Loading...
HomeMy WebLinkAboutSOIL TEST REPORT - Eaglewood Enterprises - 700 S 300 E - Rezone from MDR to HDRHARPER - LEAVITT ENGINEERING, INC. CIVIL & STRUCTURAL ENGINEERING, MATERIALS TESTING & LAND SURVEYING 985 N. Capital Ave. • P.O. Box 50691 Idaho Falls, Idaho 83405 (208) 524-0212 Fax (208) 524-0229 March 19, 2001 Mr. Keith Romney Eaglewood Enterprises, LC P:O. Box 58536 Salt Lake City, UT 84158 Re: Englewood Apartments Dear Mr. Romney: 800 W. Judicial St. • P.O. Box 866 Blackfoot, Idaho 83221 (208)785-2977 Fax (208) 785-2990 In accordance with your request, Harper -Leavitt Engineering, Inc. has completed the laboratory analysis on the two soil samples you delivered to our office last Thursday. We understand that the soils were taken from test holes excavated on the subject property located on South 2' East Street in Rexburg, Idaho. We further understand that the test holes exhibited silty material for essentially the full depth to bedrock which was encountered approximately six feet below the surface. Other information you provided us with verbally is that the proposed structures will include three story wood frame apartments with brick veneer on the first story and the two soil samples were from near the bottom of two separate test holes. Anticipated footing loads for the apartments are in the range of 3-5 kips for perimeter footings and up to 60 kips for interior column loads. Based on the soil classification, the allowable load bearing capacity of the ML class silt is 1,000 psf. Using two feet of compacted structural fill beneath the footings will provide an additional 1,000 psf for a total allowable bearing capacity of 2,000 psf. The fill material should consist of clean sandy gravel meeting a GP or GW classification according to the Unified Soil Classification System. The material should not include particles greater than 3 inches in any dimension and the percentage of material passing the #200 sieve (0.075 mm) should be less than five percent. The structural fill placed beneath the footing elevation should be placed in 12 inch lifts and compacted to a minimum of 95% of the maximum relative density as determined by ASTM D1557. The fill must extend horizontally beyond the footings six inches for each foot of depth. Using a 2 feet wide footing and two feet of structural fill, the fill must be four feet wide with the footing centered on the fill. All fill should be approved by the geotechnical engineer of record prior to hauling or placing the material. Keith Romney March 19, 2001 Page 2 of 2 Optionally the structures may bear on exposed unweathered bedrock. The basalt formation typical of the Rexburg bench area is expected to have an allowable bearing capacity of 10 ksf. If bearing on the bedrock, the depth of the formation must be verified to ensure that a thin shell of rock is not underlain by lower strength soils. To accommodate subgrade inconsistencies, a minimum footing width of 24 inches should be specified for all foundations regardless of loading. Each structure should bear on only one soil type, for example, bearing a portion of the structure on native silt and the remainder on structural fill is not recommended due to the increased potential for differential settlement. By limiting the total pressure on spread footings to the above recommended capacities, differential settlement of footings should be in less than one-half inch and total settlement less than one inch. Allowable load bearing capacities may be increased by 33% when considering wind or earthquake forces acting alone or when combined with vertical loads. To provide for frost protection the minimum earth cover from the bottom of the spread footings should be at least 36 inches. Buried irrigation main lines and valves should be kept at least six feet from bearing walls. An engineer from Harper -Leavitt Engineering should be contacted to observe the excavation and foundation portions of the project to determine that actual conditions are compatible with those considered for this report and recommendations. Placement of all fill and foundation soil should be observed and tested to confirm that the proper density and depth has been achieved. Under no circumstances should the footings be installed upon loose or saturated soil, sod, rubbish, construction debris, frozen soil, non -engineered fill, or other deleterious materials, or within ponded water. If unsuitable soils are encountered, they must be totally removed and replaced with compacted structural fill. If granular soils become loose or disturbed, they must be properly re - compacted before the footings are placed. We appreciate the opportunity to provide consulting services on this project, if you have any questions regarding our recommendations please contact me at our Idaho Falls office. Respectfully Submitted, HARPER-LEAVITT ENGINEERING, INC. Ryan Loftus, PE C:\MyFilm\2001letter\JRL-2001.020.wpd 800 W. Judicial St. • Blackfoot, Idaho 83221 / 985 N. Capital Ave. • Idaho Falls, Idaho 83405