Loading...
HomeMy WebLinkAboutINSPECTION TICKETS - 05-00102 - 362 Oaktrail Dr - New SFRINSPECTION'hC KET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By IL, Date 5 /,3 Req. By Phone No. 12!J — L0525 Projccl Pennit No. 05 — 0010 Z. Address 3 Q 2 0, Inspection Type Vrzrilin� CAl- Day /Time Req. to l �L Z; 00 2 to Inspector's Report Res. ❑ Comm. -O tL �0 s cA�aj7e-- 6-:Za-S L i n. e, ri a4— dove,. INSPECTED ITEMS CONFORM TO APPROVED DWGS lNSPEC R'S ACTION APPROVED [j DISAPPROVED (] C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: Signed Rec't Acknowledged White . Office Copy F•FIR•CO03 DY El ON/A Ll FINAL ❑ DID NOT INSPECT *Now . Job Copy Pink - rnspedw's Copp INSPECTION TICKET W Bldg. Cl Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By 6G Date '� Z,4 0, Req. By Sd� Phone No. 10`I -(J%5 2-S Projecl Permit No. OS -0010 2 Address zi p Z VBk 1 fai Inspection Type V- nC\A , Day Time Req. -+I Z $ 0 1 U:Cyyr, In.s ctor's Report Zr-­Res. ❑ Comm. r"kn fv k-jizft-n. d�Tee�P�re�I LJ,InolaL�) �v Lczec i _ (IZ-ya)ve. i (,, B&<r - i -) r.. A-, Pe,"A- L,J/condi i-IarLeal a.�r. (off// y.�sccl -- Ott ��yJ t#-F,r- race 4. W. N qe;:s 1t&6- ap . 6f-f urnaee, Gay1�5e7� &je� 5eA. R roi air pewefraho745. INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N 0 N/A INSPECTOR'S ACTION L) APPROV ED [] C.O. (FINAL) DISAPPROVED ❑ NOT APPLICABLE ❑ FINAL [] DID NOT INSPECT ACTION REQUIRED: r _�'Aisk cL6coye— i�G s. Yor re-iA e-,�(L -cvi, Signed////!//+/ Recl Acknowledged Wme - olike Copy F FiR CD00 VeNm Job Copy P" . bnpedaY Copy INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Date q[ ?l Req. By Phone No. I Project 2 r.' Permit No. dZ Address Inspection Type f1), -) 11 Day /Time Req. qA " /-Z, e Inspector's Report ❑ Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECT R'S ACTION AP�PROVED ,,�aCO.(FINAL) ACTION REQUIRED: ❑ DISAPPROVED ❑ NOT APPLICABLE ❑Y ❑N ❑N/A FINAL ❑ DID NOT INSPECT ReCt Acknowledeed NTNe - Cnice Copy YeNow Job Copy Pii - InapNCm'N Copy F-FIR C000 INSPECTION TICKET ❑ Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By J Date Req. By Phone No. _ Permit No. L-)S Cab WZ Address 7'6-)1 Inspection Type v=L i I Day Time Req. Inspector's Report 1U Res. ❑ Comm. L/yIGO�mol�if sI/4� /ole— INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y EIN ❑ N/A INSPEC OR ACTION AP OVED EJ DISAPPROVED ❑ FINAL CO. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT ACTION REQUIRED: rto2 iSl1 bLt;�jyr� /T�I>ZS Signed - Pam. Inspector ReCt Acknowledged _ wMile - plke Copy Yellow - Job Copy PiF* - Impeclor's Cc" F FIR.COtq INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By CJ-0 Date Req. By Phone No. r( �) '7 Project Permit No. O !� -Co/o a Address Inspectic Day [rime Req. �', 3� ��� (42 Inspector's Report Res. ❑ Comm. .2-2•-7 INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE R'S ACTION APPROVED El DISAPPROVED ❑ C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: ❑Y ❑N ❑N/A FINAL ❑ DID NOT INSPECT Rec'i Acknowledged wme -pike Copy Mow Job Copy Rnk - Iespecim s Copt F-FIR-CO03 INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ File Inspection Request: Rec'd By LC., Date 61 is I O Req. By Phone No. ink—(a52S Project Permit No. 05-00\02. Address��Z Inspection Type SheakvCk 1.1a11�na Day /I'ime Req. In1110 @ 2; UO iom Inspector's Report ZdRes. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE S ACTION APPROVED ❑ C.O. (FINAL) ACTION REQUIRED: 0 DISAPPROVED ❑ NOTAPPLICABLE ❑ Y [J N ❑ N/A 0 FINAL ❑ DID NOT INSPECT Rec'f Acknowledged wrwe - on" Copy F FIR-CO03 *Now Job Copy Rik - InVoCkWS Copy � INSPECTION TICIC6 4 Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By S)?— Date V-2- Req. By Phone No. Project_ Pennit No. Q(z do (i,2 Address Inspection Type Day /Time Req. Inspector's Report ❑ Res. ❑ Comm. (cxs.� r1�c.c_.t'• tMa�'✓� (CCU{ f ZY INSPECTED ITEMS CONFORM TO APPROVED []Y ❑ N 0 NIA INSPECTOR' ACTION PPROVED N�"" ISAPPROV FINAL 0 C.O. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT ACTION REQUIRED: Signed_ /mod Rec't Acknowledged While • OtFite Copy F-FIR-0003 *km • Job Copy Pb* - {rupedor s Ccpy INSPECTION TICKET Ok Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Date 1,05 Req. By I ArItVi A Phone No. 5 W -9090 Project_ IkWAU Pennit No. 05 - 001 02 Address Xpz- Oal kY4\ Dr. Inspection Type kA%D. Day /Time Req. Inspector's Report MIN Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE 'S ACTION APPROVED El DISAPPROVED [] C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: Signed Recl Acknowledged Wi 4e . Office Copy F-FIR-CO03 D Y ❑ N ❑ N/A l 3 FINAL ❑ DID NOT INSPECT *0ow - Job Copy Pink - Irqe t-3 Copp M FRAMING/MECH, CHECKLIST Date: 6_1,p5.7- Project:�c- Job Address: Building Permit Number: The following comments based on the 2003 edition of the lntemational Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the lntemational Residential Code or any federal, state or local regulations. Exterior Zconcrete Slabs (3 1/2" min. thickness & 4" gravel base min.) R506.1 Zp, Braced Wall Panels (sheathing) (nail or staple - 6" o. c. at edges & 12" o. c. in field) Table 602.3(1) Z.Adequate uplift control at floor line (sheathing split on plate or 1 Y2 X 36" straps 4' o. c. mudsill to studs) _,GSeismic hold-downs at garage panels <4' wide (APA narrow panel design if <2'8"), hold-downs must be on double stud or 3X with all nail holes filled. R602.10.4 oundation waterproofing to finish gradeR406.1 Crawl space ventilation 1 sf per 150sf (w/ vapor barrier 1 sf per 1500so within 3' of corner R408.1-2 Cripple Walls (over 4' sized as 2 story, under 14" must be solidly sheathed one side) R602.9 ud Sill (bolts in proper location, nuts tightened, 2"x2"x3/16" washers (conditional), pressure treated or redwood, joints blocked or under studs at wall and gaps grouted or shimmed) R403.1.6.1 / R602.11.1 Frame . Floor Sheathing and nailing Typ. 3/4" T&G - 6" on edges & 12" in field (perpendicular to joist) 7`Ioist Spacing and Size (as per plans) _ZBearing (1-1/2" min.) & Lapping (3" min. where joists lap over wall or beam) Notching (depth-1/6 max., length-1/3 depth max., not in middle 1/3, ends-1/4 depth max.) TJI-NO �oring (1/3 "d" max, >2" of top or bottom or another hole or notch) TJI see chart Aantilevers- Blocking, reinforcement, span and spacing as per plans. ,Joists under Load Bearing Partitions (shall be doubled as per Section 502.3.3, if plumbing space needed, the joists shall be blocked 4' o. c.) Girders and Beams (as per plans, nailed or mechanically connected to frame and proper bearing) _zJ'oist Hangers (check location & nailed properly) " /Draft Stop (required for over 1000 sq ft. of unusable space at floor/ceiling) J Basement Walls (pressure treated or redwood sill plate properly fastened to slab) �tair Opening (as per plan & properly supported with hangers or walls) Stairs (check rise- 7 3/4" max., run-10" min., vari.- 3/8" max, width-3' min. & headroom- 6'-8") ZWall Layout (as per plans) � Interior Wall Stud Spacing (load bearing is same as exterior), 24" o.c. max. Bearing Wall Window and Door Headers Nailing (edge lends) / Exterior Bearing Wall Stud Spacing - walls canning roof load only; 2x4-16" o.c. 12' max 2x4-24" o.c. 10' max,- 2x6-16" o.c. 18' max,- 2x6-24" o.c. 16' max, one floor & roof: - 2x416" o.c. 10'max., two floors & roof: 2x4-12" max 10' (Fig 602.3.2. (1-3)) /Double Top Plate (joints lapped min. 2') or Single Top Plate (bearing win 1" & adequately tied at joints by 3"x6" steel plates w/ 6 8d on nails each side) R602.3.2 ZStud Notching (bearing 25% max.) Boring 40% max, 5/8" min. to edges (60% if doubled) Fire Blocking (roof space line at wall, concealed spaces & at studs over 10') Z,Firewalls (between duplexes & garage/home) , firewall penetrations - elec. boxes- rated, ducts — 26 gauge & not open to garage, door —20 minute rated min. Ro f Truss details (35# snow load and 90 mph winds) See truss details Roof Trusses (spaced and braced as per manufacturer) ,Rafter and Truss Tie -Downs and hangers —Rafters Lateral Support (block at bearing when exceeding 5 to 1 rule (2x12) Roof Sheathing: Nailing ("H" clips w/ 7/16"), edges-6" o.c., field-12" o.c. ZAttic Access (provide 22" x 30" min. access where clear height > 30") LC Roof Ventilation standard 1 /150 or 1 /300 if 50 - 80% is 3above eaves Mechanical (Rough Plumbing Insp. Done? — Manufacturer's installation instructions are with the appliance (IRC 106.1.2/M1307.1) ZEquipment gas shutoff valves in same room (FP exception) and within 6' of appliance (IFGC 409.5) Sediment Traps (if not built into appliance) at Furnace & W.H. (IFGC 408.4) Duct Supports and sealed metal - < 10' spacing & Flexible — < 4' max — (2" sag in 4') Xciothes Dryer Ducts solid metal ducts, no screws extending into duct & vent direct) to outside) rY ( 9 Y Duct insulation (insulation in non -conditioned Space) ?;5W- , _ZRoom access 24" min width / Attic access clear opening 20x30 min (Under floor is 22x30)(IMC 306) Pressure Regulators (access, vented, tee fitting each side) (IFGC 410) /Gas pipes not in ventilating or circulating air duct (IFGC 404.1) Metallic gas pipe bends are smooth & free from buckling, cracks, or other damage (IFGC 405.2) Pressure Test: psi min duration Ib pressure drop Gas Pipe Material: CSST Sch40 MP Copper Main Line ft Diameter Branch Lines: Length To POD ft ft ft ft ft ft ft ft ft ft ft ft ft ft Diameter Appliance/BTU's (if known) FINAL INSPECTION CHECKLIST Date: 7_ Z8 Project:,e—. //,s Job Address: 3�,,Z Building Permit Number: «'Z The following comments based on the 2000 edition of the International Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the International Residential Code or any federal, state or local regulation. OUTSIDE //'House Numbers (visible from the street) Zrade. (yard is sloped away from foundation) —Z idewalk & Landscape Strip 5' wide (W/ 6" of granular borrow (hill 12")) --7' LS strip Front Setback Coverage 60% min green Windows - Covers and Screens (shall be releasable or removable from the inside for egress Window Wells min. 24" clear (out and above) well �xterior Steps (7 3/4 " max. rise & 10" min. tread) Stairway Handrails 4 or more risers or over 30" (<4" max. spacing of uprights) Yuardrails (provide if over 30" above floor/grade & 4" max sphere spacing for uprights) ,/L/andings (36" x 36" min., (not req. at the top of the stair if a door does not swing over stairs) ,/Thresholds 1 1/2" max. above floor or landing (7 3/4" max if door does not swing over landing) Zosts (required to be treated, redwood or cedar if in contact of concrete / earth) Zoofing (no apparent leaks, installed properly and roofing as per plans) _Masonry (lintels as per table 703.7. 1) _Roof Ventilation (as per plans) INSIDE —ZE/gress Doors (all egress doors must be able to open from inside without use of keys or tools) L Window Energy calc's: match actual window f Safety Glazing provided in all doors, within 24" of door arc and below 60", & in tub enclosure Bathroom Ventilation (either operable window or fan that vents directly to outside) Sinks, Bathtubs and Showers (check for caulking, operation and leaks) Stairway Illumination (switch at top and bottom) Stairs (73/4"max. riser, 10"' min. tread, (nosing 3/4"to 1 1/4" with solid risers) Handrails Cont (34" to 38", 1 1/2" to wall, and grip 1 1/4" to 2" dia. upright < 4",triangular space 6" max) Guardrails 36" high and continuous, Req'd 30" or more above grade or floor(, uprights 4" sphere max spacing, triangular space 6" sphere max spacing) Garage (Dry walled and taped, firewall penetrations and electrical boxes, door to house 20 min: rated,: ducts penetrating firewall must be 26 gauge min. & not open to garage) _Egress Windows (clear 20" width and 24" height, 5.7 sf min. opening with 44" max. sill height) Smoke Detectors (in each sleeping room outside in immediate vicinity and on each story/basement- split levels (w/o doors), only on upper floor —all interconnected without a disconnecting switch) .--Foam Plastic (meets requirement of R318) Water Heater Anchorage as over 4' with flex water conn. shall be anchored or strapped to building) OCWater Heater Vent (check air flow with return in finished basement) /Clothes Dryer Ducts (solid metal ducts, no screws in duct & vent directly to outside) Duct Supports (metal ducts supported 10' min spacing & non metal as per manuf. installation instr.) Ouct Insulation (duct in non conditioned areas shall be insulated) /Gas Line Supports spacing 10' for up to 3/4", 12' for over 1" and 6' for tubing up to 1 1/2" f uryY FurcL�/ctin. �CrLC� e1,