HomeMy WebLinkAboutCONCRETE TEST 24 - The Grove at Thomson FarmsFile Name
20001C06082021LC
0FF4C4AC-CB05-4281-9412-25EA6B44B74E 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Compressive Strength of Concrete Test Specimens
Project Number:
20001
Cumulative Test Load Amount:
69.0
Project Name:
The Grove
Test Location:
Along west end of site
Client:
Stillwater Equity Partners
Admixtures:
Required 28 day Strength
(psi):
Contractor:
Kershaw Curb and Gutter
Supplier:
Walters ready mix
Mix Number:
526F City
Ticket #:
0159
Date:
06/08/2021
Testing:
Set #:Time
Tested:
Ticket #:Test
Location:
Ambient
Temp.
(°F):
Unit Weight
(PCF):
Entrained
Air (%):
Entrained
Air
Spec.
(%):
Concrete
Temp.
(°F):
Slump
(in):
Slump
Spec.
(in):
1 12:45
PM
0159 Along
west end
of site
75 143.17 3.00 71 1.25
Remarks:
Arrived on site around 12:30 PM, begin testing at 12:45 PM, Glenn and Zack from Kershaw curb and gutter were
informed of passing test results. Let’s say around 2 PM.
Tested By:
L. Clifford
Signature:
Date:
06/08/2021
Reviewed By:
E. Vail
Signature:
Date:
06/08/2021