Loading...
HomeMy WebLinkAboutJOIST - 05-00129 - 120 Star View Dr - New SFRBuilding Supply a WOLSELEYcompany Web stiffeners required each Be diameter maximum hole for side at E1W 117/° - 20" joists: 6" diameter maximum for 9Y2" joists or for blocking panels less than 12" long. Do not cut flonges. Trus Joist rim board closure NAILING REQUIREMENTS TJI® joists at bearings: Two 8d (2Y") box nails (1 each side), 1 Y2" minimum from end. Blocking panels, rim joist or rim board to bearing plate: TJIV blocking panels or rim joist: 10d (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d (SY") box nails at 12" o.c. Shear transfer. Connections equivalent to decking nail schedule Rim board, rim joist or closure to TJI®joist: 13/a" width or less.' Two 10d (3") box nails, one each at top and bottom flange. 2%5"thru 2112" widths: Two 16d (3Y2") box nails, one each at top and bottom flange. 3Y2" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 2x4 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. WARNING Joists are unstable until braced laterally _ - Bracing Includes: * SiocMng " Sheathing • Hangars • RID Bond DO NOT allow workers " stnn Lines • Rm Joist DO NOT Stack building to walk on joists until materials on unsheathed braced. WARNING NOTES: joists' Lack of proper bracing during construction can result in serious accidents. Under normal conditions If the following guidelines are observed, accidents will be avoided. 1. Install all blocking, hangers, rim boards and rim joists at TJI N joist end supports. 2. Establish a permanent deck (sheathing), nalled to the first 4 feet of joists at the and of the bay or braced end wall. 3. Safety strut fines of lx4 (minimum) must be nailed to a braced end wall w sheathed area. 4. Sheathing must be properly nailed to each TJI ajuist befo'e additional loads can be placed on the system. 5. Ends of cantilevers require strut fines on both the top and bottom flanges. 6. TJJ�joist flanges must remain straight within a tolerance of Y2" from true alignment. A complete TJ-Xpert framing plan requires the Trus Joist Framer's Pocket Guide See Trus Joist Framer's Pocket Guide for Product Trademark Information JOIST AND BEAM LIST Plot ID Length Product Point Load Plies qty A32 32' 11 7/8" TJI 110 joist 1 6 A30 30' 11 7/8" TJI 110 joist 1 5 A28 28' 11 7/8" TJI 110 joist 1 12 A23 23' 11 7/8" TJI 110 joist 1 10 A17 17' 11 7/8" TJI 110 joist 1 4 A15 15' 11 7/8" TJI 110 joist 1 10 A14 14' 11 7/8" TJI 110 joist 1 9 A13 13' 11 7/8" TJI 110 joist 1 7 A6 6' 11 7/8" TJI 110 joist 1 9 A4 4' 11 7/8" TJI 110 joist 1 1 M1 14' 1 3/4" x 11 7/8" 1.9E Microllam LVL 2 2 342 5' 1 3/4" x 11 7/8" 1.9E Microllam LVL 1 1 ACCESSORIES LIST Pct 29' 9 1/211 11 7/8" TJI 110 joist 1 1 Pct 27' 9 1/2" 11 7/8" TJI 110 joist 1 1 Pc3 9' 10 3/4" 11 7/8" TJI 110 joist 1 1 Pc4 7' 10 3/4" 11 7/8" TJI 110 joist 1 3 Pc5 1' 10 3/4" 11 7/8" TJI 110 joist 1 2 Rml 20' 1 1/4" x 11 7/8" 1.3E TimberStrand LSL 1 8 Bkl 1' 2 1/4" 11 7/8" TJI 110 Blocking Panels 1 2 Bkl* 4' 10" 11 7/8" TJI 110 Blocking Panels 1 1 Shl 4' x 8' 23/32" Panels (24" Span Rating) 1 63 Bk*, Random length blocking panel cuts Bk, Blocking Panels; But, Rim Board; Pc, Parallel Closure 0 t Lj O LEVEL NOTES -File Name: Rex 4 K Sellers res.. Level Name: in Plotted: 4/19/2005 16:11 Design Status: main ........ .4/19/2005 16:01 NOTE: Level design times indicated above provide assurance for proper level stacking. Design Methodology: ASD Floor Area Loading Is: 40psf Live Load and 12 psf Dead Load Maxiln,m Joist Deflection: IJ480 Live Load L/240 Total Iniad TJ -Pro Rating Information: Weighted Average: 49 Lowest Rating: 40 Highest Rating: 62 Glued 6 Nailed Decking is Required Direct Applied Ceiling is Not Required Floor Decking: 23/32" Panels (24" Span Rating) Normal O.C. Spacing = 16"* Standard Blocking: Bkl* *Unless noted otherwise Layout Scale: 3/16" = 1' Hl Ml H1 E1/ Rml ��'7 II III (/A3' H1 H1 M TJAX11111111111111111111keri 1412 L p 11.SI" --A3-- A41 ~ A3)\ 15 til t Rml t 1 A14 \ 21Rel t m i _ U ° � A3 ,r floor beam 21 f- 5 1/2 z 19 1/2�1b_ Rt¢3 see report. t 62pin' 40 L4C �w'8 V alq w CREATED BY STOCK Biulding Supply 4000 Bombardier Ave Idaho Falls, Idaho 83401 208-523-0995 FAX: 208-524-3734 HANGER LIST - Simpson Strong -Tie -Company,-Inc.@ Plot ID gty Product Zabel Top Nails Face Nails Member Nails Notes H1 40 IUTll 10-N10 2-11110 Hanger Notes: XNote EINEQL Tang m from Operator Point Load - Line Load -_..: Area Load HBO Beam By Others O Detail callout label (See Framer's Pocket Guide) 1 FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE Preliminary Layout for Review and Approval TJ•xpert 6.35 (#689) C6.35 D6.35 56.35 P6.35