HomeMy WebLinkAboutADDENDUM - 05-00107 - BYUI Heat Plant - Remodelo s" 0 Stanley Consultants INC A Stanley GW Company Enaineerina. Environmental and Caratruaion Services • World%vide ADDENDUM NO. 1 April 27, 2005 BYU-IDAHO Boiler Stack Extension 1. SECTION — Notice to Bidders Section 8 — Receipt and Opening of Bids Change the date from April 26, 2005 to May 3, 2005. 2. SECTION 15556 — Lined Prefabricated Stack Article "1.02 DESIGN REQUIREMENTS" Change subparagraph D. to read: D. Minimum stack inner shell plate thickness: 11 gage. Change subparagraph E. to read: E. Minimum outer shell plate thickness: 1/4". Delete subparagraph G. Article "3.01 CONSTRUCTION" Change subparagraph F. to read: F. Field erection shall be inspected by stack manufacturer. 3. FIRE WATCH Fire watch will be performed by Brigham Young University — Idaho 4. If Alternate #1 is utilized, the existing stack portion requires sand blasting to match the surface finish of the new section of the stack. 5. Induced Draft Fans: The induced draft fan motor serving Boiler No. 2 has the following characteristics: 40 HP, 460 V, 60 Hz, 3 Ph The induced draft fan motor serving Boiler No. 3 has the following characteristics: 60 HP, 460 V, 60 Hz, 3 Ph The induced draft fan motor serving Boiler No. 4 has the following characteristics: 75 HP, 460 V, 60 Hz, 3 Ph ms Addendum No. 1 Page 1 of 2 18008 r 6. List of Contractors That Attended the Pre -Bid Walk Through Atlas Mechanical (Mike Smith) Tel: 208-523-7030 Lewis Corporation (Derek Dodsen) Tel: 208-238-1202 Wetco Inc. (Adam Wells) Tel: 801-565-1360 Bingham Mechanical (Bony Olson) Tel: 208-522-4484 L & L Mechanical, Inc. (Dana Trautner) Tel: 208-782-0204 1) C. H. Kim 2) N. E. Casalino ms Addendum No. 1 Page 2 of 2 18008 BYU-I Stack Extension Project Addendum No. l Page 1 of 1 Taylor, Mary From: Clark, Wayne Sent: Thursday, April 28, 2005 4:38 PM To: 'Kim, Cheol' Cc: Nielsen, Rulon; Taylor, Mary; Benson, Lloyd Subject: RE: BYU-1 Stack Extension Project Addendum No.1 Cheol, The Addendum item #3 addresses that BYU-Idaho will provide Fire Watch. This needs to be clarified that this is only for the fire system when it is out of service and not for hot work. Thanks, Wayne Clark From: Kim, Cheol [mailto:KimCheol@stanleygroup.com] Sent: Thursday, April 28, 2005 10:45 AM To: Ilmech@ida.net; msmith@LuwaUSA.com; kenyan@lcorp.com; bingham@ida.net; awells@wetcousa.com Cc: Nielsen, Rulon; Clark, Wayne; Steel, Coleman; Casalino, Noe; Leon Tanner; pei@cableone.net Subject: BYU-I Stack Extension Project Addendum No.1 Gentlemen, Attached is Addendum No.1. Please call if you have any questions. Cheol Kim, EIT Stanley Consultants, Inc. 5353 South 960 East Suite 220 Salt Lake City, Utah 84117-7269 tel:(801)-293-8880 fax: (801)-293-8886 <<Addendum No.1.pdf>> 4/28/2005 IN, Ralik, Stanley Consultants INC A Sm*y Group Company Enoineedna. Eff*wmental and Construction Services - Worldwide ADDENDUM NO. 2 April 28, 2005 BYU-IDAHO Boiler Stack Extension 1. Addendum No. 1 Item #3 Change item #3 to read: When the fire system is out of service, fire watch will be provided by Brigham Young University — Idaho. During hot work, contractor shall be responsible for fire watch. 2. FORM OF PROPOSAL Add Alternate No. 7 and Alternate No. 8 to this section. 3. SECTION 01100 — SUMMARY Section 1.02 — CONTRACT DESCRIPTION Add the following subparagraphs: K. Alternate #7 1. Base bid for the induced draft fan serving Boiler No.4 shall be Clarage Size 75 BIM 4450 Series. L. Alternate #8 1. Contractor shall provide alternate bids for the induced draft fan serving Boiler No.4 from approved manufacturer list found in Section 15551 — Draft Equipment. 4. SECTION 15551 — DRAFT EQUIPMENT Section 1.03 — Design Criteria Change subparagraph B.2. to read: B.2. Minimum Blade Speed Rating: a. IDF-3 = 2150 RPM 5. Sheet M1 & M2 242 conductors shall be added across all flex connectors at all induced draft fans (typical of 3). 6. Existing Induced Draft Fans The existing induced draft fans serving Boiler No.2 is a Clarage 226 XL Fan. The existing induced draft fans serving Boiler No. 3 is a Clarage 229 XL Fan. 1) C. H. Kim ms Addendum No. 2 Page 1 of 2 18008 I*v Stanley Consultants INC. A Stanley Group Company Ene ineeana. Environmental and Construction Services • Waridwide ADDENDUM NO. 3 May 2, 2005 BYU-IDAHO Boiler Stack Extension 1. SECTION 15556 — Lined Prefabricated Stack Article "1.02 DESIGN REQUIREMENTS" Add subparagraph R. to read: R. The stack design shall comply with ASME STS-1-2000 and subsequent addenda. If the State of Idaho does not recognize ASME STS-1-2000, contractor shall certify that the design per ASME STS-1-2000 meets or exceeds State of Idaho Building Code. 1) C. H. Kim 2) N. E. Casalino ms Addendum No. 3 Page 1 of 1 18008 Jun 08 05 09:01a Bret McGowan 70243729G2 p.4 " Nv0a B-=-- 1: J `J waM♦ uV.. C"Ui2 J "T - 7-2)'L7:7. o t— 4:p to / 0 7 BYU Idaho Boiler Plant Special Inspection Items 1. Structural Steel & Weldinq 2. High Strength Bolts I Epoxy Bolts