HomeMy WebLinkAboutCOMCHECK - 05-00160 - Madison County Implement - New BuildingEnvelopeCompliance Certificate
20+3 IECC
CQIYTcheck-EZ S OffWare Version 3.4 Release I
Data fflename: C:1Pmgxam Files 1Check1C01Mcheck-EZljobn deerexck
5 ection 1: Project In formati on
Project Nie:
Designer/Contractor:
Document Author:
1-71adison Courity impiement
Joh Deere
ntWr.
Steel Vision
J -W & Associates.
Section 2P0 General Information
Building Locatlon (for weather data):
Climate Zone:
Hemming Degree Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F).-
Project
):Project Type:
Window / Nall Ratio:
kexburg, Idaho
16
8493
X43
New Construction
0.06
9
S 40� 1 - (0
Permit Number
0 � 1.6 a
Activity TYp�cl
Industrial Work, < Zp ff Ceiling Height floor -Area
0Ece 9796
Retail Sales, Wholesale Showroom X285
Convention, CUIIfcCe]1Ge OT Meeting Center 3743
+Corrzdvr, Restroom733Support Area.
Storage, Industrial and Commercial 80S
3714
Secton 3: Requirements Checkfiost
.Air Leakage Component Cextification, and Vapor Retarder Requirements
1. A11 joints and penetrations are caulked, gasketed, weather-stripped, or othenMse sealed.
2. Windows, doors,, and skylights certified as meeting leakage requirements.
3. Component R -values & U-fiaors labeled as certified.
4. Stair, elevator shall vests, and other dampers integral to the building envelope are equipped
with mQt�rized d�rnpers.
5. Cargo doors and loading dock doors are weather seale.
d
6. Recessed lighting fxtures are: (i) Type IC rated and steed yr Basketed; air (ii) installed inside an
�.pproPriate aix-light assembly v��h a 0.5 inch cl=ince from combustible materials and
with 3 inches clearance from insul ati on material.
"aw,
[ ] ( 7 Building entrance doors have a vestibule and equipped with closing devices.
� Exceptions:
j Building entrances with revolving doors.
�
Doors that open diredly from a space less than 3000 sq. $6 in area.
Climate. -Specific Requirements
inion
EAST:
East Wall: Other, HC 2.4
Window 5:
i;
Gsv
i
Gross CavItY Cont* Proposed Budget
-Value R.Nalue U -Fa U-.
ivleiai Prame with, Thenal Break -Double Pane with Law -E
Tinted, SHGC 0.5$, PF a.84 139
Window 7:
Metal Frame with Thermal Break:Double Pane with Low -E
Tinted, SHGC 0.58, PF 0.84 139
Window S:
Metal Frame with Thermal Break :Dauble Pani with Low -E
Tinted, SHGC 0.58, FF 0.64
Door 8.- Solid
Door 9.- overhead
OUTS:
South Wall; Quer, JJC 2.0
Window 1
_�
0.0$4
0.540
0.540
0-067
0.520:
0.520
147 -- -- 0.540 0.520
21 -- - 0.700 0.112
480 --- - 0.136 0.112
3287
Metal rxame with ',1'hetmal Break -.Double Pane with Low -E
Tinted, SHGC 0.58 21
Window 2:
Mutat Frame with Thermal Break. -Double Pare with Low -E
T entad, S HGC 0..58 21
window 3:
ll.[etal Frame with Thermal Break:Dvuble Pani With Low -E
Tinted, SHGC 0.58 21
Window 4:
Metal Frame with Thermal Break:Double Pane with Low E
Tinted, S HGC Q.5$ 21
ivleEat name with Th=ai Break. -Double Pace with Low -E
Tinted, SHGC 0.583, PF 0.84
Door 7: Glass, Tinted
io SHGC 0.87, PF 0.64
WEST:
West Wall.- Other, HC 2.0
Door 3: Overhead
Door 4: Solid
Door 5: Overhead
Dour 6: Solid
UNSPECIFIED ORIENTATION:
Roof 1: Metal Roof with Thermal. Blocks
Floor 1: Slab -On-Grade:Unheated, Vertical 3 $.
Floor 2; Slab-Qn-Grade:Heated , Veriical 3 L
--
--_
i
10.540
0.540
0.067
0,520
34 -- --- 0.540 0.520
83 -- --- 0.920 0.520
3866
0.084
0.067
Oso --
---
0.136
0.112
21
0.700
0.112
144
0.136
0.112
21 ---
---
0.700
0.112
18791 38.0
0.0
0.X41
4.047
391 --
10.0410
---
__
---
10.0
-
-
3.
(a) Budget LJ -factors are used for software baseline cal cul aft ons QNL'Y, and are not code requirements.
Fhvelope PASSIES: Design 15% better than code
Section 4.40, COMPHOance Statement
The proposed envelope desI911, represented in this document is consistent with the building pans, specifications and other
calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2003
][ECC requirements in CQMcheck-EZ Version 3.0 Release la and
Requirements Checklist. to comply with the mandatory requirements in the
PiinclPal El Designer -Name
Date
Lighting Co P15iance Certificate
2003 IECC
COMCheck-EZ SOfware Version 3.0 Reiease la
Data filename: CAProgram Fi1eslCheeklC0Mcheck-E2ljahn deereCf-1-.
S acti on �.: Project In formati on
ProjeU Name.
esi. tractr:
Document Author:
Madison County Implernpnt
Jahn Deese
Contractor:
Seel Vision
JRW &Associates
Section 2: General Information
ill Use Description
Project Type:
Activity Type
New Construction
Activiiv Ty�c,
Industrial Work, c 20 It Ceiling Height
Office
Retail Sales, Wholesale Showroom
Convention,, Conkrence or Meeting Center
Con�.dor, Restroom, Support Area
Storage, industrial and Commercial
Section 3Requirements Checklist
Bldg.
Dept,
G L.0_40
Pennit Number
Check
Floor Area
9796
I2$5
3743
733
805
3714
Interior Lighting
( 1. Total actual watts mast be piss than or equal to total_ allowed waits
f
Allowed Watts Actual Watts Complies(Y/N)
I
24180 21698 YES
r
j Exterior Lighting
[ ] j 2. Efficacy greater than 4S IumensJ+'w
� .Exceptions;
� Specialized lighting h1401-ghting features ofhistoric buildings; signage; salty or security lighting -
low -voltage landscape lighting.
�
Controls, Switching, and. Wiring
� ] f 3. Independent controls for each spate (switch/occu anev sensor}.
f exception: Areas that must be continuously illuminated.
I
4. Master switch at entzy to hotel/motel guest mom.
5. Individual dwelling units separately metered.
6. Each space provided with a manual c,�ntral to provide uni�rm
Exceptions:-V VV
dight reduction capability.
Only one luminaire in space; An vccupanti-sensing device controls the area;
The area is a corridor, storeroom, restroom, or lobby: Areas that m,iqt hp �n�,�,�,.,,.n,., _
Areas, that „�P 1�� +1,.,., n c tzr_�,._,_ _ o
... - ----------•._ •••. •••.•�..auuuua�y itiu.[�.l3ll.c1L��
/sq.n.
7. Automatic fighting shutoff oonirol in buildings larger than 5,000 sq. f .
til. p�l[7t[1�:P!��laetrnnnm;...�1 4;..,,, --. ,.
lu� SwitLll t3�1 eXi�c]I' 11gt1tS.
Exceptions." Areas requin.ng lighting dun'tig daylight hours
9. Tandem wired fine -lamp and three -lamp ballasted. Luminaires.
.Exceptions: - _ _ _ _
Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair.
Section 4: Compliance Statement
The proposed lighting design represented in this document is consistent with the building plans, speczfications and other
c�eulations subm�ttad with this p�rrntit applicati��. The proposed lighting system has been d€�igr�ed to mit the 2003
MCC, Chapter S, requirements in CQ1VIcheck-EZ VersiQn 3.Q Release 1a and to comply with the mandatory uirements
in the ft�uir�ments Checklist.,�
1
Principal Lighting Desigiaer-Nanae
ignature
i
li
i
8 f
LightingApplication Worksheet
2003 IECC
COMcheck-EZ So$waze Version 3.0 Release la
S ectian 1: Allowed lighting power Calculation
V3
m Cats
Aa 1
Industrial Work, < 20 It Ceiling weight
Qffi ce
Retail Sales, Wholesale Showroom
Convention, Conference or Meeting Center
Cvnridor, Restroom, Support Area.
Storage, Industrial and Commercial
S ectiEon 2: Actual Lighting Power C al cul ati on
A
Fixture
ID
A"
"U t
117
trrt
Urp
"Klt
'IP
11yt
'IQ"
rr11
C4 -
Fixture Description 1
Lam Des+�ri tion1 Watt
Floor
Area
C$21
9796
1285
3743
733
805
3714
1.2
1.1
1.7
1.3
0.
0.8
tts/#2
Total Allowed Watts =
C
Lamps/
Per Larnio / BMast Fixture
Metal halide 250W ! Magnetic
24" T 12U 40W f Electronic
Triple 4 -pin 32W 1 Electronic
4$" T$ 32W 1 Electronic
48" T S 32'V4t /Electronic
Incandescent 1 UOW
Metal Halide 70W / Magnetic n,,� r ar.
Metal Halide 70W / Magnetic
48" T8 32W / Electronic
24" T 12U 40W 1 Electronic
7 S u-)
Allowed
Watts
X
�z7ss
1424
6363
953
724
2971
D E
# of Fixture
Fixtures Watt..
X
36
3
29
I
q
3
75
Z
5�
2
1
4
1
3
2abEw
'7
2
2
F
(D x1E
295 10620 v-4
]O1 2929
35 315
95 665 Al C2
65 3315 330
29b"l00 2600/in3-0
95 egg
95 285
65 455
67 ]34
1 7 75 1150
Total Actual Watts = 21698
Section 3: Compliance Calculation
If the Total A11vived Watts minus the Total -Actual Watts is grey#er than or equal to zero, the
Lighting PASSES : Design 10% better than code
building complies.
Total Allowed. Watts
Total Actual Watts
Project Compliance
= 24180
21698
2482