Loading...
HomeMy WebLinkAboutRESCHECK - 05-00117 - 302 Oaktrail Dr - New SFRREScheck Compliance Certificate 2003 IECC REScheck So$ware Version 3.6 Release la Data filenames: C;'\Pt-ogrmY]. F1leslCheck1REScheCklBasic.arek CITY: Rexburg STATE: Idaho HDD: 8693 CONSTRUCTION TYPE: Single Family W IND4VV 1 WALL RATIO: 4. 12 DAT E: 07/13/05 coMPz.LA,vCE: Passes Maximum UA = 33$ Your Home UA = 337 0.3% Better Than Cade ([JA} Ceiling L Flat Ceiling or Scissor Truss Wall 1; Wood Frame, 16" . Window 1; Vinyl Frarne.-Double Paaiewith Low -E Door 1: Solid Floor 1; Slab -On -Grade -.Unheated . Insulation dvth: 0. 0, Fu 1: Forced Hot Air, 95 AFUE Gros Area or N71 t Peiimeter -Val it 1196 1184 145 55 148 40.0 21.0 _067,60/17 Permit Number Checked By/Date Cont. l mud or Door R -Value U -Factor TJA 0.0 0.500 0._'35 0 35 56 73 19 154 COMPLIANCE STATEMENT: The praposcd building design described hire is consistent with the building plans, specifications, a�ld other calculations submitted with the permit application. The proposed building has been designed to meet the 2003 IECC requirenients in RES check Version 3.6 release la (fom-ierly MECcheck) and to comply with the mandatary requirements listed in the RES check inspection Checklist. Builder/Designer r�cv,".5e.14 iVo Grcoi ��� Fo(' f'abt-vta�tl-�ZdY� Date REScheck Compliance Certificate 2000 IECC RE5check- Saf€ware Version 3.6 Rele�e 2 Data filename: .- I urnt tr.in. s A i .- ,'; L c s\ RES CITY: Rexburg STAI'E.- Idaho HIM): 8693 CONSTRUCTION TATE; Single Faniily WINDOW /WALL RATIO: 0.1 DATE - 0 TD T E F P LAN S-. r' l 1"1., 5 PROJECT DESCRIPTIONT. Sp cc Hon Burlingrion 13" Oakbrook Subdivi-sloll Lot; 2) 6 302 trail Dr. burg, I DESIGNER/CoNjT Kartchncr Homes 3456 E. 17 Street Suite 1 AMM011 City, FD -3406 COMPLIANCE_ Passes Maximun'l UA = 564 Your Home UA = 492 1?.S°/n Better Than Cade (STA) 05 00117 Kartcluier S'FR Permit Number Checked By/Date Gross Glazing Area or Cavity cent. or Door he--rimeter -Value I -Value U --Factor LTA cep In I.- Flat Celfing or Scissor Truss . ' 00 Wall 1: Wood F -r=e,, 16H 40.0 0.0 35 Window I: Villyl Frame: Double Raii Door I Glass 4 ;4:�� Qo49'-T'- 71i Door 2 Solid 37 0.200 7 0.490 8 F i our I 1ab-Ori -Grade: Unheated 4407 Insulation the 3.01 i -Purnacc 1: Forced Hot Air, 90 AFUE COMPLIANCE STATEMENT; The proposed building design desclibed'hur, is �.vnsistent With the building plans', sp�ci�cati�ns, c`�71(,� U��1�2' C�l",11Ii.1�Io]iS 511�7T111tCf'd h theY1F:f77771 �ttr�lirati n� 'f �_ Ir tom ett1l `000 SCC r uirmandatwy requlfeffi=tS 1i k$, Ali i ! Ill r ZD y�J�JAIVCLL1V11. �,�u�us�u vuzictzng ,gas been designed to Cs in RESch � VersJOT1 �.6 Release 7 (blTnerly MECch��ck) and to comply with the i�� the RF�'eck InsPection Checklist. Date REScheckInspection Checklist 2000 IECC R E S ch eck S o kware Vcrsion 3.6 Release.? ATF,04/12/05 Bldg. Dept. Use I 1, fi n .Ceilincy 1; Flt . i' lil ri x Tri , - . cavi# �� ion Coin ni en t s Above-GradeWall: C I. Wall .I : Wood Franie, 1611 ox, R-21.0 cavi � � � . i�����1� ion Comments -0 1 Wi n d -vers ] 1. Wino 1: Vinyl Frame -.Double P- tor: 0.490 f For wIn doNvs without l le - c toes , describe atures P L-Ules Framc Type Thennal Break? comments-. Yes No Doors: I . Door 1 r Glass, -fkt or, . Coniments, 2. Door Solid., U-iftcror-. 0.1700 w Comments-. r Floors: ];I I. Floor I . Shib-On-Grade:Unheated 3.0' insulation =8.0 cointi u ou insml at n Comments - Slab doivn for the top of the slab to at least 3. 0 f. OR dowli to at I east the botturn of th e s 1 ab 'then horizontal I y ibr a total di s twice of 3. 0 ft. E-_xten'orinsulation niust have a duid o -eat Ii er-res paque, )A!I t t rotect io L n g teat overs the exposed (above-gfade) insulation acid extends at least in. below Dude. Heating and CoolingEquipment-, F urn_ �t I: Forced Hot Air, 90 AFUE higher M - Ake md Nlodel Numbers -Ir L a lv: Joints, penctY•ations, and all other such openitag5 �n the building envelope that are Sources of'.11'r I leakage must be sealed. Rccessed fights niust bc 1) Ty]pc IC ted, ur 2 installed inside a i approptlate air -tights f with a 0.5" clezuance from o r , tkie fixture must be instal I ed with a TI cleexom ilisul.t i orl � ) ' Required vti the wat7.n-in-wiilter sidc ofa11 rola-veiited framed c:ei�itl9s. wal1s, and ff oors. { Mateirials Identification: Mal., -,-,rials and equipment inust be installed in accordance with the niamiEcture-Cs 111stallation In tl ti n' . Matt-n'-Ials and eq-L11pnicnt inust be 'dent'f ed so that compl* lance can be determined. ] IMwiufacturer manuals f)r all installed heating and coolinc, serv- ice equipmetit rust be providcd. I Insulation R-valuCfs, glazilig U-factots,and� - ting equipment nt o f i enc east be cl[marked on I the building- plansr iti tion . Duct Insulation: [ ] Ducts in unconditioned spaces mint he insulated to R-5. I. Ducts outside the building must be 1'ri5ulated to R-8_0. Duct Construction: ] All joints, scans, and c-onneetions must bic securelyMailsFitt � � � s ics s , _. ), � i o n .F ext l n u ous l_�7 welded long-tudinal jarid scams oil ducts op er, allig .21t less than 2 Ill. W.9- (500 Pa). The '-_. C systern must Provide a ii-tewis forbalanCITI(I MT Md water systems. Temperature oritr l ] T h :tm s tat woe roquired fDr eacla separate HVAC sysqt na .r � ual or auton i means t l b 1 iy restri ct 0 r s hut the hea tin g and/ or co o 1 i ng 1UP Ut to each zon e r or l L. rO 1 , IServiee Water Heating Water h eatersNVIt h � ctt i j i nsers must have a heat trap n both t.il inlet and outlet nlesthe t l- heater has an int coral heat trap r is pail ot'a circulating [ Ihisulate cit ulatinu hot t- pipes. to t in Table 1 Circulating Tiot Water s 1n sulate ITCUI titin cr hotwater -��r.dip to the l e i n k ab l 1. SN11miningPools: ] 11 heated Swl*rn nin pools mus t have an on,"O ff heater swi tch md requi {e a cover over _ of the heating cneigy is fom non�dq3letablc sources. . Pool pumps require tir e clock. Heaf ltiny and Coolina Pipj,na In a1 r� t t FFVAC piping corer i� a �ui above 1 ` r hill fl - 5 OF rnust be iTisulated to the levels in Table . MI Table 1: Miylilt'Uml 111sulatioli Thickn esu r Circulatilig ilot Tvatej- Pipes. hisutabon Thicknes i I Pr)e SJ7 ,,-, 'n. Inches by i Heated Water Tem eratuxef F 17{]-180 140-169 100-139 Ta hie ?,- Non - i r u l at in t.- l uTi outs U12 tO 1 U11 to 1.25" 05 Cil its and I - H to 2. " Over. 2�1 10 1.0. .. Minimum Insulatioll Thickness p fio r H I/r, 4 C Pip Fluld Temp. Jnsulation T h P11 -11-1,1(i t r Heating Systems Low P r surd 7 niperature Low Temperature tc m Condensate ( ked water) Cooling Systents mne, oras tiess in 1nefics by Pipe S izali mlout 1" and Less 1. ,� t " 7 5 " ')01-.250 120-200 Lo -0.5 1.5 1.0 1. 1.0 -),. 1 Any 1.0 1.0. 1. 2. - 1.0 Bel v 40 1.0 1.0 1.5 1..5 N4'FFS TO FIELD (Buildincy 17q�-��nent Use OnlS')