ADDENDUM NO. 1
April 27, 2005
BYU-IDAHO Boiler Stack Extension
1. SECTION — Notice to Bidders
Section 8 — Receipt and Opening of Bids
Change the date from April 26, 2005 to May 3, 2005.
2. SECTION 15556 — Lined Prefabricated Stack
Article "1.02 DESIGN REQUIREMENTS"
Change subparagraph D. to read:
D. Minimum stack inner shell plate thickness: 11 gage.
Change subparagraph E. to read:
E. Minimum outer shell plate thickness: 1/4".
Delete subparagraph G.
Article "3.01 CONSTRUCTION"
Change subparagraph F. to read:
F. Field erection shall be inspected by stack manufacturer.
3. FIRE WATCH
Fire watch will be performed by Brigham Young University — Idaho
4. If Alternate #1 is utilized, the existing stack portion requires sand blasting to match the surface finish
of the new section of the stack.
5. Induced Draft Fans:
The induced draft fan motor serving Boiler No. 2 has the following characteristics:
40 HP, 460 V, 60 Hz, 3 Ph
The induced draft fan motor serving Boiler No. 3 has the following characteristics:
60 HP, 460 V, 60 Hz, 3 Ph
The induced draft fan motor serving Boiler No. 4 has the following characteristics:
75 HP, 460 V, 60 Hz, 3 Ph
ms
Addendum No. 1
Page 1 of 2
18008
r 6. List of Contractors That Attended the Pre -Bid Walk Through
Atlas Mechanical (Mike Smith)
Tel: 208-523-7030
Lewis Corporation (Derek Dodsen)
Tel: 208-238-1202
Wetco Inc. (Adam Wells)
Tel: 801-565-1360
Bingham Mechanical (Bony Olson)
Tel: 208-522-4484
L & L Mechanical, Inc. (Dana Trautner)
Tel: 208-782-0204
1) C. H. Kim
2) N. E. Casalino
ms
Addendum No. 1
Page 2 of 2
18008
BYU-I Stack Extension Project Addendum No. l Page 1 of 1
Taylor, Mary
From: Clark, Wayne
Sent: Thursday, April 28, 2005 4:38 PM
To: 'Kim, Cheol'
Cc: Nielsen, Rulon; Taylor, Mary; Benson, Lloyd
Subject: RE: BYU-1 Stack Extension Project Addendum No.1
Cheol,
The Addendum item #3 addresses that BYU-Idaho will provide Fire Watch. This needs to be clarified that this is
only for the fire system when it is out of service and not for hot work.
Thanks,
Wayne Clark
From: Kim, Cheol [mailto:KimCheol@stanleygroup.com]
Sent: Thursday, April 28, 2005 10:45 AM
To: Ilmech@ida.net; msmith@LuwaUSA.com; kenyan@lcorp.com; bingham@ida.net; awells@wetcousa.com
Cc: Nielsen, Rulon; Clark, Wayne; Steel, Coleman; Casalino, Noe; Leon Tanner; pei@cableone.net
Subject: BYU-I Stack Extension Project Addendum No.1
Gentlemen,
Attached is Addendum No.1. Please call if you have any questions.
Cheol Kim, EIT
Stanley Consultants, Inc.
5353 South 960 East Suite 220
Salt Lake City, Utah 84117-7269
tel:(801)-293-8880 fax: (801)-293-8886
<<Addendum No.1.pdf>>
4/28/2005
IN,
Ralik,
Stanley Consultants INC
A Sm*y Group Company
Enoineedna. Eff*wmental and Construction Services - Worldwide
ADDENDUM NO. 2
April 28, 2005
BYU-IDAHO Boiler Stack Extension
1. Addendum No. 1 Item #3
Change item #3 to read:
When the fire system is out of service, fire watch will be provided by Brigham Young
University — Idaho. During hot work, contractor shall be responsible for fire watch.
2. FORM OF PROPOSAL
Add Alternate No. 7 and Alternate No. 8 to this section.
3. SECTION 01100 — SUMMARY
Section 1.02 — CONTRACT DESCRIPTION
Add the following subparagraphs:
K. Alternate #7
1. Base bid for the induced draft fan serving Boiler No.4 shall be Clarage Size 75
BIM 4450 Series.
L. Alternate #8
1. Contractor shall provide alternate bids for the induced draft fan serving Boiler
No.4 from approved manufacturer list found in Section 15551 — Draft
Equipment.
4. SECTION 15551 — DRAFT EQUIPMENT
Section 1.03 — Design Criteria
Change subparagraph B.2. to read:
B.2. Minimum Blade Speed Rating:
a. IDF-3 = 2150 RPM
5. Sheet M1 & M2
242 conductors shall be added across all flex connectors at all induced draft fans (typical of 3).
6. Existing Induced Draft Fans
The existing induced draft fans serving Boiler No.2 is a Clarage 226 XL Fan.
The existing induced draft fans serving Boiler No. 3 is a Clarage 229 XL Fan.
1) C. H. Kim
ms
Addendum No. 2
Page 1 of 2
18008
I*v
Stanley Consultants INC.
A Stanley Group Company
Ene ineeana. Environmental and Construction Services • Waridwide
ADDENDUM NO. 3
May 2, 2005
BYU-IDAHO Boiler Stack Extension
1. SECTION 15556 — Lined Prefabricated Stack
Article "1.02 DESIGN REQUIREMENTS"
Add subparagraph R. to read:
R. The stack design shall comply with ASME STS-1-2000 and subsequent addenda. If
the State of Idaho does not recognize ASME STS-1-2000, contractor shall certify
that the design per ASME STS-1-2000 meets or exceeds State of Idaho Building
Code.
1) C. H. Kim
2) N. E. Casalino
ms
Addendum No. 3
Page 1 of 1
18008
Jun 08 05 09:01a
Bret McGowan
70243729G2
p.4
"
Nv0a B-=-- 1: J `J
waM♦ uV.. C"Ui2 J
"T - 7-2)'L7:7.
o t— 4:p to / 0 7
BYU Idaho Boiler Plant
Special Inspection Items
1. Structural Steel & Weldinq
2. High Strength Bolts
I Epoxy Bolts