Loading...
HomeMy WebLinkAboutCONCRETE TEST 24 - The Grove at Thomson FarmsFile Name 20001C06082021LC 0FF4C4AC-CB05-4281-9412-25EA6B44B74E 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 20001 Cumulative Test Load Amount: 69.0 Project Name: The Grove Test Location: Along west end of site Client: Stillwater Equity Partners Admixtures: Required 28 day Strength (psi): Contractor: Kershaw Curb and Gutter Supplier: Walters ready mix Mix Number: 526F City Ticket #: 0159 Date: 06/08/2021 Testing: Set #:Time Tested: Ticket #:Test Location: Ambient Temp. (°F): Unit Weight (PCF): Entrained Air (%): Entrained Air Spec. (%): Concrete Temp. (°F): Slump (in): Slump Spec. (in): 1 12:45 PM 0159 Along west end of site 75 143.17 3.00 71 1.25 Remarks: Arrived on site around 12:30 PM, begin testing at 12:45 PM, Glenn and Zack from Kershaw curb and gutter were informed of passing test results. Let’s say around 2 PM. Tested By: L. Clifford Signature: Date: 06/08/2021 Reviewed By: E. Vail Signature: Date: 06/08/2021