and in�pec�i4�„ 3} �tnz�,t�-a� s�e�� welding aa�Jor halting inspection. , 4spray�applied
firepl-00fin testing and inspection, and 5) asphalt testing and inspa�tion. The �c�pe rn�av be adiu�ted based on
the actLuua � �cial ins e�tian r u�.rminents. hosts v�i1l be denerders# an the acival numbez 4�` triv�l�ime fir--
testing and insv�tioDsl,
A detai'led explanation of testinglinspwtivn ire for eacb phase of construction his been provided below:
� Soils — Fill pla�ement monitoring will be perfonned throughout the project. Geotechnical obseTva6ons
will Wsa bc performed during stdpping actj`Ymes and at footing & paricing lot bearing surfaces,
Concrete -- "Testing" of concrete with be perfon-nud on foatiugs, stem walls, S I.ab --on- grade, and
elevated Nabs. Coacrete will be tested at intervals of vne sit of 4 concrete cyhndexs fo-r each 15Q bic
yards or f[action thereof of each con 'Trete rnix placed each dad. Exterior sidewalk will bD tested at two
intervals throughout tt�e project, unless a greater frequency
Concrete for stag -treads and site concrete -�,ot 011t1ined in
.requested by the architect or owner,
is requested by the architect or owner.
this proposal will not be. tested unless
. '
Masonry � "Special Lnspectlon is not anticipated at this time, but can be, perfumed upon request.
23.0 N. Skyline r*ufi ra iis, It) 8:9402
208 �8 Fax 200 - -11
E -Mail eimfiasry.net v�wws cyberh fir. rmV—i
j"iuI.1L 2 0 05_
3:��P�� Nie1.s.,a� Bo�i�y � 1�550CId�£S, P.
MATERIALS
TesTiNra Fs
INSPECTION
❑ Envlrmmental Services
❑ Gecterhnl'cal 97-Mineer4n
R, �r�es�s����No. 2606
P. 1/7 P - z
FRAY fi"
PAGE it 2 OFS
D ATS TId 140 IS
PROPOSAL4111S TERM )v0kCJP5 n ; HE J E
IPF -D CMUFT UNION. R1EX@ R9.QQ
d Conut►uctian Materials Teen
Sr�ecial I nsa&ctlnns
•
Structural Steel — ""Special luspection" of welded and/or bolt�d connections is arequired. Periodic
visual welding inspection will be perfomed an all field melds. Bolted comectivns will be inspected �n
accordance with the project specifications. The first trip should be performed prior to the start-up of
welding or boluffig operons to check certifications or bolt calibrations and review procedures with on-
site welders l .steel woi-kers. Interme&ate trips should be performed to inspmt weds car bults that are to
be cove -red pri.ot to the final inspecfion. The fimal inspection should be perforn-ted at the carnpletxon of
melding and 1 yr bolting, but prior to departure of the steel crew, to inspect the finished productA
Spray -Applied Fireproofing - "'Special Inspection" is not arificipated at this time, but can be perfomed
Upon Tegtiest.
• Asphalt — Munitofing of placement and density testing will be perfoed. ATbalt cares will be taken
to verify thickness and density of asphalt and to perform. nuclear gauge corn -elation.
It isMT1's intention that vur services will complement your efforts towards maintaining the highest standards
Of qUality. Please let 1�� "ow if yQu require additlona� inform�.t#��1. e thank you for considering our firm and
lack §Grwai-d to working with you on this project.
Respectfully Submitted,
DAN KiNG,
EASTERV IDAH"C]N.d GER
1230 _ Skyline Uve, SuAL% C, Idaho Falls ID A3402 20$ 529-8242 FaX 205 529-6911
-d ehV4rrv.riet www-cyberhigh nev--,mb
Nielson
August 12,,2005
Bodily& Assocides Pa
)Architects
990 John Adam,cirkivay * P.O. Box 2212 - Idaho Falls, ID 8340-3-2212 - Telephone 522-8779 * Fav 2081522-878
Val Christensen
City of Rexburg
P.O. Box 280
Rexburg, ID 83440
Project:
Dear Val,
Beehive Federal Credit Union
On Sheet x,0.3 of the Beehive Federal Credit Union drawings reviewed by your
department, it indicates in note G for the basement area that a one hour occupancy separation
is required per IBS 302. i . Z . Storage room in excess of 100 square feet requires a one hour
occupancy separation. Upon- further review, it has been determined that this one hour
separation is not required if the building is 100% fire sprinklered, which this building is.
Wherefore we will eliminate the sprayed on Fire proofing indicated for the floor ceiling
assembly.
You mai also recall that the basement area has been revised in size and that the total
area of the basement is now fess than 3,000 square feet and has been changed to an S-1
occupancy. IBC code in table 302.3.2 , indicates chat a three hour separation is required
between and S- 1 occupancy and a B occupancy, unless, according to footnote B-2, the area is
provided with an automatic fire extinguishing system and is less than 3 ,004 square feed. We
comply with that exception so we occupancy separation �etween the storage area and the B
occupancy is not required.
Please lei us know immediately if you do. not agree with this assessment as we are
faking steps to eliminate the spray -on fire proofing.
Sincerely,
Nielson Bodily & Associates, P.A.
Kevin R. Bodilv Aa I..
Scott L. Nlels.on, A.Q.A.
Kevin R. Boddy, A.M.
Members of The Arnerican Institute of Architects
Jul 02 2005 1; 07'
MATERIALS
TeSTING
-INS-PE-CnON
E) Ern -end Se rvioes
Tri
L) Geotechnical Engineed
To. City of Rexburg
Fa)a (2p8) 359-43024
Phone. (208) 3:59-:3020
Rem Beehive Fed Credit Union
1] Urgent
*Comments:
For Review
� Insp. 2085296911 P,1
_ ❑ Construction Materials Testi
From: Vio,-toda Mesonson
Date; July 8, 2005
Pages: Three
N
page #1 Cf 1
ev D 2W
C] Please Comment ❑Please Reply ❑ Please Recycle
Here's the Scope of Services letter for Beehive Federal Credit -Unk>n. Please let me know ff you need anything further.
Thank you,
Victo6a Morrison
The foRowinginformat"P
ion has been specifically prepared by Materials Testing nsp�+ion fnr the intended user as
addressed an this 'FaCSimiie sheet and attached do
curneflts. if
you have received this infarmaticx, in error and are not
theintended recipient, Please destroy all the documents and notify Materials Testing & Inspection, via phone numbers
indicated on this facsimile immediately
1230 N Skyline Moe,, Suite, Idaho Falls 1 [ 83402
Fax: 20 �1 1.
Email: M r -tPd, Mrn Website. ww
Ju l 08 2005 12 e 07P a-tr i a l s Test i ng & Insp. 2085296911 p
t:MATERIALS
_•TeSTING &
1NSP6CT10K
E. Environmental Ser ires
SCOTT NIELSON
N LSON BODILY &c ASSOCIATES, P.A.
990 Sohn Adams Parkway
Idaho Falls, Idaho 83403
Construction Materials Teeth,
Re: Testing and Inspectioli Services for the
Proposed Prc�Ject: Beehive Fed CreditUni-on - Rexburg, Idaho
Dear Mr. Nielson,
ExHiis]T "A"
PAGE 0 1 OF
DATR 715135
FF -0 CREDIT UNIC-NRE BLFR .DOS
❑ Special Ins
to n
PHONE: 522-8779
FAX: 522-8785
The enclosed cyst proposal has been prepared for your review and evaluation. Materl--als Testing &. Inspection,
Inc. (NITI) appreciates the opportunity to submit this estimate to provide, materials testil-ig and inspcction
services on the above referenced project.
The 1estimate is hayed on our review of plans and specifications, similar projects, and City of Rexburg
requirements, The est'
rnate is also based on a presumed construction schedule. If the construction schedule
does not fellow MT1 15 s estimated production rates and schedule, the quantifies and number of trips required will
vim. Please review the number of trips and quantities to insure that each item follows your construction
schedule/production rates. Varianc,es from our estimate and your schedule/production rates will be billed at the
indica�cd unit rates. The result may be a decrease or increase in the total testing and inspection posts. scope of
services for the project have been outlined below.
,1-A,640 square food type of structure �- The Scope of Services includes; 1) sans testingi axed n,spection, �.j
concrete testing,
and inspection, 3) structural steel wclding and/or bol
tinu inspection, 4} spray-alied
fireproofing testing amd inspection, and. 5") asphalt Testing and inspection- The scope mav be adiusted based on
the actual special inspection re uircments. hosts will bc dependent on the actual number
testinQ, and zns ect1vns.
of tri s/tim e. for
A detailed explanation of tes�k�ng/`uispectian items for each phase of construction has been provided bclow--
Soils
— Fill placement monitoEng will be performed throughout the project., Geotechnical, observations
will also be performed during stripping activities and at footing & parUng lot bearing surfaces.
Concrete -- "Testing" of concrete will. be per -formed an footings, stem walls, Slab -an -grade, and
elevated nabs. Concrete will be tested at intervals of one sit of 4 concrete cylinders for each 1 J.cube
yards or fraction thereof of each concrete mix placed each day. Exterior sidewalk will be tested at two
intervals throughout the project, unless a greater ftequency -is requested by tlte arcbAect or owner.
Concrete for stair treads and site COI1G1ete not outliz�.ed in this proposal v4tili not be tested unless
requested bv the architect or vNArner,
E0
Masonry — "Special Inspection" is not anticipated at phis time, but can be perfornad upon request.
1230 I. Skyline rig SAO C, Idaho Falls, ID 83402 208 529-8242 Fax 208 529-6911
Jul
.08 200512: 07PM Matarials Testing Insp,
MATeRIALSTeSTING &I NSPC=CTION
0 Environmenlal Services
❑ Geotechnical Enaineerin
2085296911
Construction Materials Testin
p
ExHISIT "All
PAGE aF
DAT E 7151U
C] Special Insp-ections
structural Steel — "S�ecial Inspection" of welded and/or bolted conncctians is required. Periodic
visual welding inspection will be performed on ail field v�Telds. Bolted connections will be, inspectedi
in
accordance with the project specifications. 'The first trip should be perfornied pn'or to the start-up of
welding or boltinar operations to check certiffications or bolt calibrations and review procedures with on-
site welders l steel workers_ Intennediate trips should be performed to inspect weds or bolts that are to
be covered prior to the final inspection_ The final inspeal'on shod be performed at the conipletion of
welding and ! or halting, but prior to departure of the steel crew, to inspect the finished product.
• Spray -Applied Fireproofing - "Special Inspectian" is not anticipated at this llm�, but caYi be perfomed
upon request.
Asphalt
-- Monitorm'g
of placement and
density testing
will be
performed. Asphalt ores will be taken
to verify
thickness and
density of asphalt
aad to perfomi
nuclear
gauge correlation.
It Xs NiTI's intention that our services will complement your efforts towardsmai'ntaining the highest standards
of quality. Please let us know if you require additional information, We thank you fOT considering our firm and.
look forward to working with you on this project.
Respectfully Submitted.,
DAA ICING,
EASTE.R?Il IDA HO A 1A NA GER
1230 N. Skyline DO Sufte Ca Idaho Falls, ID 83402 208 529-8242 Fax 208 529-6911
E -Mail eJmU@srv.net www.cYber1h1ghwaY.net/--omti
-TUN -25-2005 14:23 SHOOK CONSTRUCTIONP.01/07
Niekon
9w /v )
Bodily,& AsyOdaie$ PA
)Architects
June 29, 2005
Kris Woodhouse
FaxT,nStUIratta�
• rdvhoFaUs, 1D8NO3�2212 t Tcrq�ojv 20V5x2-$779-,FaF m/52i-ali5
Monica Shook
Shook Construct
1011 colnpany�� Inc.
i�
2�-S24-0734
Pa g 111CIDdi
�rp�c:4t:
Bechin Fcdczal Credit UI1lUrl
Rcxlju-rg, Ida-pho
Re- Pusl Bid Add du�t�
7
flfDvk � 61�a Ilat" S
%
FIA
dil
9
Ali— -2005 14:28
0
SHOOK CONSTRUCTION
P�4YN�`
E gingering Ing
beehive Federal Credit Union-- Rexburg, I Dob
Post Sid Electrical Addendurn #1
June 22, 2005
P. 02/07
CUNSUL7ING ENGINEERS
Attachcd pleW find (evised c{e.rtl'ical drawingL& FI.ORP E2 i R, & E.4.2.2Rj with ch:tngcs riatu!
�:vcrythin� sho►tirn w the IROU, Bid& alciuding QB N: dulmd A --z jr1t#ic-we&d.
'"!lie sNt znk1cr C'untroller will move to bulldiiig 3s dixt-clod by landscape srchitccl. Circuit the
c:c+ntrc)ller, to oure Zd arn� brc.�&-cr 'it Panel -'T"-
Refer io revfs�i r�1�c���aiic� d�nwings wiit���� i�»s addendum for ciew locauan of'ixha��5t
EF -3. wid :wjl�Wr layout ofc:onciup'lls�r18 units oa dxi%."c thou cwlupy that W"e on vroutid zidi-icmt
1k) brelik. ori.
If
IF
14
ta23 EAST-CENTEM STMET PQCA3'ELLp, IDAHO 0201 ("08) 232-4 439 FAX (2R3) 232-14 15
- .0,
TUN -29-2885 14:29
�I
XTLRE
L
C
po
SHOOK CONSTRUCT:Ohl
a
Ff
Ce ALL: 145
f
Dm5ADo6) (E) (E.7
0
5F
p . 03/07
r
UNtAbAVATE-1
i
TUN -29-2025
4
I
SHOD -K CONSTRUCT.ION
P. 04/0
%4ach Mend 1 -a M l -3
a
JUN -29-2005
I&
1 !. 213
SHOOKCONSTRUCTION
Ir—
C
i .
66. IV
p4p
C
4 }
r
D
a.
A
VS 9fx91
7
— e!
� � I
LW
L
Ae
s
"L —1111— e
1m ui�ee_
M R —
f � . — e. e_ • � e . � _ � - e , e � . � � Lit �� �1 � . �= a� .. e
rA-
n
I'"m . .1
P -Q5/07
a.
JUN --2005
6
a
14:29
SHOOK CONSTRUCTION
� 1
1
. 1
p3 1
—�� II r a
}
t
i
I I nrr-N�,
p _ 06/07
ILL.
U
.f
�AI,l I!
k-
-TAm�
. 4.
'.J . -
r - _ w4r- --&
— -
L
P. '
AM-' s
1
. -IT I
I
dr - r -e
k
�OI-d
r —_
CJI --2005
1
SHOOK CONSTRUCTION
_n\�,IL N
�.� -+ -
ML
1 1�
TOTAL P.07
Ir
MATERIALS
11-: TESTING Er
INSPECTION
0 Env rmmntt Services
Val Christensen
C ity of Rexburg
PO Box 280
Rexburg, ID 83440
Q Geolechnical Engineering,
Q Construction Materials Testina
PAGE #1 OF 1
REVISION DATE 1 1 15
FAREPOFATS\FEAST;RN
EEHIVEF CU\RPT028SWE.D
D Snecial 1.n.qnAr-t'1'nnQ
Phone** (208) 359-3020
Fax.0 (?D8) 359-3022
Other:
Prnje�t: Beehive Federal. Credit Union
Inspector: KyleKofford
Inspection Date* October 7, 2005
STRUCTURAL STEEL WELDIATG INSPECTION REPORT
Can the above date, our representative performed work on the referenced project as reported below.
Arrived on site and inspected welders' qualification papers; they were current. Visually inspected the completed
welding performed by qualified welders using a SMAW process with E602.2 electrodec,_ Immer-ted qrr Q„nrC
welds and button punching at roof deck
entrance (ref*. engineer drawings.).
on top second floor, roof on drive-thru and roof on overhang on front
Work inspected was in compliance with project plans and specifications.
If you have questions concerning this report (rpt028swe.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by; Dan King
Eastern Idaho Manager
Cory Roberts, Nielson Bodily & Associates.; Val Christensen City of Rexburg*
Shook Construction
1.230 North Skyline Driver Suite C, Idaho Falls., I .83402 208-529-8242 Fax: 208-529-6911-� i ti roti- d. r Website: ww.m i-id.com
JUN -0-2005 16:47
SHa„U� GONSTRUCT T DN
1105 IONA ROAD a P.O. BOX 2620
IDAHO FALLS, ID 83403-2620
June 30, 20Q5
City Of Rcxbu�g
19 E. Main
P.O, Box 280
R=buM Idaho 83440
REFERENCE.- New IBWdft
�V
Beehive FWeral:Credit Union
1097 Erib
Rexbw& Uktho 83440
Crend en:
p- 01/01
S1111h Gm S�te FireFxotectian his bcen n0tified byrv�kuc
clot"11111"Ilkwa".�oncmpmy).rn.Irw.' of thm
Antcat to award Gcm Staff Fire prot=fion a ca��taGt an the above referonced projcct. This
t'ystexn tO bc d=igncd Per N.F.-P-A. 13 for light ha=d ouuupancies.
uia 'Very �.
roe C. Morw
Gam S tatc Fi
T T AL P. 01
I
tr rIATERIALS
�.
TESTING &INSPECT101V
J Environmental Services
Val Christensen
City of Rexburg
PO Box 280
Rexburg, ID 83440
lio
ASTM D-2922 D%inWflsity of Soil and
Soil -Aggregate in Place by Nuclear
Methods (Shallow Depth)
Geotechnical Engineering
J Construction Materials T ti
Project,a
Inspector.,
1*
lnspet-vfior.Dee
Phone:
Fax:
Other:
PAGE #1 OF1
BEMs ICON CHAT E 1111 51 o S
RREPOAT \EASTERN
10 H0 05REPORT \E5008 6C -
nxao n l
(208) 359-3020
08) 359-3022
Beehive Fed -era] Credit Union
Cris McMurtrey
Novernber-4. 2005
As requested, MTS performed density testing in accordance with current applicable standards.
compaction is 95%. The .results obtained are as (allows.
Test
Location & Depth
Wet Percent
East parking lot, final grade # �
northwest corner f' r l n lot 1 . .
East parking lot, final orrade,' north,
southeast corner rinor lot �� 1 t
3 South r n lot, finer grade, 171
gest ' south of 139.8
northeast corner of Parking lot 6.9
youth Parking lot., final grade, ' south
northeast corner parking lot . .
youth parking lot, final grade, ' south of southwest
building corner 140-6 .
6 West parking lot, final
West, I F north of
southeast building corner 1 -
Wiest parking lot, final gTade, ' west, ' north of
-southeast building cornu 6._3
.
Method of testing: BS I's Backscatter; Depth in inches is Direct Transmission
Material Type: A** 128.4pcf @ 7-o5% HK Ashcroft Pit - 3/499 aggregat
4
` 1 i
MTJ #: 33 Make& Model: Troxier 3411
SerialStandard Counts.* DS:
Required
Dry
Ma�'1•
%
Passl
Density
Type
Comp.
Fail
130-9
A
100
Pass
129.5
A
100
Pass
130.7
A
100
Pass
133.8
A
100
Pass
132.0
A
lOQ
Pass
13Q.7
A
1.00
Pass
1313.0
A
goo
Pass
If you have questions concerning this report QPW301nd-doc), please contact us immediately.
RespectfuDy submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Cristopher McMurtrey
Eastern Idaho Assistant Manager
* Cory Roberts, Nielson BodAy, & Associates+a F
l r1 t n r . 1t f Rexburg; Shook Construction
ASTM D-1557
NOrM 6Kyllnerive, Suite Idaho .F1f, 183402 208-529-8242 Fax: 208-529-6911
Emal .F imti@roWebsite:ti-id, or 1
MATERIALS
TESTING Fs
INSPECTION
0 Environmental Services
Val Christensen
City of Rexburg
PO Box 280
Rexburg,,, ID .93,440
MOISTURE DENSITY/——
PROCTOR TEST REPORT
0 Geotechnical Engineering
DATE: r:l3E R 8, 2005
C5 _1W=W I- F:1REPORT5IEASTERN
I0AHo12005REw0R7S\F540B6C -
BEFHIVEFCl1kPROCTC3R 1443-5_(}pC
0 Construction date ria l's Testi nci r_1 n0�i-m-,+a.
Phone: (2Q$) 359-3020
Fax: (20$) 359-3Q22
Other:
Project** Beehive Federal {Credit Union
Test Date: November 4, 20p5
As requested MTI has performed a proctor on the sample referenced below. The testing was performed in
accordance with current ASTM standards. The results obtained in our laboratory were as follows-
Assumed
p.'ter# Number Moisture Density Densityry i
isture
2.54 1 3.9 122.9
2 12
i Uncorrected-, ecce _ 128.4 tb ft
9.4 126.1 ASTM D 4718 Correction: N/A IbS/ftA3 N/A
12.5
118.1 s Fouad Correct i R 3 N.
129.0
127.0
125.0
123.E
117.0
Proctor curve
13ereent Moisture
dote: ASTM D698 and D1.557 valid with up to 5°Ic Oversize Particles; correctable up to 34% via
Oversized Particles greater than 30% retained on the 3/ inch screen.
Respectfully Submitted,
MATERIALS TESTING & INSPECTION
Reviewed by: Johan Lund
Eastern Idaho Laboratory Manager
ASTM D 471$ and invalid for
CC: Cory Roberts, Nielson Bodily & Associates; Val Christensen, City of Rexburg- Shook
1230 North Skylineri Suite C, Idaho
Email: imti-@mti-ij Website: www.mti,.id.com
MATERIALS
TESTING �
INSPECTION
❑ Environmental Services
E Geotechnical E i rin
Ll Construction Mat ri Testing
Val Christensen Phone:
City of Rexburg Fax:
PO Box 2g0 Othe.r:
Rexburg, ID 83444
Project;
Inspector;
Inspection Date;
PAGE #1 OF 1
REVISION DATE 11/412005
FAREISOR MEASTERN
DAHO '' X05 R E PO RTS\ E5 008
BEEHIVERURPT029SBDOC
i
(A208) 359-3n20
(208) 359-3022
Beehive Federal credit Union
kyle Kofford
October 7, 2405
HIGH STRENGTH BOLTING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below.
Inspected installation of full tension/slip critical turn -of -the -nut method ASTM A325 3I4"' bolts with hardened
washer. Faying surfaces were flush and in full contact. Visually monitored turn -of -the -nut method. Verified
installation equipment and bolts using Skl*dmore-Wilhelm tension measuring device. Verified ail bolts at every
connection at staircases and columns in drive-thru.
Work inspected was in compliance with project plans and specifications.
If you have questions concerning this report (rPt029sb.d0c)., please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
d
Reviewed bye. Dan Ding
Eastem Idaho Manager
C: Cory Roberts, Nielson Bodily & its Val ChristenCity,
Christensen,Shook Constructi
1230 North Skyline Drive, Suite G, Idaho Falls, ID 83402 208-529-8242 Fax: 208-529-6911
Email: eimti Ocz,ft-id.Gomb t: www.mti-id'.com
.,1MATERIALS
r i
TeSTING &lNspr=CTION
El Environmental Services
Val Christensen
City of Rexburg
PO Box 280
Rexburg, ID 834-40
❑ Geotechnical Engineering
Construction Materials Testi n
Phonem6
Fax,,
ether:
PAGE #1 OF 1
REVISION DATE 11/4/2005
FAREPORMEASTERN
IDH\2005REPORTS\E,5D08
FEEHI V EFCLA Pfi0 8 E. DOC
ri f lncznai-firinp-
%..F to : _ - - , -- r +f +� &.1 %.r 9- i LJ
(208) 3.5"9-3020
(208)359-3022
Project: Beehive Federal Credit Unian
Inspector: Kyle Kofford
Inspection Date: October 7, 2005
STRUCTURAL STEEL WELDING INSPECTION REPORT
Oen the above date, our representative performed work an the referenced project as reported below.
Arrived on site and inspected welders` qualification papers; they were current. Visually inspected the completed
welding performed by qualified welders using a SMAW process with E6022 electrodes. Inspected arc spots
welds and button punching at roof deck on top, second floor, roof on drive-thiru and roof on overhang on front
entrance (ref*. engineer drawings),
Work inspected was in compliancewith project plans and speeffications.
If you have questions concerning this report (rPtO28swe.doc.), please contact us immediately,
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
0
Reviewed by: Dan King
Eastern Idaho Manager
GC: Cory Roberts, Nielson Bodily &Associates; Val Christensen, City of Rexburgr; Shook construction
1230 Forth Skyline Drive, Suite C. Idaho o Fair i 83402
208-529-52"�42 F 2''0----8----.-5-29 - ------- -----------
Email, i ti @ mti-id. Website: www. roti -i y o
MATERIALS
TESTING Er
INSPECTION
0 Environmental Services
Val Christensen
City of Rexburg
PO Box 280
Rexburg, TD 83440
Z1 Geotechnical Engineering
Ll Construction Materials Testinn
ProJ ect.
Inspector:
Inspection Date,,,,
Phone,
di
Fax
Other-,
PAGE #1 OF1
REVISION DATE 11/41200,5
FAREPORM TERN
IDA# \2005 REPORMP-500860 -
B E EH IVE FC U\R PT026,SWE.DOC
El Rnoninl
(208) 359-3020
(208) 359-3022
Beehive Federal Credit Union
kyle Kofford
September 29, 20U5
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below.
Arri'ved on site and inspected welders' 4ualification papers; they were current. Visually inspected the in-
progresslco�np�eted welding performed by qualified welders using a SHAW prvicess with E7vi8 and E7Q�4
electiades. Inspection consisted of single pas5 fillet welds and multi -pass filet w�ld.sat bar joist connections
with retaining X -bracing (ref: engineer drawing),
I ZJL) Nortli Skyl Email: e4rnti@rntHd. Website: www.mti-id.com
Ire rive uit , Idaho Falls""", I D 83402 0_- F -
Note:' On gridline A, third floor west side, X-bracinori s nvtin line. The Engineer of Record gage approval of
this item to remain as constructed. Notification came via email on October 3, 24Q5.
Work inspected was in compliance with project plans and specifications.
If you have questions concerning this report (rpt026swe.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Dan King
Eastem Idaho Manager
CC: Cory Roberts, Nielson Bodily &Associates; Val Christensen, City of Rexburg; Shook Construction
MATERIALS
TESTING it
NOW INSPECTION
El Environmental Services
Val Christensen
Citi of Rexburg
PQ Box 28€}
Rexburg, ID 83440
El Geotechnical Engineering
Construction Materials Testina
Pro ect,
Inspector*
Inspection Date:
Phone.-
Fax:
hone:
Fax:
Other.
PAGE #1 OF 1
REVISION DATE 11/1oo
FAREPORT \ TERN
1 DAH0\2005 R EP HTS\E500
BEEHIVE FWAPTQB.D0
(208) 359-3020
(2Q$) 359-3022
Beehive Federal Credit Union
kyle Kofford
September 23, 2D05
HIGH STRENGTH BOLTING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below.
inspected installation of snuff tight only, full tension/sl" critical turn -of -the -nut method and twist -off bolts were
used ("Lejune" bolts), ASTM A325 '/s" bolts with hardened washers. Fayinor surfaces were flush and in full
contact, free from paint, oil, etc. Visually monitored turn -of -the -nut method. Visually inspected twist -off bolts;
ushers at slotted holes under turning element. Verified all bolts at every connection at all truss to foist to
column connections on or under first and second floor and staircases,
Note: Need RFI on tum -of -the -nut on column dips, and RFI on snug tight of staircase; drawings call for
twist -offs.
Work inspected was in cornp�ianee with project plans and specifications, except as noted.
Ifyou have questions concerning this report (rj,7t025sb.doc)., please contact us immediately-
Respectfully
submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Dan Ding
Easteriz Idaho Matiager
- Cory Roberts, Nielson Bodily Yat- Val Christensen
Rexburg; n sn bion
1230 North Skyline [Drive, Suite C,. Idaho Falls, ID 8340
ErnaII! e'l"mti@mti-id.com Website- www.mti-id.com
MATERIALS
TESTING Er
INSPECTION
❑ Environmental Services
J Geotechnical Engineering
13 Construction Materials Testina
Val Christensen Phone:
City of Rexburg Fax -1:
PO Box 28Q other:
Rexburg, ID 8344+Q
ProJect:
Inspector.
Inspection Date;
PAGE #1 OF 1
REVISION [SATE 11/4/2005
FAREPORMEA TERN
BE E H IVE FC LAR PT0 E,C OC
a
- - - - - - - T - _ F- - ,-- - - ..-r - r 16..F
(208) 359-3020
(208) 359-3022
Beehive Federal Credit Union
kyle Kofford
September 23, 2005
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below,
Arrived an site and inspected welders' qualification papers; they were current. Visually inspected the in-
procyress/completed weldiIP ng performed by qualified webers using a GMAW process with E7018/E6022
electr+ades. inspection consisted of single pass fillet welds, multi -pass fillet welds, are spot welds and button
punching. Type of r, r% and locations: Lands on staircases, bolting on staircases, hex bolting on
on ilTYlfiC ClY17___ii_ _ ■ ..
vVLµ11.RL 117 .���a� l��ul, .���11 �:a�� wCIUS, ouiion punch anc1 puddle welds on stairea.se.,
performed an regular visas for *; inspections performed on latter welds (ref:
V
All re -inspections
engineer, drawing).
Note: Need RFI on embed fillets made out of tube steel under main floor. *Ali deficiencies on weds and
bolting on earlier inspections have been repaired.
Work inspected was in compliance with project plans and speciffications, except as noted.
If you have questions concerning this report (rptO24swe.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Cristopher McMurtrey
Eastern Idaho Assistant ,Manager
CC: Cor Roberts, 1tChristensen,fit
y of'Rexburg- Shook Construction
1230 North Skyline Drive- Suits r, a - -
8242� Fax: 208-529-6911
Email: 9imti*mtHd.,com Website: www..mti-id.com
RIALF3MATE
TESTING Fi
INSPECTION
El Environmental Services
Val Christensen
C ity of Rexburg
PO Box 280
Rexburg, ID 83440
El Geotechnical Engineering
U Construction Materials Testina
PAGE #1 OF1
REVISION DATE 11/4/ 1DO5
R: REPORTS\EA TER
D H\2005REPOR 1E 0()B6 -
8EEH1 EF UWPT0 1 SVVE,DOC
11 Snernal I n irye
- F- — -IF ;c,..r a I%.e
Phone: (20$) 359-3020
Fax: (208) 359-322
ether:
Project: Beehive Federal Credit Union
Inspector: Kyle. Kofford
Inspection Date: September 14, 2+45
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced pro9
ject as reported below,
Arrived on site and inspected welders' qualification papers; they were current. Visually inspected the in-
Progress/completed welding performed by qualified welders using a SMAW process with E701$ electrodes.
Inspection consisted of singe pass fillet welds, are spot welds, and shear studs on metal decking. Type of
connections and locations: Second floor are spot welds, shear studs, bent plate connections, clip connections on
columns, K -connections of tube steel ref:0
engineer drawing}.
dote: RFS needed on second floor center base place connection; welded instead of b I ing# IP
(misplaced hales).
'/s" hex head bolts need replaced with twist -ofd at truss connections center overhead on first floor.
*FtFI requested on hex head bolting on staircase.
Work inspected was in compliance with project plans and specifications, except as noted.
If you have questions concerning this report (rpt021swe.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Dan King
Eastern Idaho Manager
CE Cory Roberts, Melson Bodily & Associates; Val Cbristensen,ur , h trC ion
1230 North SkyfinDrir Suite C a Idaho Falls, ID ax.-, 208-529-6911
Email: im i t -i , + r Website.- , fi-id. om
MATERIALS
TESTING £r
INSPECTION
Q En-vironmental Services
Ll Geotechnical Fnglneering
Q Construction Materials T t'
PAGE #1 OF 1
REVISION DAT -E 11/4/2()05
FABEPORT \ TERN
IDAH0 00 REPORT T5008
B EEH I VE FC U\RPTO I8SEW
D Sperini 1 rr-firNnc
Val Christensen Phone: (208) ss9-�ozo
City of Rexburg Fax: (208) 359-3022
PO Box 280
Other.,,
Rexburg, ID 83440
Project: Beehive Federal Credit Union
Inspector: Kyle Kofford
Inspection Date: September S, 2005
HIGH STRENGTH BOLTING INSPECTION REPORT
On the above date,, our representative performed work on the referenced project as reported below.
inspected installation of full tension/slip critical twist -off bolts ("Cajuns" bolts) ASTM A325 %S" balls per
installation verification. Verified installation equipment and bolts using Skidmore -Wilhelm tension mP.asurina
device.
Note: Washers not in compliance on base plate on bottom of columns. Two column -truss connections do not
have twist -off bolts and trussing washers on oversized holes,, Balling in staircase not twist -offs.
Work inspected was in compliance with prflject plans and specifications, except as noted.
***RE-INSPECTION/RETESTING REQUIRED
If you have questions concerning this report (rpt018sb.doc), please contact us immediately,,
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Dan King
Eastern Idaho Manager
CC: Cory Roberts, Nielson Bodily & Associates; Val Chn"stensen, City of Rexburg- Shook Construct'
I ion
123V NorM Skyline Olive, Suite C, Idaho Falls,ID 83402 208-529-8242 Fax 208- 9-6911
1
Email: eimti.@Mti-id.com Wbit , www..mti-id.com
MATERIALS
TESTING Er
INSPECTION
4 Environmental Services
0 Geotechnical Engineering
El Gonstruction Materials Testina
Val Christensen Phone:
City of Rexburg pax:
PC} Box 280 Other:
Rexburg, ID 83444
Project:
Inspecton
Inspection Date.,
PAGE #1 OF 1
REVISION DATE 1114/2005
F,' REPORMTERN
BEEHIVEF0U\RPTO 17 E-o0c
J ne i l Ire orti nc
(2081) 359-3424
(208) 359-3022
Beehive Federal credit Union
Kyle Kofford
September 7, 2005
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below.
Arrived on site and inspected welders' qualification papers; they were current. Visually inspected the in-
progress/completed welding performed by qualified welders using a SMAW process with E7018 electrodes.
Inspection consisted of single pass fillet welds and multi -pass fillet welds. Inspected arc spot welds, shear suds
on metal decking, and button punching. Type of connections and locations: K -connections., staircase to
basement Pref: engineer drawing}. All �-cr�nnections checked vc�ere in compliance. Shear studs in compliance
on bottom floor; buttonunchpin compliance; re -inspection complete (faults okay).
dote: Staircase connection at wide flange on trip, cut to fit request (RFI)*.
Work inspected was in comp Hance with project plans and specifications, except as noted.
If you have questions concerning this report (rptOl 7swedoc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Dan ding
Eastern Idaho Manager
Cory Roberts, Nielson Bodily & Associates; ValChristensen,t1
on
1230 North Skyline Drive, Suite C, Idaho Falls, ID 83402 208-529-8242 Fax.0 208-529-6911
Email. i t O mfi-id. m Website- ww., tkid. om
MATERIALS
TESTING Fr
INSPECTION
L) Environmental Services
U Geotechnical Engineering
LJ Construction Materials Testing
Val Christensen Phone:
pity of Rexburg Fax :
PO Box 280 ether:
Rexburg, ID $34- 0
Project:
Inspector:
Inspection Date;
PAGE #1 OF I
REVISION DATE 1114/2005
F AH EPORMEA TERN
i DA HOT005 R E PORT T 08 -
BEERI E FC U\RPTS1 6SWE.DOC
Ll a
J
(208) 359-3020
()08)359-3022
Beehive Federal Credit Union
Kyle Kofford
September f, 2005
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced Project as reported below,
Arrived on site and inspected welders' qualification
progress/completed welding performed by qualified
papers; they were current. Visually inspected the in -
welders
cicctroaes. mspectecl arc spot welds, shear studs and button
locations; shear studs on deck., puddle welds, fillet welds on K -c
using a SMAW process with E7018/E6022 at seams. Type of connections and
onnections (ref: engineer drawing).
Note.- Failed shear studs were marked; button punching insufficient.
***RE-INSPECTION/RETESTING REQUIRED
If you have questions concerning this report (r-�t0lGswe.doe), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING 8z INSPECTION INC.
Reviewed by: Dan King
Eastern, Idaho Manager
CC. Cory Roberts, Nielson Bodily & Associates; Val Christensen, City of Rexburg; Shook Construction
1230 North Skyline Drive, Buba C, Idaho Falls ID 83402 208-'5'29-8242
Email. iM O m i -id. om Website- .mti- d. r
MATERtAlS
TESTING fr
INSPECTION
Q Environrnental Services
Q Geatechnicai Engineering
J Construction MaterialsTestina
Val Christensen Phone:
City of Rexburg Fax:
PCS Box 2$a Other.
Rexburg, ID 83440
Project;
Inspector:
Inspection Date.!,
PAGE #1 F 1
REVISION DATE 11/412DO5
FAREP I MEA TERN
IDAHO 0 REP RT \E 008 -
BEEHIVEFCLARPTO1 E, DOC
Ll Sni Insner.-tioncz
(208) 359-3020
(208) 359-3022
Beehive Federal Credit Union
Kyle Kofford
September 1,, 2005
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work an the referenced project as reported below.
Arrived on site and inspected welders' qualffication papers; they were current. Visually inspected the in-
progress/completed welding performed by qualified welders using a SMAW process with E7018 electrodes and
verified proper electrode storage. Inspection consisted of single pass filet welds at shear connections on tube
steel, K -connections and best plate connections (ref: engineer drawing),
Nate: Gridlines 6.3 and 10.6. misplaced shear cannectians. Welded connections have moved, request RFI.
Tube steel slobs not radiused; request RFS on bass plates an columns that are welded instead of bolting,
***RE-INSPECTIONIRETESTING REOUIRED
Work inspected was in compliance with project ,plans and specifications, except as noted.
If you have questians concerning this report (rpt015swe.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Ilan King
Eastern Idaho Manager
Cory Roberts, Nielson n Bodey & Associates- Val Christen f
1 r ; Shook Con tion
1230 forth Skyline Drive} Suite C, 1 r ho Fahs, ID 83402 208-529-8242 Fax: 208-529-6911
Ery l: i ti @Mt1-i _C0 Website- www.mti-id-com
MATERIALS
TESTING &
INSPECTION
D Environmental Services
ZI Geotechnical Engineering
Q
❑ Construction Materials Testing
Val Christensen Phone:
City of Rexburg Fax:
PO Box 280 Other:
Rexburg., ID 83440
PAGE #1 OF I
REVI 10N 0ATE 11/4/2005
FAREPORT \EASTERN
IDAH ' 5REPORT T50 `
(3E2H1VEF PPT 1 3SWE.DOC
(208)359-3020
(208)359-3022
Project: Beehive Federal Credit Union
Inspector: kyle Kofford
Inspectian Date: August 23, 2005
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below,
,Arrived on side and inspectedwelders' qualification papers; they were current. Visually inspec�e� th
progress/completed welding pee in-
rformed by qualified welders using a SMAW grocers with E701 8 electrodes and
verifiect proper electrode storage. Inspection consisted of single pass fillet welds and anile butt splices at wide
flange to amide flange, angle to
drawings).,
r- - -01 1, f %.f i 1 11.01
1
angle ledaer connections; all floor connections on main frame (ref: engineer
Work inspected was in compliancewith project plans and specifications.
If you have questions concerning this report (rpt013swe.doc), please contact us xmmediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by.* Dan ming
Eastern Idaho Manager
CC: Cory Roberts, Nielson Bodily & Associates; Val Christensen, City of Rexburg; Shook Construct -ion
------- ------
1230 North Skyline Drive} Suite C, Idaho Fa -11s, I 83402 208-529-8242 F 7 x14'q _208- M- -
Email, eimtmti-id.comWebsite: www.mti TEd.
MATERIALS
TESTING &
INSPECTION
fl Environmental Services
0 Geotechnical Eng'ineering U Construction Materials Testinn
PAGE #1 OF1
REVISION IDATE 12/6/2D05
FARE RMEASTERN
DAHO)2005 R ER T \#E50
BEiEH]VEFCU\RPT0 SWE,D0
F) ry of `i
ValCh4 -- . . - co — — r– — — 0 %"% * I I r %,?v %_ %.,?.L I W F 1%0
ristensen Phone: (208) 3ff59- 020
City of Rexburg fax : (208) Y)9"3022PQ Bax 280
Rexburg, I] 8344+D Other:
Project: Beehive Federal Credit Union
Inspector*. Kyle Kofford
_ Inspection Date: November 28, 204
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above date, our representative performed work on the referenced project as reported below,
Arrived Qn site and inspected welders' qualification papers; they were current. Visually inspected the completed
welding performed by qualified welders using a SMAW process with E7018 electra&es and verifted proper
electrode storac,e. Inspection consisted of single pass fillet wilds and multi -pass fillet welds at cross -frame
connections, Ci1eVi0I7's on east side, second door. *Compete and final inspection.*
Note: All welding complete and in compliance with AWS D 1. 1 Structural Welding Code.
Work inspected was in compliance with project plans and specificativns.
If you have questions concerning this report (rPtO32swe.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
J
Reviewed by: Dan King
'astern Idaho Manager
+ ry Roberts. Nielson "l y Associates -
7 istensen, City of Rexburg; Shook Construction
�5Kyllne Drive,
Fax., 20'8-529-6911
Suite C,
Idaho
Falls, ID -83402 208-529-8242
Email:
i t @ mtkid-com
Website: www.mti-'Id.co
MATERIALS
TESTING Er
INSPECTION
13 Environrnental Services
Val Christensen
City of Rexburg
Pa Box 280
Rexburg, ID 83440
ASTM C-39 Concrete Cylinder
Compressive Strength
E Geotechnical Englheering
Contractor: S ho'ok Construction
Supplier.- Walters
Mix ID: 172
Location-. Slab on deck on row D-5 a
MIX PROPORTIONS PROVIDED BY SUPPLIER:
13 Construction Materials Testina
PAGE #1 OF I
REVISION DATE 11/2M05
FAREP RT TA TERN
DAI--IO\2005 RE I OBTME 0 -
BEEHIVEFGUJ GS- 1701.DOC
E n P -r 1ncznr,+;nm&n
�-F — I— — —.--.. .. •�r�v%b.rf�I%'-aI rte.
Phone-. (208) 359-3020
Fax: (208) 359-3022
Other:
Prqicc Credit
Union
Inspector-- Cris McMurtrey
Truck Ticket 01344
TEST PROPERTIES & CONDITIONS:
.Size of Load: I I yards Weather Conditions: Partly cloudy
Cement (Ibs)- .. .� iNent T +
47
H Ash (lbs). Not Concrete TeWater (gal) - Provided ns p+
+ Time Concrete '(ASTM
from Ticket)- 6-58am
Coarse Agg. #1 (lbs). By Time Representative Concrete. Placed..' 8:00am
Coarse Agg. #2 (lbs); The Air Content 2
Fine Agg. #1 (lbs): Redi Slump (ASTM C 143) (*nches): 53/4
Fin Agg. #lh: Mixni
Weight (ASTM 138):
Yield T I
Water Added HCl
Water/Garment Ratio:
Sampled in aoral ce with ASTM C 17
CvEnders cast in accordance with ASTM C31 , Field 1. -1 h
]k.TFIR ,- tr^7-
ba -Sed
+ham s '' #-h'� y•.a _,. ;+ °ti
•� r• ,r` mar.+�'!! pa—cls
, r , +,±� }� F ,.
I..4 ■ �iLV��rT�La� ti#°ilY4"J+7�S�l e7r+tr jJL�14.r+i
Note: Slump spec 3" ± 199 — air spec 3% maximum.
If you have questions concerning this report (c51701.doc), please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by,*, Dan King
Eastern Idaho Manager
Cory Roberts, Nielson Bodily & Associates* Val Chest
ensen, City of Rexburg; Shook Constmcti
9 ion
izxju - e
o In rive Mite e Idaho Pairs, ID 83402 208-529-82 -
iii; e1 � 1
+ t -idf ''bit : www.mti-id.com
MATERIALS
TESTING Fr
INSPECTION
Ll Environmental Sere*ices
Val Christensen
City of Rexburg
PO BOX 280
Rexburg, ID 83440
Geotechnical Engineering
❑' Construction Materials Yp.. tiro
PAGE #1 OF 1
REVSSM DATr= 11,f2J
FAREPORTs\ TERN
1-DAHOW05REPORTME50086c -
B EEH I V EFC LARPT029SB, DOC
F1 0NrVnf-11in1
Phone: (2Q8) 359-3020
Fax: (Z08) 359-302
ether:
Project: Beehive Federal credit Union
Inspector; Kyle Kofford
Inspeciian Date: October 7, 2005
HIGH STRENGTH BOLTING INSPECTION REPORT
Can the above date, our representaiiwe performed work, on the referenced P
roject as reported below.,
Inspected installation of full tension/slip critical turn-vf-the-nut method ASTM A325 �/a" dolts with hardened
washers. Paying surfaces were flush and in foil contact. Visually monitored turn -of -the -nut method. Verified
installation equipment and bolts using Skidmore -Wilhelm tension measuring device. Verified all bolts at every
connection at staircases and columns in drive-thru,
Work inspected was in compliance with project plans and specifications.
ff you have questions concerning this report (rPt029sb.doc),,. please contact us immediately.
Respectfully submitted,
MATERIALS TESTING & INSPECTION INC.
Reviewed by: Dan King
.astern Idaho Manager
CC: CorY Roberts, Nielson Bodily & Associates; Val Christensen, City of RexburEr
1230 North Skyline Drive, Suite , Idaho Falls'
I D83402
r- - - 11
Email: l� t* mt id-com bite: .mtl'-id.com