HomeMy WebLinkAboutTRAFFIC IMPACT STUDY Rev. (1) 4.27.2021 - 21-00080 - Iron Horse Division 1 - 1076 S 12th W - Plat
IRON HORSE DIVISION I
TRAFFIC IMPACT STUDY
Prepared For: Ball Ventures, LLC
2194 Snake River Parkway, Suite 300
Idaho Falls, ID, 83402
Prepared By: Horrocks Engineers
2194 Snake River Parkway, Suite 205
Idaho Falls, ID, 83402
Date: March 2021
04/27/21
Iron Horse D ivision I Traffic Impact Study
i
Table of Contents
Introduction ......................................................................................................................................1
Proposed Development ......................................................................................................................1
Study Area Conditions ........................................................................................................................2
Roadway Characteristics ...............................................................................................................2
University Boulevard ............................................................................................................................. 2
12th West ............................................................................................................................................... 2
Existing Traffic Conditions .............................................................................................................2
Existing Queue Length Analysis ............................................................................................................ 4
Projected Traffic ................................................................................................................................5
Trip Generation .............................................................................................................................5
Trip Distribution.................................................................................................................................6
Traffic Analysis ...................................................................................................................................7
2026 Background Traffic ................................................................................................................7
2026 Queue Length Analysis ................................................................................................................. 9
2026 Traffic with Development ......................................................................................................9
2026 with Development Traffic Queue Length Analysis..................................................................... 12
2026 Development Mitigations at 12th West & University Boulevard ............................................... 12
Recommendations ........................................................................................................................... 13
Appendix A: Site Plan ........................................................................................................................ A
Appendix B: Synchro Reports ............................................................................................................ B
Appendix C: Land Use Descriptions .................................................................................................... C
Appendix D: FHWA Double Crossover Diamond Interchange TechBrief ............................................... D
Iron Horse D ivision I Traffic Impact Study
ii
List of Tables
Table 1-Intersection Level of Service ............................................................................................................ 4
Table 2-Existing LOS Analysis ........................................................................................................................ 4
Table 3-Existing Queue Length Analysis ....................................................................................................... 5
Table 4-Average Growth from Historic Data ................................................................................................ 5
Table 5-Trip Generation for the Proposed Iron Horse Development ........................................................... 6
Table 6-2026 LOS Analysis ............................................................................................................................ 7
Table 7-2026 Queue Length Analysis ............................................................................................................ 9
Table 8- 2026 Traffic Percentages ................................................................................................................. 9
Table 9-2026 with Development Traffic LOS Analysis .................................................................................. 9
Table 10-2026 Queue Length Analysis with Development Traffic .............................................................. 12
Table 11-2026 LOS Analysis with Mitigations at 12th West and University Boulevard .............................. 12
Table 12-2026 Mitigations Queue Length Analysis .................................................................................... 13
List of Figures
Figure 1-Location of Iron Horse .................................................................................................................... 1
Figure 2-Existing Turning Movement Counts................................................................................................ 3
Figure 3-Trip Distribution for the Iron Horse Development ......................................................................... 6
Figure 4-2026 Background Turning Movement Counts ................................................................................ 8
Figure 5-2026 Turning Movement Counts with Development Traffic ........................................................ 11
Iron Horse D ivision I Traffic Impact Study
1
Introduction
This report presents the findings of the Traffic Impact Study (TIS) performed for the Iron Horse Division I
development in Rexburg, Idaho This report addresses the impacts based on Level of Service (LOS) values
calculated by delay per vehicle for the intersection at University Boulevard and 12 th West.
In this report, the potential traffic impact of the Iron Horse Development is addressed as proposed by
Ball Ventures.
Proposed Development
The proposed development at Iron Horse is planned to be built in one phase. The anticipated build-out
year is 2026. Figure 1 shows the location of the Iron Hills development. The development is planned to
include approximately 7,500 square feet (sq. ft.) of fast-food restaurants with drive-throughs, 10,000 sq.
ft. of warehousing space, and 13,000 sq. ft. of recreational vehicle (RV) sales.
Figure 1-Location of Iron Horse
The accesses to the development are planned to connect to University Boulevard and 12th West. There
are two accesses planned on University Boulevard and two accesses planned on 12th West. A full site
plan is included in the Appendix.
Iron Horse D ivision I Traffic Impact Study
2
Study Area Conditions
The Iron Horse development is located on the west side of Highway 20, near Madison High School on
University Boulevard. The main roads around the future development are University Boulevard and 12th
West.
Madison High School is located to the west of Iron Horse on the north side of University Boulevard.
Traffic from the school affects the morning peak hour, the noon hour when students leave the school for
lunch, and the release time at 3:30 PM Monday-Thursday (2:15 on Friday). The enrollment at Madison
High School is nearly 1200 students.
ROADWAY CHARACTERISTICS
UNIVERSITY BOULEVARD
University Boulevard is a two-lane road that runs from just west of Madison High School, under US-20,
and then curves north to go towards the university. The speed limit is 25 miles-per-hour (mph) in the
project area, and 35 mph to the east of the development.
12TH WEST
12th West is a rural two-lane road that runs north/south past the project area. The speed limit is 35 mph.
EXISTING TRAFFIC CONDITIONS
Weekday AM, Noon, and PM turning movement counts were performed at the intersection of 12 th West
and University Boulevard
Intersection geometry, control, and turn pocket lengths were obtained by field review and entered with
the turning movement volumes into Synchro 10 for analysis. Future traffic data was forecasted for the
AM and PM peak hours using historic traffic counts as discussed in the Projected Traffic section.
Existing turning movement counts were used to establish a base condition for the analysis and provide a
comparison for future traffic impacts from the proposed development. The existing turning movement
counts are shown in Figure 2.
SCALE:
DATE:
Iron Horse Division I Development
Existing AM, Noon, & PM Peak Traffic
Turn Movement Volumes
FIGURE
2
N/A
3/2021
2194 SNAKE RIVER PARKWAY
SUITE #205
IDAHO FALLS, ID
(208) 522-1223
1 AM PEAK HOUR NOON PEAK HOUR
2 AM PEAK HOUR
3 AM PEAK HOUR
PM PEAK HOUR
PM PEAK HOUR
1 2University Boulevard
12
t
h
W
e
s
t
US
-
2
0
PM PEAK HOUR
3
Iron Horse D ivision I Traffic Impact Study
4
In order to quantify the traffic conditions currently exhibited in the study area, the roadway geometries
and traffic data were entered in the Synchro 10 software package. Using the 6th edition of Highway
Capacity Manual (HCM) method of calculating intersection delay, a Level of Service (LOS) grade was
assigned to the intersection for both the AM, Noon, and PM peak hours.
Level of Service (LOS) is a term used by the HCM to describe the traffic operations of an intersection,
based on congestion and delay. LOS ranges from A (almost no congestion or delay) to F (traffic demand
exceeds capacity and intersection experiences long queues and delay). LOS E is the threshold when the
intersection exceeds an acceptable standard and intersection improvements are required. The delay
criteria used to assign a letter grade to an intersection for signalized and unsignalized intersections is
shown below in Table 1. The full Synchro reports are included in the Appendix.
Table 1-Intersection Level of Service
Table 2 shows the existing LOS conditions at the study intersections.
Table 2-Existing LOS Analysis
The intersections on University Boulevard at 12th West and the US-20 northbound ramps operate at an
acceptable LOS C or above. The intersection at the US-20 southbound ramps however is operating at a
failing LOS in the peak hours. The interchange is planned to be rebuilt as a diverging diamond
interchange (DDI) by 2023. The new interchange should mitigate any unacceptable delays that exist.
EXISTING QUEUE LENGTH ANALYSIS
A queue length analysis was performed by using the SimTraffic modeling software to model the
maximum queue lengths at each intersection. Table 3 shows the maximum queue length at each
intersection as well as the approach where the maximum queue occurs.
Average Delay
(sec/veh)
Level of
Service
Average Delay
(sec/veh)
Level of
Service
Average Delay
(veh/sec)
Level of
Service
12th West & University Boulevard 19.0 C 13.4 B 13.7 B
University Boulevard & US-20 Southbound Ramp 137.1 F -- --188.0 F
University Boulevard & US-20 Northbound Ramp 13.1 C -- -- 18.0 C
Intersection
AM Peak Hour Midday Peak Hour PM Peak Hour
Iron Horse D ivision I Traffic Impact Study
5
Table 3-Existing Queue Length Analysis
The max queue lengths and their approaches give insight into where the traffic at the intersection is
waiting the longest. In the case of these intersections, vehicles have trouble turning onto University
Boulevard to travel east.
Projected Traffic
In order to successfully analyze traffic conditions for future scenarios, existing traffic is grown based on
the projected growth in the surrounding area. To find an appropriate growth rate, historic average
annual daily traffic (AADT) counts from the Idaho Transportation Department (ITD) were analyzed for
12th West, University Boulevard, and Yellowstone Parkway.
Table 4 shows the AADT for the roadways around the Iron Horse development. Growth per year in the
area has ranged from 3.85 percent to almost 7 percent. From 2017 to 2019 the growth averaged 4.25
percent. For this traffic study, four percent growth was used estimate future traffic around the
development.
Table 4-Average Growth from Historic Data
TRIP GENERATION
The estimated number of vehicle trips to be generated by the development was calculated using the
methodology found in the Institute of Transportation Engineers (ITE) Trip Generation Manual 10 th
edition. The following ITE Land Uses were used for this development:
150: Warehousing
842: Recreational Vehicle Sales
934: Fast-Food Restaurant with Drive-Through
Maximum
Queue Length Approach Maximum
Queue Length Approach
12th West & University Boulevard 88' SBL 76' SBL
University Boulevard & US-20 Southbound Ramp 138' SBL 134' SBL
University Boulevard & US-20 Northbound Ramp 85' NBR 186' NBR
Intersection
AM Peak Hour PM Peak Hour
Roadway 3 Year 5 Year 10 Year
2019
AADT
2018
AADT
2017
AADT
2016
AADT
2015
AADT
2014
AADT
2013
AADT
2012
AADT
2011
AADT
2010
AADT
2009
AADT
2008
AADT
4000 3600 3,600 3,600 3,600 3,400 3,400 3,000 1,400 1,400 1,400 1,400
11.11% 0.00% 0.00% 0.00% 5.88% 0.00% 13.33% 114.29% 0.00% 0.00% 0.00%
10,500 11,000 10,000 9,900 9,900 9,000 9,000 9,000 11,000 11,000 11,000 13,000
-4.55% 10.00% 1.01% 0.00% 10.00% 0.00% 0.00% -18.18% 0.00% 0.00% -15.38%
7,000 5,800 5,800 5,800 5,800 5,600 5,600 5,800 3,200 3,200 3,200 3,200
20.69% 0.00% 0.00% 0.00% 3.57% 0.00% -3.45% 81.25% 0.00% 0.00% 0.00%
9.28%
6.96%
University Blvd at 12th West
3.70% 13.15%
Yellowstone Highway at University
Blvd
4.85%
2.15% -1.55%
12th West at 1000 South
3.29%
3.40%
3.85%4.25%Average
6.90%
Iron Horse D ivision I Traffic Impact Study
6
A description of these land uses can be found in the Appendix. Table 5 shows the estimated trip
generation of the development in each phase. It was assumed that each Fast-Food Restaurant will be
2,500 square feet.
Table 5-Trip Generation for the Proposed Iron Horse Development
Trip Distribution
The new trips estimated to be generated from the proposed development were distributed onto the
roadway network based on the proposed site access locations, existing turning movements, existing
traffic patterns, and proximity to major roadways. Figure 3 shows the trip distribution to and from the
Iron Horse development and the surrounding areas.
Figure 3-Trip Distribution for the Iron Horse Development
Iron Horse D ivision I Traffic Impact Study
7
Traffic Analysis
Future traffic was analyzed by projecting the existing 2021 traffic based on the historical data and
growth rate discussed previously. The development traffic was then added to the background traffic to
estimate the total future traffic. The AM and PM peak hours were analyzed for the future development
scenarios. The noon hour was not analyzed because the ITE Trip Generation manual does not keep data
for the noon hour.
2026 BACKGROUND TRAFFIC
Future traffic was analyzed by projecting the existing 2021 traffic based on the historical data and
growth rate discussed previously. The 2026 turning movement counts without the development traffic
are shown in Figure 4. Table 6 shows the LOS analysis for the 2026 traffic.
Table 6-2026 LOS Analysis
The intersections on University Boulevard at 12th West and the US-20 northbound ramps operate at an
acceptable LOS D or above in 2026. LOS D is beginning to approach capacity, but is still considered
acceptable. The intersection at the US-20 southbound ramps, however, continues operating at a failing
LOS in the peak hours.
The DDI will be constructed by the buildout of the Iron Horse development. In a DDI, left-turn and
through movements are relocated to the opposite side of the road and two signals are used to regulate
the crossover points.
In a study done by the FHWA using a VISSIM traffic model, a DDI was shown to have less delays, fewer
stops, reduced stop times, and shorter queue lengths compared to a conventional interchange design.
The introduction of a DDI reduced delay by 15 to 60 percent. The simulation also showed that volumes
of left-turn movements (veh/h/lane) could be twice that of the corresponding left-turn volumes of a
conventional diamond interchange. The DDI study by the FHWA can be found in the Appendix of this
report.
The improvements that would come with a DDI are likely to improve the operation of the intersection at
University Boulevard and the US-20 southbound ramps. The main movement causing delay is the
southbound left movement which would be greatly improved with a signal and a DDI traffic pattern
where the left movement from the ramp is the main movement. For the purposes of this report, it is
assumed that the delays at the ramp intersections will be resolved by the construction of the DDI in this
location.
Average Delay
(sec/veh)
Level of
Service
Average Delay
(veh/sec)
Level of
Service
12th West & University Boulevard 29.9 D 17.1 C
University Boulevard & US-20 Southbound Ramp * F * F
University Boulevard & US-20 Northbound Ramp 16.0 C 31.8 D
*indicates high delay, the software stops calculating at 300 sec/veh
Intersection
AM Peak Hour PM Peak Hour
SCALE:
DATE:
Iron Horse Division I Development
2026 Background AM, & PM Peak Traffic
Turn Movement Volumes
FIGURE
4
N/A
3/2021
2194 SNAKE RIVER PARKWAY
SUITE #205
IDAHO FALLS, ID
(208)522-1223
1 AM PEAK HOUR
2 AM PEAK HOUR
3 AM PEAK HOUR
PM PEAK HOUR
PM PEAK HOUR
1 2University Boulevard
12
t
h
W
e
s
t
US
-
2
0
PM PEAK HOUR
3
Iron Horse D ivision I Traffic Impact Study
9
2026 QUEUE LENGTH ANALYSIS
Table 7 shows the maximum queue lengths at the intersection of 12 th West and University Boulevard.
The US-20 on and off ramps were not included because the maximum queue lengths will change with
the introduction of the DDI.
Table 7-2026 Queue Length Analysis
The southbound left movement continues to have the maximum queue at this intersection.
2026 TRAFFIC WITH DEVELOPMENT
2026 traffic with the addition of the proposed development traffic was estimated by adding the
distributed development traffic to the projected 2026 traffic. The estimated turning movement counts
are shown in Figure 5. Table 8 shows the percentage of traffic in 2026 that is from the proposed project.
Between 20- and 25-percent of the future traffic is anticipated to be from the proposed development.
Table 8- 2026 Traffic Percentages
Table 9 shows the LOS analysis for the projected 2026 traffic with development traffic.
Table 9-2026 with Development Traffic LOS Analysis
The proposed accesses for the development are anticipated to operate at LOS B or above as stop-
controlled intersections. The intersection of University Boulevard with the US-20 southbound ramps
continue to fail. With the new traffic from the development, the northbound ramp intersection also
Maximum
Queue Length Approach Maximum
Queue Length Approach
12th West & University Boulevard 104' SBL 111' SBL
Intersection
AM Peak Hour PM Peak Hour
Average Delay
(sec/veh)
Level of
Service
Average Delay
(veh/sec)
Level of
Service
12th West & University Boulevard 136.5 F 79.7 F
University Boulevard & US-20 Southbound Ramp * F * F
University Boulevard & US-20 Northbound Ramp 34.5 D 47.0 E
University Boulevard & Development West Access 10.0 B 9.0 A
University Boulevard & Development East Access 11.6 B 9.3 A
12th West & Development North Access 10.4 B 10.5 B
12th West & Development South Access 9.4 A 9.7 A
*indicates high delay, the software stops calculating at 300 sec/veh
Intersection
AM Peak Hour PM Peak Hour
Iron Horse D ivision I Traffic Impact Study
10
becomes a LOS E in the PM peak hour, which is considered unacceptable. As mentioned previously, it is
anticipated that the capacity of the interchange will be increased significantly with the construction of
the DDI. The interchange is anticipated to achieve acceptable LOS at the two ramp terminal
intersections.
The intersection at 12th West and University Boulevard is anticipated to fail with the introduction of the
proposed development traffic. Recommended mitigations will be discussed following the queue length
analysis.
SCALE:
DATE:
Iron Horse Division I Development
2026 Traffic with Development AM, & PM Peak Traffic
Turn Movement Volumes
FIGURE
5
N/A
3/2021
2194 SNAKE RIVER PARKWAY
SUITE #205
IDAHO FALLS, ID
(208)522-1223
1 AM PEAK HOUR
2 AM PEAK HOUR
3 AM PEAK HOUR
PM PEAK HOUR
PM PEAK HOUR
1 2University Boulevard
12
t
h
W
e
s
t
US
-
2
0
PM PEAK HOUR
345
6
7
5 AM PEAK HOUR
6 AM PEAK HOUR
7 AM PEAK HOUR
PM PEAK HOUR
PM PEAK HOUR
PM PEAK HOUR
4 AM PEAK HOUR PM PEAK HOUR
Iron Horse D ivision I Traffic Impact Study
12
2026 WITH DEVELOPMENT TRAFFIC QUEUE LENGTH ANALYSIS
Table 10 shows the Queue Length Analysis for the 2026 traffic with the addition of the project traffic.
Table 10-2026 Queue Length Analysis with Development Traffic
Intersection
AM Peak Hour PM Peak Hour
Maximum
Queue Length Approach Maximum
Queue Length Approach
12th West & University Boulevard 140' NBLTR 192' SBL
University Boulevard & Development West Access 88' WBLT 64' WBLT
University Boulevard & Development East Access 44' WBLT 30' WBLT
12th West & Development North Access 59' EBL 78' EBL
12th West & Development South Access 31' EBL/EBR 36' EBL
The maximum queue length at 12th West and University Boulevard occurs on the southbound approach.
Vehicles stopped at the stop sign do not have enough gaps to cross or turn onto University Boulevard
when the Iron Horse traffic is added to the intersection.
The maximum queue lengths at each of the access also represent the amount of storage each access
should have. For example, at the West Access on University Boulevard, the maximum queue length
occurs during that AM peak hour and is 88 feet. At least 88 feet of storage should be provided at that
access.
2026 DEVELOPMENT MITIGATIONS AT 12TH WEST & UNIVERSITY BOULEVARD
To mitigate the failing LOS at the intersection of 12th West and University Boulevard, the intersection
was modeled in Synchro 10 with the existing geometry and the following mitigations: a four-way stop
controlled intersection, and a traffic signal at the intersection.
Table 11 shows the LOS at the intersection with the two mitigations.
Table 11-2026 LOS Analysis with Mitigations at 12th West and University Boulevard
With a four-way stop, the delay is greatly reduced at the intersection. The delay decreases from 136.5
seconds in the AM peak to 57.9 seconds. The delay in the PM peak decreases from 79.7 seconds to 19.3
seconds. The intersection still operates at LOS F during the AM peak hour, but the PM peak hour is
expected to operate at an acceptable LOS C with a four-way stop. A four-way stop may be an interim
solution if a signal cannot be built at the time the Iron Horse development reaches buildout.
The signal operates at an acceptable LOS B in the AM peak and LOS A in the PM peak. The delay
decreases from 136.5 seconds at the two-way stop to 12 seconds with a signal in the AM peak hour, and
from 79.7 seconds to 9.6 seconds in the PM peak.
Average Delay
(sec/veh)
Level of
Service
Average Delay
(veh/sec)
Level of
Service
Four-way Stop 57.9 F 19.3 C
Signal 12.0 B 9.6 A
Mitigation
AM Peak Hour PM Peak Hour
Iron Horse D ivision I Traffic Impact Study
13
2026 Queue Length Analysis for Mitigations at 12 th West and University Boulevard
Table 12 shows the results of the queue length analysis for the four-way stop and signal at 12 th West and
University Boulevard. With a four-way stop, the maximum queue occurs in the AM peak hour on the
westbound leg. The traffic trying to get to the school in the morning backs up at the westbound stop
sign. In the PM peak, the maximum queue occurs in the southbound left movement.
Table 12-2026 Mitigations Queue Length Analysis
At the signal, the delays are significantly lower than the four-way stop, but the queue lengths are longer.
This is typically expected at a signal. If these mitigations are used, the recommended storage length is
the maximum queue length. In this case, the longest queue length occurs during the morning peak hour
in the westbound-through movement. Left turns usually create the longest queue lengths, which occurs
in the PM peak hour, but the number of vehicles traveling west to Madison High School in the morning
causes the through movement to require a longer storage length.
Recommendations
The intersection of University Boulevard and the US-20 southbound ramps is currently operating at a
failing LOS. The DDI planned for the interchange by 2023 is expected to mitigate the failing LOS. With
the addition of the Iron Horse development traffic in 2026, the northbound ramp intersection will also
fail. This is also expected to operate at an acceptable LOS with the DDI.
The development is also expected to contribute to a failing LOS at the intersection of 12 th West and
University Boulevard. This may be mitigated by a signal at the intersection. The signal would be
approximately 960 feet from the nearest signal at the planned DDI. If a signal is used to mitigate the
effects of traffic at this intersection, it is recommended that the signal be coordinated with the planned
DDI signals due to its proximity to the DDI. A four-way stop may be an interim solution at the
intersection with the understanding that it will still operate at a failing LOS in the AM peak hour.
The proposed accesses operate at an acceptable LOS. The storage length of the access should be at least
the length of the maximum queue lengths.
Maximum
Queue Length Approach Maximum
Queue Length Approach
Four-way Stop 184' WBT 105' SBL
Signal 232' WBT 149' SBL
Mitigation
AM Peak Hour PM Peak Hour
Iron Horse D ivision I Traffic Impact Study
A
Appendix A: Site Plan
H:\!2020\ID-2676-2009 BV University Blvd. Surveys\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.1.0_COVER SHEET.dwg - C.1.0_COVER SHEET - 2/05/2021 11:50pm, jalen.fuhriman
1 5
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
C
PR
O
J
E
C
T
CH
E
C
K
E
D
D
B
A
#
2 3 4
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTIONREVISIONS
DESCRIPTIONBYDATEREV
2194 Snake River Parkway
Suite 205
Idaho Falls, ID 83402
(208) 522-1223
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
CO
V
E
R
S
H
E
E
T
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
1
C.1.0
51
78
95
20I-
8
4
93
I-
8
4
I-86
I
-
1
5
I-
1
5
I
-
1
5
30
34
2
6
9
3
20
33
75
26
20
2
6
2
8
75
21
93
55
I
-
8
4
52
95
95
95
12
1
3
9
5
95
I-90
95
95
M
O
N
T
A
N
A
W
Y
O
M
I
N
G
UTAH
CANADA
WA
S
H
I
N
G
T
O
N
OR
E
G
O
N
BOUNDARY
BONNER
KOOTENAI
SHOSHONE
BENEWAH
LATAH
CLEARWATER
NEZ PERCE
LEWIS
IDAHO
ADAMS
WASHINGTON
VALLEY
LEMHI
CUSTER
CLARK
FREMONT
BOISEGEM
PAYETTE
BLAINE
CAMAS
ELMOREADA
CANYON
OWYHEE
BUTTE
LINCOLNGOODING
JEROME
TWIN FALLS CASSIA
MINIDOKA
POWER
ONEIDA
BANNOCK
CARIBOU
FRANKLIN
BEAR LAKE
BINGHAM
BONNEVILLE
JEFFERSON MADISON TETON
NEVADA
STATE MAP
VICINITY MAP
PROJECT SITE
University Blvd
Be
l
l
C
o
r
n
e
r
R
d
ENGINEER:
HORROCKS ENGINEERS
Know what's below.
Call before you dig.
R
SITE PLAN
FOR
BV IRON HORSE I
CITY OF REXBURG, IDAHO
2194 Snake River Parkway, Suite 205
Idaho Falls, ID 83402
(208) 522-1223
CONTACT: LEITH SHEETS, PE
OWNER/APPLICANT:
IRON HORSE I PROPERTIES LLC,
2194 SNAKE RIVER PARKWAY, ST 300
Idaho Falls, ID 83402
(208) 523-3794
CONTACT: TANA BARNEY
BASIS OF BEARING:
CENTRAL MERIDIAN OF THE EAST ZONE OF THE
IDAHO STATE PLANE COORDINATE SYSTEM
University Blvd
Burton Oil Rd.
UTILITIES:
POWER- ROCKY MOUNTAIN POWER
GAS- INTERMOUNTAIN GAS
SEWER- CITY OF REXBURG
WATER- CITY OF REXBURG
Be
l
l
C
o
r
n
e
r
R
d
SHEET INDEX
PAGE #SHEET #SHEET TITLE
1 C.1.0 COVER SHEET
2 C.1.1 GENERAL NOTES
3 C.1.2 LEGEND
4 C.1.3 FINAL PLAT
5 C.2.0 EXISTING & DEMOLITION
6 C.3.0 OVERALL SITE PLAN
7 C.3.1 SITE PLAN - NORTH
8 C.3.2 SITE PLAN - CENTRAL
9 C.3.3 SITE PLAN - SOUTH
10 C.3.4 SITE PLAN DETAILS
11 C.4.0 OVERALL GRADING PLAN
12 C.4.1 GRADING PLAN - NORTH
13 C.4.2 GRADING PLAN - CENTRAL
14 C.4.3 GRADING PLAN SOUTH
15 C.5.0 OVERALL UTILITY & DRAINAGE PLAN
16 C.5.1 UTILITY & DRAINAGE PLAN
17 C.5.2 12TH NORTH PP
18 C.5.3 12TH SOUTH PP
19 C.5.4 UNIVERSITY BLVD PP
20 C.5.5 PRIVATE PP
21 C.5.6 PRIVATE PP 2
22 C.5.7 SITE DRAINAGE PLAN
23 C.6.0 EROSION CONTROL
CP#BENCHMARK:
CP#1
ELEV:4850.73
N:779480.3333
E:748423.1904
FOUND: BC
CP#4
ELEV:4849.60
N:776863.8415
E:748441.7228
FOUND: BC
CP#11
ELEV:4851.08
N:778147.1417
E:748475.8091
FOUND: IR-5
CP#12
ELEV:4846.35
N:779476.6393
E:745794.2787
FOUND: IR-5
- VERTICAL CONTROL DATUM BASED ON NAVD88
H
O
R
R
O
C
K
S
E
N
G
I
N
E
E
R
S
02-05-21
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
01.18.21 11:02 AM | H:\!2020\ID-2676-2009 BV University Blvd. Surveys\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\C.1.1_GENERAL NOTES.dwg
Know what's below.
Call before you dig.
R
1.ALL CONTRACTORS WORKING WITHIN THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO
SECURE A RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ITD AT LEAST TWENTY-FOUR (24)
HOURS PRIOR TO ANY CONSTRUCTION.
GENERAL NOTES UTILITY NOTES
INTERMOUNTAIN GAS COMPANY
1527 HOLLIPARK DR.
IDAHO FALLS, IDAHO 83401
(208) 542-6600
NATURAL GAS
POWER
CITY OF REXBURG PUBLIC WORKS
35 NORTH 1ST EAST
REXBURG, IDAHO 83440
(208) 372-2320
WATER / SEWER
ROCKY MOUNTAIN POWER
170 W 2ND N
REXBURG, ID 83440
(208) 359-6155
UTILITY CONTACTS
1. THE STANDARD SPECIFICATIONS AND DRAWINGS USED FOR THIS PROJECT ARE CITY OF REXBURG
ENGINEERING DEPARTMENT STANDARD SPECIFICATIONS AND DRAWINGS,CITY OF IDAHO FALLS
ENGINEERING DEPARTMENT STANDARD SPECIFICATIONS(2018). CITY OF IDAHO FALLS PUBLIC WORKS
DIVISION ENGINEERING DEPARTMENT STANDARD DRAWINGS(2018), AND IDAHO STANDARDS FOR PUBLIC
WORKS CONSTRUCTION(ISPWC, 2017).
2. ALL SURPLUS EXCAVATION SHALL BE REMOVED FROM SITE AS PART OF THE PROJECT AND DISPOSED OF AT
AN APPROVED LOCATION.
3. ALL CONSTRUCTION OF WATER, SEWER AND STORM SHALL BE TO THE CITY OF IDAHO FALLS STANDARDS
UNLESS SPECIFIED OTHERWISE BY THE CITY OF REXBURG. THE SPECIFICATIONS AND DRAWINGS ARE
AVAILABLE ONLINE AT: http://www.idahofallsidaho.gov/ OR http://rexburg.org/
4. ALL CONSTRUCTION OF STREETS LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE TO THE CITY OF
REXBURG STANDARDS.
5. THE CONTRACTOR SHALL LOCATE, RETAIN, AND PROTECT ALL EXISTING UTILITIES UNLESS DESIGNATED TO
BE REMOVED.
7. ALL UTILITIES ADJUSTMENT OF MANHOLES, WATER VALVES, ETC. SHALL BE ADJUSTED TO FINISH GRADE BY
THE CONTRACTOR AFTER PAVING AND LANDSCAPING ARE COMPLETE.
8. CONTRACTOR IS REQUIRED TO HAVE A SWPPP IN PLACE PRIOR TO ANY EARTH WORK OR CONSTRUCTION.
9. CONTRACTOR IS REQUIRED TO MAINTAIN THE SWPPP UNTIL THE NOTICE OF TERMINATION (NOT) IS FILED.
10. ANY MODIFICATION TO THE CONSTRUCTION, TO THE CONSTRUCTION SCHEDULE, OR TO THE
CONSTRUCTION PHASE LIMITS SHALL BE APPROVED BY THE CITY ENGINEER. PRIOR TO SAID APPROVAL ALL
IMPROVEMENT DRAWINGS SHALL BE RE-SUBMITTED TO THE CITY ENGINEER DEPT. SHOWING THE
PROPOSED CHANGES.
11. CONTRACTOR IS RESPONSIBLE TO CONTROL ALL TEMPORARY STORM WATER POLLUTION AND DUST
ABATEMENT DURING THE CONSTRUCTION PHASE AS REQUIRED BY THE FEDERAL CLEAN WATER ACT.
12. ALL STORM PIPE AND SANITARY SEWER PIPE SHALL BE TO THE CITY OF REXBURG STANDARDS.
13.THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE
CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING
WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ANY AND ALL DAMAGES CAUSED BY HIS
FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
14.THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITHIN THE CONSTRUCTION AREA
UNTIL THE DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING.
15.ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCE
WITH ALL APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND THE
CONSTRUCTION AREA.
16.THE CONTRACTOR SHALL KEEP ON SITE AT ALL TIMES A COPY OF THE APPROVED CONSTRUCTION PLANS
ON WHICH IS RECORDED THE ACTUAL LOCATIONS OF THE CONSTRUCTED UTILITIES AND ANY OTHER
UTILITIES ENCOUNTERED. THE CONTRACTOR SHALL PROVIDE THESE LOCATIONS TO THE DESIGN
ENGINEER.
17.THE CONTRACTOR(S) SHALL REMOVE ALL OBSTRUCTIONS, BOTH ABOVE AND BELOW GROUND, AS
REQUIRED FOR THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THIS SHALL INCLUDE CLEARING
AND GRUBBING WHICH CONSISTS OF CLEARING THE GROUND SURFACE OF ALL TREES, STUMPS, BRUSH,
UNDERGROWTH, HEDGES, HEAVY GROWTH OF GRASS OR WEEDS, FENCES, STRUCTURES, DEBRIS,
RUBBISH, AND SUCH MATERIAL WHICH IN THE OPINION OF THE ENGINEER, IS UNSUITABLE FOR THE
FOUNDATION OF PAVEMENTS. ALL MATERIAL NOT SUITABLE FOR FUTURE USE ON SITE SHALL BE DISPOSED
OF OFF SITE.
18.CONTRACTOR IS REQUIRED TO CALL DIG LINE OF IDAHO 1-800-342-1585 AT LEAST (2) BUSINESS DAYS PRIOR
TO CONSTRUCTION, TO DETERMINE LOCATION OF UNDERGROUND UTILITIES.
19.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL RECOMMENDATIONS WITHIN THE
GEOTECHNICAL REPORT.
20.GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF WORK AND BETWEEN TRADES.
SUB-CONTRACTORS ARE ALSO RESPONSIBLE FOR COORDINATION WITH OTHER TRADES AND DISCIPLINES
INCLUDED IN THE CONTRACT DOCUMENTS. IF ANY DISCREPANCIES ARE FOUND, THE GENERAL
CONTRACTOR IS TO NOTIFY ENGINEER IMMEDIATELY BEFORE COMMENCEMENT OF WORK. NO EXTRA
COSTS TO THE PROJECT WILL BE INCURRED DUE TO FAILURE OF GENERAL CONTRACTOR AND/OR
SUB-CONTRACTORS TO REVIEW CONTRACT DOCUMENTS AND COORDINATE WITH OTHER TRADES.
21.ALL TRAFFIC CONTROL SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND
CITY STANDARDS.
22.THE CONTRACTOR MUST OBTAIN A PERMIT FROM THE BUILDING DEPARTMENT FOR ANY WALLS
GREATER THAN 4' IN HEIGHT CONSTRUCTED WITHIN THE PROJECT. ALL ROCK WALLS CONSTRUCTED WITHIN
THE PROJECT MUST BE CERTIFIED AND INSPECTED BY A LICENSED ENGINEER PRIOR TO THE CITY'S FINAL
ACCEPTANCE.
1.THE WATER LINE CONSTRUCTION SHALL CONFORM TO REXBURG STANDARD DRAWINGS &
SPECIFICATIONS AND THE DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATIONS OF
PUBLIC DRINKING WATER SYSTEMS AND DISINFECTION SPECIFICATIONS SHOULD BE TO
ANSI/AWWA C 651-92: DISINFECTION OF WATER MAINS STANDARDS.
2.THE CONTRACTOR SHALL MAINTAIN 10' HORIZ. AND 18'' VERT. SEPARATION BETWEEN
WATER AND NON-POTABLE LINES.
WATER
SEWER
1.ALL SANITARY SEWER PIPE SHALL BE TO THE PROJECT STANDARDS.
2.CONTRACTOR SHALL INSTALL ALL SANITARY SEWER MAINS AND SERVICE LINES PRIOR
TO INSTALLING ANY WATER SYSTEM IMPROVEMENTS. ADJUST WATER LINES AS PER
PLANS TO MAINTAIN SEPARATION OF MAIN LINES AND TO AVOID SANITARY SEWER
SERVICE LINES.
3.THE CONTRACTOR SHALL MAINTAIN 10' HORIZ. AND 18'' VERT. SEPARATION BETWEEN
WATER AND NON-POTABLE LINES.
4.ALL NEW AND EXISTING SEWER SYSTEMS WILL BE MANDREL AND AIR TESTED.
5.ALL REMOVED EXISTING SEWER OR WATER UTILITIES SHALL EITHER BE SALVAGED OR
PROPERLY DISPOSED OF ACCORDING TO GOVERNING REGULATIONS.
6.SEWER LATERALS MAY EITHER BE COMPLETELY REMOVED OR ABANDONED IN PLACE.
LATERALS TO BE REMOVED SHALL BE CUT AT THE MAIN AND CAPPED ON BOTH ENDS
AS INDICATED IN NOTE 6 ABOVE.
A.HORROCKS ENGINEERS HAS PREPARED GRADING PLANS AND SIZED DRAINAGE FACILITY SHOWN ON THIS
PLAN TO CONTAIN THE RUNOFF FROM THE CITY OF REXBURG SPECIFIED DESIGN STORM EVENT FOR THE
PROPOSED SITE. ONLY.
B.ALL IMPORTED STRUCTURAL FILL, IF REQUIRED, SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER
PRIOR TO DELIVERY TO THE SITE
C.THE GRADING AND DRAINAGE PLANS DO NOT IDENTIFY THE CONSTRUCTION METHODS, EQUIPMENT,
PROCEDURES, AND OR SEQUENCING TO BE EMPLOYED BY THE CONTRACTOR. ALL GRADING OPERATIONS
INCLUDING BUT NOT LIMITED TO SITE PREPARATION, SCARIFICATION, EXCAVATION, OVER-EXCAVATION,
PLACEMENT OF FILLS, AND COMPACTION OF FILLS, SHALL BE PERFORMED BY THE CONTRACTOR IN
CONFORMANCE WITH THE GEOTECHNICAL REQUIREMENTS FOR THE SITE AND ONSITE FIELD
OBSERVATIONS AS REQUIRED BY THE GEOTECHNICAL FIRM.
D.IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY HORROCKS IMMEDIATELY IF THERE ARE ANY
CONFLICTS BETWEEN THE REQUIREMENTS OF THE GRADING AND DRAINAGE PLANS AND THE
REQUIREMENTS OF THE GEOTECHNICAL REPORT OR GEOTECHNICAL FIELD OBSERVATIONS.
E.ALL EXCAVATION, GRADING, AND FILL OPERATIONS WITHIN THE BUILDING AREA SHOULD BE OBSERVED BY
THE GEOTECHNICAL ENGINEER TO VERIFY SUBSOIL CONDITIONS AND DETERMINE ADEQUACY OF SITE
PREPARATION, SUITABILITY OF FILL MATERIALS AND COMPLIANCE WITH COMPACTION REQUIREMENTS.
F.THE CONTRACTOR SHALL PROVIDE SUITABLE METHODS & EQUIPMENT TO CONTROL DUST AND AIR
POLLUTION CAUSED BY CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL ALSO PROVIDE SUITABLE
MUD AND DIRT CONTAINMENT TO MAINTAIN THE WORK SITE. ACCESS ROADWAYS AND ADJACENT
PROPERTIES IN A CLEAN CONDITION.
G.ALL EXCAVATION AND GRADING SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF IDAHO
CITY CODES, UNIFORM BUILDING CODES, AND THE GEOTECHNICAL INVESTIGATION STUDY.
H.THE GEOTECHNICAL ENGINEER SHALL PROVIDE A FINAL GRADING REPORT TO CONFIRM WORK HAS BEEN
PERFORMED IN CONFORMANCE WITH THEIR RECOMMENDATIONS.
GRADING & DRAINAGE NOTES
REVISIONS
REV No.SHEET No.DATE OF REV DESCRIPTION ·IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC, 2017).
·GEOTECHNICAL REPORT - PREPARED BY MTI, FILE #E200203g AND DATED 11/24/2020
·IDAHO DEQ TECHNICAL GUIDANCE MANUAL
·CITY OF REXBURG ENGINEERING STANDARDS (2016)
NOTE:
CONTRACTOR SHALL MAINTAIN A CURRENT COPY OF ALL PROJECT SPECIFICATIONS AND STANDARDS AT THE
JOBSITE DURING CONSTRUCTION.
PROJECT SPECIFICATIONS AND STANDARDS THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES
OR STRUCTURES SHOWN ON THESE DRAWINGS ARE OBTAINED BY A
SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR
KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN
ON THESE DRAWINGS AND WE ASSUME NO RESPONSIBILITY AS TO THE
ACCURACY OF THEIR DEPICTED LOCATION ON THESE DRAWINGS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES
TO PROTECT THE UTILITY LINES SHOWN, AND ALL OTHER LINES NOT OF
RECORD OR NOT SHOWN ON THESE DRAWING BY VERIFICATION OF
THEIR LOCATION IN THE FIELD PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
ENGINEER'S NOTICE TO CONTRACTOR
USE OF THE INFORMATION CONTAINED IN THIS INSTRUMENT FOR
OTHER THAN THE SPECIFIC PURPOSE FOR WHICH IT WAS INTENDED
AND FOR OTHER THAN THE CLIENT FOR WHOM IT WAS PREPARED IS
FORBIDDEN UNLESS EXPRESSLY PERMITTED IN WRITING IN ADVANCE
TO HORROCKS ENGINEERS, AND HORROCKS ENGINEERS SHALL HAVE
NO LIABILITY TO ANY USE OF THIS INFORMATION WITHOUT THEIR
WRITTEN CONSENT.
LEGAL NOTICE TO CONTRACTOR
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
GE
N
E
R
A
L
N
O
T
E
S
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
2
C.1.1
ROADWAY
02-05-21
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
3/4'' W 3/4'' W
1'' W 1'' W
2'' W 2'' W
3'' W 3'' W
4'' W 4'' W
6'' W 6'' W
8'' W 8'' W
WATER
PROPOSEDEXISTING
W W
A ALGEBRAIC GRADE CHANGE
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CEMENT OR CONCRETE
BC BUILDING CORNER
BCR BACK OF CURB RETURN
BFE BASE FLOOD ELEVATION
BFF BASEMENT FINISH FLOOR ELEVATION
BLDG BUILDING
BM BENCHMARK
BP BEGIN POINT
BV BUTTERFLY VALVE
BVC BEGIN VERTICAL CURVE
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
BVP BEGIN VERTICAL PROFILE
BVW BOTTOM OF VISIBLE WALL
C&G CURB & GUTTER
CL CENTERLINE
CB CATCH BASIN
CLR CLEAR
CO CLEANOUT
CONC CONCRETE
Cu COPPER
C.Y.CYCUBIC YARD
DIA DIAMETER
DIP DUCTILE IRON PIPE
DWG DRAWING
E EAST OR EASTING
EA EACH
EL ELEVATION
EOC EDGE OF CONCRETE
EOP EDGE OF PAVEMENT
EP END POINT
ESMT EASEMENT
EVC END VERTICAL CURVE
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EVP END VERTICAL PROFILE
EX EXISTING
FF FINISHED FLOOR ELEVATION
FE FLANGE END
FG FINISHED GRADE ELEVATION
FL FLOW LINE
FJ FLANGE JOINT
FM FORCE MAIN
FPS FEET PER SECOND
FT FOOT OR FEET
FUT FUTURE
G GAS LINE
GB GRADE BREAK
GFF GARAGE FINISHED FLOOR ELEVATION
GV GATE VALVE
HGL HYDRAULIC GRADE LINE
HRZ HORIZONTAL
HP HIGH POINT
HWM HIGH WATER MARK
ID INSIDE DIAMETER
IN INCH(ES)
IRR IRRIGATION (PRESSURIZED)/ NON-POTABLE
K VERTICAL CURVE COEFFICIENT
L LENGTH
LF LINEAR FEET
L/S LANDSCAPE
LP LOW POINT
LT LEFT
MAX MAXIMUM
MFR MANUFACTURER
MGD MILLION GALLONS PER DAY
MID MIDDLE
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
N NORTH OR NORTHING, FRICTION FACTOR
N/A NOT APPLICABLE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OVHP OVERALL HIGH POINT
OVLP OVERALL LOW POINT
PC POINT OF CURVE
PCC POINT OF COMPOUND CURVE
PH PHASE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PRC POINT OF REVERSE CURVE
PT POINT OF TANGENCY
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
Q RATE OF FLOW
R RADIUS
R/W RIGHT OF WAY
REV REVISION
RT RIGHT
S SLOPE
S/W SIDEWALK
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SPEC SPECIFICATIONS
SSMH SANITARY SEWER MANHOLE
SS SANITARY SEWER
S/L STREETLIGHT
STA STATION
STD STANDARD
SVE SIGHT VISIBILITY EASEMENT
TBM TEMPORARY BENCH MARK
TC TOP OF CONCRETE
TBC TOP BACK OF CURB
TEMP TEMPORARY
TA TOP OF ASPHALT
TF TOP OF FOOTING
TG TOP OF GRATE
TRW TOP OF RETAINING WALL
TW TOP OF WALL
TYP TYPICAL
UTC UNTREATED BASE COURSE
V VELOCITY
VC VERTICAL CURVE
VRT VERTICAL
WTR WATER
W/WITH
MATCHLINE STA. XX+XX.XX
SEE SHEET PP-XX
UNKNOWN
18'' W 18'' W
24'' W 24'' W
30'' W 30'' W
36'' W 36'' W
EXISTING PROPOSED
ELECTRICAL MANHOLE
#
PROPOSED BUILDING FINISHED FLOOR ELEVATION
PARKING STALL COUNT
PROPOSED TBC SPOT ELEVATION (@ PC'S, PT'S & PL
PROPOSED EOP SPOT ELEVATION (@ EDGE OF
75.19
75.19
FFE: XXXX.XX
ABBREVIATIONSSTANDARD SYMBOLSHATCH PATTERNS
SURFACE FEATURES
BUILDING / PAD
CONCRETE SIDEWALK / FLATWORK
POOL DECK
XERISCAPE
HEAVY DUTY PAVEMENT SECTION
LIGHT DUTY PAVEMENT SECTION
RIPRAP
CALLOUTS
CONSTRUCTION KEYNOTE TAGS
DETAIL REFERENCE
1-1/2'' W 1-1/2'' W
SCALE:
X
-
DETAIL NAME
NTS
ADA ACCESS RAMP TRUNCATED DOMES
GRAVEL
LANDSCAPE AREAS / GRASS
35
D00 OR DEMO PLAN
OR GRADING PLAN
OR SITE PLAN
OR WATER
OR SEWER
OR STORM DRAIN
OR IRRIGATION
OR CABLE TV
OR TELEPHONE
OR GAS
OR MISCELLANEOUS
66
36
81
51
91
94
97
A
01
G1 G9
D99
50
65
80
90
93
96
99
Z
00 00OR POWER
FO
TV
TB
E
JB
IR
PP
S
SD
W
E
T
FO
IR
W
G
G
TV
T
CO
SD
TP
BH
fo
tv
t
jb
ir
pp
s
w
e
t
fo
ir
w
g
g
tv
tb
co
e
sd
FIBER OPTIC MANHOLE
TELEPHONE MANHOLE
CABLE TV MANHOLE
ELECTRICAL POWER POLE
SIGNAL POLE
ELECTRICAL BOX
FIBER OPTIC BOX
JUNCTION BOX
TELEPHONE BOX
TELEPHONE PEDESTAL
CABLE TV BOX
LIGHT POLE
LIGHT POLE OPT 2
LIGHT POLE OPT 3
GAS MANHOLE
GAS METER
CLEANOUT
SEWER MANHOLE
IRRIGATION MANHOLE
IRRIGATION BOX
WATER MANHOLE
WATER METER
FIRE HYDRANT
FIRE HYDRANT OPT 2
GATE VALVE
GATE VALVE OPT 2
CROSS
TEE
90° BEND
45° BEND
22.5° BEND
11.25° BEND
WYE
REDUCER
CAP & PLUG
STORM DRAIN MANHOLE
AREA DRAIN ROUND
AREA DRAIN SQUARE
DROP INLET
CURB INLET
CURB INLET OPT 2
CURB INLET OPT 3
CURB DOUBLE INLET
CURB DOUBLE INLET OPT 2
COMBO BOX
OIL/WATER
SAND/GREASE
OIL/WATER
SAND/GREASE OPT 2
FLARED END LARGE
FLARED END SMALL
SIGN
BOLLARD
BORE HOLE
TEST PIT
SD
TP
BH
DECORATIVE BRICK / SIDEWALK /
FLATWORK / LANDSCAPE AREAS
10'' W 10'' W
12'' W 12'' W
14'' W 14'' W
16'' W 16'' W
48'' W 48'' W
60'' W 60'' W
72'' W 72'' W
3/4 INCH
1 INCH
1-1/2 INCH
2 INCH
3 INCH
4 INCH
6 INCH
8 INCH
10 INCH
12 INCH
14 INCH
16 INCH
18 INCH
24 INCH
30 INCH
36 INCH
48 INCH
60 INCH
72 INCH
4'' SD 4'' SD
6'' SD 6'' SD
10'' SD 10'' SD
12'' SD 12'' SD
15'' SD 15'' SD
16'' SD 16'' SD
18'' SD 18'' SD
STORM
PROPOSEDEXISTING
SD SDUNKNOWN
48'' SD 48'' SD
54'' SD 54'' SD
60'' SD 60'' SD
66'' SD 66'' SD
8'' SD 8'' SD
24'' SD 24'' SD
30'' SD 30'' SD
36'' SD 36'' SD
42'' SD 42'' SD
72'' SD 72'' SD
4 INCH
6 INCH
8 INCH
10 INCH
12 INCH
15 INCH
16 INCH
18 INCH
24 INCH
30 INCH
36 INCH
42 INCH
48 INCH
54 INCH
60 INCH
66 INCH
72 INCH
4'' SS 4'' SS
6'' SS 6'' SS
10'' SS 10'' SS
12'' SS 12'' SS
14'' SS 14'' SS
15'' SS 15'' SS
16'' SS 16'' SS
SEWER
PROPOSEDEXISTING
SS SSUNKNOWN
8'' SS 8'' SS
18'' SS 18'' SS
24'' SS 24'' SS
30'' SS 30'' SS
36'' SS 36'' SS
4 INCH
6 INCH
8 INCH
10 INCH
12 INCH
15 INCH
16 INCH
18 INCH
24 INCH
30 INCH
36 INCH
14 INCH
SERVICE LATERAL
1'' IRR 1'' IRR
2'' IRR 2'' IRR
6'' IRR 6'' IRR
8'' IRR 8'' IRR
10'' IRR 10'' IRR
12'' IRR 12'' IRR
IRRIGATION
PROPOSEDEXISTING
IRR IRRUNKNOWN
4'' IRR 4'' IRR
1 INCH
2 INCH
4 INCH
6 INCH
8 INCH
10 INCH
12 INCH
18 INCH
24 INCH
30 INCH
36 INCH
BEL BEL
2'' BEL 2'' BEL
4'' BEL 4'' BEL
6'' BEL 6'' BEL
8'' BEL 8'' BEL
10'' BEL 10'' BEL
A-1/0 A-1/0 A-1/0
POWER
PROPOSEDEXISTING
OHP OHPOVERHEAD
3'' BEL 3'' BEL
A-4/0 A-4/0 A-4/0
B-1/0 B-1/0
B-4/0 B-4/0 B-4/0
C-1/0 C-1/0
UNDERGROUND
2 INCH
3 INCH
4 INCH
6 INCH
10 INCH
1 PH A 1/0
1 PH A 4/0
1 PH B 1/0
1 PH B 4/0
1 PH C 1/0
8 INCH
SERVICE LATERAL
SERVICE LATERAL
C-4/0 C-4/0
ABC-4/0 ABC-4/0
ABC-750
SEC SEC
SL SL SL
A-1/0A-1/0A-1/0
A-4/0A-4/0A-4/0
B-1/0B-1/0
B-4/0B-4/0B-4/0
C-1/0C-1/0
C-4/0C-4/0
ABC-4/0ABC-4/0
ABC-750
SECSEC
SLSLSL
1 PH C 4/0
3 PH ABC 4/0
3 PH ABC 750A
SECONDARY
STREET LIGHT
BCTV BCTV
BFO BFO
TEL TEL
BTEL BTEL BTEL
COMMUNICATIONS
PROPOSEDEXISTING
CTV CTVOVERHEAD CABLE TV
FO FO
UNDERGROUND CABLE TV
OVERHEAD FIBER OPTIC
UNDERGROUNG FIBER OPTIC
OVERHEAD TELEPHONE
UNDERGROUND TELEPHONE
1'' G 1'' G
2'' G 2'' G
6'' G 6'' G
8'' G 8'' G
12'' G 12'' G
GAS
PROPOSEDEXISTING
G GUNKNOWN
4'' G 4'' G
1 INCH
2 INCH
4 INCH
6 INCH
8 INCH
12 INCH
3 INCH
HPG HPGHIGH PRESSURE
LD LDLAND DRAIN
FILL FILL
LOD LOD
GB GB GB
HWM
HWM 1YR
HWM 5YR
HWM 10YR
CUT CUT CUT
HWM 25YR
HWM 50YR
HWM 100YR
X X X X X
CUT LINE
FILL LINE
LIMITS OF DISTURBANCE
DITCH
GRADE BREAK
HIGH WATER MARK
HIGH WATER MARK - 1 YEAR EVENT
HIGH WATER MARK - 5 YEAR EVENT
HIGH WATER MARK - 10 YEAR EVENT
HIGH WATER MARK - 25 YEAR EVENT
HIGH WATER MARK - 50 YEAR EVENT
HIGH WATER MARK - 100 YEAR EVENT
FENCE - BARBED
FENCE - CHAIN LINK
FENCE - DECORATIVE
FENCE - WOOD
WALL - BLOCK
WALL - PANEL
WALL - ROCK
R/W RIGHT OF WAY
WALL - CONCRETE
CENTERLINE (ROAD/ENTITY)
CURB & GUTTER
PARCEL LINE
PROPERTY BOUNDARY
10' PUBLIC UTILITY & DRAINAGE EASEMENT (P.U.E.)
JUT
TOP TOP TOP
>>>
MISCELLANEOUS
PROPOSEDEXISTING
DEMO
TOE TOE
UNKNOWN PIPE
JOINT UTILITY TRENCH
TOE OF SLOPE
TOP OF SLOPE
DIRECTIONAL FLOWLINE
GUARDRAIL
RAILROAD TRACKS
EDGE OF PAVEMENT
top top top
toe toe
PAINT STRIPE - SOLID
PAINT STRIPE - DOUBLE SOLID
PAINT STRIPE - BROKEN
PAINT STRIPE - BIKE LANE INTERSECTION
PAINT STRIPE - LANE DROP
PAINT STRIPE - LANE LINE EXTENSION
FUT FUT
LTG LTG
PED PED
DET DET
EXISTING/PROPOSED
TRAFFIC SIGNAL - DETECTION CONDUIT
PWR PWR
SIG SIG
TRAFFIC SIGNAL - FUTURE CONDUIT
TRAFFIC SIGNAL - LIGHTING CONDUIT
TRAFFIC SIGNAL - PEDESTRIAN CONDUIT
TRAFFIC SIGNAL - POWER SOURCE CONDUIT
TRAFFIC SIGNAL - SIGNAL CONDUIT
4000
4002
4000
4002
CONTOUR - MAJOR
CONTOUR - MINOR
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
LE
G
E
N
D
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
3
C.1.2
NOTE:
NOT ALL HATCHES, LINETYPES,
AND SYMBOLS SHOWN ON THIS
SHEET ARE INCLUDED IN THIS
PLAN SET.
02-05-21
1
56184 SQ FT
1.29 ACRES
2
54618 SQ FT
1.25 ACRES
3
61960 SQ FT
1.42 ACRES
4
81012 SQ FT
1.86 ACRES
5
376775 SQ FT
8.65 ACRES
6
179233 SQ FT
4.11 ACRES
7
65414 SQ FT
1.50 ACRES
8
9652 SQ FT
0.22 ACRES
S0°23'20"E
273.14'
S0°23'20"E
290.18'
S0°23'08"E
390.00'
S8
9
°
5
5
'
3
1
"
W
20
7
.
6
6
'
N8
9
°
3
5
'
3
9
"
E
62
6
.
3
8
'
N8
9
°
5
5
'
1
0
"
E
6
7
6
.
3
9
'
S0°24'21"E 1308.29'
N8
9
°
5
6
'
0
4
"
E
6
7
6
.
3
9
'
S0°24'21"E 1308.19'
245.79'390.00'
20
7
.
8
0
'
24
0
.
3
8
'
19
3
.
0
0
'
19
3
.
0
0
'
284.28'342.66'
288.00'729.04'291.24'
16
7
.
0
0
'
N8
9
°
5
5
'
3
1
"
E
2633.86'
1308.26'
36
'
C
R
O
S
S
AC
C
E
S
S
E
A
S
E
M
E
N
T
40' CROSS
ACCESS & P.U.E
20'20'
15' P.U.E.
15
'
P
.
U
.
E
.
C
1
C
2
C
3
C4
45.39'
45
9
.
3
8
'
50
.
0
0
'
50
.
0
0
'
Curve Table
Curve #
C1
C2
C3
C4
Length
193.80'
48.13'
193.72'
25.93'
Radius
2246.00'
2346.00'
2346.00'
2346.00'
Delta
4°56'38"
1°10'32"
4°43'52"
0°38'00"
Chord Direction
S83°48'30"W
S81°55'27"W
S84°52'39"W
S87°33'34"W
Chord Length
193.74'
48.13'
193.66'
25.93'
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
FI
N
A
L
P
L
A
T
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
4
C.1.3
IRON HORSE DIVISION No.1
AN ADDITION TO THE CITY OF REXBURG, MADISON COUNTY, IDAHO
PART OF THE SE 1/4 OF SECTION 35, T. 6 N., R. 39 E., B.M.
-2021-
H
O R R O C
K
S
E
N
G I N E E R
S
N
0 100'200'
SCALE: 1" = 100'
SUBDIVISION BOUNDARY LINE
LOT LINE
PUBLIC UTILITIES EASEMENT LINE (P.U.E.) (OR AS
NOTED OTHERWISE)
STREET CENTERLINE
SET P.L.S.S. CORNER AS NOTED
SECTION LINE
CALCULATED POINT
POINT OF BEGINNINGP.O.B.
SET 1/2" REBAR W/ PLASTIC CAP - P. L.S. 12457
PUBLIC UTILITIES EASEMENTP.U.E.
CENTRAL MERIDIAN OF THE EAST ZONE OF THE
IDAHO STATE PLANE COORDINATE SYSTEM
FOUND 5/8" REBAR WITH PLASTIC CAP - P.L.S. 12457
1.CONVEYED TO THE CITY OF REXBURG PURSUANT TO OWNERS DEDICATION
ON SHEET 2 OF THIS PLAT
2.TOTAL RIGHT-OF-WAY DEDICATED TO THE CITY OF REXBURG IS 1.72 ACRES
INTERIOR 1/2" REBAR W/ PLASTIC CAP P. L.S. 12457
SET AT A FUTURE DATE AS SHOWN ON INTERIOR
MONUMENT COMPLETION CERTIFICATE
2194 Snake River Parkway
Suite 205
Idaho Falls, Idaho
Main: 208-522-1223
SHEET 1 of 2
S
T
ATE OF I D A H O
R E G I S T ERE
D
C
H
RISTOPHE R A D A M S
P R O F E S S I O N A L L AND SU
R
V
E
Y
O
R12457
PLAT SHOWN HEREON
FOR HORIZONTAL
CONTROL REFERENCE
PURPOSES
S. 12TH W.
E COR SEC. 5
FOUND BRASS CAP
IN SURVEY VAULT
CP&F INST# 392495 (MONUMENTED BASIS OF BEARINGS)
UNPLATTED
S0°24'21"E 5250.42'
UN
I
V
E
R
S
I
T
Y
B
L
V
D
.
SE COR SEC. 35
FOUND BRASS CAP
IN SURVEY VAULT
CP&F INST# 392506
UN
P
L
A
T
T
E
D
N8
9
°
5
5
'
1
0
"
E
26
2
8
.
9
1
'
C 1/4 COR
FOUND 5/8 REBAR WCAP
STAMPED BARNES LS 826
THE PURPOSE OF THIS SURVEY IS TO SUBDIVIDE 20.314 ACRES INTO
LOTS AND STREETS AS SHOWN HEREON. THE NORTH LINE OF THE
SUBDIVISION BOUNDARY WAS DETERMINED BY THE RIGHT-OF-WAY
LINE OF UNIVERSITY BOULEVARD AS SHOWN HEREON. THE EAST
LINE OF THE SUBDIVISION BOUNDARY WAS DETERMINED BY THE
EAST LINE OF SECTION 35 AS SHOWN HEREON. THE SOUTH LINE OF
THE SUBDIVISION BOUNDARY WAS DETERMINED BY THE SOUTH LINE
OF THE NORTH HALF OF THE SOUTHEAST QUARTER AS SHOWN
HEREON. THE WEST LINE OF THE PROPERTY WAS DETERMINED BY
THE DEVELOPMENT.
PREL
I
M
I
N
A
R
Y
02-05-21
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
to
b
to
b
to
b
to
b
to
b
to
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
tob tob tob tob tob tob tob tob tob tob tob tob tob tob
t
o
b
t
o
b
t
o
b
tob tob tob
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl
f
l
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl fl fl fl fl fl fl fl fl fl fl fl fl fl fl fl fl fl fl flfl
f
l
f
l
f
l
f
l
f
l
f
l
fl fl fl fl fl
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
pp
pp
pp
pp
pp
pp
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ssss
s
s
t
t
w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
pp
pp
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe t
o
e
t
o
e
toe t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe
t
o
e
t
o
e
toe
t
o
e
s
s
s
s
s
s
s
s
s
s
s
s
ss
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
1
56184 SQ FT
1.29 ACRES
2
54618 SQ FT
1.25 ACRES
3
61960 SQ FT
1.42 ACRES
4
81012 SQ FT
1.86 ACRES
5
376775 SQ FT
8.65 ACRES
6
179233 SQ FT
4.11 ACRES
65414 SQ FT
1.50 ACRES
8
9652 SQ FT
0.22 ACRES
N8
9
°
5
5
'
1
0
"
E
67
6
.
3
9
'
S0°24'21"E
1308.19'
S8
9
°
5
6
'
0
2
"
W
61
4
.
3
8
'
S0°24'21"E
1308.29'
S8
9
°
3
5
'
3
9
"
W
61
4
.
3
7
'
S0°23'20"E
273.14'
S0°23'20"E
290.18'
N0°23'08"W
390.00'
40'
PUE/CAE
36
'
CA
E
15
'
PU
E
15'
PUE
4
8
4
8
48
4
8
48
4
8
4
8
4
9
4
8
4
9
4849
4
8
4
8
484
9
48
4
8
48
4
7
484
9
48
4
7
484
8
4
8
4
9
4848
4
8
4
9
4
8
4
9
S8
9
°
5
5
'
3
1
"
W
20
7
.
6
6
'
S0°24'21"E
390.00'
S8
9
°
5
5
'
3
1
"
W
20
7
.
8
0
'
N0°24'21"W
246.59'
S8
9
°
5
5
'
3
1
"
W
41
8
.
5
9
'
S8
9
°
5
5
'
3
1
"
W
41
8
.
5
9
'
N0°24'21"W
291.24'
S8
9
°
5
5
'
3
8
"
W
16
7
.
0
0
'
N0°24'21"W
342.59'
N0°24'21"W
284.36'
N0°24'21"W
729.04'
N0°24'21"W
288.00'
N8
9
°
5
5
'
1
0
"
E
67
6
.
3
9
'
N8
9
°
5
5
'
1
0
"
E
67
6
.
3
9
'
S8
9
°
5
5
'
3
8
"
W
16
7
.
0
0
'
S8
9
°
5
5
'
3
8
"
W
16
7
.
0
0
'
S
8
3
°
4
8
'
3
0
"
W
1
9
3
.
7
4
S
8
4
°
5
2
'
3
9
"
W
1 9
3
.
6
6
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
EX
I
S
T
I
N
G
&
D
E
M
O
L
I
T
I
O
N
P
L
A
N
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
5
C.2.0
0 50'100'
SCALE: 1" = 50'
1.CONTRACTOR TO VERIFY ALL UTILITY SIZES, LOCATIONS &
ELEVATIONS PRIOR TO ORDERING MATERIALS FOR CONSTRUCTION.
2.ALL SUBSURFACE ITEMS DESIGNATED FOR REMOVAL SHALL BE
REPLACED WITH FILL MATERIAL PER PROJECT GEOTECHNICAL
REPORT. SAID MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS
SET FORTH IN PROJECT GEOTECHNICAL REPORT BY MTI, FILE
NUMBER E180207G AND DATED 10-11-2018.
3.CONTOURS ARE SHOWN AT 0.5' and 1' INTERVALS.
SHEET NOTES:SURVEY NOTE:
THIS SITE PLAN CONFORMS TO AN ACTUAL SURVEY THAT WAS PERFORMED
ON THE GROUND BY A LICENSED LAND SURVEYOR IN AND FOR THE STATE
OF IDAHO. IT IS THE OWNER'S RESPONSIBILITY TO CONSTRUCT ALL
STRUCTURES SHOWN ON THIS SITE PLAN IN ACCORDANANCE WITH SAID
SURVEY.
H
O R R O C
K
S
E
N
G I N E E R
S
N
PROTECT IN PLACE NOTES:
EXISTING WATER LINES
EXISTING APPROACH
EXISTING DITCH
EXISTING SANITARY SEWER LINES
EXISTING SANITARY SEWER MANHOLES
EXISTING HEAD GATES
EXISTING FIRE HYDRANT
EXISTING TELEPHONE LINE.
EXISTING WATER GATE VALVE
EXISTING ASPHALT
P01
P02
P03
P04
P05
P06
P07
P08
P09
DEMOLITION/EXISTING KEY NOTES:
EXISTING ASPHALT
EXISTING POWER POLES TO BE RELOCATED BY ROCKY MOUNTAIN
POWER
EXISTING DITCH
EXISTING WELL TO BE DECOMMISSIONED PER DEQ
REQUIREMENTS
EXISTING OVERHEAD POWER LINE (PER IDAHO POWER DIRECTION
& COORDINATION) (REMOVE AS NEEDED)
EXISTING UNDERGROUND POWER LINES (REMOVE AS NEEDED)
EXISTING CANAL TO BE BURIED BY OTHERS
EXISTING TELEPHONE BOXES TO RELOCATED BY OTHERS
EXISTING GRAVEL TO BE REMOVED
D01
D02
D03
D04
D05
D06
PROPOSED PARCEL A
18.590 ACRES (NET)
20.314 ACRES (GROSS)
P01
P01
P01
P01
P02
D07
D07
P04
P04
P04
P05
P05 P05 P05
P06
P07
P07
D08 D08
P09
P09
P09
P01
D02
D02
D02 D02
D02 D02D02
D03 D03D03
D03
D04
D05
D04D05
D04
D06
2,070 LF
4,142.10 SF
D01
D01
P10
P10
P10
P03
D07
D08
D09
D09
P03
P03
P03
BASIS OF BEARING:
CENTRAL MERIDIAN OF THE EAST ZONE OF THE
IDAHO STATE PLANE COORDINATE SYSTEM
CP#BENCHMARK:
CP#1
ELEV:4850.73
N:779480.3333
E:748423.1904
FOUND: BC
CP#4
ELEV:4849.60
N:776863.8415
E:748441.7228
FOUND: BC
CP#11
ELEV:4851.08
N:778147.1417
E:748475.8091
FOUND: IR-5
CP#12
ELEV:4846.35
N:779476.6393
E:745794.2787
FOUND: IR-5
- VERTICAL CONTROL DATUM BASED ON NAVD88
02-05-21
pp
pp
pp
pp
ss
s
s
w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe t
o
e
t
o
e
toe t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe
t
o
e
t
o
e
toe
t
o
e
15
'
PU
E
15'
PUE
15
'
PU
E
15
'
PU
E
36
'
CA
E
40'
PUE/CAE
36
'
CA
E
36
'
CA
E
40'
PUE/CAE
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
OV
E
R
A
L
L
S
I
T
E
P
L
A
N
&
K
E
Y
M
A
P
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
6
C.3.0
H
O R R O C
K
S
E
N
G I N E E R
S
N
0 50'100'
SCALE: 1" = 50'
SITE PLAN- NORTH
SEE SHEET C.3.1
SITE PLAN DETAILS SHEET C.3.4
PROPOSED
BUILDING
±5,000 SF
12TH STREET
UN
I
V
E
R
S
I
T
Y
B
L
V
D
12TH STREET 12TH STREET
SITE PLAN- CENTRAL
SEE SHEET C.3.2
SITE PLAN DETAILS SHEET C.3.4
SITE PLAN- SOUTH
SEE SHEET C.3.3
SITE PLAN DETAILS SHEET C.3.4
PROPOSED
BUILDING
±10,000 SF
1.CONTRACTOR TO VERIFY ALL UTILITY SIZES, LOCATIONS
& ELEVATIONS PRIOR TO ORDERING MATERIALS FOR
SHEET NOTES:
PROPOSED
BUILDING
±5,000 SF
PROPOSED
BUILDING
± 3,000 SF
11
3
25
6
RV SALES
LOT
RMS LOT
MATERIAL SPECIFICATIONS:
ASPHALTIC CONCRETE:ASPHALT MIX SHALL MEET THE REQUIREMENTS OF THE ISPWC, SECTION
59 CLASS III PLANT MIX. MATERIALS SHALL BE PLACED IN ACCORDANCE
WITH ISPWC STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
AGGREGATE BASE:MATERIAL COMPLYING WITH ISPWC STANDARDS FOR CRUSHED
AGGREGATE MATERIALS
STRUCTURAL SUBBASE:GRANULAR STRUCTURAL FILL MATERIAL COMPLYING WITH THE
REQUIREMENTS DETAILED IN THE THE STRUCTURE FILL SECTION OF
THE GEOTECHINCAL REPORT (PREPARED BY MTI DATED
10-11-2018) EXCEPT THAT THE MAXIMUM MATERIAL DIAMETER IS NO MORE
THAN 2 3 THE COMPONENT THICKNESS. GRADATION AND SUITABILITY
REQUIREMENTS SHALL BE PER ISPWC SECTION 501, TABLE 1.
- IT WILL BE REQUIRED FOR MTI PERSONNEL TO VERIFY SUBGRADE COMPETENCY
AT THE TIME OF CONSTRUCTION
RIGID PAVEMENT SECTION:
THE AASHTO PAVEMENT DESIGN METHOD WAS USED TO DEVELOP THE FOLLOWING RIGID CONCRETE
PAVEMENT SECTION. CONCRETE PAVEMENT SHALL BE BATCHED AND CONSTRUCTED IN ACCORDANCE
WITH THE MOST CURRENT AMERICAN CONCRETE INSTITUTE STANDARDS AND IN ACCORDANCE WITH
IDAHO TRANSPORTATION DEPARTMENT STANDARD DRAWINGS C-1-A AND C-1-B. NATIVE SUBGRADE
SOILS ON THE SITE ARE FROST SUSCEPTIBLE, AND THEREFORE, REQUIRE JOINTS SEALERS OR
UNDER-DRAINS.
MATERIAL SPECIFICATIONS:
PORTLAND CEMENT CONCRETE:4,000 PSI CONCRETE WITH A MODULUS OF RUPTURE GREATER THAN 650 PSI
GENERALLY COMPLYING WITH ITD REQUIREMENT FOR URBAN CONCRETE.
CRUSHED AGGREGATE BASE:MATERIAL COMPLYING WITH ITD STANDARD SPECIFICATIONS FOR HIGHWAY
CONSTRUCTION SECTION 303 AND 703 FOR AGGREGATES.
STRUCTURAL SUBBASE:GRANULAR STRUCTURAL FILL MATERIAL COMPLYING WITH THE REQUIREMENTS
DETAILED IN THE THE STRUCTURE FILL SECTION OF THE ORIGINAL
GEOTECHINCAL REPORT (PREPARED BY MTI DATED 10-11-2018) EXCEPT THAT
THE MAXIMUM MATERIAL DIAMETER IS NO MORE THAN 2 3 THE COMPONENT
THICKNESS. GRADATION AND SUITABILITY REQUIREMENTS SHALL BE PER TABLE 1,
ISPWC.
- IT WILL BE REQUIRED FOR MTI PERSONNEL TO VERIFY SUBGRADE
COMPETENCY AT THE TIME OF CONSTRUCTION
PCCP PAVEMENT SECTION SUMMARY
PORTLAND CEMENT
CONCRETE PAVEMENT 6.0 INCHES
CRUSHED AGGREGATE BASE 6.0 INCHES
STRUCTURAL SUBBASE NOT REQUIRED
COMPACTED SUBGRADE SEE PAVEMENT SUBGRADE
PREPARATION SECTION
NOTES:
RECOMMENDATIONS PER GEOTECHNICAL REPORT PREPARED BY MTI,
FILE NUMBER E180207G AND DATED 10-11-2018
PCFLEXIBLE PAVEMENT SECTION SUMMARY
CLASSIFICATION MODERATE DUTY
ASPHALTIC CONCRETE 3.0"
CRUSHED AGGREGATE BASE 4.0"
STRUCTURAL SUBBASE 12.0"
SUBGRADE PREPARATION
(MAX LIFT PER GEOTECHNICAL
REPORT)
SEE PAVEMENT SUBGRADE
PREPARATION SECTION
NOTES:
FLEXIBLE PAVEMENT SPECIFICATIONS ARE PER GEOTECHNICAL REPORT
PREPARED BY MTI, FILE NUMBER E180207G AND DATED 10-11-2018
MD
RV SALES PARKING COUNT
LOCATION MINIMUM
REQUIRED PROVIDED
CITY REQUIRED ONSITE PARKING 39 39
TOTAL 39 STALLS 39 STALLS
*MINIMUM REQUIRED PARKING PER AUTOMOTIVE, MARINE CRAFT, AIRCRAFT AND
ACCESSORIES (SALES AND SERVICE) = (3 STALLS PER 1,000 GROSS SQ FT) = (13,000 SQ
FT / 1000) * 3 = 39 STALLS
#
RMS PARKING COUNT
LOCATION MINIMUM
REQUIRED PROVIDED
CITY REQUIRED ONSITE PARKING 6 6
TOTAL 6 STALLS 6 STALLS
*MINIMUM REQUIRED PARKING PER AUTOMOTIVE, MARINE CRAFT, AIRCRAFT AND
ACCESSORIES (DOES NOT INCLUDE REPAIR GARAGES) BUILDING MATERIALS,
HARDWARE AND FARM EQUIPMENT FURNITURE, HOME FURNISHINGS, AND EQUIPMENT
MANUFACTURING (PLUS 3 SPACES PER 1,000 SQUARE FEET OF OFFICE, RETAIL, OR
OTHER PUBLIC AREA) = (1 STALLS PER 1,000 GROSS SQ FT) = (5,000 SQ FT / 1000) * 1 = 5
STALLS
ALL WAREHOUSING (PLUS 3 SPACES PER 1,000 SQUARE FEET OF OFFICE, RETAIL, OR
OTHER PUBLIC AREA) = (0.2 STALLS PER 1,000 GROSS SQ FT) = (5,000 SQ FT / 1000) * 0.2
= 1 STALLS
#
RV SALES LANDSCAPING TABLE
*OVERALL SITE LANDSCAPING
SITE AREA = 376,775 SF
TOTAL LANDSCAPING = 30,510.08 SF (8% OF SITE)
TOTAL HARDSCAPE = 346,246.92 SF (92% OF SITE)
TOTAL SNOW REMOVAL AREA = 16,000 SF (4% OF SITE)
TOTAL SNOW STORAGE = 1,600 SF (10% OF PLOW-ABLE
HARDSCAPE )
SNOW STORAGE AREA
RMS LANDSCAPING TABLE
*OVERALL SITE LANDSCAPING
SITE AREA = 81,012 SF
TOTAL LANDSCAPING = 9,047.41 SF (11.1% OF SITE)
TOTAL HARDSCAPE = 71,964.59 SF (88.9% OF SITE)
TOTAL SNOW REMOVAL AREA = 20,394 SF (25.1% OF SITE)
TOTAL SNOW STORAGE = 2,039.4 SF (10% OF PLOW-ABLE
HARDSCAPE )
SNOW STORAGE AREA
02-05-21
middle lot only
Access to lot 1
Access to lot 3
pp
s
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
to
e
to
e
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
15'
23
8
.
4
'
9.5'
R
3
.
5
'
R5
.
5
'
R
5
.
5
'
R
9
.
5
'
R2
.
5
'
R
2
.
5
'
R2.5'
R
4
.
5
'
R19
.
3
'
R
3
0
'
R29
.
3
'
R
1
9
.
3
'
R
2
0
'
R20
'
R20
'
R30'
R
1
9
.
3
'
R1
9
.
3
'
R
2
3
6
3
.
5
'
R
2
3
6
3
.
5
'
565'
242.6'
30.8'
40'40'
7
'
4
'
96'
198.7'
34'
9
5
.
4
'
99
'
44.8'
116.7'
65.9'
32.9'
9
.
5
'
20.5'
242.6'
5
'
5'
4'
4
'
2
5
.
8
'
19'
19'
590.9'
40.1'
4
'
36.5'
1
8
.
7
'
22.2'
1
8
.
7
'
24'
1
2
'
22'
24'
1
2
'
5
'
1
5
'
P
U
E
15'
PUE
36'
CAE
4
0
'
P
U
E
/
C
A
E
4
0
'
P
U
E
/
C
A
E
3'
7.
5
'
6'
7'
6'
5'
7
'
5'
7
'
5
'
7'
6
'
6'
5
'
7'
6'
6
'
5
'
7'
5
'
7'
6'
0
.
5
'
5
'
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
SI
T
E
P
L
A
N
-
N
O
R
T
H
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
7
C.3.1
H
O R R O
C
K
S
E
N
G I N E E R
SN
0 40'80'
SCALE: 1" = 40'
CURB RAMP W/ TRUNCATED DOMES PER CITY OF REXBURG STANDARDS
ADA ACCESSIBLE PARKING STALL, DIMENSIONS PER PLAN UNLESS OTHERWISE
NOTED
ADA HANDICAP SIGN SEE DETAIL 3 SHEET C.3.4.
INSTALL TRASH PAD & ENCLOSURE PER CITY OF REXBURG SD-11
1.5' FLAT PAN CURB & GUTTER SEE DETAIL 1 SHEET C.3.4
4" THICK SIDEWALK. WIDTH VARIES PER ISPWC SD-709, SD-714, SD-714A & SD-714B
MODERATE DUTY ASPHALT, SEE SHEET C.3.0
ALL STRIPING PER MUTCD STANDARDS
SNOW STORAGE AREA (SEE LANDSCAPE TABLE FOR AREA) SEE DETAIL 4 SHEET
C.3.4
INSTALL PORTLAND CEMENT CONCRETE PAVEMENT SEE PAVEMENT SECTION
SUMMARY SHEET C.3.0
INSTALL CURB TAPER PER ISPWC SD-707 (LENGTH PER PLANS)
INSTALL CROSS DRAIN PER CITY OF REXBURG SD-7
INSTALL CURB & GUTTER PER CITY OF REXBURG SD-3
PROPOSED MONUMENT SIGN, SEE ARCHITECTURAL PLANS FOR DETAILS
SIGN & LIGHT LOCATIONS (REFER TO ARCHITECTURAL AND ELECTRICAL PLANS
FOR DETAILS) SIGNS SHOWN IN APPROXIMATE LOCATION (SIGNS N.I.C)
ELECTRICAL TRANSFORMER PAD. SEE ELECTRICAL PLANS FOR DETAILS
INSTALL GRAVEL (SUB-BASE PER GEOTECH REPORT)
INSTALL PAVERS PER LANDSCAPE PLANS
INSTALL 3' CURB TERMINUS PER ISPWC SD-707
INSTALL TYPICAL SECTION PER CITY OF REXBURG SD-3 TYPICAL SECTION 5
LANDSCAPED AREA, SEE LANDSCAPE PLAN
CURB & GUTTER TRANSITION FROM CITY OF REXBURG SD-3 TO 1.5" FLAT PAN CURB
SITE PLAN KEY NOTES:
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
UNIVERSITY BLVD
12
T
H
S
T
01
01
01
01
01
01
13
13
13
11
22
12
12
12
19
21
21
21
04
06
06
06
20
07
20
11
02-05-21
pp
s
s
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
to
e
t
o
e
t
o
e
to
e
to
e
15'
26
5
'
6'
13
.
4
'
10'
7'
20
0
'
R
5
.
5
'
R
4
.
5
'
R
5
'
R
2
.
5
'
R
3
.
5
'
R5.
5
'
R4
.
5
'
R5
.
5
'
R
5
.
5
'
R
9
.
5
'
R2
.
5
'
R
2
.
5
'
R2.5'
R
4
.
5
'
R19
.
3
'
R4.
5
'
R
2
.
5
'
R2
.
5
'
R
1
4
.
5
'
R2.5'
R2.5'
R4.5
'
2'
R5'
R
8
'R3'
R
2
0
'
R
3
'
R8'
R8'
R3'
R5'
2
6
9
.
5
'
30'
1
0
7
'
27'
1
7
'
3'
17'
1
7
'
4'
2
5
'
40'
50'
4
'
17'
30'
1
0
0
'
100'
1
0
0
'
130'
242.6'
30.8'
5
3
.
6
'
40'40'
7
'
31.9'
3
4
2
.
9
'
144.6'
140.7'
3
3
6
.
9
'
36.9'
4
'
96'
4
0
'
7'
2
2
7
'
7'
4
0
'
1
0
.
6
'
1
8
.
7
'
2
3
7
'
1
8
.
3
'
50'
50'
10
0
'
1
0
0
'
198.7'
1
2
2
7
'
9.5'
20.5'
34'
5'
30'
9
'
T
Y
P
20'
TYP100.7'
185.6'
6
5
.
3
'
375.7'
8
0
.
5
'
8
0
.
5
'
20.5'9.5'
242.6'
50'10'
11'
5'
150'
9
8
.
6
'
54'
19'
1
0
'
24'
1
2
'
22'
24'
1
2
'
99'
6
'
7.1
'
100'
30'
6'
1
0
0
'
5
'
5'18'
5
'
15'
PUE
CAE
4
0
'
P
U
E
/
C
A
E
36'
CAE
4
0
'
P
U
E
/
C
A
E
6'
6'
3'
3'
6
'
6'
6
'
6
'
3'
3'
9
'
T
Y
P
20'
TYP
9
'
T
Y
P
20'
TYP
5'
7'
6'
5
'
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
SI
T
E
P
L
A
N
-
C
E
N
T
R
A
L
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
8
C.3.2
H
O R R O C
K
S
E
N
G I N E E R
SN
0 30'60'
SCALE: 1" = 30'
02
03
05
5
05
5
05
6
06
08
06
19
13
18
21
21
21
21
21
21
10
10
19
19
12
07
07
20
07
08
08
CURB RAMP W/ TRUNCATED DOMES PER CITY OF REXBURG STANDARDS
ADA ACCESSIBLE PARKING STALL, DIMENSIONS PER PLAN UNLESS OTHERWISE
NOTED
ADA HANDICAP SIGN SEE DETAIL 3 SHEET C.3.4.
INSTALL TRASH PAD & ENCLOSURE PER CITY OF REXBURG SD-11
1.5' FLAT PAN CURB & GUTTER SEE DETAIL 1 SHEET C.3.4
4" THICK SIDEWALK. WIDTH VARIES PER ISPWC SD-709, SD-714, SD-714A & SD-714B
MODERATE DUTY ASPHALT, SEE SHEET C.3.0
ALL STRIPING PER MUTCD STANDARDS
SNOW STORAGE AREA (SEE LANDSCAPE TABLE FOR AREA) SEE DETAIL 4 SHEET
C.3.4
INSTALL PORTLAND CEMENT CONCRETE PAVEMENT SEE PAVEMENT SECTION
SUMMARY SHEET C.3.0
INSTALL CURB TAPER PER ISPWC SD-707 (LENGTH PER PLANS)
INSTALL CROSS DRAIN PER CITY OF REXBURG SD-7
INSTALL CURB & GUTTER PER CITY OF REXBURG SD-3
PROPOSED MONUMENT SIGN, SEE ARCHITECTURAL PLANS FOR DETAILS
SIGN & LIGHT LOCATIONS (REFER TO ARCHITECTURAL AND ELECTRICAL PLANS
FOR DETAILS) SIGNS SHOWN IN APPROXIMATE LOCATION (SIGNS N.I.C)
ELECTRICAL TRANSFORMER PAD. SEE ELECTRICAL PLANS FOR DETAILS
INSTALL GRAVEL (SUB-BASE PER GEOTECH REPORT)
INSTALL PAVERS PER LANDSCAPE PLANS
INSTALL 3' CURB TERMINUS PER ISPWC SD-707
INSTALL TYPICAL SECTION PER CITY OF REXBURG SD-3 TYPICAL SECTION 5
LANDSCAPED AREA, SEE LANDSCAPE PLAN
CURB & GUTTER TRANSITION FROM CITY OF REXBURG SD-3 TO 1.5" FLAT PAN CURB
SITE PLAN KEY NOTES:
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
01
05
13
05
0505
05
05
08
19
21
21
21
21
21
21
22
10
10
19
06
06
07
17
PROPOSED
BUILDING
±5,000 SF
PROPOSED
BUILDING
±10,000 SF
PROPOSED
BUILDING
±5,000 SF
PROPOSED
BUILDING
± 3,000 SF
RV SALES
LOT
RMS LOT
22
02-05-21
pp
pp
s
s
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
t
o
e
t
o
e
t
o
e
to
e
toe
R
4
.
5
'
R
5
'
R
1
9
.
3
'
R
1
5
'
R2
0
'
R3'
R15
'
R
1
5
'
R3'
R30
'
R64
'
R20
'
588.3'
9
1
9
'
3
6
'
555.1'
515.4'
1
3
2
.
6
'
1
2
0
.
5
'
20'
4
0
'
2'
2'
3
7
2
.
4
'
3
8
2
'
20'
34'
32.1'
6
6
0
.
9
'
4'
18.9'
15'
5'9.5'
1
1
.
5
'
15'
PUE
36'
CAE
5'
6'
7
'
3
6
'
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
SI
T
E
P
L
A
N
-
S
O
U
T
H
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
9
C.3.3
H
O R R O
C
K
S
E
N
G I N E E R
SN
0 30'60'
SCALE: 1" = 30'
1
06
06
13
13
21
2121
21
21
12
20
07
07
CURB RAMP W/ TRUNCATED DOMES PER CITY OF REXBURG STANDARDS
ADA ACCESSIBLE PARKING STALL, DIMENSIONS PER PLAN UNLESS OTHERWISE
NOTED
ADA HANDICAP SIGN SEE DETAIL 3 SHEET C.3.4.
INSTALL TRASH PAD & ENCLOSURE PER CITY OF REXBURG SD-11
1.5' FLAT PAN CURB & GUTTER SEE DETAIL 1 SHEET C.3.4
4" THICK SIDEWALK. WIDTH VARIES PER ISPWC SD-709, SD-714, SD-714A & SD-714B
MODERATE DUTY ASPHALT, SEE SHEET C.3.0
ALL STRIPING PER MUTCD STANDARDS
SNOW STORAGE AREA (SEE LANDSCAPE TABLE FOR AREA) SEE DETAIL 4 SHEET
C.3.4
INSTALL PORTLAND CEMENT CONCRETE PAVEMENT SEE PAVEMENT SECTION
SUMMARY SHEET C.3.0
INSTALL CURB TAPER PER ISPWC SD-707 (LENGTH PER PLANS)
INSTALL CROSS DRAIN PER CITY OF REXBURG SD-7
INSTALL CURB & GUTTER PER CITY OF REXBURG SD-3
PROPOSED MONUMENT SIGN, SEE ARCHITECTURAL PLANS FOR DETAILS
SIGN & LIGHT LOCATIONS (REFER TO ARCHITECTURAL AND ELECTRICAL PLANS
FOR DETAILS) SIGNS SHOWN IN APPROXIMATE LOCATION (SIGNS N.I.C)
ELECTRICAL TRANSFORMER PAD. SEE ELECTRICAL PLANS FOR DETAILS
INSTALL GRAVEL (SUB-BASE PER GEOTECH REPORT)
INSTALL PAVERS PER LANDSCAPE PLANS
INSTALL 3' CURB TERMINUS PER ISPWC SD-707
INSTALL TYPICAL SECTION PER CITY OF REXBURG SD-3 TYPICAL SECTION 5
LANDSCAPED AREA, SEE LANDSCAPE PLAN
CURB & GUTTER TRANSITION FROM CITY OF REXBURG SD-3 TO 1.5" FLAT PAN CURB
SITE PLAN KEY NOTES:
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
17
02-05-21
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
--
-
-
SI
T
E
P
L
A
N
D
E
T
A
I
L
S
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
10
C.3.4
TYPICAL HANDICAP SIGN DETAIL
NTSC.3.1
3
CAP TOP OF POST
3/5"X3 1/2"
CADMIUM PLATED
HEX HEAD BOLT WITH
FLAT LOCK WASHER
AND NUT
6'
-
0
"
3"
15
"
6"
12"
BLUE BACKGROUND W/
WHITE SYMBOL AND
LETTERING
PROVIDE SIGN THAT
IDENTIFIES ALL VAN
ACCESSIBLE STALLS.
REFER TO PLAN FOR
LOCATIONS
NOTE: TOP OF POST TO BE
CUT 1/2" BELOW TOP OF SIGN
3/4" GRAVEL ROAD BASE
FIN. GRADE
(W/ LIP FLAT)
CONC. CURB & GUTTER
3/4'' GRAVEL
ROAD BASE
ASPHALT PAVEMENT
1.
0
'
0.
5
'
0.
5
'
2''±
4''
1.5'
0.5'
FLAT PAN CURB & GUTTER1
C.3.1
1'
WELDED WIRE FABRIC
SECTION
3,000 PSI CONCRETE
WELDED WIRE FABRIC
6"
2"
PLAN
6"
SEE PLAN
CONCRETE DUMPSTER PAD DETAIL
NTS
4" TYPE I
CRUSHED AGGREGATE
SE
E
P
L
A
N
2
C.3.1
02-05-21
pp
pp
pp
pp
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ssss
s
s
w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe t
o
e
t
o
e
toe t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe
t
o
e
t
o
e
toe
t
o
e
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
EOP:4849.14
EOP:4848.75
484
8
48
4
8
48
4
8
4
8
4
9
.
5
4
8
5
0
4
8
4
8
.
5
4
8
4
9
4
8
4
8
48
4
8
.
5
48
4
9
4
8
4
8
4
8
4
9
4849
4848
4848
4849
4848.5
484
8
.
5
4848
.
5
4849
.
5
4849
4848.5
4
8
5
0
4
8
4
9
.
5
4
8
4
9
48
4
8
.
5
4
8
4
9
48
4
8
.
5
48
4
9
48
4
8
.
5
48
4
8
48
4
8
48
4
9
48
4
8
.
5
48
4
9
.
5
48
5
1
48
5
0
.
5
48
5
0
.
5
4
8
5
0
4
8
5
0
4
8
4
9
.
5
4
8
4
9
4
8
4
8
.
5
4849
4849.
5
484
9
.
5
4848
.
5
4844
4
8
4
5
4845 48
4
5
4
8
4
6
48
4
6
48
4
6
48
4
7
48
4
7
4
8
4
4
.
5
4844.5 484
4
.
5
4
8
4
5
.
5
4845.5 48
4
5
.
5
48
4
6
.
5
48
4
6
.
5
48
4
7
.
5
48
4
7
.
5
48474846.5
4848
4848.5
4849
4849
4848.5
4848
4848
48
4
8
.
5
48
4
9484
9
.
5
484
9
484
8
.
5
48
4
9
4848.5
4
8
4
9
4
8
4
8
.
5
4
8
4
8
48
5
0
4
8
4
9
.
5
48
5
0
48
4
9
48
4
9
.
5
48
4
9
.
5
4848
4
8
4
7
.
5
4
8
4
9
48
4
9
.
5
4
8
4
9
4
8
4
8
.
5
48484848.5
484
9
4849.
5
485
0
48494849.5
4
8
4
9
4
8
4
9
.
5
4851
4850.5
4850
4850.54851
4850
4849.5
4850
48
4
9
.
5
4
8
5
0
4850
4849.5
4850
4850
4849
4848.5
4849.5
4848
4848.5
4849
4850
4850
4850
.
5
4848.5
4848.5
4848.5
48484848.5
484
8
4
8
4
9
.
5
484
9
.
0
4
8
4
8
.
5
4850485048504850
4848.5
4
8
5
0
4
8
4
8
.
5
48
4
8
.
5
4849
4849.5
4
8
4
8
.
5
48
4
7
.
5
48
4
7
4
8
4
9
4
8
5
0
48
4
8
48
4
8
4
8
4
8
4848
48
4
8
4
8
4
9
4
8
4
8
4
8
4
8
4
8
4
8
4
8
4
8
4
8
4
8
4
8
4
9
4
8
4
9
4
8
4
9
4
8
4
9
48
4
8
4
8
4
9
484
9
48
4
7
484
8
4
8
4
8
48
4
9
48
4
9
48
5
0
48
4
8
48
4
8
48
4
8
1.
2
%
1.
1
%
1.
2
%
0.
4
%
0.4%
0.4%
0.7%
1.0%
1.7%
0.
6
%
1.
2
%
1.
2
%
1.
2
%
6.
6
%
0.4%
0.6%
1.0%
1.6%
0.1%
0.6%0.3%
1.
2
%
1
.
9
%
1
.
3
%
1.6%
1.6%
1
.
6
%
2.
1
%
1.6%
1.5
%
33
.
3
%
1.3
%
1.4%
0
.
4
%
0
.
4
%
1.4
%
5.5%
0
.
4
%
0
.
4
%
2.0%
2.1%
2.0%
1.
6
%
1.5
%
1.2%
1.6
%
1.
7
%
1.
2
%
1.
2
%
1.
5
%
1.
5
%
1.5%1.5%1.5%
1.5%
1.
5
%
1.
5
%
1.
6
%
2.4%
0.
0
%
7.
4
%
1.1%
0.5%
0.
3
%
0.
3
%
0.
3
%
1
.
1
%
0.4%
0.9%
1.1
%
2
.
0
%
25.0%
300.0%
0.
9
%
2.
0
%
2.
0
%
2
.
0
%
EOP:4848.65
EOP:4848.37 EOP:4850.10 EOP:4849.81 EOP:4849.12 EOP:4848.77
EOP:4848.54
TOS:4847.93
TOS:4848.00TOS:4848.15
TOS:4848.00TOS:4848.00
TOS:4849.00
TOS:4848.00
BOS:4846.59
BOS:4845.50
BOS:4848.24
BOS:4847.00BOS:4847.50
BOS:4848.50
BOS:4847.50
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
OV
E
R
A
L
L
G
R
A
D
I
N
G
P
L
A
N
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
11
C.4.0
H
O R R O
C
K
S
E
N
G I N E E R
S
N
0 50'100'
SCALE: 1" = 50'
SITE PLAN- NORTH
SEE SHEET C.4.1
PROPOSED
BUILDING
FFE:4849.26
SITE PLAN- CENTRAL
SEE SHEET C.4.2
SITE PLAN- SOUTH
SEE SHEET C.4.3
PROPOSED
BUILDING
FFE:4850.50
PROPOSED
BUILDING
FFE:4849.26
PROPOSED
BUILDING
FFE:4850.50
02-05-21
pp
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
to
e
to
e
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
TBC: 4849.69
TBC: 4849.71
TBC: 4849.36
TBC: 4849.38 TBC: 4849.32
TBC: 4849.25
TBC: 4849.09
TBC: 4848.64
TBC: 4849.22
TBC: 4849.05
TBC: 4848.88
TBC: 4848.57TBC: 4848.19
TBC: 4848.11TBC: 4848.57
TBC: 4849.23
TBC: 4849.42 TBC: 4850.45
TBC: 4850.20
TBC: 4849.96
TBC: 4850.41
TBC: 4850.50
TBC: 4850.57
TBC: 4849.92
TBC: 4849.21
TBC: 4850.28
TBC: 4849.92
TBC: 4849.60
TBC: 4848.75
TBC: 4848.77
TBC: 4850.45
DEPTBC:4849.05
DEPTBC:4848.92
DEPTBC:4848.96
DEPTBC:4849.01
DEPTBC:4850.03
DEPTBC:4850.05
DEPTBC:4850.10
DEPTBC:4850.20
DEPTBC:4850.06
DEPTBC:4849.91
DEPTBC:4849.87
DEPTBC:4849.75
DEPTBC:4851.00
DEPTBC:4850.88
DEPTBC:4850.78
DEPTBC:4850.67
DEPTBC:4850.49
DEPTBC:4850.38
DEPTBC:4850.28
DEPTBC:4850.17
DEPTBC:4850.14
DEPTBC:4850.16
DEPTBC:4850.09
DEPTBC:4850.00
DEPTBC:4850.08
DEPTBC:4850.11
DEPTBC:4850.19
DEPTBC:4850.31
TOA:4849.46
TOA:4849.62
TOA:4849.69
TOA:4849.75
TOA:4849.81
TOA:4849.91
TOA:4849.95
TOA:4850.00
TOA:4850.07
TOA:4849.82
TOG:4849.12
TOA:4849.78
TOA:4849.71
TOA:4849.68
TOA:4849.65
TOA:4850.08
TOA:4850.64
TOA:4850.54
TOA:4850.45
TOA:4850.32
TOA:4850.14
TOA:4850.01
TOA:4849.92
TOA:4849.81
TOA:4849.57
TOA:4849.58
TOA:4849.62
TOA:4849.66
TOA:4849.70
TOA:4849.52
TOA:4849.52
TOA:4849.56
TOA:4849.48
TOA:4849.41
TOA:4849.33
TOA:4849.37
TOA:4849.37
TOA:4849.25
TOA:4848.35
TOA:4848.42
TOA:4848.47
TOA:4848.51
TOA:4848.55
TOA:4848.75
TOA:4848.51
TOA:4848.56
TOA:4848.40
TOA:4848.37
TOA:4847.61
TOA:4847.69
TOA:4848.38
TOA:4848.55
TOA:4848.72
TOA:4848.07
TOA:4848.07
TOA:4848.14
TOA:4848.59
TOA:4848.75
TOA:4848.82
TOA:4849.21
TOA:4849.19
TOA:4848.86
TOA:4848.88
TOA:4848.48TOA:4848.38
TOA:4848.67
TOA:4848.57
TOA:4848.96
TOA:4848.91 TOA:4848.85
TOA:4848.92
TOC: 4850.18
TOC: 4850.18
TOC: 4850.25
TOC: 4850.24
TOC: 4850.22
TOC: 4850.03
TOC: 4850.32
TOC: 4849.88
TOC: 4850.94
TOC: 4850.81
TOC: 4850.87
TOC: 4851.03
TOC: 4851.01
TOC: 4850.46
TOC: 4850.47
TOC: 4850.48
TOC: 4850.64
TOC: 4850.49
TOC: 4849.86
TOC: 4849.90
TOC: 4849.87
TOC: 4849.70
TOC: 4849.95
TOC: 4850.13
TOC: 4850.12
TOC: 4850.07
TOC: 4848.83
TOC: 4848.83
TOC: 4848.94
TOC: 4848.92
TOC: 4848.67
TOC: 4848.78TOC: 4848.56
TOC: 4849.07TOC: 4848.98
TOC: 4848.77
TOC: 4848.97
TOC: 4848.88
TOA:4849.84
TOA:4849.84
TOA:4849.69
TOA:4849.69
TOA:4849.70
TOA:4849.95TOA:4848.92
TOA:4848.73
48
4
9
.
5
4
8
4
9
48
4
9
484
9
484
8
.
5
484
8
4849.5
4
8
4
8
4847.
5
4849
4849.5
4849 4848.5
48
4
8
48
4
8
.
5
4
8
4
9
4
8
4
9
.
5
4
8
5
0
48
4
9
48
4
9
.
5
4849 4849.5
48
5
1
48
5
0
.
5
4
8
5
0
4
8
5
0
.
5
4
8
5
1
4
8
4
8
.
5
4
8
4
9
4
8
4
9
.
5
4848.5
4847.5
4847
4849
4850
4848
4849
484
9
48494849
48
4
8
4849
48
4
9
4849
4849
4850
484848484848
GRADE
BREAK
GRADE
BREAK
GR
A
D
E
BR
E
A
K
GR
A
D
E
BR
E
A
K
FL:4849.66
FL:4849.34
FL:4848.50
METOA:4848.81
FG:4847.84
FG:4847.91
FG:4848.01
FG:4848.20
FG:4848.85
FG:4848.75
FG:4848.59
FG:4848.49
1
.
1
%
0.
5
%
0.3
%
0.3
%
0.3
%
1.1%
0.
4
%
0
.
9
%
1.
1
%
2.0%
25
.
0
%
3
0
0
.
0
%
0.9
%
2.0%
EOP:4848.65
EOP:4848.37
EOP:4850.10
EOP:4849.81
METOA:4850.39
METOA:4850.57
METOA:4851.14
METOA:4850.56METOA:4850.32
METOA:4849.91
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
GR
A
D
I
N
G
P
L
A
N
-
N
O
R
T
H
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
12
C.4.1
H
O R R O
C
K
S
E
N
G I N E E R
SN
0 30'60'
SCALE: 1" = 30'
SHEET NOTE:
1. CONTOURS SHOWN AT 0.5' AND 1.0' INTERVALS
2. SEE SHEET __C.5.__ FOR DRAINAGE DETAILS
LEGEND
TOA: TOP OF ASPHALT
METOA: MATCH EXISTING TOP OF ASPHALT
TBC: THE BACK OF CURB
TOC: TOP OF CONCRETE
FFE: FINAL FLOOR ELEVATION
FG: FINAL GRADE
TOG: TOP OF GRATE
DEPTBC: DEPRESSION THE BACK OF CURB
FL: FLOW LINE
TOS: TOP OF SWALE
BOS: BOTTOM OF SWALE
EOP: EDGE OF PAVEMENT
02-05-21
pp
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
to
e
t
o
e
t
o
e
to
e
to
e
TBC: 4849.69
TBC: 4849.71
TBC: 4849.36
TBC: 4849.38 TBC: 4849.32
TBC: 4849.25
TBC: 4849.09
TBC: 4848.64
TBC: 4849.22
TBC: 4849.05
TBC: 4848.88
TBC: 4848.57TBC: 4848.19
TBC: 4848.11TBC: 4848.57
TBC: 4848.78
TBC: 4848.78
TBC: 4848.39
TBC: 4849.32
TBC: 4848.93
TBC: 4848.65
TBC: 4848.72
TBC: 4849.85
TBC: 4848.60
TBC: 4848.57
TBC: 4849.05
TBC: 4848.99
TBC: 4849.23
TBC: 4849.42 TBC: 4850.45
TBC: 4850.20
TBC: 4850.05
TBC: 4850.05
TBC: 4850.12
TBC: 4850.09
TBC: 4850.26
TBC: 4850.35
TBC: 4850.34
TBC: 4850.03
TBC: 4850.05
TBC: 4850.09
TBC: 4850.25
TBC: 4850.35
TBC: 4849.94
TBC: 4849.95
TBC: 4850.07
TBC: 4850.25
TBC: 4850.35
TBC: 4850.35
TBC: 4850.26
TBC: 4850.09
TBC: 4850.05TBC: 4850.05
TBC: 4850.12
TBC: 4850.26
TBC: 4850.35
TBC: 4849.96
TBC: 4850.41
TBC: 4850.50
TBC: 4850.57
TBC: 4849.92
TBC: 4849.08
TBC: 4849.06
TBC: 4849.21
TBC: 4849.42
TBC: 4849.71
TBC: 4849.42
TBC: 4849.21
TBC: 4848.47
TBC: 4848.27
TBC: 4848.26
TBC: 4848.46
TBC: 4850.45
TBC: 4848.39
TBC: 4848.99
TBC: 4848.99
DEPTBC:4850.09
DEPTBC:4850.08
DEPTBC:4850.11
DEPTBC:4850.19
DEPTBC:4850.31
TOA:4849.46
TOA:4849.62
TOA:4849.69
TOA:4849.75
TOA:4849.81
TOA:4849.91
TOA:4849.95
TOA:4850.00
TOA:4850.07
TOA:4849.82
TOG:4849.12
TOA:4849.33
TOA:4849.63
TOA:4849.33
TOA:4849.12
TOG:4848.89
TOG:4848.89
TOA:4848.96
TOA:4848.98
TOA:4850.04
TOA:4850.04
TOA:4850.09
TOA:4850.26
TOA:4850.35
TOA:4850.11
TOA:4850.34
TOA:4850.02
TOA:4850.02
TOA:4850.09TOA:4850.26
TOA:4850.35
TOA:4849.89
TOA:4849.89
TOA:4850.09
TOA:4850.25
TOA:4850.35
TOA:4850.35
TOA:4850.26
TOA:4850.09
TOA:4850.02TOA:4850.02
TOA:4850.12
TOA:4850.26
TOA:4850.35
TOA:4848.15
TOA:4848.22
TOA:4849.37
TOA:4848.49
TOG:4847.89
TOG:4847.89
TOA:4847.76
TOA:4847.96
TOA:4848.28
TOA:4847.76
TOA:4848.28
TOA:4847.97
TOA:4847.61
TOA:4847.69
TOA:4848.38
TOA:4848.55
TOA:4848.72
TOA:4848.07
TOA:4848.07
TOA:4848.14
TOA:4848.59
TOA:4848.75
TOA:4848.82
TOA:4849.21
TOA:4849.19
TOA:4848.86
TOA:4848.88
TOA:4848.48TOA:4848.38
TOA:4848.67
TOA:4848.57
TOA:4848.96
TOA:4848.91 TOA:4848.85
TOA:4848.92
TOA:4848.30
TOA:4848.23TOA:4848.33
TOA:4848.46
TOA:4847.72
TOA:4847.55
TOA:4847.75
TOA:4848.00
TOA:4848.12
TOA:4848.06
TOA:4848.07
TOA:4848.22
TOA:4849.05
TOC: 4850.50
TOC: 4850.50
TOC: 4850.41
TOC: 4850.50
TOC: 4850.41
TOC: 4850.50
TOC: 4850.41
TOC: 4850.50
TOC: 4850.50
TOC: 4850.41
TOC: 4849.26
TOC: 4849.17TOC: 4849.25
TOC: 4849.26
TOC: 4849.17
TOC: 4849.26TOC: 4848.35
TOC: 4850.18
TOC: 4850.18
TOC: 4850.25
TOC: 4850.24
TOC: 4848.67
TOC: 4848.78TOC: 4848.56
TOC: 4849.07TOC: 4848.98
TOC: 4848.77
TOC: 4848.97
TOC: 4848.88
TOA:4848.34
TOA:4848.55
TOA:4849.69
TOA:4849.69
TOA:4849.70
TOA:4849.95TOA:4848.92
TOA:4848.73
48
4
8
48
4
8
4851
4850.5
4850.5
4850
4850
4849.5
48494848.
5
4
8
4
9
4
8
4
9
.
5
48
4
9
.
5
4
8
4
8
.
5
48
4
6
48
4
5
.
5
48
4
7
48
4
6
.
5
4
8
4
8
4
8
4
8
.
5
4
8
4
9
4
8
4
9
4
8
4
8
.
5
48
4
8
4
8
4
8
48
4
8
.
5
48
4
9
48
4
9
.
5
4
8
4
9
4
8
4
8
.
5
48
4
9
48
4
8
.
5
484
9
484
8
.
5
484
8
4850
4849.5
4850
484
9
484
9
.
5
4849.5
4
8
5
0
48
4
9
.
5
48
5
0
48
4
9
.
5
4850
4
8
5
0
48
4
9
.
5
48
5
0
48
5
0
48
4
9
48
4
8
.
5
48
4
9
.
5
48
4
8
48
4
8
.
5
48
4
9
4
8
4
9
.
0
4848
.
5
4
8
5
0
4
8
5
0
4
8
5
0
4
8
5
0
4
8
4
8
.
5
4850
4849
4850
4
8
4
8
48
4
8
4849
48494849
4847
4
8
4
8
GRADE
BREAK
GRADE
BREAK
GR
A
D
E
BR
E
A
K
GR
A
D
E
BR
E
A
K
GRADE
BREAK
FL:4849.66
FL:4848.69
TOG:4848.86
TOG:4848.86
FG:4848.82
FG:4848.93
FG:4848.48
FG:4848.45
FG:4847.40
FG:4849.35
FG:4850.60
FG:4850.64 FG:4850.45
FG:4849.47
1.2%
1.1
%
1.2%
0.4%
0.
4
%
0.
6
%
0.
3
%
GR
A
D
E
BR
E
A
K
1.2%
1.9%
1.3%
1
.
6
%
1.
6
%
1.5
%
1
.
2
%
1.7
%
1.2%
1.2%
1.5%
1.5%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.5%
1.5%
1.6%
2
.
4
%
0.0%
7.4%
TOG:4847.26
TOG:4848.03
TBC: 4848.53
TBC: 4847.76
EOP:4849.81
EOP:4849.12
EOP:4848.77
METOA:4850.39
TOS:4848.15
TOS:4848.00
TOS:4848.00
BOS:4848.24
BOS:4847.00
BOS:4847.50
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
GR
A
D
I
N
G
P
L
A
N
-
C
E
N
T
R
A
L
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
13
C.4.2
H
O R R O
C
K
S
E
N
G I N E E R
SN
0 30'60'
SCALE: 1" = 30'
SHEET NOTE:
1. CONTOURS SHOWN AT 0.5' AND 1.0' INTERVALS
2. SEE SHEET _______ FOR DRAINAGE DETAILS
LEGEND
TOA: TOP OF ASPHALT
METOA: MATCH EXISTING TOP OF ASPHALT
TBC: THE BACK OF CURB
TOC: TOP OF CONCRETE
FFE: FINAL FLOOR ELEVATION
FG: FINAL GRADE
TOG: TOP OF GRATE
DEPTBC: DEPRESSION THE BACK OF CURB
FL: FLOW LINE
TOS: TOP OF SWALE
BOS: BOTTOM OF SWALE
EOP: EDGE OF PAVEMENT
02-05-21
pp
pp
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
t
o
e
t
o
e
t
o
e
to
e
toe
TBC: 4848.93
TBC: 4850.37
DEPTBC:4850.24
DEPTBC:4850.30
DEPTBC:4850.23
DEPTBC:4849.72
TOA:4849.77
TOA:4849.79
TOA:4849.83
TOA:4849.87
TOA:4848.06
TOA:4848.42
TOA:4850.60TOA:4850.60
EOP:4849.14
EOP:4848.75
TOC: 4850.24
TOC: 4850.07
TOC: 4850.40
TOC: 4850.10
TOA:4849.81
TOA:4850.10
TOA:4850.10
4
8
4
8
4849.5
4850
4848.5
4849
4848
4848
.
5
4849
4848
484
9
4
8
4
9
4
8
4
8
4
8
4
8
48
4
9
4
8
4
8
.
5
48
4
8
.
5
4
8
4
8
.
5
4
8
4
9
.
5
4
8
4
9
4
8
4
8
.
5
4850
4849.548494848.5
4849
484
8
.
5
48494848.5
4848 4848 48494848.5
4849.5
4850.5
4850
4
8
4
9
4
8
4
9
.
5
48
4
9
.
5
4
8
4
8
.
5
48
4
4
4845
48
4
5
484
5
4846
48
4
6
484
6
4847
484
7
484
4
.
5
48
4
4
.
5
4
8
4
4
.
5
4845.
5
48
4
5
.
5
484
5
.
5
4846.5
48
4
6
.
5
4847.5
4847.5
48
5
0
4
8
5
0
48
5
0
.
5
48
4
8
.
5
48
4
8
.
5
48
4
8
.
5
48
4
8
48
4
8
.
5
4
8
4
8
4849.
5
4
8
5
0
4
8
5
0
4
8
5
0
4
8
5
0
4848
.
5
48
4
8
4848
4848
4848484848484848
484
8
GR
A
D
E
BR
E
A
K
GRADE
BREAK
GR
A
D
E
BR
E
A
K
GR
A
D
E
BR
E
A
K
GR
A
D
E
BR
E
A
K
GRADE
BREAK
GRADE
BREAK
GR
A
D
E
BR
E
A
K
GR
A
D
E
BR
E
A
K
FL:4850.09
METOA:4850.80
FG:4848.48
FG:4847.40
FG:4843.69
FG:4843.84
FG:4844.60
FG:4844.03
FG:4844.04
FG:4846.26
FG:4849.23
FG:4849.56
FG:4849.95
FG:4849.93
FG:4848.91
FG:4850.24FG:4850.41FG:4848.62FG:4848.84
FG:4848.93 FG:4849.67FG:4848.17 FG:4849.11
TOG:4847.65FG:4848.79TOG:4847.65FG:4848.56
FG:4848.90 FG:4848.13 FG:4849.60 FG:4848.94
0.
4
%
0.
7
%
1.
0
%
1.
7
%
0.6%1.2%1.2%1.2%6.6%
0.
4
%
0.
6
%
1.
0
%
1.
6
%
0.
1
%
1.
6
%
1.6%
2.1%
1
.
6
%
1.5
%
33.3%
1.3
%
1
.
4
%
0.4%0.4%
1.
4
%
5.
5
%
0.4%
0.4%
2.
0
%
2
.
1
%
2
.
0
%
1.6%
1.5
%
1
.
2
%
1.
6
%
2.0%
2.0%
EOP:4848.54
METOA:4850.65
METOA:4850.39
METOA:4850.23
TOS:4847.93
TOS:4848.00
TOS:4849.00
TOS:4848.00
BOS:4846.59
BOS:4845.50
BOS:4848.50
BOS:4847.50
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
GR
A
D
I
N
G
P
L
A
N
-
S
O
U
T
H
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
14
C.4.3
H
O R R O
C
K
S
E
N
G I N E E R
SN
0 30'60'
SCALE: 1" = 30'
SHEET NOTE:
1. CONTOURS SHOWN AT 0.5' AND 1.0' INTERVALS
2. SEE SHEET _______ FOR DRAINAGE DETAILS
LEGEND
TOA: TOP OF ASPHALT
METOA: MATCH EXISTING TOP OF ASPHALT
TBC: THE BACK OF CURB
TOC: TOP OF CONCRETE
FFE: FINAL FLOOR ELEVATION
FG: FINAL GRADE
TOG: TOP OF GRATE
DEPTBC: DEPRESSION THE BACK OF CURB
FL: FLOW LINE
TOS: TOP OF SWALE
BOS: BOTTOM OF SWALE
EOP: EDGE OF PAVEMENT
02-05-21
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0014+37
SD SD SD
S
D
SD
S
D
S
D
S
SS
M
H
-
1
S
SS
M
H
-
2
SS
SS
S
SS
M
H
-
3
SS
EX
S
S
M
H
-
1
s
EX SSMH - 2 s
EX SSMH - 3
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
EX SSMH - 4
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
SD
SD
S
D
s
ss
s
s
s
s
ss
s
s
ss
ss
s
s
ss
s
s
s
s
ss
s
s
ss
s
s
s
s
0+
0
0
1+
0
0
2+
0
0
3+
0
0
4+
0
0
5+
0
0
6+
0
0
7+
0
0
7+
6
4
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
SD
I
N
L
E
T
-
N
SD
S
D
S
D
SD
0+00 1+00 2+00
3+
0
0
4+
0
0
5+
0
0
6+
0
0
7+00
8+00 9+009+13
BP
:
0
+
0
0
.
0
0
PI
:
2
+
3
6
.
5
3
PI: 6+11.21
P
I
:
6
+
7
7
.
9
4
PI
:
7
+
4
1
.
8
7
PI: 7+85.59
EP
:
9
+
1
3
.
0
9
S
D
ST
R
U
C
T
U
R
E
-
(
3
4
)
S
D
0
+
0
0
1
+
0
0
2
+
0
0
3
+
0
0
4
+
0
0
5
+
0
0
6+
0
0
7+
0
0
7+
7
8
0+
0
0
1+
0
0
2+
0
0
3+
0
0
4+
0
0
5+
0
0
6+
0
0
7+0
0
8+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0020+25
pp
pp
pp
pp
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ssss
s
s
w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe t
o
e
t
o
e
toe t
o
e
t
o
e
toe toe toe toe toe toe
t
o
e
toe toe toe
t
o
e
t
o
e
toe
t
o
e
ss
ss
s
s
s
s
s
s
s
s
s
s
s
s
s
s
ss
s
s
s
s
s
s
s
s
ss
s
s
4
8
4
8
484
8
4
8
4
8
48
4
8
4
8
4
8
48
4
8
4
8
4
8
484
8
4
8
4
8
48
4
8
48484849
48
4
9
4849
484948494849
484
9
4
8
4
9
4849
4849
4849
4849
48
4
9
4849
484
9
48
4
9
48
4
9
4
8
4
9
48
4
9
4848
484
8
4
8
4
8
48
4
8
4
8
4
8
4848
4850
48504850
4847.0
4848.0
484
9
.
0
4850
48
5
0
4
8
5
0
48
5
0
4
8
5
0
4
8
4
7
.
0
48
4
7
.
0
48
4
8
.
0
4
8
4
8
.
0
4848.0
4848
.
0
48
4
8
.
0
48
4
8
.
0
4
8
4
9
.
0
48
4
9
.
0
4
8
4
9
.
0
48
4
9
.
0
4849.0
4849.0
484
9
.
0
484
9
.
0
4849.0
48
4
9
.
0
48
5
1
.
0
48
5
1
.
0
48454844.0
4846.04847.0
4848.
0
4848.0
4
8
5
0
4
8
4
9
.
0
48
4
9
.
0
4
8
4
9
.
0
48
5
0
4850485048504850
0
.
6
%
0
.
5
%
0
.
4
%
0
.
4
%
1.
7
%
1.4%
1.6%
1.7%
1.7%
1.6%
1.5
%
1.5%
1.5%
1
.
6
%
1
.
8
%
1.3%
1.6%
1.6
%
1.
5
%
2.0
%
2.
0
%
2
.
1
%
0.4%
1.
5
%
1
.
9
%
1.
3
%
1.
5
%
1.
8
%
2.
0
%
2.
0
%
2
.
0
%
2.
0
%
0.3
%
0.
3
%
2
.
0
%
2.
1
%
2.1%
2.0%
2.0%
1.
4
%
2.
8
%
2.
6
%
2
.
2
%
2
.
1
%
1.
5
%
1.3%
1.
2
%
2.1%
1.8%
1.6%
1
.
1
%
0.
3
%
0.
3
%
1.
5
%
1.
3
%
1.7
%
2.5%
2.3%
2.0%
2.1%
2
.
2
%
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
OV
E
R
A
L
L
U
T
I
L
I
T
Y
&
D
R
A
I
N
A
G
E
P
L
A
N
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
15
C.5.0
H
O R R O C
K
S
E
N
G I N E E R
S
N
0 50'100'
SCALE: 1" = 50'
UN
I
V
E
R
S
I
T
Y
B
L
V
D
P
&
P
PROPOSED
BUILDING
±5,000 SF
UN
I
V
E
R
S
I
T
Y
B
L
V
D
12TH STREET 12TH STREET12TH NORTH P&P 12TH SOUTH P&P
PROPOSED
BUILDING
±10,000 SF
PROPOSED
BUILDING
±5,000 SF
PROPOSED
BUILDING
± 3,000 SF
RV SALES
LOT
RMS LOT
PRIVATE DRIVE
02-05-21
f
l
f
l
f
l
f
l
f
l
f
l
fl fl fl fl fl fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl
fl
f
l
f
l
fl
f
l
f
l
f
l
f
l
f
l
f
l
fl fl fl fl fl fl
pp
pp
pp
pp
pp
pp
pp
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
t
t
t
t
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
pp
pp
b
e
l
b
e
l
b
e
l
b
e
l
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
t
o
e
t
o
e
t
o
e
to
e
t
o
e
to
e
t
o
e
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
S
D
SD
W
W
W
W
SD
S SSS S
s
s
ss
ss
ss
ss
s
ss
ss
ss
ss
ss
ss
ss
S
D
S
D
S
D
s
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
--
-
-
UT
I
L
I
T
Y
&
D
R
A
I
N
A
G
E
P
L
A
N
D
E
T
A
I
L
S
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
16
C.5.1
12" MIN.
SIZE PER
TABLE
12" MIN.
ADS N-12 PERFORATED
INFILTRATION PIPE, SIZE PER TABLE(OR
EQUIVALENT)
NOTES:
1)STORMWATER DISTRIBUTION PIPES TO BE PERFORATED ADS N-12 INFILTRATION PIPE, SIZE
PER TABLE(OR EQUIVALENT)
2)ALL WASHED STONE IN INFILTRATION TRENCH TO BE GRANITE. LIMESTONE BASED GRAVEL
WILL NOT BE ACCEPTED. MATERIAL TO BE APPROVED BY GEOTECH
3)INFILTRATION TRENCH TO BE LINED IN FILTER FABRIC - TOP AND SIDES.
4)INFILTRATION STONE TO BE 3/4" TO 2" GRANITE, OR APPROVED EQUAL, FREE FROM SLATE,
SHALE, CLAY & SILT
UNDISTURBED MATERIAL
95% COMPACTED FILL
(D)
5' (TYP)
MIN. 1' OF
ASTM C33 FILTER SAND
3/4" TO 2" WASHED,
GRANITE STONE
PAVEMENT 5' MIN
(TYP)
1' MIN
(TYP)
TYPICAL SECTION A
5' (TYP)
FILTER FABRIC TO BE PLACED AROUND TOP,
AND SIDES OF INFILTRATION CHAMBER. FABRIC
TO BE AMOCO 4545 NON-WOVEN OR
EQUIVALENT LAYER OF CLEAN, WASHED SAND
TO BE INSTALLED BELOW FILTER FABRIC
1.GROUND WATER IS NOT FOUND WITHIN 10' OF THE SURFACE BASED ON THE PROJECT GEOTECHNICAL REPORT DATED
02/14/2019. IF GROUNDWATER IS ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR REDESIGN
OF SEEPAGE TRENCHES TO PROVIDE 3' MINIMUM CLEARANCE BETWEEN GROUNDWATER AND THE BOTTOM OF THE TRENCH.
UNTIMELY NOTIFICATION OF THE ENGINEER MAY RESULT IN ADDITIONAL COSTS TO THE CONTRACTOR.
2.WHEN ROCK IS ENCOUNTERED, CONTRACTOR SHALL HAVE PERCOLATION TEST PERFORMED BY SOILS ENGINEER AFTER
SEEPAGE TRENCH IS FULLY EXCAVATED. IF THE PERCOLATION TEST IS LESS THAN SPECIFIED BY THE SOILS REPORT AND
ENGINEER, CONTRACTOR SHALL BLAST TO CREATE CRACKS IN ROCK FOR DRAINAGE TO OCCUR, OR REDESIGN OF THE SYSTEM
TO ACHIEVE REQUIRED CRITERIA. IN SUCH AREAS THE FINE AGGREGATE LAYER MAY BE REDUCED TO 1.5'
3.THE TRENCH SHALL BE EXTENDED INTO ANY POORLY GRADED GRAVEL LAYER A MINIMUM OF 1.5'. BACKFILL WITH A LOW FINE PIT
RUN MATERIAL IS ACCEPTABLE BETWEEN THE BOTTOM OF THE TRENCH AND THE FINE AGGREGATE LAYER IF AVAILABLE.
4.SAND SHALL MEET THE REQUIREMENTS OF ISPWC SECTION 800, ASTM C33, OR ITD SPECIFICATION 703.02.
WRAP TRENCHES TOP
AND SIDES WITH AMOCO
4545 OR EQUIVALENT
END CAP
2' MIN. COVER
OVER CRUSHED GRAVEL
IN PAVED AREAS
SLOPE=0%(D )
1'2' MIN. TO THE
TOP OF PIPE
ROADWAY SURFACING
UNDISTURBED MATERIAL
TO DISTRIBUTION HEADER
EXCAVATE TO FREE DRAINING
SAND AND GRAVEL PER PROJECT
GEOTECHNICAL REPORT.
CONSULT GEOTECHNICAL
ENGINEER (TYP) (BOTTOM OF
SAND AS SHOWN SHALL BE THE
MINIMUM EXCAVATION)TYPICAL SECTION B
ELEV:(A )
INFILTRATION TABLE
INFILTRATION
TRENCH
DRAINAGE
AREA
(FT²)
DESIGNED
STORM
(YEAR(S))
DESIGNED
STORM VOLUME
(FT³)
VOLUME
PROVIDED
(FT³)
(L)
LENGTH
(FEET)
(W)
WIDTH
(FEET)
(D)
DEPTH
(FEET)
ELEVATION PERFORATED
PIPE SIZEABC
-195,800 25 16,330 16,464 110'75.0'4'4843.00 4846.00 4842.00 24"
NOTE: POROSITY OF ROCK IS 30% PER CITY STANDARD
3/4" TO 2"WASHED
GRANITE STONE
THROAT WIDTH
RING AND GRATE ELEVATION
INVERT IN (FROM
INLETS)
OUTLET BAFFLE WALL
ELEVATION
INLET BAFFLE WALL
ELEVATION
SAND & GREASE TRAP SPECIFICATIONS
SIZE
(GALLONS)NAME
RING &
GRATE
ELEVATION
INVERT IN
ELEVATION
INLET BAFFLE
WALL
ELEVATION
THROAT WIDTH
(INCHES)
OUTLET
BAFFLE WALL
ELEVATION
INVERT OUT
ELEVATION
1500
S&G
INTERCEPTOR A
(STORM)
4848.73 4843.40 4842.80 11 4843.30 4843.00
SAND & GREASE TRAP NOTES:
1.REFER TO SITE GEOTECH REPORT, PREPARED BY MTI & DATED ______, FOR INFILTRATION FACILITY DESIGN.
2.SEE THE GRADING PLAN FOR MORE AND/GREASE TRAP ELEVATIONS.
3.REFER TO THE SAND AND GREASE TRAP STANDARD DRAWING, ISPWC SD-624 FOR MORE DETAIL.
4.THE SAND AND GREASE TRAP MUST BE CONSTRUCTED PER THE SPECIFICATIONS DESCRIBED IN THE ISPWC SPECIFICATIONS AND SD-624 FOR MORE
DETAIL.
5.SEE THE STORM DRAIN PLAN FOR THE SAND & GREASE TRAP LOCATIONS AND THE OBSERVATION WELL PIT LOCATIONS.
6.THE INVERT IN OF THE DISTRIBUTION HEADER PIPE MUST BE A MINIMUM OF 0.10 FEET HIGHER THAN THE INVERT OUT.
INVERT OUT (TO INFILTRATION
TRENCH) MUST BE A MINIMUM OF
0.10' BELOW INFLOW INVERT
PROFILE VIEW
SCALE:
1
-
TYPICAL INFILTRATION TRENCH DETAIL
NTS
SCALE:
1A
-
SAND & GREASE TRAP DETAIL
NTS
2' MIN.
ELEV:(B )
ELEV:(C )
ELEV: 4846.00'
ELEV: 4842.00'
DRAINAGE SYSTEM CALCULATIONS
SYSTEM REQUIREMENTS:
DRAINAGE AREA:
·BASIN A 30,775 SF
·BASIN B 11,574 SF
·BASIN C 14,482 SF
·BASIN D 63,649 SF
·BASIN E 429,000 SF
·BASIN F 195,800 SF
·BASIN G *TBD
TOTAL AREA: 752,437 SF
DESIGN STORM:25 YEAR (REXBURG, 1 HR)
STORM VOLUME REQUIRED:84,579 CF
PROPOSED SYSTEM:
STORAGE SYSTEM:STORM TECH INFILTRATORS (MC-3500)
INFILTRATION TRENCH (PER THIS SHEET)
ROADSIDE SWALE
SUMMARY:
BASIN A
STORAGE SYSTEM:STORMTECH INFILTRATOR
TOTAL STORAGE REQUIRED:2,619 CF
TOTAL STORAGE PROVIDED:2,792 CF
BASIN B
STORAGE SYSTEM:STORMTECH INFILTRATOR
TOTAL STORAGE REQUIRED:926 CF
TOTAL STORAGE PROVIDED:993 CF
BASIN C
STORAGE SYSTEM:STORMTECH INFILTRATOR
TOTAL STORAGE REQUIRED:1,181 CF
TOTAL STORAGE PROVIDED:1,353 CF
BASIN D
STORAGE SYSTEM:STORMTECH INFILTRATOR
TOTAL STORAGE REQUIRED:5,181 CF
TOTAL STORAGE PROVIDED:5,311 CF
BASIN E
STORAGE SYSTEM:ROADSIDE SWALE
TOTAL STORAGE REQUIRED:58,342 CF
TOTAL STORAGE PROVIDED:67,100 CF
BASIN F
STORAGE SYSTEM:INFILTRATION TRENCH
TOTAL STORAGE REQUIRED:16,330 CF
TOTAL STORAGE PROVIDED:16,464 CF
BASIN G
*STORAGE VOLUMES TO BE CALCULATED
AT TIME OF DEVELOPMENT
TOTAL STORAGE REQUIRED:84,579 CF
TOTAL STORAGE PROVIDED:94,013 CF
BASIN A BASIN B
BASIN C
BASIN D
BASIN F
BASIN E
BASIN G
02-05-21
pp
pp
s
s
s
w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
w
w
w
w
w
w
w
w
6+007+008+009+0010+0011+0012+0013+0014+0014+37
SD SD SD SD SD SD
S
SS
SS
s
s
SD
S
D
s
6+
0
0
7+
0
0
7+
6
4
SD SD SD
S
D
0+00 1+00 2+00
3+
0
0
BP
:
0
+
0
0
.
0
0
PI
:
2
+
3
6
.
5
3
6+
0
0
7+
0
0
7+
7
8
2
.
2
%
1
.
8
%
2
.
3
%
2
.
4
%
1.
8
%
2
.
3
%
2.
3
%
1.
8
%
2.
0
%
2.
0
%
2
.
0
%
2
.
0
%
2.
0
%
2.
0
%
2
.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
2
%
48
4
9
48
4
9
48
4
9
4850
48
5
0
4850
4849
48
5
1
4
8
5
0
48
5
0
4850
4850
48
5
0
4849
4850
4850
4851 4850
4851
48
5
1
48
4
9
485
0
4850
4850
0.4%0.4%0.4%0.6%0.5%0.6%0.7%
2.
5
%
2.
0
%
2.
0
%
1.6
%1.2%
3.
2
%
2
.
2
%
2
.
0
%
2.
6
%
3
.
4
%
2.
7
%
2
.
1
%
2
.
2
%
1
.
0
%
1
.
1
%
2.0
%
2.
0
%
2.
0
%
MATOA: 4850.25
MATOA: 4850.28
MATOA: 4850.23MATOA: 4850.32MATOA: 4850.30MATOA: 4850.34MATOA: 4850.37MATOA: 4850.40
MATOA: 4850.47
MATOA: 4850.54MATOA: 4850.52
MATOA: 4850.63
MATOA: 4850.97MATOA: 4851.26
MATOA: 4851.23MATOA: 4851.14
MATOA: 4850.85
MATOA: 4850.68
MATOA: 4850.61
MATOA: 4850.48
MATOA: 4850.43
TBC: 4849.74TBC: 4850.22TBC: 4849.77TBC: 4850.31TBC: 4849.96
TBC: 4850.08
DEP TBC: 4850.11
DEP TBC: 4850.19
TBC: 4850.31
TBC: 4850.41
TBC: 4850.12
DEP TBC: 4850.16
DEP TBC: 4850.09
TBC: 4850.14
TBC: 4850.28
TBC: 4850.18
TBC: 4851.01
TBC: 4851.00
TBC: 4850.88
TBC: 4850.78
TBC: 4850.67
DEP TBC: 4850.49
DEP TBC: 4850.38
TBC: 4850.28
TBC: 4850.17
TBC: 4850.32
TBC: 4850.50
TBC: 4850.45
MATOA: 4850.41
MATOA: 4850.41
MATOA: 4850.26
2.
1
%
2.1%
2.6%
1.6%
1
.
9
%
2.0%
25.0%
25.0%
3.7%2.
0
%
TOC: 4850.03TOC: 4850.51TOC: 4850.06
TOC: 4850.56
TOC: 4850.25
TOC: 4850.18
TOC: 4850.25
TOC: 4849.69
TOC: 4849.69
TOC: 4849.84
TOC: 4849.84
TOC: 4850.08
TOC: 4849.84
TOC: 4850.32
TOC: 4849.88
TOC: 4850.57
TOC: 4851.01
TOC: 4850.87
TOC: 4850.46
TOC: 4850.63
TOC: 4850.49
TOC: 4850.74
TOC: 4851.03
48
5
0
4849
4830
4840
4850
4860
7+008+009+0010+0011+0012+0013+0014+00
48
4
9
.
8
1
48
4
9
.
0
9
48
4
9
.
4
1
48
4
9
.
2
3
48
4
9
.
8
1
48
4
8
.
8
6
48
4
9
.
6
8
48
4
8
.
6
8
48
4
9
.
9
2
48
4
9
.
9
8
48
5
0
.
1
2
48
4
8
.
4
5
48
5
0
.
5
2
48
4
9
.
1
1
EX. 10" S.S.
EX. 10" S.S.
218.94' of 18" S.D. @ 0.40%
231.36' of 18" S.D. @ 0.40%
ST
A
:
1
0
+
1
9
.
0
4
(
-
1
.
5
0
,
L
)
SD
I
N
L
E
T
-
D
RI
M
:
4
8
4
9
.
5
1
IN
V
O
U
T
:
4
8
4
6
.
4
8
-
1
8
"
(
S
)
ST
A
:
8
+
0
0
.
1
0
(
-
1
.
5
0
,
L
)
SD
I
N
L
E
T
-
E
RI
M
:
4
8
4
9
.
2
9
IN
V
I
N
:
4
8
4
5
.
6
0
-
1
8
"
(
N
)
IN
V
O
U
T
:
4
8
4
5
.
5
0
-
1
8
"
(
S
)
ST
A
:
1
1
+
2
6
.
9
0
(
-
1
.
5
0
,
L
)
SD
I
N
L
E
T
-
C
RI
M
:
4
8
4
9
.
2
0
IN
V
O
U
T
:
4
8
4
6
.
6
8
-
1
2
"
(
W
)
ST
A
:
1
1
+
2
6
.
9
0
(
-
7
.
2
5
,
L
)
SD
M
H
-
C
RI
M
:
4
8
4
9
.
3
3
IN
V
I
N
:
4
8
4
6
.
6
2
-
1
2
"
(
E
)
IN
V
O
U
T
:
4
8
4
6
.
1
2
-
1
2
"
(
N
)
E
l
e
v
a
t
i
o
n
4830
4840
4850
4860
0+00
Station
12TH_W PROFILE
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
12
T
H
N
O
R
T
H
P
P
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
17
C.5.2
H
O R R O
C
K
S
E
N
G I N E E R
S
0 30'60'
SCALE: 1" = 30'
N
WATER KEYNOTES
EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY
EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD
OF ANY DISCREPANCIES
CONNECT 8" WATER MAIN LINE TO EXISTING 8" WATER MAIN,
INCLUDING 8" GATE VALVE PER CITY OF REXBURG STANDARDS, AND
A TEE THRUST BLOCK PER ISPWC SD-403
INSTALL 8" DUCTILE IRON PIPE (PER CITY OF REXBURG STANDARD),
LENGTH PER PLANS, MUST MAINTAIN 5' COVER
INSTALL FIRE HYDRANT PER ISPWC SD-404. FIRE HYDRANT TO MEET
CITY REXBURG STANDARDS
POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC
SD-407, MINIMUM 1.5' VERTICAL SEPARATION
INSTALL 2" WATER SERVICE STUB PER ISPWC SD-402. STUBS PER
CITY OF REXBURG STANDARD
INSTALL 6" X 8" WITH GATE VALVE PER CITY OF REXBURG
STANDARDS
INSTALL 6" WATER SERVICE STUB
INSTALL 8" 90° HORIZONTAL BEND, INCLUDING THRUST BLOCK PER
ISPWC SD-403
INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR
CONTINUATION
26
27
28
29
30
31
32
33
34
35
STORM DRAIN KEYNOTES
INSTALL STORM DRAIN CATCH BASIN PER ISPWC SD-601 TYPE 1.
GRATE TO BE NEENAH MODEL NUMBER R-3067 OR APPROVED
EQUAL
INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN
INSTALL INFILTRATOR DRAIN PER REXBURG SD-16. TO INCLUDE
MANHOLE, CHAMBERS, AND DRAIN ROCK MATERIALS
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 30" STORM DRAIN STRUCTURE WITH SOLID CIRCULAR LID
INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A THIS
SHEET
INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9
INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624
INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC
SD-627.
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 6" C/O WITH TRAFFIC RATED LID
51
52
53
54
55
56
57
58
59
60
61
MISCELLANEOUS KEYNOTES
LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS
FOR DETAILS
PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS
A
B
SEWER KEYNOTES
TIE INTO EXISTING SEWER MAIN WITH MANHOLE. CONTRACTOR TO
FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER
LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
AT CONNECTION POINT PER CITY OF REXBURG STANDARDS.
INSTALL 8" PVC SDR-35 SEWER MAIN, SLOPE AND LENGTH PER
PLANS
INSTALL MANHOLE PER ISPWC SD-501 TYPE A
INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER
PLANS
INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR
CONTINUATION
71
72
73
74
75
76
GENERAL NOTES:
1.ALL RIMS, VALVE LIDS SHALL BE SET FLUSH TO FINISH SURFACES
2.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT
EXISTING SANITARY SEWER DURING CONSTRUCTION.
3.STORM DRAIN PIPE TO BE SDR 35 FOR 6" PIPE, AND SANITITE HP OR
APPROVED EQUAL FOR PIPES 12" AND LARGER, USE OTHER PIPE TYPES
WHERE SPECIFIED.
51
51
51
53
52 52
71
2726
72
PROPOSED SURFACE
EX SURFACE
12TH STREET
PR
I
V
A
T
E
D
R
I
V
E
UN
I
V
E
R
S
I
T
Y
B
L
V
D
02-05-21
pp
pp
ss
w w w w w w w w w w w w w w w w w w w w w w w w w
0+001+002+003+004+005+006+00
SD
S
D
S
D
S
D
SD
S
D
S
D
S
D
s s
0+
0
0
1+
0
0
2+
0
0
1.
8
%
48
5
0
4850
0.7%0.4%0.4%0.9%0.4%0.4%
2.
5
%
2.
3
%
1.
6
%
1
.
6
%
2
.
4
%
2.
4
%
1.
9
%
1.
4
%
1
.
9
%
2.2
%
2.0%
2.4%
2.0%
2.
0
%
2.
0
%
2
.
0
%
2
.
0
%
2.
0
%
2
.
0
%
2.
0
%
2.
0
%
3
.
8
%
3.
7
%
1.
2
%
3.
5
%
6.
2
%
3
.
4
%
1.6
%
MATOA: 4850.80MATOA: 4850.72MATOA: 4850.62MATOA: 4850.37 MATOA: 4850.51MATOA: 4850.37MATOA: 4850.33MATOA: 4850.25MATOA: 4850.23MATOA: 4850.25
MATOA: 4850.28
MATOA: 4850.23
TBC: 4849.72
TBC: 4850.24
TBC: 4850.37TBC: 4850.59TBC: 4849.83
TBC: 4850.24TBC: 4849.74
TOC: 4850.60
TOC: 4850.60
TOC: 4850.10
TOC: 4850.10
TOC: 4849.77
TOC: 4850.10
TOC: 4850.40
TOC: 4850.88TOC: 4850.12
TOC: 4850.53TOC: 4850.03
DEP TBC: 4850.23
DEP TBC: 4850.30
4
8
5
0
4
8
4
9
48
4
9
4
8
5
0
4850
4850
48
5
0
4851
48504850
E
l
e
v
a
t
i
o
n
4830
4840
4850
4860
0+001+002+003+004+005+006+00
48
5
0
.
0
2
48
4
9
.
8
2
48
5
0
.
0
5
48
4
9
.
6
4
48
4
9
.
6
5
48
4
9
.
4
9
48
4
9
.
7
0
48
4
9
.
6
4
48
4
9
.
6
6
48
4
9
.
1
8
48
4
9
.
5
1
48
4
9
.
2
7
EX. 10" S.S.
EX. 10" S.S.
225.62' of 18" S.D. @ 0.40%
243.11' of 18" S.D. @ 0.40%
ST
A
:
5
+
6
8
.
7
3
(
-
1
.
5
0
,
L
)
SD
I
N
L
E
T
-
F
RI
M
:
4
8
4
9
.
2
7
IN
V
I
N
:
4
8
4
4
.
5
7
-
1
8
"
(
S
)
IN
V
I
N
:
4
8
4
4
.
5
7
-
1
8
"
(
N
)
IN
V
O
U
T
:
4
8
4
4
.
9
1
-
1
2
"
(
W
)
ST
A
:
3
+
4
3
.
1
1
(
-
1
.
5
0
,
L
)
SD
I
N
L
E
T
-
G
RI
M
:
4
8
4
9
.
3
5
IN
V
I
N
:
4
8
4
5
.
5
7
-
1
8
"
(
S
)
IN
V
O
U
T
:
4
8
4
5
.
4
7
-
1
8
"
(
N
)
ST
A
:
1
+
0
0
.
0
0
(
-
1
.
5
0
,
L
)
SD
I
N
L
E
T
-
H
RI
M
:
4
8
4
9
.
9
0
IN
V
O
U
T
:
4
8
4
6
.
5
4
-
1
8
"
(
N
)
ST
A
:
5
+
6
8
.
7
3
(
-
7
.
2
5
,
L
)
SD
M
H
-
D
RI
M
:
4
8
4
9
.
8
4
IN
V
I
N
:
4
8
4
4
.
8
5
-
1
2
"
(
E
)
IN
V
O
U
T
:
4
8
4
4
.
3
5
-
1
2
"
(
N
)
SD
M
H
-
D
RI
M
:
4
8
4
9
.
8
4
IN
V
I
N
:
4
8
4
4
.
8
5
-
1
2
"
(
E
)
IN
V
O
U
T
:
4
8
4
4
.
3
5
-
1
2
"
(
N
)
4830
4840
4850
4860
14+00
Station
12TH_W PROFILE
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
12
T
H
S
O
U
T
H
P
P
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
18
C.5.3
H
O R R O
C
K
S
E
N
G I N E E R
S
0 30'60'
SCALE: 1" = 30'
WATER KEYNOTES
EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY
EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD
OF ANY DISCREPANCIES
CONNECT 8" WATER MAIN LINE TO EXISTING 8" WATER MAIN,
INCLUDING 8" GATE VALVE PER CITY OF REXBURG STANDARDS, AND
A TEE THRUST BLOCK PER ISPWC SD-403
INSTALL 8" DUCTILE IRON PIPE (PER CITY OF REXBURG STANDARD),
LENGTH PER PLANS, MUST MAINTAIN 5' COVER
INSTALL FIRE HYDRANT PER ISPWC SD-404. FIRE HYDRANT TO MEET
CITY REXBURG STANDARDS
POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC
SD-407, MINIMUM 1.5' VERTICAL SEPARATION
INSTALL 2" WATER SERVICE STUB PER ISPWC SD-402. STUBS PER
CITY OF REXBURG STANDARD
INSTALL 6" X 8" WITH GATE VALVE PER CITY OF REXBURG
STANDARDS
INSTALL 6" WATER SERVICE STUB
INSTALL 8" 90° HORIZONTAL BEND, INCLUDING THRUST BLOCK PER
ISPWC SD-403
INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR
CONTINUATION
INSTALL 8" PLUG
26
27
28
29
30
31
32
33
34
35
36
STORM DRAIN KEYNOTES
INSTALL STORM DRAIN CATCH BASIN PER ISPWC SD-601 TYPE 1.
GRATE TO BE NEENAH MODEL NUMBER R-3067 OR APPROVED
EQUAL
INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN
INSTALL INFILTRATOR DRAIN PER REXBURG SD-16. TO INCLUDE
MANHOLE, CHAMBERS, AND DRAIN ROCK MATERIALS
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 30" STORM DRAIN STRUCTURE WITH SOLID CIRCULAR LID
INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A THIS
SHEET
INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9
INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624
INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC
SD-627.
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 6" C/O WITH TRAFFIC RATED LID
51
52
53
54
55
56
57
58
59
60
61
MISCELLANEOUS KEYNOTES
LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS
FOR DETAILS
PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS
A
B
SEWER KEYNOTES
TIE INTO EXISTING SEWER MAIN WITH MANHOLE. CONTRACTOR TO
FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER
LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
AT CONNECTION POINT PER CITY OF REXBURG STANDARDS.
INSTALL 8" PVC SDR-35 SEWER MAIN, SLOPE AND LENGTH PER
PLANS
INSTALL MANHOLE PER ISPWC SD-501 TYPE A
INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER
PLANS
INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR
CONTINUATION
71
72
73
74
75
76
GENERAL NOTES:
1.ALL RIMS, VALVE LIDS SHALL BE SET FLUSH TO FINISH SURFACES
2.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT
EXISTING SANITARY SEWER DURING CONSTRUCTION.
3.STORM DRAIN PIPE TO BE SDR 35 FOR 6" PIPE, AND SANITITE HP OR
APPROVED EQUAL FOR PIPES 12" AND LARGER, USE OTHER PIPE TYPES
WHERE SPECIFIED.
52
2726
52 52
52 51
53
51 51
30
33
31
36
28
PROPOSED SURFACE EX SURFACE
12TH STREET
PR
I
V
A
T
E
D
R
I
V
E
N
02-05-21
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
t
o
e
S
D
S
D
1+00
2+00
3+00
4+00
5+00 6+00
19
+
0
0
20
+
0
0
20
+
2
5
48
4
9
4849
2.0
%
DEP TBC: 4850.49DEP TBC: 4850.38TBC: 4850.28
TBC: 4850.17
TBC: 4850.32
TBC: 4850.50
TBC: 4850.45TBC: 4849.92
TBC: 4850.03
DEP TBC: 4850.05
DEP TBC: 4850.10
TBC: 4850.20TBC: 4850.00
DEP TBC: 4849.91
DEP TBC: 4849.87
TBC: 4849.75
TBC: 4849.60
TBC: 4848.68
TBC: 4848.78
TBC: 4848.92
DEP TBC: 4848.96
DEP TBC: 4849.01
TBC: 4849.05
TBC: 4848.77
MATOA: 4850.41
MATOA: 4850.26MATOA: 4850.13
MATOA: 4850.11
MATOA: 4850.05
MATOA: 4849.91MATOA: 4849.91MATOA: 4849.65
MATOA: 4849.62
MATOA: 4849.60
MATOA: 4849.37
MATOA: 4849.26
MATOA: 4848.81
2.
1
%
2.
6
%
1.
6
%
2.
0
%
2.
1
%
2.
2
%
2.
7
%
2.
3
%
2.
4
%
2.
7
%
2.
7
%
2.
1
%
1
.
2
%
0.7
%
1.9
%
2
.
0
%
2
.
0
%
2
.
0
%
2
.
0
%
2
.
0
%
2
.
0
%
2
.
0
%
2
.
0
%
2
5
.
0
%
2
.
0
%
2
.
0
%
25
.
0
%
25
.
0
%
TOC: 4850.46
TOC: 4850.63
TOC: 4850.49TOC: 4850.74TOC: 4850.00TOC: 4850.13
TOC: 4849.95TOC: 4849.87
TOC: 4849.70
TOC: 4849.39
TOC: 4848.83
TOC: 4848.83
TOC: 4848.56
TOC: 4848.37
TOC: 4848.40 TOC: 4848.51
TOC: 4849.37
TOC: 4849.37
TOC: 4849.52
TOC: 4849.52
4849
4850
484
9
4850
4850
48
4
9
4848
4850
4
8
4
9
4849
4849
4849
4850
E
l
e
v
a
t
i
o
n
Station
UNIVERSITY_BLVD PROFILE
4830
4840
4850
4860
4830
4840
4850
4860
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00
48
4
8
.
5
4
48
4
8
.
4
1
48
4
8
.
5
2
48
4
9
.
6
3
48
4
8
.
9
2
48
4
9
.
8
2
48
4
9
.
3
2
48
4
7
.
9
7
48
4
9
.
7
2
48
4
9
.
3
3
48
5
0
.
1
2
48
4
7
.
4
0
48
5
0
.
2
4
48
4
8
.
6
1
ST
A
:
1
+
4
9
.
9
8
(
1
.
5
0
,
R
)
SD
I
N
L
E
T
-
A
RI
M
:
4
8
4
8
.
2
0
IN
V
O
U
T
:
4
8
4
5
.
2
0
-
1
2
"
(
S
)
ST
A
:
6
+
2
8
.
4
6
(
1
.
5
0
,
R
)
SD
I
N
L
E
T
-
B
RI
M
:
4
8
4
9
.
8
5
IN
V
O
U
T
:
4
8
4
6
.
8
5
-
1
2
"
(
S
)
SD
M
H
-
B
RI
M
:
4
8
5
0
.
4
2
IN
V
I
N
:
4
8
4
6
.
7
9
-
1
2
"
(
N
)
IN
V
O
U
T
:
4
8
4
6
.
2
9
-
1
2
"
(
W
)
SD
M
H
-
A
RI
M
:
4
8
4
8
.
7
7
IN
V
I
N
:
4
8
4
5
.
1
4
-
1
2
"
(
N
)
IN
V
O
U
T
:
4
8
4
4
.
6
4
-
1
2
"
(
E
)
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
UN
I
V
E
R
S
I
T
Y
B
L
V
D
P
P
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
19
C.5.4
H
O R R O
C
K
S
E
N
G I N E E R
S
0 30'60'
SCALE: 1" = 30'
WATER KEYNOTES
EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY
EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD
OF ANY DISCREPANCIES
CONNECT 8" WATER MAIN LINE TO EXISTING 8" WATER MAIN,
INCLUDING 8" GATE VALVE PER CITY OF REXBURG STANDARDS, AND
A TEE THRUST BLOCK PER ISPWC SD-403
INSTALL 8" DUCTILE IRON PIPE (PER CITY OF REXBURG STANDARD),
LENGTH PER PLANS, MUST MAINTAIN 5' COVER
INSTALL FIRE HYDRANT PER ISPWC SD-404. FIRE HYDRANT TO MEET
CITY REXBURG STANDARDS
POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC
SD-407, MINIMUM 1.5' VERTICAL SEPARATION
INSTALL 2" WATER SERVICE STUB PER ISPWC SD-402. STUBS PER
CITY OF REXBURG STANDARD
INSTALL 6" X 8" WITH GATE VALVE PER CITY OF REXBURG
STANDARDS
INSTALL 6" WATER SERVICE STUB
INSTALL 8" 90° HORIZONTAL BEND, INCLUDING THRUST BLOCK PER
ISPWC SD-403
INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR
CONTINUATION
26
27
28
29
30
31
32
33
34
35
STORM DRAIN KEYNOTES
INSTALL STORM DRAIN CATCH BASIN PER ISPWC SD-601 TYPE 1.
GRATE TO BE NEENAH MODEL NUMBER R-3067 OR APPROVED
EQUAL
INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN
INSTALL INFILTRATOR DRAIN PER REXBURG SD-16. TO INCLUDE
MANHOLE, CHAMBERS, AND DRAIN ROCK MATERIALS
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 30" STORM DRAIN STRUCTURE WITH SOLID CIRCULAR LID
INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A THIS
SHEET
INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9
INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624
INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC
SD-627.
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 6" C/O WITH TRAFFIC RATED LID
51
52
53
54
55
56
57
58
59
60
61
MISCELLANEOUS KEYNOTES
LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS
FOR DETAILS
PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS
A
B
SEWER KEYNOTES
TIE INTO EXISTING SEWER MAIN WITH MANHOLE. CONTRACTOR TO
FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER
LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
AT CONNECTION POINT PER CITY OF REXBURG STANDARDS.
INSTALL 8" PVC SDR-35 SEWER MAIN, SLOPE AND LENGTH PER
PLANS
INSTALL MANHOLE PER ISPWC SD-501 TYPE A
INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER
PLANS
INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR
CONTINUATION
71
72
73
74
75
76
GENERAL NOTES:
1.ALL RIMS, VALVE LIDS SHALL BE SET FLUSH TO FINISH SURFACES
2.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT
EXISTING SANITARY SEWER DURING CONSTRUCTION.
3.STORM DRAIN PIPE TO BE SDR 35 FOR 6" PIPE, AND SANITITE HP OR
APPROVED EQUAL FOR PIPES 12" AND LARGER, USE OTHER PIPE TYPES
WHERE SPECIFIED.
51
53
26
PROPOSED SURFACEEX SURFACE
51
53
27
28
UNIVERSITY BLV
D
PR
I
V
A
T
E
D
R
I
V
E
N
02-05-21
s
w
w
w
w
w
w
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
10
+
0
0
11
+
0
0
S
S
S SSSSSSSSS SSSSSSS
S
S
S
S
S
S
S
S
s
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
0+
0
0
BP: 0+00.00
17
+
0
0
2
.
0
%
4850
4
8
4
9
48
5
0
4
8
5
0
0.
4
%
2
.
2
%
2.
0
%
TBC: 4850.08
DEP TBC: 4850.11
DEP TBC: 4850.19TBC: 4850.31TBC: 4850.41
TBC: 4850.12
DEP TBC: 4850.16
DEP TBC: 4850.09
TBC: 4850.14
TOC: 4850.18
TOC: 4850.25
TOC: 4850.08
TOC: 4849.84
TOC: 4850.32
TOC: 4849.88
TBC: 4850.57
TBC: 4849.92
1.6%
2.
0
%
2
.
0
%
2.
0
%
2
.
0
%
2.2
%
2.
1
%
2
.
1
%
TBC: 4850.45TBC: 4849.42TBC: 4849.22TBC: 4849.38
TOA:4848.86 TOA:4848.31
TBC: 4848.83
TOA:4850.10
TOA:4850.11
TOA:4849.50
TOA:4850.02
TOA:4848.96
1+00 2+00 3+00 4+00 5+00 6+00 7+00
1+00
48
4
9
.
2
3
48
4
8
.
3
2
2+00
48
4
8
.
7
1
48
4
8
.
0
2
3+00
48
4
9
.
1
3
48
4
9
.
0
1
4+00
48
4
9
.
5
6
48
4
9
.
0
1
5+00
48
4
9
.
9
8
48
4
9
.
2
7
6+00
48
5
0
.
4
0
48
4
9
.
5
1
7+00
48
5
0
.
1
8
48
4
9
.
8
2
ST
A
:
1
+
8
2
.
9
0
(
0
.
0
0
,
)
SS
M
H
-
1
RI
M
:
4
8
4
8
.
8
0
IN
V
O
U
T
:
4
8
4
4
.
6
5
-
8
"
(
E
)
288.48' of 8" S.S. @ 0.60%
ST
A
:
4
+
7
1
.
3
8
(
0
.
0
0
,
)
SS
M
H
-
2
RI
M
:
4
8
4
9
.
8
6
IN
V
I
N
:
4
8
4
2
.
9
2
-
8
"
(
W
)
IN
V
O
U
T
:
4
8
4
2
.
8
2
-
8
"
(
E
)
231.09' of 8" S.S. @ 0.40%
ST
A
:
7
+
0
2
.
4
7
(
0
.
0
0
,
)
SS
M
H
-
3
RI
M
:
4
8
5
0
.
2
4
IN
V
I
N
:
4
8
4
1
.
9
0
-
8
"
(
W
)
IN
V
I
N
:
4
8
4
1
.
7
3
-
1
0
"
(
S
)
IN
V
O
U
T
:
4
8
4
1
.
7
3
-
1
0
"
(
N
)
ST
A
=
0
+
7
0
.
8
0
T.
O
.
W
.
=
4
8
4
3
.
4
5
STA = 2+00.00
T.O.W. = 4842.47
STA = 4+86.01
T.O.W. = 4841.58
ST
A
=
7
+
4
7
.
7
5
T.
O
.
W
.
=
4
8
4
4
.
6
4
ST
A
:
2
+
6
8
.
2
0
2"
W
A
T
E
R
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
4
+
6
1
.
3
1
2"
W
A
T
E
R
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
4
+
8
1
.
3
1
2"
W
A
T
E
R
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
2
+
6
3
.
2
0
6"
F
I
R
E
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
4
+
5
6
.
3
1
6"
F
I
R
E
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
4
+
8
6
.
3
1
6"
F
I
R
E
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
0
+
8
8
.
9
5
2"
W
A
T
E
R
S
E
R
V
I
C
E
(
R
T
)
ST
A
:
5
+
4
1
.
9
3
2"
W
A
T
E
R
S
E
R
V
I
C
E
(
R
T
)
ST
A
:
0
+
9
3
.
9
4
6"
F
I
R
E
S
E
R
V
I
C
E
(
R
T
)
ST
A
:
5
+
3
6
.
9
3
6"
F
I
R
E
S
E
R
V
I
C
E
(
R
T
)
ST
A
:
2
+
5
1
.
2
4
6"
S
S
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
4
+
4
4
.
3
1
6"
S
S
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
4
+
9
8
.
3
8
6"
S
S
S
E
R
V
I
C
E
(
L
T
)
ST
A
:
1
+
8
9
.
9
0
6"
S
S
S
E
R
V
I
C
E
(
R
T
)
ST
A
:
5
+
2
5
.
0
0
6"
S
S
S
E
R
V
I
C
E
(
R
T
)
↕ 4.15' (SS)
↕ 7.03' (SS)↕ 8.51' (SS)
ST
A
:
6
+
5
1
.
3
3
8"
x
6
"
W
A
T
E
R
T
E
E
ST
A
:
7
+
4
2
.
5
4
8"
G
A
T
E
V
A
L
V
E
ST
A
:
7
+
4
7
.
7
5
8"
x
1
2
"
W
A
T
E
R
T
E
E
ST
A
:
0
+
7
0
.
8
5
6"
F
I
R
E
S
E
R
V
I
C
E
(
R
T
)
8" WATER MAIN
8" WATER MAIN
Station
PRIVATE_DR-1 PROFILE
E
l
e
v
a
t
i
o
n
4830
4840
4850
4860
0+00
4830
4840
4850
4860
8+00
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
--
-
-
C.
5
.
5
P
R
I
V
A
T
E
P
P
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
20
C.5.5
H
O R R O
C
K
S
E
N
G I N E E R
S
0 30'60'
SCALE: 1" = 30'
N
WATER KEYNOTES
EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY
EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD
OF ANY DISCREPANCIES
CONNECT 8" WATER MAIN LINE TO EXISTING 8" WATER MAIN,
INCLUDING 8" GATE VALVE PER CITY OF REXBURG STANDARDS, AND
A TEE THRUST BLOCK PER ISPWC SD-403
INSTALL 8" DUCTILE IRON PIPE (PER CITY OF REXBURG STANDARD),
LENGTH PER PLANS, MUST MAINTAIN 5' COVER
INSTALL FIRE HYDRANT PER ISPWC SD-404. FIRE HYDRANT TO MEET
CITY REXBURG STANDARDS
POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC
SD-407, MINIMUM 1.5' VERTICAL SEPARATION
INSTALL 2" WATER SERVICE STUB PER ISPWC SD-402. STUBS PER
CITY OF REXBURG STANDARD
INSTALL 6" X 8" WITH GATE VALVE PER CITY OF REXBURG
STANDARDS
INSTALL 6" WATER SERVICE STUB
INSTALL 8" 90° HORIZONTAL BEND, INCLUDING THRUST BLOCK PER
ISPWC SD-403
INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR
CONTINUATION
26
27
28
29
30
31
32
33
34
35
STORM DRAIN KEYNOTES
INSTALL STORM DRAIN CATCH BASIN PER ISPWC SD-601 TYPE 1.
GRATE TO BE NEENAH MODEL NUMBER R-3067 OR APPROVED
EQUAL
INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN
INSTALL INFILTRATOR DRAIN PER REXBURG SD-16. TO INCLUDE
MANHOLE, CHAMBERS, AND DRAIN ROCK MATERIALS
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 30" STORM DRAIN STRUCTURE WITH SOLID CIRCULAR LID
INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A THIS
SHEET
INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9
INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624
INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC
SD-627.
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 6" C/O WITH TRAFFIC RATED LID
51
52
53
54
55
56
57
58
59
60
61
MISCELLANEOUS KEYNOTES
LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS
FOR DETAILS
PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS
A
B
SEWER KEYNOTES
TIE INTO EXISTING SEWER MAIN WITH MANHOLE. CONTRACTOR TO
FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER
LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
AT CONNECTION POINT PER CITY OF REXBURG STANDARDS.
INSTALL 8" PVC SDR-35 SEWER MAIN, SLOPE AND LENGTH PER
PLANS
INSTALL MANHOLE PER ISPWC SD-501 TYPE A
INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER
PLANS
INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR
CONTINUATION
71
72
73
74
75
GENERAL NOTES:
1.ALL RIMS, VALVE LIDS SHALL BE SET FLUSH TO FINISH SURFACES
2.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT
EXISTING SANITARY SEWER DURING CONSTRUCTION.
3.STORM DRAIN PIPE TO BE SDR 35 FOR 6" PIPE, AND SANITITE HP OR
APPROVED EQUAL FOR PIPES 12" AND LARGER, USE OTHER PIPE TYPES
WHERE SPECIFIED.
27
282828
29
30
30
30
3030
30
31
31
31 31 31333333
33
33
32
323232
32
34 7272
7373 73
74 7474
74 12
T
H
S
T
PRIVATE DRIVE
PR
I
V
A
T
E
D
R
I
V
E
74
02-05-21
w
w
w
w
w
w
toe
t
o
e
t
o
e
t
o
e
t
o
e
toe toe toe toe toe toe toe
SD
0+
0
0
1+
0
0
1
+
0
0
17+0018+00
19+0020+00
MATOA: 4848.81
1.2%
1.0%
1.9
%
TOC: 4848.37
TOC: 4848.40
2.2
%
2.1%2.1%
2.
0
%
2.
0
%
1.
8
%
2
.
2
%
1.4%
1
.
2
%
TBC: 4849.38
TOA:4848.86
TOA:4849.50TOA:4849.78
TOA:4849.51
TOA:4849.47
TOA:4850.46 TOA:4850.02
TBC: 4848.77
TOC: 4848.83TOC: 4848.83
DEP TBC: 4849.01
DEP TBC: 4848.96
TOC: 4848.56
TOC: 4848.51
TOC: 4848.59
TOC: 4848.58
TOC: 4849.05
TOC: 4848.92
TOA:4848.96
E
l
e
v
a
t
i
o
n
Station
PRIVATE_DR-2 PROFILE
4830
4840
4850
4860
4830
4840
4850
4860
16+7517+0018+0019+0020+00
17+00
48
4
9
.
7
6
48
4
8
.
7
7
18+00
48
5
0
.
0
0
48
4
8
.
3
4
19+00
48
4
9
.
0
0
48
4
8
.
0
5
ST
A
:
1
9
+
0
6
.
5
8
8"
x
6
"
W
A
T
E
R
T
E
E
ST
A
:
1
6
+
9
1
.
1
3
8"
x
9
0
°
H
O
R
Z
.
B
E
N
D
ST
A
:
1
9
+
8
1
.
8
8
8"
G
A
T
E
V
A
L
V
E
ST
A
:
1
9
+
8
6
.
8
8
8"
x
1
0
"
W
A
T
E
R
T
E
E
8" WATER MAIN
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
--
-
-
C.
5
.
6
P
R
I
V
A
T
E
2
P
P
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
21
C.5.6
N
H
O R R O
C
K
S
E
N
G I N E E R
S
0 30'60'
SCALE: 1" = 30'
WATER KEYNOTES
EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY
EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD
OF ANY DISCREPANCIES
CONNECT 8" WATER MAIN LINE TO EXISTING 8" WATER MAIN,
INCLUDING 8" GATE VALVE PER CITY OF REXBURG STANDARDS, AND
A TEE THRUST BLOCK PER ISPWC SD-403
INSTALL 8" DUCTILE IRON PIPE (PER CITY OF REXBURG STANDARD),
LENGTH PER PLANS, MUST MAINTAIN 5' COVER
INSTALL FIRE HYDRANT PER ISPWC SD-404. FIRE HYDRANT TO MEET
CITY REXBURG STANDARDS
POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC
SD-407, MINIMUM 1.5' VERTICAL SEPARATION
INSTALL 2" WATER SERVICE STUB PER ISPWC SD-402. STUBS PER
CITY OF REXBURG STANDARD
INSTALL 6" X 8" WITH GATE VALVE PER CITY OF REXBURG
STANDARDS
INSTALL 6" WATER SERVICE STUB
INSTALL 8" 90° HORIZONTAL BEND, INCLUDING THRUST BLOCK PER
ISPWC SD-403
INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR
CONTINUATION
26
27
28
29
30
31
32
33
34
35
STORM DRAIN KEYNOTES
INSTALL STORM DRAIN CATCH BASIN PER ISPWC SD-601 TYPE 1.
GRATE TO BE NEENAH MODEL NUMBER R-3067 OR APPROVED
EQUAL
INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN
INSTALL INFILTRATOR DRAIN PER REXBURG SD-16. TO INCLUDE
MANHOLE, CHAMBERS, AND DRAIN ROCK MATERIALS
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 30" STORM DRAIN STRUCTURE WITH GRATED CIRCULAR LID
INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A THIS
SHEET
INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9
INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624
INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC
SD-627.
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 6" C/O WITH TRAFFIC RATED LID
51
52
53
54
55
56
57
58
59
60
61
MISCELLANEOUS KEYNOTES
LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS
FOR DETAILS
PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS
A
B
SEWER KEYNOTES
TIE INTO EXISTING SEWER MAIN WITH MANHOLE. CONTRACTOR TO
FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER
LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
AT CONNECTION POINT PER CITY OF REXBURG STANDARDS.
INSTALL 8" PVC SDR-35 SEWER MAIN, SLOPE AND LENGTH PER
PLANS
INSTALL MANHOLE PER ISPWC SD-501 TYPE A
INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER
PLANS
INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR
CONTINUATION
71
72
73
74
75
UN
I
V
E
R
S
I
T
Y
B
L
V
D
PRIVATE DRIVE
27 28
29
32
34
02-05-21
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
to
b
to
b
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl
f
l
pp
pp
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
w
w
w
w
w
w
w
w
w
4
8
4
9
4849
4849
4
8
4
9
4
8
4
8
48
4
8
48
4
7
484
8
4
8
4
8
48
4
8
48
5
0
48
4
9
48
5
0
48
4
9
48
4
9
48
5
0
4
8
4
9
4
8
5
0
48
5
0
4850484
9
4850
4850
484
8
4849
48
4
9
48
5
0
4850
48
4
9
4849
4849
4849
4850
4850
4
8
5
0
4850
4850
484
9
484
9
4
8
4
9
4
8
4
9
48
4
9
4
8
4
8
48
4
8
48
4
8
4
8
4
8
484
8
4848
484
8
4
8
4
8
48
4
8
4
8
4
9
4
8
4
9
4
8
4
8
48
4
9
48
4
8
4
8
4
9
48
4
9
4849
4848
4849
48
4
8
48
4
8
STRUCTURE - (30)
RIM: 4848.73
INV IN: 4843.40 18" (W)
INV OUT: 4843.00 24" (S)
SD INLET - L
RIM: 4848.03
INV IN: 4843.60 18" (S)
INV IN: 4844.90 24" (N)
INV OUT: 4843.50 18" (E)
SD INLET - J
RIM: 4847.26
INV IN: 4843.84 18" (S)
INV OUT: 4843.74 18" (N)
SD INLET - M
RIM: 4847.79
INV IN: 4844.09 18" (E)
INV OUT: 4843.99 18" (N)
221LF OF 18" S.D. @ 0.22%153LF OF 18" S.D. @ 0.22%
SD INLET - R
RIM: 4847.65
INV IN: 4844.23 18" (E)
INV OUT: 4844.13 18" (W)127LF OF 18" S.D. @ 0.22%191LF OF 18" S.D. @ 0.22%
SD INLET - Q
RIM: 4847.65
INV OUT: 4844.65 18" (W)
STRUCTURE - (34)
RIM: 4845.47
INV IN: 4843.85 18" (E)
SD INLET - I
RIM: 4848.33
INV OUT: 4845.33 18" (SE)
SD INLET - K
RIM: 4849.28
INV IN: 4845.21 18" (NW)
INV OUT: 4845.11 24" (S)
97
L
F
O
F
2
4
"
S
.
D
.
@
0
.
2
2
%
56
L
F
O
F
1
8
"
S
.
D
.
@
0
.
2
2
%
SD INLET - P
RIM: 4849.12
INV OUT: 4845.60 18" (S)
21
8
L
F
O
F
1
8
"
S
.
D
.
@
0
.
2
2
%
SD INLET - O
RIM: 4848.79
INV IN: 4845.12 18" (N)
INV OUT: 4845.02 18" (W)
5+
0
0
6+
0
0
7+
0
0
8+
0
0
9+
0
0
10
+
0
0
S
D
S
D
S
D
S
D
S
D
S
D
SD
SD
S
S
S
SSMH - 1
S
SSMH - 2
SS SS SS SS S
SSMH - 3
SS SS SS
S
S
S
S
S
S
S
S
s
EX
S
S
M
H
-
2
ss
s
EX
S
S
M
H
-
3
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
1+00 2+00 3+00 4+00 5+00 6+00 7+00
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
64
L
F
O
F
1
8
"
S
.
D
.
@
0
.
2
2
%
6
7
L
F
O
F
1
8
"
S
.
D
.
@
0
.
2
2
%
SD INLET - N
RIM: 4848.69
INV IN: 4844.68 18" (E)
INV OUT: 4844.58 18" (W)
44LF OF 18" S.D. @ 0.22%
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
SI
T
E
D
R
A
I
N
A
G
E
P
L
A
N
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
22
C.5.7
H
O R R O
C
K
S
E
N
G I N E E R
S
0 30'60'
SCALE: 1" = 30'
N
WATER KEYNOTES
EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY
EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD
OF ANY DISCREPANCIES
CONNECT 8" WATER MAIN LINE TO EXISTING 8" WATER MAIN,
INCLUDING 8" GATE VALVE PER CITY OF REXBURG STANDARDS, AND
A TEE THRUST BLOCK PER ISPWC SD-403
INSTALL 8" DUCTILE IRON PIPE (PER CITY OF REXBURG STANDARD),
LENGTH PER PLANS, MUST MAINTAIN 5' COVER
INSTALL FIRE HYDRANT PER ISPWC SD-404. FIRE HYDRANT TO MEET
CITY REXBURG STANDARDS
POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC
SD-407, MINIMUM 1.5' VERTICAL SEPARATION
INSTALL 2" WATER SERVICE STUB PER ISPWC SD-402. STUBS PER
CITY OF REXBURG STANDARD
INSTALL 6" X 8" WITH GATE VALVE PER CITY OF REXBURG
STANDARDS
INSTALL 6" WATER SERVICE STUB
INSTALL 8" 90° HORIZONTAL BEND, INCLUDING THRUST BLOCK PER
ISPWC SD-403
INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR
CONTINUATION
26
27
28
29
30
31
32
33
34
35
STORM DRAIN KEYNOTES
INSTALL STORM DRAIN CATCH BASIN PER ISPWC SD-601 TYPE 1.
GRATE TO BE NEENAH MODEL NUMBER R-3067 OR APPROVED
EQUAL
INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN
INSTALL INFILTRATOR DRAIN PER REXBURG SD-16. TO INCLUDE
MANHOLE, CHAMBERS, AND DRAIN ROCK MATERIALS
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 30" STORM DRAIN STRUCTURE WITH GRATED CIRCULAR LID
INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A ON
SHEET C.5.6
INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9
INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624
INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC
SD-627.
INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR
CONTINUATION
INSTALL 6" C/O WITH TRAFFIC RATED LID
51
52
53
54
55
56
57
58
59
60
61
MISCELLANEOUS KEYNOTES
LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS
FOR DETAILS
PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS
A
B
SEWER KEYNOTES
TIE INTO EXISTING SEWER MAIN WITH MANHOLE. CONTRACTOR TO
FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER
LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES
AT CONNECTION POINT PER CITY OF REXBURG STANDARDS.
INSTALL 8" PVC SDR-35 SEWER MAIN, SLOPE AND LENGTH PER
PLANS
INSTALL MANHOLE PER ISPWC SD-501 TYPE A
INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER
PLANS
INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR
CONTINUATION
71
72
73
74
75
GENERAL NOTES:
1.ALL RIMS, VALVE LIDS SHALL BE SET FLUSH TO FINISH SURFACES
2.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT
EXISTING SANITARY SEWER DURING CONSTRUCTION.
3.STORM DRAIN PIPE TO BE SDR 35 FOR 6" PIPE, AND SANITITE HP OR
APPROVED EQUAL FOR PIPES 12" AND LARGER, USE OTHER PIPE TYPES
WHERE SPECIFIED.
56
71
5252
52
52
5252
52
52
52
57
57
57
57
57
57
57
58
55
5555
55
12
T
H
S
T
PRIVATE DRIVE
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING 02-05-21
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
to
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
to
b
to
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
t
o
b
tob tob tob tob tob tob tob tob
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
fl
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl
fl
fl
fl
f
l
f
l
f
l
f
l
fl
fl
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
f
l
fl fl fl fl fl fl fl fl fl fl fl
pp
pp
pp
pp
pp
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
t
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
pp
pp
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
b
e
l
to
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
to
e
t
o
e
to
e
t
o
e
t
o
e
t
o
e
t
o
e
t
o
e
to
e
t
o
e
t
o
e
t
o
e
to
e
t
o
e
to
e
ss
ss
ss
ss
ss
ss
SD
W
W
W
W
W
W
W
S SSSSS SSS
s
s
ss
ss
ss
ss
ss
ss
ss
s
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
S
D
S
D
S
D
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
ss
0+001+002+003+004+005+006+00
7
+
0
0
8+
0
0
9+
0
0
10
+
0
0
11
+
0
0
12
+
0
0
13
+
0
0
14
+
0
0
15
+
0
0
16
+
0
0
17
+
0
0
18
+
0
0
19
+
0
0
20
+
0
0
20
+
2
5
4
8
4
8
4848
48
4
8
4848
4
8
4
8
4848
48
4
8
4849 4849
4849
484
9
4848
4849
4
8
4
9
4
8
4
9
4
8
4
9
4
8
5
0
48
4
9
48
4
9
48
4
8
48
4
9
48
5
0
4848
48
4
8
48
4
8
484
9
48
4
8
4847
4
8
4
8
4847
4
8
4
9
484
8
48
4
8
4849
4848
4849
48484849
4848
48
5
0
4848 4849
4850
48
5
0
48
5
0
48
4
9
4850
48504849
4
8
5
0
48
5
0
4
8
5
1
48
5
0
48
5
0
48
4
9
4
8
4
9
48
5
0
4
8
4
9
48
5
0
4848
48
4
8
4848
4849
4849
4849 4850
48
5
0
4849
4847
4849
48
4
9
4
8
4
9
48
4
8
484
8
484
9
48
4
9
48
5
0
4850
48
5
0
48
4
9
4849
484
9
4
8
4
8
48
4
9
48
4
9
48
4
8
485
0
4849
4850
4
8
4
9
48494
8
4
9
48
4
8
4
8
4
8
48
4
9
4
8
4
9
4848
4850
4850
4
8
4
9
4849
4
8
4
8
4845
48
4
6
48
4
7
48
4
8
48
4
8
4847
48
4
6
48
4
5
48
4
4
48
4
8
48
4
7
48
4
6
48
4
5
4844
4844
4849
4849
4849
4850
4
8
5
0
4850
48
5
0
48
5
0
4851
4
8
5
0
48
5
0
48
5
0
48
5
1
4850
4
8
4
9
4848
4848
4
8
5
0
48
4
9
48
4
8
48
4
7
48
4
8
48
4
8
48
4
8
48
4
8
4
8
4
8
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
SF SF SF SF SF SF SF SF SF SF SF SF
RE
V
I
S
I
O
N
S
RE
V
#
DA
T
E
DR
A
W
I
N
G
I
N
F
O
DA
T
E
DE
S
I
G
N
E
D
DR
A
W
N
*S
E
E
G
E
N
E
R
A
L
N
O
T
E
S
S
H
E
E
T
WA
R
N
I
N
G
0
1
2
IF
T
H
I
S
B
A
R
D
O
E
S
N
O
T
ME
A
S
U
R
E
2
"
T
H
E
N
DR
A
W
I
N
G
I
S
N
O
T
T
O
S
C
A
L
E
CI
T
Y
R
E
V
I
E
W
S
E
T
ww
w
.
h
o
r
r
o
c
k
s
.
c
o
m
PAGE
PR
O
J
E
C
T
CH
E
C
K
E
D
#
21
9
4
S
n
a
k
e
R
i
v
e
r
P
a
r
k
w
a
y
,
S
u
i
t
e
2
0
5
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
2
(2
0
8
)
5
2
2
-
1
2
2
3
PRELIMINARY
NOT FOR
CONSTRUCTION
ID
-
2
6
7
6
-
2
0
0
9
LT
S
CJ
F
CJ
F
02
/
0
5
/
2
0
2
1
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
BV
I
R
O
N
H
O
R
S
E
I
RE
X
B
U
R
G
,
I
D
A
H
O
23
C.6.0
R25'
1" TO 3"
COARSE AGGREGATE
FILTER FABRIC
50' MI
N
PU
B
L
I
C
R
O
A
D
HA
R
D
S
U
R
F
A
C
E
STABILIZED CONSTRUCTION ENTRANCE
30'
MIN
12"
DIAMETER ROCK
6" MIN
18" MIN
18
"
M
I
N
48" MIN48" MIN
4" PVC PIPE
FLOW
CROSS-SECTION
WOVEN FABRIC SANDBAG FILLED WITH
COARSE SAND-MIN WEIGHT 40 LBS.
24" MIN
FRONT VIEW
4" PVC PIPE FOR DRAINAGE
SANDBAG BARRIER
INLET PROTECTION (PAVED AREA)
RETRIEVAL STRAP
OVERFLOW
(PEAK STORM)
SEDIMENT ACCUMULATION
GEOTEXTILE FABRIC
SILT FENCE
BMP 63-68
EQUAL ALTERNATE: STEEL FENCE POST
FILTER FABRIC MATERIAL 60" WIDE ROLLS. USE
STAPLES OR WIRE RINGS TO ATTACH FABRIC
TO WIRE
2" X 2" 14 GA WIRE
FABRIC OR EQUIV.
BURY BOTTOM OF FILTER MATERIAL IN
8" X 12" TRENCH
FILTER FABRIC MATERIAL
2" X 2" 14 GA WIRE
FABRIC OR EQUIV.
PROVIDE 3/4" - 1 1/2" WASHED GRAVEL
BACKFILL IN TRENCH AND ON BOTH
SIDES OR FILTER FENCE FABRIC ON
THE SURFACE
2" X 4" WOOD POST ALT:
STEEL FENCE POSTS
8"
12
"
2'
-
6
"
2'
-
0
"
5'
-
0
"
6"
H
O R R O
C
K
S
E
N
G I N E E R
SN
0 60'120'
SCALE: 1" = 60'
LEGEND
SILT FENCE SEE DETAIL THIS SHEETSFSF
CONSTRUCTION FENCE
INLET PROTECTION SEE DETAIL THIS SHEET
STABILIZED CONSTRUCTION
ENTRANCE SEE DETAIL THIS SHEET
PROPERTY BOUNDARY
LIMITS OF DISTURBANCE
PORTABLE TOILET CONTAINMENT
JOBSITE DUMPSTER
CONCRETE WASHOUT AREA
DIRECTION OF EXISTING OVERLAND FLOW
LOD LOD
1 INSTALL TEMPORARY INLET PROTECTION AT STORM DRAIN INLETS,
2 BAGS HIGH PER BMP31. ALL SILT TO BE REMOVED REGULARLY
(FOR EXISTING AND PROPOSED INLETS)
STABILIZED CONSTRUCTION ENTRANCE PER APWA 126 AT
ENTRANCES AS SHOWN.
CONSTRUCT SILT FENCE/PRESERVATION PER BMP 63-68
PROVIDE DUST CONTROL FOR ENTIRE SITE.
CONCRETE WASHOUT AREA
2
3
4
5
1)BMP NEEDS FOR STORM WATER RUNOFF FOR A PARTICULAR AREA WILL BE
DETERMINED WHEN A NEW STRUCTURE IS PROPOSED FOR CONSTRUCTION.
2)IT IS NOT INTENDED FOR THE SITE TO RECEIVE ANY ONCOMING FLOW FROM
OUTSIDE SOURCES NOT CONTAINED IN EXISTING FLOW STRUCTURES.
3)FIELD MARK LIMITS OF DISTURBANCE FOR APPROVAL BY LOCAL AUTHORITY
AND OBTAIN APPROPRIATE STORM WATER MANAGEMENT PERMIT.
4)INSTALL SILT FENCE AND/OR ENVIRONMENTAL FENCE AROUND PERIMETER OF
PROJECT AS INDICATED ON THIS PLAN SHEET.
5)INSTALL SEDIMENT CONTROL MEASURES INDICATED IN ALL EXISTING STORM
DRAIN INLETS ADJACENT TO THE CONSTRUCTION SITE.
6)CONTRACTOR WILL BEGIN DEMOLITION, GRADING, EXCAVATION, AND
CONSTRUCTING SITE UTILITY IMPROVEMENTS AS NEW DRAINAGE ELEMENTS
ARE COMPLETED, CONSTRUCT SEDIMENT PROTECTION AT ALL NEW INLETS.
7)AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WILL BE STABILIZED WITH
NATIVE GRASS MATERIAL OUTSIDE THE STREET RIGHT OF WAY AND
PAVEMENT AREAS OF PARKING AND DRIVEWAY AREAS. SITE STABILIZATION
OF AREAS DISTURBED BY CONSTRUCTION ACTIVITIES TO BE COMPLETED
WITHIN 14 DAYS OF FINISHING AN AREA TO THE FINAL LINES AND GRADES
INDICATED ON THE GRADING PLAN.
8)LANDSCAPE ESTABLISHMENT, REMOVE TEMPORARY MEASURES AND CLEAN
STORM DRAIN SYSTEM PRIOR TO RELEASING SYSTEM TO PROJECT OWNER.
9)DISCHARGE FROM THE SITE WILL BE THROUGH THE NEW STORM DRAIN
SYSTEM AND INTO THE SNAKE RIVER LANDING COMMUNAL SYSTEM.
10)THE BMPS AND SITE WILL BE MONITORED REGULARLY, ANY ADDITIONAL
BMPS THAT ARE NEEDED WILL BE DETERMINED DURING REGULAR
INSPECTIONS AND INSTALLED ACCORDING TO SPECIFICATIONS.
11)CONTRACTOR TO UTILIZE STABLIZED CONSTRUCTION ENTRANCE FOR
VEHICLE TIRE WASH, AS NECESSARY.
SWPPP NOTES
APPROXIMATE QUANTITY SUMMARY
LINEAR FIBER ROLL -
SILT FENCE 1930 LF
CONSTRUCTION FENCE -
EARTH DIKE & DRAINAGE
SWALE -
RIP RAP -
HYDROSEEDING -
STABILIZED CONSTRUCTION
ENTRANCE 2 EA
STABILIZED STAGING AREA 1 EA
CONCRETE WASH OUT 1 EA
SEDIMENT BASIN -
WHEEL WASH -
INLET PROTECTION 19 EA
CHECK DAM -
LIMITS OF DISTURBANCE ±20.71 AC
PROJECT ACRES ±20.71 AC
INLET PROTECTION SEE DETAIL THIS SHEET
1
1
1
1
1
1
1
1
1
1
1
1
111
1
1
1
1
2
2
5
4 4
4
4
4
4
4
4
4
4 4
4
4
4
4
4
4
4
3
3
3
3
3 3 3
PROPOSED
BUILDINGPROPOSED
BUILDING
PROPOSED
BUILDING
UNIVERSITY BLVD
12
T
H
S
T
R
E
E
T
PRIVATE DRIVE
PR
I
V
A
T
E
D
R
I
V
E
PRIVATE DRIVE
02-05-21
Iron Horse D ivision I Traffic Impact Study
B
Appendix B: Synchro Reports
HCM 6th TWSC
3: 12th West & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing AM Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 117 6 54 351 149 20 3 51 100 6 50
Future Vol, veh/h 25 117 6 54 351 149 20 3 51 100 6 50
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 100 - - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 27 127 7 59 382 162 22 3 55 109 7 54
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 544 0 0 134 0 0 797 847 131 714 688 382
Stage 1 - - - - - - 185 185 - 500 500 -
Stage 2 - - - - - - 612 662 - 214 188 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1025 - - 1451 - - 305 299 919 346 369 665
Stage 1 - - - - - - 817 747 - 553 543 -
Stage 2 - - - - - - 480 459 - 788 745 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1025 - - 1451 - - 262 279 919 306 345 665
Mov Cap-2 Maneuver - - - - - - 262 279 - 306 345 -
Stage 1 - - - - - - 796 728 - 539 521 -
Stage 2 - - - - - - 418 440 - 718 726 -
Approach EB WB NB SB
HCM Control Delay, s 1.5 0.7 13.2 19
HCM LOS B C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 519 1025 - - 1451 - - 306 605
HCM Lane V/C Ratio 0.155 0.027 - - 0.04 - - 0.355 0.101
HCM Control Delay (s) 13.2 8.6 - - 7.6 - - 23.1 11.6
HCM Lane LOS B A - - A - - C B
HCM 95th %tile Q(veh) 0.5 0.1 - - 0.1 - - 1.6 0.3
HCM 6th TWSC
6: SB Ramps & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing AM Synchro 10 Report
Page 2
Intersection
Int Delay, s/veh 22.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 204 24 401 360 0 0 0 0 87 1 73
Future Vol, veh/h 0 204 24 401 360 0 0 0 0 87 1 73
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 222 26 436 391 0 0 0 0 95 1 79
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 248 0 0 1498 1511 196
Stage 1 - - - - - - 1263 1263 -
Stage 2 - - - - - - 235 248 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1316 - 0 123 120 813
Stage 1 0 - - - - 0 230 240 -
Stage 2 0 - - - - 0 803 701 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1316 - - ~ 82 0 813
Mov Cap-2 Maneuver - - - - - - ~ 82 0 -
Stage 1 - - - - - - 230 0 -
Stage 2 - - - - - - 537 0 -
Approach EB WB SB
HCM Control Delay, s 0 4.8 137.1
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1316 - 82 813
HCM Lane V/C Ratio - - 0.331 - 1.166 0.098
HCM Control Delay (s) - - 9.1 - 242.7 9.9
HCM Lane LOS - - A - F A
HCM 95th %tile Q(veh) - - 1.5 - 6.9 0.3
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramps & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing AM Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 34 299 0 0 666 70 72 0 265 0 0 0
Future Vol, veh/h 34 299 0 0 666 70 72 0 265 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 37 325 0 0 724 76 78 0 288 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 800 0 - - - 0 761 1199 163
Stage 1 - - - - - - 399 399 -
Stage 2 - - - - - - 362 800 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 819 - 0 0 - - 342 184 853
Stage 1 - - 0 0 - - 647 601 -
Stage 2 - - 0 0 - - 675 395 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 819 - - - - - 327 0 853
Mov Cap-2 Maneuver - - - - - - 327 0 -
Stage 1 - - - - - - 618 0 -
Stage 2 - - - - - - 675 0 -
Approach EB WB NB
HCM Control Delay, s 1 0 13.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 327 853 819 - - -
HCM Lane V/C Ratio 0.239 0.338 0.045 - - -
HCM Control Delay (s) 19.4 11.4 9.6 - - -
HCM Lane LOS C B A - - -
HCM 95th %tile Q(veh) 0.9 1.5 0.1 - - -
Queuing and Blocking Report
Iron Horse Existing AM 03/12/2021
SimTraffic Report
Page 1
Intersection: 3: 12th West & University Blvd
Movement EB WB WB WB NB SB SB
Directions Served L L T R LTR L TR
Maximum Queue (ft) 31 36 4 32 62 88 54
Average Queue (ft) 11 8 0 2 29 34 20
95th Queue (ft) 35 30 0 13 50 63 39
Link Distance (ft) 551 719 542 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 100 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: SB Ramps & University Blvd
Movement EB EB WB SB SB
Directions Served T R L LT R
Maximum Queue (ft) 10 16 98 138 60
Average Queue (ft) 0 1 42 54 26
95th Queue (ft) 6 7 79 107 47
Link Distance (ft) 719 719 392
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 95 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Intersection: 9: NB Ramps & University Blvd
Movement EB WB WB NB NB
Directions Served L T TR LT R
Maximum Queue (ft) 50 4 17 84 85
Average Queue (ft) 13 0 1 34 40
95th Queue (ft) 38 3 8 65 68
Link Distance (ft) 360 360 448
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 130 200
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 0
HCM 6th TWSC
3: 12th West & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing Noon Hour Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 5.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 92 8 41 106 112 5 11 38 131 9 27
Future Vol, veh/h 18 92 8 41 106 112 5 11 38 131 9 27
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 100 - - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 20 100 9 45 115 122 5 12 41 142 10 29
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 237 0 0 109 0 0 431 472 105 376 354 115
Stage 1 - - - - - - 145 145 - 205 205 -
Stage 2 - - - - - - 286 327 - 171 149 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1330 - - 1481 - - 535 490 949 581 571 937
Stage 1 - - - - - - 858 777 - 797 732 -
Stage 2 - - - - - - 721 648 - 831 774 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1330 - - 1481 - - 494 468 949 526 545 937
Mov Cap-2 Maneuver - - - - - - 494 468 - 526 545 -
Stage 1 - - - - - - 845 765 - 785 710 -
Stage 2 - - - - - - 668 629 - 771 762 -
Approach EB WB NB SB
HCM Control Delay, s 1.2 1.2 10.3 13.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 733 1330 - - 1481 - - 526 794
HCM Lane V/C Ratio 0.08 0.015 - - 0.03 - - 0.271 0.049
HCM Control Delay (s) 10.3 7.7 - - 7.5 - - 14.4 9.8
HCM Lane LOS B A - - A - - B A
HCM 95th %tile Q(veh) 0.3 0 - - 0.1 - - 1.1 0.2
HCM 6th TWSC
3: 12th West & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing PM Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 7.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 13 51 7 46 32 137 5 9 57 215 17 12
Future Vol, veh/h 13 51 7 46 32 137 5 9 57 215 17 12
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 100 - - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 14 55 8 50 35 149 5 10 62 234 18 13
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 184 0 0 63 0 0 312 371 59 258 226 35
Stage 1 - - - - - - 87 87 - 135 135 -
Stage 2 - - - - - - 225 284 - 123 91 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1391 - - 1540 - - 641 559 1007 695 673 1038
Stage 1 - - - - - - 921 823 - 868 785 -
Stage 2 - - - - - - 778 676 - 881 820 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1391 - - 1540 - - 599 536 1007 623 645 1038
Mov Cap-2 Maneuver - - - - - - 599 536 - 623 645 -
Stage 1 - - - - - - 912 815 - 859 760 -
Stage 2 - - - - - - 725 654 - 809 812 -
Approach EB WB NB SB
HCM Control Delay, s 1.4 1.6 9.5 13.7
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 869 1391 - - 1540 - - 623 765
HCM Lane V/C Ratio 0.089 0.01 - - 0.032 - - 0.375 0.041
HCM Control Delay (s) 9.5 7.6 - - 7.4 - - 14.2 9.9
HCM Lane LOS A A - - A - - B A
HCM 95th %tile Q(veh) 0.3 0 - - 0.1 - - 1.7 0.1
HCM 6th TWSC
6: SB Ramps & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing PM Synchro 10 Report
Page 2
Intersection
Int Delay, s/veh 27.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 210 62 407 247 0 0 0 0 101 0 32
Future Vol, veh/h 0 210 62 407 247 0 0 0 0 101 0 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 228 67 442 268 0 0 0 0 110 0 35
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 295 0 0 1414 1447 134
Stage 1 - - - - - - 1152 1152 -
Stage 2 - - - - - - 262 295 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1265 - 0 140 131 891
Stage 1 0 - - - - 0 264 271 -
Stage 2 0 - - - - 0 781 668 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1265 - - ~ 91 0 891
Mov Cap-2 Maneuver - - - - - - ~ 91 0 -
Stage 1 - - - - - - 264 0 -
Stage 2 - - - - - - 508 0 -
Approach EB WB SB
HCM Control Delay, s 0 5.8 188
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1265 - 91 891
HCM Lane V/C Ratio - - 0.35 - 1.206 0.039
HCM Control Delay (s) - - 9.4 - 244.7 9.2
HCM Lane LOS - - A - F A
HCM 95th %tile Q(veh) - - 1.6 - 7.7 0.1
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramps & University Blvd 03/11/2021
03/11/2021 Iron Horse Existing PM Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 7.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 56 270 0 0 566 111 68 1 558 0 0 0
Future Vol, veh/h 56 270 0 0 566 111 68 1 558 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 61 293 0 0 615 121 74 1 607 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 736 0 - - - 0 723 1151 147
Stage 1 - - - - - - 415 415 -
Stage 2 - - - - - - 308 736 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 865 - 0 0 - - 361 197 873
Stage 1 - - 0 0 - - 635 591 -
Stage 2 - - 0 0 - - 719 423 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 865 - - - - - 335 0 873
Mov Cap-2 Maneuver - - - - - - 335 0 -
Stage 1 - - - - - - 590 0 -
Stage 2 - - - - - - 719 0 -
Approach EB WB NB
HCM Control Delay, s 1.6 0 18
HCM LOS C
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 335 873 865 - - -
HCM Lane V/C Ratio 0.224 0.695 0.07 - - -
HCM Control Delay (s) 18.8 17.9 9.5 - - -
HCM Lane LOS C C A - - -
HCM 95th %tile Q(veh) 0.8 5.8 0.2 - - -
Queuing and Blocking Report
Iron Horse Existing PM 03/12/2021
SimTraffic Report
Page 1
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB NB SB SB
Directions Served L TR L R LTR L TR
Maximum Queue (ft) 35 4 24 4 56 76 25
Average Queue (ft) 3 0 2 0 27 38 13
95th Queue (ft) 17 4 12 0 45 63 29
Link Distance (ft) 551 542 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: SB Ramps & University Blvd
Movement EB EB WB SB SB
Directions Served T R L LT R
Maximum Queue (ft) 18 16 112 134 47
Average Queue (ft) 1 1 49 50 17
95th Queue (ft) 8 9 88 99 40
Link Distance (ft) 719 719 392
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 95 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Intersection: 9: NB Ramps & University Blvd
Movement EB WB NB NB
Directions Served L TR LT R
Maximum Queue (ft) 47 13 67 186
Average Queue (ft) 19 1 34 83
95th Queue (ft) 41 8 60 140
Link Distance (ft) 360 448
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Network Summary
Network wide Queuing Penalty: 0
HCM 6th TWSC
3: 12th West & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Background Traffic AM Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 142 7 66 427 181 24 4 62 122 7 61
Future Vol, veh/h 30 142 7 66 427 181 24 4 62 122 7 61
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 100 - - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 33 154 8 72 464 197 26 4 67 133 8 66
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 661 0 0 162 0 0 968 1029 158 868 836 464
Stage 1 - - - - - - 224 224 - 608 608 -
Stage 2 - - - - - - 744 805 - 260 228 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 927 - - 1417 - - 233 234 887 273 303 598
Stage 1 - - - - - - 779 718 - 483 486 -
Stage 2 - - - - - - 407 395 - 745 715 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 927 - - 1417 - - 190 214 887 232 277 598
Mov Cap-2 Maneuver - - - - - - 190 214 - 232 277 -
Stage 1 - - - - - - 751 692 - 466 461 -
Stage 2 - - - - - - 338 375 - 660 689 -
Approach EB WB NB SB
HCM Control Delay, s 1.5 0.8 16.2 29.9
HCM LOS C D
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 419 927 - - 1417 - - 232 534
HCM Lane V/C Ratio 0.233 0.035 - - 0.051 - - 0.572 0.138
HCM Control Delay (s) 16.2 9 - - 7.7 - - 39.4 12.8
HCM Lane LOS C A - - A - - E B
HCM 95th %tile Q(veh) 0.9 0.1 - - 0.2 - - 3.2 0.5
HCM 6th TWSC
6: SB Ramps & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Background Traffic AM Synchro 10 Report
Page 2
Intersection
Int Delay, s/veh 75.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 249 30 488 438 0 0 0 0 106 1 89
Future Vol, veh/h 0 249 30 488 438 0 0 0 0 106 1 89
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 271 33 530 476 0 0 0 0 115 1 97
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 304 0 0 1824 1840 238
Stage 1 - - - - - - 1536 1536 -
Stage 2 - - - - - - 288 304 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1255 - 0 ~ 76 75 764
Stage 1 0 - - - - 0 164 177 -
Stage 2 0 - - - - 0 760 662 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1255 - - ~ 44 0 764
Mov Cap-2 Maneuver - - - - - - ~ 44 0 -
Stage 1 - - - - - - 164 0 -
Stage 2 - - - - - - 439 0 -
Approach EB WB SB
HCM Control Delay, s 0 5.2 $ 518
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1255 - 44 764
HCM Lane V/C Ratio - - 0.423 - 2.643 0.127
HCM Control Delay (s) - - 10 -$ 940.3 10.4
HCM Lane LOS - - A - F B
HCM 95th %tile Q(veh) - - 2.1 - 12.5 0.4
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramps & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Background Traffic AM Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 41 364 0 0 810 85 88 0 322 0 0 0
Future Vol, veh/h 41 364 0 0 810 85 88 0 322 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 45 396 0 0 880 92 96 0 350 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 972 0 - - - 0 926 1458 198
Stage 1 - - - - - - 486 486 -
Stage 2 - - - - - - 440 972 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 705 - 0 0 - - 268 128 810
Stage 1 - - 0 0 - - 584 549 -
Stage 2 - - 0 0 - - 616 329 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 705 - - - - - 251 0 810
Mov Cap-2 Maneuver - - - - - - 251 0 -
Stage 1 - - - - - - 547 0 -
Stage 2 - - - - - - 616 0 -
Approach EB WB NB
HCM Control Delay, s 1.1 0 16
HCM LOS C
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 251 810 705 - - -
HCM Lane V/C Ratio 0.381 0.432 0.063 - - -
HCM Control Delay (s) 27.9 12.8 10.5 - - -
HCM Lane LOS D B B - - -
HCM 95th %tile Q(veh) 1.7 2.2 0.2 - - -
Queuing and Blocking Report
Iron Horse 2026 Background Traffic AM 03/15/2021
SimTraffic Report
Page 1
Intersection: 3: 12th West & University Blvd
Movement EB WB WB WB NB SB SB
Directions Served L L T R LTR L TR
Maximum Queue (ft) 56 45 4 18 73 104 63
Average Queue (ft) 17 10 0 1 34 44 21
95th Queue (ft) 46 35 3 10 58 82 45
Link Distance (ft) 551 719 542 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 100 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: SB Ramps & University Blvd
Movement EB EB WB WB WB SB SB
Directions Served T R L T T LT R
Maximum Queue (ft) 14 16 159 9 6 189 60
Average Queue (ft) 1 1 65 0 0 88 28
95th Queue (ft) 8 10 117 6 4 176 49
Link Distance (ft) 719 719 400 400 392
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 95 200
Storage Blk Time (%) 2 2
Queuing Penalty (veh) 4 2
Intersection: 9: NB Ramps & University Blvd
Movement EB WB WB NB NB
Directions Served L T TR LT R
Maximum Queue (ft) 47 11 16 126 101
Average Queue (ft) 16 0 1 49 51
95th Queue (ft) 41 8 7 97 88
Link Distance (ft) 360 360 448
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Network Summary
Network wide Queuing Penalty: 5
HCM 6th TWSC
3: 12th West & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Background Traffic PM Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 8.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 16 62 9 56 39 167 6 11 69 262 21 15
Future Vol, veh/h 16 62 9 56 39 167 6 11 69 262 21 15
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 0 - - 100 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 17 67 10 61 42 182 7 12 75 285 23 16
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 224 0 0 77 0 0 381 452 72 314 275 42
Stage 1 - - - - - - 106 106 - 164 164 -
Stage 2 - - - - - - 275 346 - 150 111 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1345 - - 1522 - - 577 503 990 639 632 1029
Stage 1 - - - - - - 900 807 - 838 762 -
Stage 2 - - - - - - 731 635 - 853 804 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1345 - - 1522 - - 530 477 990 557 599 1029
Mov Cap-2 Maneuver - - - - - - 530 477 - 557 599 -
Stage 1 - - - - - - 888 797 - 827 732 -
Stage 2 - - - - - - 669 610 - 767 794 -
Approach EB WB NB SB
HCM Control Delay, s 1.4 1.6 9.6 17.1
HCM LOS A C
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 494 990 1345 - - 1522 - - 557 725
HCM Lane V/C Ratio 0.037 0.076 0.013 - - 0.04 - - 0.511 0.054
HCM Control Delay (s) 12.6 8.9 7.7 - - 7.5 - - 18 10.2
HCM Lane LOS B A A - - A - - C B
HCM 95th %tile Q(veh) 0.1 0.2 0 - - 0.1 - - 2.9 0.2
HCM 6th TWSC
6: SB Ramps & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Background Traffic PM Synchro 10 Report
Page 2
Intersection
Int Delay, s/veh 95.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 255 75 495 301 0 0 0 0 123 0 39
Future Vol, veh/h 0 255 75 495 301 0 0 0 0 123 0 39
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 277 82 538 327 0 0 0 0 134 0 42
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 359 0 0 1721 1762 164
Stage 1 - - - - - - 1403 1403 -
Stage 2 - - - - - - 318 359 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1198 - 0 ~ 89 84 852
Stage 1 0 - - - - 0 194 205 -
Stage 2 0 - - - - 0 737 626 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1198 - - ~ 49 0 852
Mov Cap-2 Maneuver - - - - - - ~ 49 0 -
Stage 1 - - - - - - 194 0 -
Stage 2 - - - - - - 406 0 -
Approach EB WB SB
HCM Control Delay, s 0 6.5 $ 730.2
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1198 - 49 852
HCM Lane V/C Ratio - - 0.449 - 2.728 0.05
HCM Control Delay (s) - - 10.4 -$ 958.8 9.4
HCM Lane LOS - - B - F A
HCM 95th %tile Q(veh) - - 2.4 - 14.1 0.2
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramps & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Background Traffic PM Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 12.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 68 328 0 0 689 135 83 0 679 0 0 0
Future Vol, veh/h 68 328 0 0 689 135 83 0 679 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 74 357 0 0 749 147 90 0 738 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 896 0 - - - 0 880 1401 179
Stage 1 - - - - - - 505 505 -
Stage 2 - - - - - - 375 896 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 753 - 0 0 - - 287 139 833
Stage 1 - - 0 0 - - 571 539 -
Stage 2 - - 0 0 - - 665 357 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 753 - - - - - 259 0 833
Mov Cap-2 Maneuver - - - - - - 259 0 -
Stage 1 - - - - - - 515 0 -
Stage 2 - - - - - - 665 0 -
Approach EB WB NB
HCM Control Delay, s 1.8 0 31.8
HCM LOS D
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 259 833 753 - - -
HCM Lane V/C Ratio 0.348 0.886 0.098 - - -
HCM Control Delay (s) 26.2 32.5 10.3 - - -
HCM Lane LOS D D B - - -
HCM 95th %tile Q(veh) 1.5 11.7 0.3 - - -
Queuing and Blocking Report
Iron Horse 2026 Background Traffic PM 04/09/2021
SimTraffic Report
Page 1
Intersection: 3: 12th West & University Blvd
Movement EB WB WB NB NB SB SB
Directions Served L L R LT R L TR
Maximum Queue (ft) 36 31 15 35 59 111 30
Average Queue (ft) 5 4 0 15 29 50 15
95th Queue (ft) 25 20 7 40 49 90 31
Link Distance (ft) 551 709 555 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 100 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: SB Ramps & University Blvd
Movement EB EB WB WB SB SB
Directions Served T R L T LT R
Maximum Queue (ft) 21 26 119 3 240 50
Average Queue (ft) 2 2 60 0 102 18
95th Queue (ft) 12 14 100 2 212 40
Link Distance (ft) 709 400 392
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 95 200
Storage Blk Time (%) 1 6
Queuing Penalty (veh) 1 2
Intersection: 9: NB Ramps & University Blvd
Movement EB WB WB NB NB
Directions Served L T TR LT R
Maximum Queue (ft) 55 9 22 241 346
Average Queue (ft) 22 0 1 47 161
95th Queue (ft) 47 5 10 145 311
Link Distance (ft) 360 360 448
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 12
Queuing Penalty (veh) 10
Network Summary
Network wide Queuing Penalty: 14
HCM 6th TWSC
2: 12th West & 12th West South Access 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 12 3 3 86 84 13
Future Vol, veh/h 12 3 3 86 84 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 13 3 3 93 91 14
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 197 98 105 0 - 0
Stage 1 98 - - - - -
Stage 2 99 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 792 958 1486 - - -
Stage 1 926 - - - - -
Stage 2 925 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 790 958 1486 - - -
Mov Cap-2 Maneuver 790 - - - - -
Stage 1 924 - - - - -
Stage 2 925 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.4 0.3 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1486 - 790 958 - -
HCM Lane V/C Ratio 0.002 - 0.017 0.003 - -
HCM Control Delay (s) 7.4 0 9.6 8.8 - -
HCM Lane LOS A A A A - -
HCM 95th %tile Q(veh) 0 - 0.1 0 - -
HCM 6th TWSC
3: 12th West & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 2
Intersection
Int Delay, s/veh 26.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 36 187 9 130 475 181 26 26 122 122 31 67
Future Vol, veh/h 36 187 9 130 475 181 26 26 122 122 31 67
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 100 - - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 39 203 10 141 516 197 28 28 133 133 34 73
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 713 0 0 213 0 0 1236 1281 208 1165 1089 516
Stage 1 - - - - - - 286 286 - 798 798 -
Stage 2 - - - - - - 950 995 - 367 291 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 887 - - 1357 - - 153 166 832 171 215 559
Stage 1 - - - - - - 721 675 - 380 398 -
Stage 2 - - - - - - 312 323 - 653 672 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 887 - - 1357 - - 102 142 832 ~ 109 184 559
Mov Cap-2 Maneuver - - - - - - 102 142 - ~ 109 184 -
Stage 1 - - - - - - 689 645 - 363 357 -
Stage 2 - - - - - - 220 289 - 502 642 -
Approach EB WB NB SB
HCM Control Delay, s 1.4 1.3 35.9 136.5
HCM LOS E F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 298 887 - - 1357 - - 109 340
HCM Lane V/C Ratio 0.635 0.044 - - 0.104 - - 1.217 0.313
HCM Control Delay (s) 35.9 9.2 - - 8 - - 229.8 20.3
HCM Lane LOS E A - - A - - F C
HCM 95th %tile Q(veh) 4 0.1 - - 0.3 - - 8.7 1.3
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
6: SB Ramp & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 136.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 386 45 488 665 0 0 0 0 106 0 121
Future Vol, veh/h 0 386 45 488 665 0 0 0 0 106 0 121
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 420 49 530 723 0 0 0 0 115 0 132
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 469 0 0 2228 2252 362
Stage 1 - - - - - - 1783 1783 -
Stage 2 - - - - - - 445 469 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1091 - 0 ~ 42 41 635
Stage 1 0 - - - - 0 120 133 -
Stage 2 0 - - - - 0 645 560 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1091 - - ~ 22 0 635
Mov Cap-2 Maneuver - - - - - - ~ 22 0 -
Stage 1 - - - - - - 120 0 -
Stage 2 - - - - - - 332 0 -
Approach EB WB SB
HCM Control Delay, s 0 4.8 $ 1061.7
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1091 - 22 635
HCM Lane V/C Ratio - - 0.486 - 5.237 0.207
HCM Control Delay (s) - - 11.4 -$ 2259.8 12.1
HCM Lane LOS - - B - F B
HCM 95th %tile Q(veh) - - 2.7 - 14.6 0.8
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramp & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 4
Intersection
Int Delay, s/veh 7.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 70 424 0 0 1030 85 123 0 322 0 0 0
Future Vol, veh/h 70 424 0 0 1030 85 123 0 322 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 76 461 0 0 1120 92 134 0 350 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 1212 0 - - - 0 1173 1825 231
Stage 1 - - - - - - 613 613 -
Stage 2 - - - - - - 560 1212 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 571 - 0 0 - - 185 76 771
Stage 1 - - 0 0 - - 503 481 -
Stage 2 - - 0 0 - - 535 253 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 571 - - - - - 160 0 771
Mov Cap-2 Maneuver - - - - - - 160 0 -
Stage 1 - - - - - - 436 0 -
Stage 2 - - - - - - 535 0 -
Approach EB WB NB
HCM Control Delay, s 1.7 0 34.5
HCM LOS D
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 160 771 571 - - -
HCM Lane V/C Ratio 0.836 0.454 0.133 - - -
HCM Control Delay (s) 89.6 13.5 12.3 - - -
HCM Lane LOS F B B - - -
HCM 95th %tile Q(veh) 5.6 2.4 0.5 - - -
HCM 6th TWSC
12: West University Access & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 5
Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 185 3 45 516 3 42
Future Vol, veh/h 185 3 45 516 3 42
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 201 3 49 561 3 46
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 204 0 862 203
Stage 1 - - - - 203 -
Stage 2 - - - - 659 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1368 - 325 838
Stage 1 - - - - 831 -
Stage 2 - - - - 515 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1368 - 308 838
Mov Cap-2 Maneuver - - - - 308 -
Stage 1 - - - - 831 -
Stage 2 - - - - 488 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 10
HCM LOS B
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 308 838 - - 1368 -
HCM Lane V/C Ratio 0.011 0.054 - - 0.036 -
HCM Control Delay (s) 16.8 9.5 - - 7.7 -
HCM Lane LOS C A - - A -
HCM 95th %tile Q(veh) 0 0.2 - - 0.1 -
HCM 6th TWSC
14: East University Access & University Blvd 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 6
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 222 5 11 557 4 10
Future Vol, veh/h 222 5 11 557 4 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 241 5 12 605 4 11
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 246 0 873 244
Stage 1 - - - - 244 -
Stage 2 - - - - 629 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1320 - 321 795
Stage 1 - - - - 797 -
Stage 2 - - - - 531 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1320 - 317 795
Mov Cap-2 Maneuver - - - - 317 -
Stage 1 - - - - 797 -
Stage 2 - - - - 524 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 11.6
HCM LOS B
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 317 795 - - 1320 -
HCM Lane V/C Ratio 0.014 0.014 - - 0.009 -
HCM Control Delay (s) 16.5 9.6 - - 7.8 0
HCM Lane LOS C A - - A A
HCM 95th %tile Q(veh) 0 0 - - 0 -
HCM 6th TWSC
17: 12th West & 12th West North Access 03/15/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 7
Intersection
Int Delay, s/veh 2.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 72 3 2 98 94 76
Future Vol, veh/h 72 3 2 98 94 76
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 78 3 2 107 102 83
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 255 144 185 0 - 0
Stage 1 144 - - - - -
Stage 2 111 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 734 903 1390 - - -
Stage 1 883 - - - - -
Stage 2 914 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 733 903 1390 - - -
Mov Cap-2 Maneuver 733 - - - - -
Stage 1 881 - - - - -
Stage 2 914 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.4 0.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1390 - 733 903 - -
HCM Lane V/C Ratio 0.002 - 0.107 0.004 - -
HCM Control Delay (s) 7.6 0 10.5 9 - -
HCM Lane LOS A A B A - -
HCM 95th %tile Q(veh) 0 - 0.4 0 - -
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 03/15/2021
SimTraffic Report
Page 1
Intersection: 2: 12th West & 12th West South Access
Movement EB EB NB
Directions Served L R LT
Maximum Queue (ft) 31 30 11
Average Queue (ft) 9 3 0
95th Queue (ft) 31 19 6
Link Distance (ft) 183 183 556
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB WB NB SB SB
Directions Served L TR L T R LTR L TR
Maximum Queue (ft) 48 4 58 17 28 140 138 85
Average Queue (ft) 17 0 24 1 4 57 52 29
95th Queue (ft) 43 3 52 7 19 107 108 62
Link Distance (ft) 211 719 293 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: SB Ramp & University Blvd
Movement EB EB WB WB WB SB SB
Directions Served T R L T T LT R
Maximum Queue (ft) 27 20 152 28 31 426 350
Average Queue (ft) 2 2 71 2 1 322 176
95th Queue (ft) 15 10 125 16 13 526 441
Link Distance (ft) 719 719 400 400 392
Upstream Blk Time (%) 59
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 95 200
Storage Blk Time (%) 2 0 75 0
Queuing Penalty (veh) 8 0 91 0
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 03/15/2021
SimTraffic Report
Page 2
Intersection: 9: NB Ramp & University Blvd
Movement EB WB WB NB NB
Directions Served L T TR LT R
Maximum Queue (ft) 61 17 16 197 97
Average Queue (ft) 26 1 1 92 50
95th Queue (ft) 51 7 9 173 84
Link Distance (ft) 360 360 448
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 2
Queuing Penalty (veh) 6
Intersection: 12: West University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 88 24 61
Average Queue (ft) 11 2 22
95th Queue (ft) 48 14 48
Link Distance (ft) 209 142 142
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 14: East University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 44 30 29
Average Queue (ft) 2 3 9
95th Queue (ft) 19 18 31
Link Distance (ft) 211 73 73
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 03/15/2021
SimTraffic Report
Page 3
Intersection: 17: 12th West & 12th West North Access
Movement EB EB NB
Directions Served L R LT
Maximum Queue (ft) 59 30 6
Average Queue (ft) 32 3 0
95th Queue (ft) 54 18 5
Link Distance (ft) 142 142 721
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 105
HCM 6th AWSC
3: 12th West & University Blvd 03/11/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 1
Intersection
Intersection Delay, s/veh 40
Intersection LOS E
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 36 187 9 130 475 181 26 26 122 122 31 67
Future Vol, veh/h 36 187 9 130 475 181 26 26 122 122 31 67
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 39 203 10 141 516 197 28 28 133 133 34 73
Number of Lanes 1 1 0 1 1 1 0 1 0 1 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 3 2 2 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2 1 2 3
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 2 3 2
HCM Control Delay 18.8 57.9 18.1 15.5
HCM LOS C F C C
Lane NBLn1 EBLn1 EBLn2 WBLn1 WBLn2 WBLn3 SBLn1 SBLn2
Vol Left, % 15% 100% 0% 100% 0% 0% 100% 0%
Vol Thru, % 15% 0% 95% 0% 100% 0% 0% 32%
Vol Right, % 70% 0% 5% 0% 0% 100% 0% 68%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 174 36 196 130 475 181 122 98
LT Vol 26 36 0 130 0 0 122 0
Through Vol 26 0 187 0 475 0 0 31
RT Vol 122 0 9 0 0 181 0 67
Lane Flow Rate 189 39 213 141 516 197 133 107
Geometry Grp 8 8 8 8 8 8 8 8
Degree of Util (X) 0.444 0.098 0.499 0.312 1.067 0.367 0.336 0.243
Departure Headway (Hd) 8.661 9.312 8.76 7.951 7.439 6.722 9.456 8.45
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 418 387 413 454 490 537 383 427
Service Time 6.361 7.012 6.46 5.668 5.156 4.439 7.156 6.15
HCM Lane V/C Ratio 0.452 0.101 0.516 0.311 1.053 0.367 0.347 0.251
HCM Control Delay 18.1 13 19.9 14.2 86.9 13.3 16.9 13.8
HCM Lane LOS C B C B F B C B
HCM 95th-tile Q 2.2 0.3 2.7 1.3 16.1 1.7 1.5 0.9
Queuing and Blocking Report
Iron Horse 2026 AM Traffic with Development, 4-way Stop at 12th West 03/12/2021
SimTraffic Report
Page 1
Intersection: 2: 12th West & 12th West South Access
Movement EB NB
Directions Served L LT
Maximum Queue (ft) 54 30
Average Queue (ft) 15 1
95th Queue (ft) 42 10
Link Distance (ft) 183 556
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB WB NB SB SB
Directions Served L TR L T R LTR L TR
Maximum Queue (ft) 54 92 68 184 150 54 96 84
Average Queue (ft) 23 50 41 94 54 38 36 28
95th Queue (ft) 53 76 61 142 103 55 70 53
Link Distance (ft) 211 719 305 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%) 5 0
Queuing Penalty (veh) 16 1
Intersection: 6: SB Ramp & University Blvd
Movement EB EB WB WB SB SB
Directions Served T R L T LT R
Maximum Queue (ft) 21 20 134 18 426 350
Average Queue (ft) 4 2 75 1 299 142
95th Queue (ft) 16 12 120 6 551 400
Link Distance (ft) 719 719 400 392
Upstream Blk Time (%) 60
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 95 200
Storage Blk Time (%) 2 68
Queuing Penalty (veh) 7 83
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West 03/12/2021
SimTraffic Report
Page 2
Intersection: 9: NB Ramp & University Blvd
Movement EB NB NB
Directions Served L LT R
Maximum Queue (ft) 51 354 99
Average Queue (ft) 23 151 42
95th Queue (ft) 45 322 75
Link Distance (ft) 448
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 28
Queuing Penalty (veh) 89
Intersection: 12: West University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 32 24 43
Average Queue (ft) 2 1 14
95th Queue (ft) 15 8 31
Link Distance (ft) 209 128 128
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 14: East University Access & University Blvd
Movement NB NB
Directions Served L R
Maximum Queue (ft) 30 29
Average Queue (ft) 4 5
95th Queue (ft) 19 23
Link Distance (ft) 73 73
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West 03/12/2021
SimTraffic Report
Page 3
Intersection: 17: 12th West & 12th West North Access
Movement EB EB
Directions Served L R
Maximum Queue (ft) 56 30
Average Queue (ft) 27 2
95th Queue (ft) 46 15
Link Distance (ft) 142 142
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 195
HCM 6th Signalized Intersection Summary
3: 12th West & University Blvd 03/12/2021
03/11/2021 Iron Horse 2026 AM Traffic with Development, signal Synchro 10 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 36 187 9 130 475 181 26 26 122 122 31 67
Future Volume (veh/h) 36 187 9 130 475 181 26 26 122 122 31 67
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 39 203 10 141 516 197 28 28 133 133 34 73
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 252 627 31 489 664 562 150 154 488 740 228 489
Arrive On Green 0.35 0.35 0.35 0.35 0.35 0.35 0.43 0.43 0.43 0.43 0.43 0.43
Sat Flow, veh/h 737 1768 87 1168 1870 1585 119 359 1135 1225 529 1136
Grp Volume(v), veh/h 39 0 213 141 516 197 189 0 0 133 0 107
Grp Sat Flow(s),veh/h/ln 737 0 1855 1168 1870 1585 1612 0 0 1225 0 1666
Q Serve(g_s), s 2.1 0.0 3.5 4.2 10.3 3.8 0.0 0.0 0.0 0.0 0.0 1.6
Cycle Q Clear(g_c), s 12.4 0.0 3.5 7.7 10.3 3.8 3.1 0.0 0.0 1.9 0.0 1.6
Prop In Lane 1.00 0.05 1.00 1.00 0.15 0.70 1.00 0.68
Lane Grp Cap(c), veh/h 252 0 658 489 664 562 792 0 0 740 0 717
V/C Ratio(X) 0.15 0.00 0.32 0.29 0.78 0.35 0.24 0.00 0.00 0.18 0.00 0.15
Avail Cap(c_a), veh/h 308 0 798 577 805 682 792 0 0 740 0 717
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 17.5 0.0 9.8 12.6 12.0 9.9 7.7 0.0 0.0 7.3 0.0 7.3
Incr Delay (d2), s/veh 0.3 0.0 0.3 0.3 4.0 0.4 0.7 0.0 0.0 0.5 0.0 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 1.2 1.0 4.2 1.1 0.9 0.0 0.0 0.6 0.0 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 17.8 0.0 10.1 13.0 16.0 10.3 8.4 0.0 0.0 7.9 0.0 7.7
LnGrp LOS B A B B B B A A A A A A
Approach Vol, veh/h 252 854 189 240
Approach Delay, s/veh 11.3 14.2 8.4 7.8
Approach LOS B B A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 22.5 19.3 22.5 19.3
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0
Max Q Clear Time (g_c+I1), s 5.1 14.4 3.9 12.3
Green Ext Time (p_c), s 0.8 0.5 0.8 2.4
Intersection Summary
HCM 6th Ctrl Delay 12.0
HCM 6th LOS B
Queuing and Blocking Report
Iron Horse 2026 AM Traffic with Development, signal 03/12/2021
SimTraffic Report
Page 1
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB WB NB SB SB
Directions Served L TR L T R LTR L TR
Maximum Queue (ft) 89 123 166 232 150 114 89 76
Average Queue (ft) 29 57 63 127 66 42 39 27
95th Queue (ft) 61 105 122 200 145 82 75 59
Link Distance (ft) 211 719 305 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%) 0 1 13
Queuing Penalty (veh) 0 8 40
HCM 6th TWSC
2: 12th West & 12th West South Access 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 0.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 3 3 89 120 10
Future Vol, veh/h 10 3 3 89 120 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 3 3 97 130 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 239 136 141 0 - 0
Stage 1 136 - - - - -
Stage 2 103 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 749 913 1442 - - -
Stage 1 890 - - - - -
Stage 2 921 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 748 913 1442 - - -
Mov Cap-2 Maneuver 748 - - - - -
Stage 1 888 - - - - -
Stage 2 921 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.7 0.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1442 - 748 913 - -
HCM Lane V/C Ratio 0.002 - 0.015 0.004 - -
HCM Control Delay (s) 7.5 0 9.9 9 - -
HCM Lane LOS A A A A - -
HCM 95th %tile Q(veh) 0 - 0 0 - -
HCM 6th TWSC
3: 12th West & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 2
Intersection
Int Delay, s/veh 27.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 100 10 133 93 205 7 30 120 262 46 20
Future Vol, veh/h 21 100 10 133 93 205 7 30 120 262 46 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 100 - 0 - - 100 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 23 109 11 145 101 223 8 33 130 285 50 22
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 324 0 0 120 0 0 700 775 115 633 557 101
Stage 1 - - - - - - 161 161 - 391 391 -
Stage 2 - - - - - - 539 614 - 242 166 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1236 - - 1468 - - 354 329 937 392 439 954
Stage 1 - - - - - - 841 765 - 633 607 -
Stage 2 - - - - - - 527 483 - 762 761 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1236 - - 1468 - - 285 291 937 ~ 282 388 954
Mov Cap-2 Maneuver - - - - - - 285 291 - ~ 282 388 -
Stage 1 - - - - - - 825 750 - 621 547 -
Stage 2 - - - - - - 422 435 - 616 747 -
Approach EB WB NB SB
HCM Control Delay, s 1.3 2.4 11.8 79.7
HCM LOS B F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 290 937 1236 - - 1468 - - 282 473
HCM Lane V/C Ratio 0.139 0.139 0.018 - - 0.098 - - 1.01 0.152
HCM Control Delay (s) 19.4 9.5 8 - - 7.7 - - 96.2 14
HCM Lane LOS C A A - - A - - F B
HCM 95th %tile Q(veh) 0.5 0.5 0.1 - - 0.3 - - 10.5 0.5
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
6: SB Ramp & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 150.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 394 88 495 379 0 0 0 0 123 0 52
Future Vol, veh/h 0 394 88 495 379 0 0 0 0 123 0 52
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 428 96 538 412 0 0 0 0 134 0 57
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 524 0 0 1964 2012 206
Stage 1 - - - - - - 1488 1488 -
Stage 2 - - - - - - 476 524 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1041 - 0 ~ 62 59 801
Stage 1 0 - - - - 0 174 187 -
Stage 2 0 - - - - 0 624 529 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1041 - - ~ 30 0 801
Mov Cap-2 Maneuver - - - - - - ~ 30 0 -
Stage 1 - - - - - - 174 0 -
Stage 2 - - - - - - 301 0 -
Approach EB WB SB
HCM Control Delay, s 0 6.9 $ 1283.7
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1041 - 30 801
HCM Lane V/C Ratio - - 0.517 - 4.457 0.071
HCM Control Delay (s) - - 12.1 -$ 1822.2 9.8
HCM Lane LOS - - B - F A
HCM 95th %tile Q(veh) - - 3.1 - 16.1 0.2
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramp & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 4
Intersection
Int Delay, s/veh 17.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 94 423 0 0 765 85 109 1 679 0 0 0
Future Vol, veh/h 94 423 0 0 765 85 109 1 679 0 0 0
Conflicting Peds, #/hr 0 0 0 810 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 102 460 0 0 832 92 118 1 738 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 924 0 - - - 0 1080 1588 230
Stage 1 - - - - - - 664 664 -
Stage 2 - - - - - - 416 924 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 735 - 0 0 - - 213 107 772
Stage 1 - - 0 0 - - 474 456 -
Stage 2 - - 0 0 - - 634 346 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 735 - - - - - 183 0 772
Mov Cap-2 Maneuver - - - - - - 183 0 -
Stage 1 - - - - - - 408 0 -
Stage 2 - - - - - - 634 0 -
Approach EB WB NB
HCM Control Delay, s 1.9 0 47
HCM LOS E
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 183 772 735 - - -
HCM Lane V/C Ratio 0.653 0.956 0.139 - - -
HCM Control Delay (s) 55.6 45.6 10.7 - - -
HCM Lane LOS F E B - - -
HCM 95th %tile Q(veh) 3.8 14.6 0.5 - - -
HCM 6th TWSC
12: West University Access & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 5
Intersection
Int Delay, s/veh 2.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 90 3 36 79 3 36
Future Vol, veh/h 90 3 36 79 3 36
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 98 3 39 86 3 39
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 101 0 264 100
Stage 1 - - - - 100 -
Stage 2 - - - - 164 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1491 - 725 956
Stage 1 - - - - 924 -
Stage 2 - - - - 865 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1491 - 705 956
Mov Cap-2 Maneuver - - - - 705 -
Stage 1 - - - - 924 -
Stage 2 - - - - 842 -
Approach EB WB NB
HCM Control Delay, s 0 2.3 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 705 956 - - 1491 -
HCM Lane V/C Ratio 0.005 0.041 - - 0.026 -
HCM Control Delay (s) 10.1 8.9 - - 7.5 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0 0.1 - - 0.1 -
HCM 6th TWSC
14: East University Access & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 6
Intersection
Int Delay, s/veh 0.7
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 122 4 9 111 4 9
Future Vol, veh/h 122 4 9 111 4 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 133 4 10 121 4 10
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 137 0 276 135
Stage 1 - - - - 135 -
Stage 2 - - - - 141 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1447 - 714 914
Stage 1 - - - - 891 -
Stage 2 - - - - 886 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1447 - 709 914
Mov Cap-2 Maneuver - - - - 709 -
Stage 1 - - - - 891 -
Stage 2 - - - - 880 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 9.3
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 709 914 - - 1447 -
HCM Lane V/C Ratio 0.006 0.011 - - 0.007 -
HCM Control Delay (s) 10.1 9 - - 7.5 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0 0 - - 0 -
HCM 6th TWSC
17: 12th West & 12th West North Access 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 7
Intersection
Int Delay, s/veh 2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 61 3 3 96 127 62
Future Vol, veh/h 61 3 3 96 127 62
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 66 3 3 104 138 67
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 282 172 205 0 - 0
Stage 1 172 - - - - -
Stage 2 110 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 708 872 1366 - - -
Stage 1 858 - - - - -
Stage 2 915 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 707 872 1366 - - -
Mov Cap-2 Maneuver 707 - - - - -
Stage 1 856 - - - - -
Stage 2 915 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.5 0.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1366 - 707 872 - -
HCM Lane V/C Ratio 0.002 - 0.094 0.004 - -
HCM Control Delay (s) 7.6 0 10.6 9.1 - -
HCM Lane LOS A A B A - -
HCM 95th %tile Q(veh) 0 - 0.3 0 - -
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 04/09/2021
SimTraffic Report
Page 1
Intersection: 2: 12th West & 12th West South Access
Movement EB EB
Directions Served L R
Maximum Queue (ft) 36 31
Average Queue (ft) 9 3
95th Queue (ft) 33 19
Link Distance (ft) 183 183
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB WB NB NB SB SB
Directions Served L TR L T R LT R L TR
Maximum Queue (ft) 33 10 53 2 31 68 76 192 76
Average Queue (ft) 5 0 16 0 1 24 38 75 23
95th Queue (ft) 23 3 43 2 9 53 61 142 50
Link Distance (ft) 211 709 709 303 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%) 0 0 0
Queuing Penalty (veh) 0 0 0
Intersection: 6: SB Ramp & University Blvd
Movement EB EB WB WB WB SB SB
Directions Served T R L T T LT R
Maximum Queue (ft) 31 33 158 43 4 320 228
Average Queue (ft) 4 6 77 2 0 189 70
95th Queue (ft) 19 24 135 31 3 404 264
Link Distance (ft) 709 400 400 392
Upstream Blk Time (%) 7
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 100 95 200
Storage Blk Time (%) 4 36
Queuing Penalty (veh) 7 19
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 04/09/2021
SimTraffic Report
Page 2
Intersection: 9: NB Ramp & University Blvd
Movement EB WB WB NB NB
Directions Served L T TR LT R
Maximum Queue (ft) 79 4 26 503 400
Average Queue (ft) 32 0 1 469 400
95th Queue (ft) 63 3 11 488 402
Link Distance (ft) 360 360 448
Upstream Blk Time (%) 98
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 0 9 100
Queuing Penalty (veh) 0 60 110
Intersection: 12: West University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 44 24 55
Average Queue (ft) 5 2 24
95th Queue (ft) 26 16 46
Link Distance (ft) 209 142 142
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 14: East University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 23 30 29
Average Queue (ft) 1 4 7
95th Queue (ft) 11 19 27
Link Distance (ft) 211 73 73
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 04/09/2021
SimTraffic Report
Page 3
Intersection: 17: 12th West & 12th West North Access
Movement EB EB NB
Directions Served L R LT
Maximum Queue (ft) 64 30 12
Average Queue (ft) 31 3 0
95th Queue (ft) 53 19 6
Link Distance (ft) 142 142 721
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 196
HCM 6th TWSC
2: 12th West & 12th West South Access 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 0.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 3 3 89 120 10
Future Vol, veh/h 10 3 3 89 120 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 3 3 97 130 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 239 136 141 0 - 0
Stage 1 136 - - - - -
Stage 2 103 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 749 913 1442 - - -
Stage 1 890 - - - - -
Stage 2 921 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 748 913 1442 - - -
Mov Cap-2 Maneuver 748 - - - - -
Stage 1 888 - - - - -
Stage 2 921 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.7 0.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1442 - 748 913 - -
HCM Lane V/C Ratio 0.002 - 0.015 0.004 - -
HCM Control Delay (s) 7.5 0 9.9 9 - -
HCM Lane LOS A A A A - -
HCM 95th %tile Q(veh) 0 - 0 0 - -
HCM 6th AWSC
3: 12th West & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 2
Intersection
Intersection Delay, s/veh 15.1
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 100 10 133 93 205 7 30 120 262 46 20
Future Vol, veh/h 21 100 10 133 93 205 7 30 120 262 46 20
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 23 109 11 145 101 223 8 33 130 285 50 22
Number of Lanes 1 1 0 1 1 1 0 1 0 1 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 3 2 2 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2 1 2 3
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 2 3 2
HCM Control Delay 13 13.1 13.6 19.3
HCM LOS B B B C
Lane NBLn1 EBLn1 EBLn2 WBLn1 WBLn2 WBLn3 SBLn1 SBLn2
Vol Left, % 4% 100% 0% 100% 0% 0% 100% 0%
Vol Thru, % 19% 0% 91% 0% 100% 0% 0% 70%
Vol Right, % 76% 0% 9% 0% 0% 100% 0% 30%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 157 21 110 133 93 205 262 66
LT Vol 7 21 0 133 0 0 262 0
Through Vol 30 0 100 0 93 0 0 46
RT Vol 120 0 10 0 0 205 0 20
Lane Flow Rate 171 23 120 145 101 223 285 72
Geometry Grp 8 8 8 8 8 8 8 8
Degree of Util (X) 0.341 0.053 0.26 0.305 0.199 0.395 0.604 0.138
Departure Headway (Hd) 7.193 8.401 7.819 7.604 7.093 6.378 7.641 6.92
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 500 426 459 473 506 564 473 518
Service Time 4.944 6.157 5.575 5.347 4.836 4.121 5.386 4.665
HCM Lane V/C Ratio 0.342 0.054 0.261 0.307 0.2 0.395 0.603 0.139
HCM Control Delay 13.6 11.6 13.3 13.7 11.6 13.3 21.4 10.8
HCM Lane LOS B B B B B B C B
HCM 95th-tile Q 1.5 0.2 1 1.3 0.7 1.9 3.9 0.5
HCM 6th TWSC
6: SB Ramp & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 3
Intersection
Int Delay, s/veh 150.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 394 88 495 379 0 0 0 0 123 0 52
Future Vol, veh/h 0 394 88 495 379 0 0 0 0 123 0 52
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 95 - - - - - - - 200
Veh in Median Storage, # - 0 - - 0 - - 16974 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 428 96 538 412 0 0 0 0 134 0 57
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 524 0 0 1964 2012 206
Stage 1 - - - - - - 1488 1488 -
Stage 2 - - - - - - 476 524 -
Critical Hdwy - - - 4.13 - - 6.63 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 5.83 5.53 -
Critical Hdwy Stg 2 - - - - - - 5.43 5.53 -
Follow-up Hdwy - - - 2.219 - - 3.519 4.019 3.319
Pot Cap-1 Maneuver 0 - - 1041 - 0 ~ 62 59 801
Stage 1 0 - - - - 0 174 187 -
Stage 2 0 - - - - 0 624 529 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1041 - - ~ 30 0 801
Mov Cap-2 Maneuver - - - - - - ~ 30 0 -
Stage 1 - - - - - - 174 0 -
Stage 2 - - - - - - 301 0 -
Approach EB WB SB
HCM Control Delay, s 0 6.9 $ 1283.7
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2
Capacity (veh/h) - - 1041 - 30 801
HCM Lane V/C Ratio - - 0.517 - 4.457 0.071
HCM Control Delay (s) - - 12.1 -$ 1822.2 9.8
HCM Lane LOS - - B - F A
HCM 95th %tile Q(veh) - - 3.1 - 16.1 0.2
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC
9: NB Ramp & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 4
Intersection
Int Delay, s/veh 17.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 94 423 0 0 765 135 109 1 679 0 0 0
Future Vol, veh/h 94 423 0 0 765 135 109 1 679 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 130 - - - - - - - 200 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 16965 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 102 460 0 0 832 147 118 1 738 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 979 0 - - - 0 1080 1643 230
Stage 1 - - - - - - 664 664 -
Stage 2 - - - - - - 416 979 -
Critical Hdwy 4.14 - - - - - 6.84 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 5.84 5.54 -
Critical Hdwy Stg 2 - - - - - - 5.84 5.54 -
Follow-up Hdwy 2.22 - - - - - 3.52 4.02 3.32
Pot Cap-1 Maneuver 701 - 0 0 - - 213 99 772
Stage 1 - - 0 0 - - 474 456 -
Stage 2 - - 0 0 - - 634 326 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 701 - - - - - 182 0 772
Mov Cap-2 Maneuver - - - - - - 182 0 -
Stage 1 - - - - - - 405 0 -
Stage 2 - - - - - - 634 0 -
Approach EB WB NB
HCM Control Delay, s 2 0 47.1
HCM LOS E
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) 182 772 701 - - -
HCM Lane V/C Ratio 0.657 0.956 0.146 - - -
HCM Control Delay (s) 56.2 45.6 11 - - -
HCM Lane LOS F E B - - -
HCM 95th %tile Q(veh) 3.8 14.6 0.5 - - -
HCM 6th TWSC
12: West University Access & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 5
Intersection
Int Delay, s/veh 2.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 90 3 36 79 3 36
Future Vol, veh/h 90 3 36 79 3 36
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 98 3 39 86 3 39
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 101 0 264 100
Stage 1 - - - - 100 -
Stage 2 - - - - 164 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1491 - 725 956
Stage 1 - - - - 924 -
Stage 2 - - - - 865 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1491 - 705 956
Mov Cap-2 Maneuver - - - - 705 -
Stage 1 - - - - 924 -
Stage 2 - - - - 842 -
Approach EB WB NB
HCM Control Delay, s 0 2.3 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 705 956 - - 1491 -
HCM Lane V/C Ratio 0.005 0.041 - - 0.026 -
HCM Control Delay (s) 10.1 8.9 - - 7.5 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0 0.1 - - 0.1 -
HCM 6th TWSC
14: East University Access & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 6
Intersection
Int Delay, s/veh 0.7
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 122 4 9 111 4 9
Future Vol, veh/h 122 4 9 111 4 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 133 4 10 121 4 10
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 137 0 276 135
Stage 1 - - - - 135 -
Stage 2 - - - - 141 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1447 - 714 914
Stage 1 - - - - 891 -
Stage 2 - - - - 886 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1447 - 709 914
Mov Cap-2 Maneuver - - - - 709 -
Stage 1 - - - - 891 -
Stage 2 - - - - 880 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 9.3
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 709 914 - - 1447 -
HCM Lane V/C Ratio 0.006 0.011 - - 0.007 -
HCM Control Delay (s) 10.1 9 - - 7.5 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0 0 - - 0 -
HCM 6th TWSC
17: 12th West & 12th West North Access 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West Synchro 10 Report
Page 7
Intersection
Int Delay, s/veh 2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 61 3 3 96 127 62
Future Vol, veh/h 61 3 3 96 127 62
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 66 3 3 104 138 67
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 282 172 205 0 - 0
Stage 1 172 - - - - -
Stage 2 110 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 708 872 1366 - - -
Stage 1 858 - - - - -
Stage 2 915 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 707 872 1366 - - -
Mov Cap-2 Maneuver 707 - - - - -
Stage 1 856 - - - - -
Stage 2 915 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.5 0.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1366 - 707 872 - -
HCM Lane V/C Ratio 0.002 - 0.094 0.004 - -
HCM Control Delay (s) 7.6 0 10.6 9.1 - -
HCM Lane LOS A A B A - -
HCM 95th %tile Q(veh) 0 - 0.3 0 - -
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West 04/09/2021
SimTraffic Report
Page 1
Intersection: 2: 12th West & 12th West South Access
Movement EB EB NB
Directions Served L R LT
Maximum Queue (ft) 31 29 6
Average Queue (ft) 10 4 0
95th Queue (ft) 34 21 4
Link Distance (ft) 183 183 556
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB WB NB NB SB SB
Directions Served L TR L T R LT R L TR
Maximum Queue (ft) 30 72 72 61 75 49 75 105 49
Average Queue (ft) 15 38 37 28 38 22 36 48 20
95th Queue (ft) 39 61 60 50 63 47 59 83 40
Link Distance (ft) 211 709 709 303 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Intersection: 6: SB Ramp & University Blvd
Movement EB EB WB WB WB SB SB
Directions Served T R L T T LT R
Maximum Queue (ft) 25 30 177 54 62 393 292
Average Queue (ft) 3 5 78 3 2 246 86
95th Queue (ft) 17 23 138 52 42 465 309
Link Distance (ft) 709 400 400 392
Upstream Blk Time (%) 25
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 100 95 200
Storage Blk Time (%) 4 53
Queuing Penalty (veh) 8 27
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West 04/09/2021
SimTraffic Report
Page 2
Intersection: 9: NB Ramp & University Blvd
Movement EB WB WB NB NB
Directions Served L T TR LT R
Maximum Queue (ft) 63 4 22 407 383
Average Queue (ft) 29 0 1 101 191
95th Queue (ft) 53 3 9 294 356
Link Distance (ft) 360 360 448
Upstream Blk Time (%) 1
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 130 200
Storage Blk Time (%) 0 17
Queuing Penalty (veh) 1 19
Intersection: 12: West University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 36 30 50
Average Queue (ft) 4 2 21
95th Queue (ft) 21 16 45
Link Distance (ft) 209 142 142
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 14: East University Access & University Blvd
Movement WB NB NB
Directions Served LT L R
Maximum Queue (ft) 18 30 30
Average Queue (ft) 1 3 7
95th Queue (ft) 9 17 27
Link Distance (ft) 211 73 73
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development, 4-way Stop at 12th West 04/09/2021
SimTraffic Report
Page 3
Intersection: 17: 12th West & 12th West North Access
Movement EB EB
Directions Served L R
Maximum Queue (ft) 61 30
Average Queue (ft) 29 3
95th Queue (ft) 56 18
Link Distance (ft) 142 142
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 54
HCM 6th Signalized Intersection Summary
3: 12th West & University Blvd 04/09/2021
03/11/2021 Iron Horse 2026 Traffic with Development Synchro 10 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 21 100 10 133 93 205 7 30 120 262 46 20
Future Volume (veh/h) 21 100 10 133 93 205 7 30 120 262 46 20
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 23 109 11 145 101 223 8 33 130 285 50 22
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 419 418 42 451 468 396 222 791 793 798 616 271
Arrive On Green 0.25 0.25 0.25 0.25 0.25 0.25 0.50 0.50 0.50 0.50 0.50 0.50
Sat Flow, veh/h 1056 1671 169 1272 1870 1585 205 1582 1585 1223 1231 542
Grp Volume(v), veh/h 23 0 120 145 101 223 41 0 130 285 0 72
Grp Sat Flow(s),veh/h/ln 1056 0 1840 1272 1870 1585 1787 0 1585 1223 0 1773
Q Serve(g_s), s 0.6 0.0 1.9 3.7 1.5 4.4 0.0 0.0 1.6 5.6 0.0 0.8
Cycle Q Clear(g_c), s 2.2 0.0 1.9 5.6 1.5 4.4 0.4 0.0 1.6 6.0 0.0 0.8
Prop In Lane 1.00 0.09 1.00 1.00 0.20 1.00 1.00 0.31
Lane Grp Cap(c), veh/h 419 0 460 451 468 396 1013 0 793 798 0 886
V/C Ratio(X) 0.05 0.00 0.26 0.32 0.22 0.56 0.04 0.00 0.16 0.36 0.00 0.08
Avail Cap(c_a), veh/h 683 0 920 769 935 793 1013 0 793 798 0 886
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 11.6 0.0 10.8 13.1 10.7 11.8 4.6 0.0 4.9 6.1 0.0 4.7
Incr Delay (d2), s/veh 0.1 0.0 0.3 0.4 0.2 1.3 0.1 0.0 0.4 1.2 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.0 0.7 0.9 0.5 1.4 0.1 0.0 0.4 1.0 0.0 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 11.6 0.0 11.1 13.5 10.9 13.0 4.7 0.0 5.3 7.4 0.0 4.9
LnGrp LOS B A B B B B A A A A A A
Approach Vol, veh/h 143 469 171 357
Approach Delay, s/veh 11.2 12.7 5.2 6.9
Approach LOS B B A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 22.5 13.5 22.5 13.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0
Max Q Clear Time (g_c+I1), s 3.6 4.2 8.0 7.6
Green Ext Time (p_c), s 0.5 0.6 1.0 1.4
Intersection Summary
HCM 6th Ctrl Delay 9.6
HCM 6th LOS A
Queuing and Blocking Report
Iron Horse 2026 Traffic with Development 04/09/2021
SimTraffic Report
Page 2
Intersection: 3: 12th West & University Blvd
Movement EB EB WB WB WB NB NB SB SB
Directions Served L TR L T R LT R L TR
Maximum Queue (ft) 46 96 90 86 70 47 64 149 50
Average Queue (ft) 13 39 46 33 38 9 29 73 13
95th Queue (ft) 40 77 80 70 64 34 53 125 35
Link Distance (ft) 211 709 709 303 469
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 150 100 100 200
Storage Blk Time (%) 0 0 0
Queuing Penalty (veh) 0 0 0
Iron Horse D ivision I Traffic Impact Study
C
Appendix C: Land Use Descriptions
Land Use: 150
Warehousing
Description
A warehouse is primarily devoted to the storage of materials, but it may also include office and
maintenance areas. High-cube transload and short-term storage warehouse (Land Use 154), high-
cube fulfillment center warehouse (Land Use 155), high-cube parcel hub warehouse (Land Use 156),
and high-cube cold storage warehouse (Land Use 157) are related uses.
Additional Data
Time-of-day distribution data for this land use are presented in Appendix A. For the 13 general urban/
suburban sites with data, the overall highest vehicle volumes during the AM and PM on a weekday
were counted between 11:30 a.m. and 12:30 p.m. and 3:00 and 4:00 p.m., respectively.
The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in California,
Connecticut, Minnesota, New Jersey, New York, Ohio, Oregon, Pennsylvania, and Texas.
Source Numbers
184, 331, 406, 411, 443, 579, 583, 596, 598, 611, 619, 642, 752, 869, 875, 876, 914, 940
67Trip Generation Manual 10th Edition • Volume 2: Data • Industrial (Land Uses 100–199)
Land Use: 842
Recreational Vehicle Sales
Description
A recreational vehicle (RV) sales dealership is a free-standing facility that specializes in the sales of
new RVs. Recreational vehicle services, parts and accessories sales, and substantial used RV sales
may also be available. Some RV dealerships may also include boat sales and servicing. Automobile
sales (Land Use 841) is a related use.
Additional Data
Time-of-day distribution data for this land use are presented in Appendix A. For the five general
urban/suburban sites with data, the overall highest vehicle volumes during the AM and PM on a
weekday were counted between 9:30 and 10:30 a.m. and 12:00 and 1:00 p.m., respectively.
The sites were surveyed in the 2000s and the 2010s in Florida and Texas.
Source Numbers
721, 881
213Trip Generation Manual 10th Edition • Volume 2: Data • Retail (Land Uses 800–899)
Land Use: 934
Fast-Food Restaurant with Drive-Through Window
Description
This category includes fast-food restaurants with drive-through windows. This type of restaurant is
characterized by a large drive-through clientele, long hours of service (some are open for breakfast,
all are open for lunch and dinner, some are open late at night or 24 hours a day) and high turnover
rates for eat-in customers. These limited-service eating establishments do not provide table service.
Non-drive-through patrons generally order at a cash register and pay before they eat. Fast casual
restaurant (Land Use 930), high-turnover (sit-down) restaurant (Land Use 932), fast-food restaurant
without drive-through window (Land Use 933), and fast-food restaurant with drive-through window
and no indoor seating (Land Use 935) are related uses.
Additional Data
Users should exercise caution when applying statistics during the AM peak periods, as the
sites contained in the database for this land use may or may not be open for breakfast. In
cases where it was confirmed that the sites were not open for breakfast, data for the AM peak
hour of the adjacent street traffic were removed from the database.
The outdoor seating area is not included in the overall gross floor area. Therefore, the number of
seats may be a more reliable independent variable on which to establish trip generation rates for
facilities having significant outdoor seating.
Time-of-day distribution data for this land use for a weekday, Saturday, and Sunday are presented in
Appendix A. For the 46 general urban/suburban sites with data, the overall highest vehicle volumes
during the AM and PM on a weekday were counted between 11:45 a.m. and 12:45 p.m. and 12:00
and 1:00 p.m., respectively. For the one dense multi-use urban site with data, the same AM and PM
peak hours were observed.
The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Alaska, Alberta
(CAN), California, Colorado, Florida, Indiana, Kentucky, Maryland, Massachusetts, Minnesota,
Montana, New Hampshire, New Jersey, New York, North Carolina, Ohio, Pennsylvania, South
Dakota, Texas, Vermont, Virginia, Washington, and Wisconsin.
Source Numbers
163, 164, 168, 180, 181, 241, 245, 278, 294, 300, 301, 319, 338, 340, 342, 358, 389, 438, 502, 552,
577, 583, 584, 617, 640, 641, 704, 715, 728, 810, 866, 867, 869, 885, 886, 927, 935, 962, 977
156 Trip Generation Manual 10th Edition • Volume 2: Data • Services (Land Uses 900–999)
Iron Horse Division I Traffic Impact Study
D
Appendix D: FHWA Double Crossover Diamond
Interchange TechBrief
Research, Development, and Technology Turner-Fairbank Highway Research Center 300 Georgetown Pike, McLean, VA 22101-2296
www.tfhrc.gov
Double Crossover Diamond Interchange
Objective
Today’s transportation professionals, with limited
resources available to them, are challenged to
meet the mobility needs of an increasing popul-
ation. At many highway junctions, congestion
continues to worsen, and drivers, pedestrians,
and bicyclists experience increasing delays and
heightened exposure
to risk. Today’s traffic
volumes and travel
demands often lead
to safety problems
that are too complex
for conventional inter-
change designs to
properly handle. Con-
sequently, more engi-
neers are consider-
ing various innova-
tive treatments as they
seek solutions to these
complex problems.
The corresponding tech-
nical report, Alternative
Intersections/Interch-
anges: Informational
Report (AIIR) (FHWA-
HRT-09-060), covers
four intersection des-
igns and two interch-
ange designs that offer
substantial advantages
over conventional at-
grade intersections and
grade-separated dia-
mond interchanges. The
AIIR provides information on each alternative
treatment covering salient geometric design feat-
ures, operational and safety issues, access man-
agement, costs, construction sequencing, environ-
mental benefits, and applicability. This TechBrief
summarizes information on one alternative inter-
change design—the double crossover diamond
(DCD) interchange (see figure 1).
Figure 1. First U.S. DCD interchange at I-44 and Route 13 in Springfield, MO.
FHWA Publication No.: FHWA-HRT-09-054
FHWA Contact: Joe Bared, HRDS-05, (202) 493-3314, joe.bared@dot.gov
This document is a technical summary of the Federal Highway Administration
report, Alternative Intersections/Interchanges: Information Report (AIIR)
(FHWA-HRT-09-060).
TECHBRIEF
Source: Missouri Department of Transportation
2
Introduction
The DCD interchange, also known as a diverging
diamond interchange (DDI), is a new interchange
design that has much in common with the design
of a conventional diamond interchange. The main
difference between a DCD interchange and a
conventional diamond interchange is in the way
left and through movements navigate between
the cross street intersections with ramps (see
figure 2). The DCD design accommodates left-
turning movements onto arterials and limited-
access highways while eliminating the need for
a left-turn signal phase at signalized ramp term-
inal intersections. On the cross street, the traffic
moves to the left side of the roadway between
the signalized ramp intersections. This allows driv-
ers of vehicles on the cross street who want to
turn left onto the ramps the chance to continue
to the ramps without conflicting with opposing
through traffic and without stopping.
Several DCD interchanges have been built in
France, including the intersection of Highway A13
and RD 182 (Boulevard de Jardy) in Versailles, the
intersection of Highway A4 (Boulevard des Allies)
and Boulevard de Stalingrad in Le Perreux-sur-
Marne, and the intersection of Highway A1 and
Route d’Avelin in Seclin. In the United States, the
first DCD interchange was completed in July 2009
in Springfield, MO, at the intersection of Route 13
and I-44 (see figure 1). Several other DCD interch-
anges are being planned, including the intersection
of I-435 and Front Street in Kansas City, MO.
Geometric Design
The primary elements of a DCD interchange design
are as follows:
• Left-turn and through movements are relo-
cated to the opposite side of the road on the
bridge structure. Turning radii used at the
crossover junction are typically in the 150- to
300-ft range.
• Median width is increased to allow for the
flaring required for reverse curves on the
interchange approaches.
• The skew angle between the intersecting
directions is closer to perpendicular when
possible.
• Median openings are placed upstream of the
interchange to allow U-turn movements on
the arterial roadway.
“Crossed-over” through and left-turn
movement in one direction on arterial
“Crossed-back” through movement in one
direction on arterial
Right-turn movement onto freeway on-ramp
Signal-controlled crossovers
Unopposed left-turn movement onto
freeway on-ramp
Signal-controlled off-ramp
Figure 2. Crossover movement in a DCD interchange.
Freeway
Freeway
3
• Pedestrian crossings are accommodated
by installing crosswalks and signalization at
the junctions or nodes of the interchange (see
figure 3). The two-phase signal control poss-
ible in a DCD is more efficient for pedestri-
ans, but it requires them to cross the junction
in two stages with the central island serving
as a refuge between signal phases. Addit-
ionally, pedestrians could have the option
to walk in the median of the DCD inter-
change (implemented for the DCD interchange
at the junction of I-44 and Route 13 in
Springfield, MO).
Traffic Signal Control
A DCD interchange typically has two signalized
junctions or nodes at the points of left-turn cross-
overs. The signals operate with just two phases,
with each phase dedicated to the alternative
opposing movements. The two-phase operation of
a DCD interchange allows for shorter cycle lengths
and reduced lost time per cycle compared to the
three- or four-phase operation at conventional
diamond interchanges. Signals on a DCD inter-
change may be fully actuated to minimize delay,
and both signalized junctions can be operated
using either one or two controllers.
Operational Performance
The traffic simulation software VISSIM was used
to compare the operational performance of DCD
interchanges to conventional diamond inter-
changes. Two DCD interchange designs and two
conventional diamond interchange designs were
simulated under high and low traffic volumes.
At the higher traffic volume simulations, the DCD
interchange demonstrated overall better perfor-
mance. It had less delays, fewer stops, reduced
stop times, and shorter queue lengths compared
to the conventional design. Delays were reduced
by 15 to 60 percent, and throughput was increased
by 10 to 30 percent. However, at lower volumes,
the performance of the DCD interchange and
conventional diamond interchanges were similar.
The simulation showed that service volumes of
left-turn movements (650 vehicles per hour per
lane (veh/h/lane)) could be twice that of the
corresponding left-turn service volumes of a
conventional diamond. An advantage of the DCD
interchange over the conventional diamond is
that exclusive left-turn lanes are not necessary for
the DCD interchange.
Figure 3. Typical DCD interchange movements.
Side Street
Fr
e
e
w
a
y
Freeway Ramps Freeway Ramps
Pedestrians
4
Researchers—This study was performed by Principal Investigators Warren Hughes and Ram Jagannathan. For
more information about this research, contact Joe Bared, FHWA Project Manager, HRDS-05 at (202) 493-3314,
joe.bared@dot.gov.
Distribution—This TechBrief is being distributed according to a standard distribution. Direct distribution is being
made to the Divisions and Resource Center.
Availability—This TechBrief may be obtained from the FHWA Product Distribution Center by e-mail to
report.center@dot.gov, fax to (814) 239-2156, phone to (814) 239-1160, or online at http://www.tfhrc.gov/safety.
Key Words—Diverging diamond interchange, DDI, Alternative interchange, Double crossover diamond, and DCD.
Notice—This document is disseminated under the sponsorship of the U.S. Department of Transportation in the
interest of information exchange. The U.S. Government assumes no liability for the use of the information contained
in this document. The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’
names appear in this report only because they are considered essential to the objective of the document.
Quality Assurance Statement—The Federal Highway Administration (FHWA) provides high-quality information to
serve the Government, industry, and public in a manner that promotes public understanding. Standards and policies
are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically
reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement.
Safety Performance
A DCD interchange has only 14 conflict points
and two crossing points. In comparison, a con-
ventional diamond interchange has 26 conflict
points. Missouri Department of Transportation
designers noted that the DCD interchange geom-
etry also has traffic calming features that reduce
speeds while maintaining capacity. This is expected
to result in fewer and less severe crashes than in
a conventional intersection. They also noted that
the shorter clearance distances on the DCD inter-
change ramps compared to an equivalent con-
ventional diamond interchange could result in
reduced vehicle exposure times within the
intersection and thereby lead to improved safety.
Another noted feature of a DCD interchange is that
wrong-way movements onto ramps are eliminated.
Applicability
The main reasons to choose a DCD interchange
design instead of a conventional interchange
design include traffic operational benefits, potential
safety benefits, right-of-way benefits, and reduced
construction costs. DCD interchanges are especially
suitable in suburban/urban settings where lim-
ited and costly right-of-way and reduced duration
of construction are critical issues. Environmental
benefits have not yet been estimated, but it is clear
that the reduced congestion and possible safety
benefits will result in reduced fuel consumption
and pollution. Some situations where DCD inter-
changes are most applicable are as follows:
• Heavy volumes of left turns onto freeway ramps.
• Moderate and unbalanced through volumes
on bridge approaches on the arterial road.
• Moderate to very heavy off-ramp left-turn
volumes.
• Limited bridge deck width availability.
Summary
The DCD interchange offers benefits over con-
ventional interchange designs with its efficient
two-phase operation, narrower bridge struc-
ture width, lower costs, fewer conflict points,
expected increase in throughput, reduced vehicu-
lar delay, decreased speeds, and reduced environ-
mental impact. At this time, there is one existing
DCD interchange site in the United States and
three DCD interchanges in France. Other State
transportation departments have initiated and
planned the construction of several additional
DCD interchanges. More details on DCD inter-
changes and other innovative intersection designs
can be found in the full AIIR available from the
Federal Highway Administration.
OCTOBER 2009 FHWA-HRT-09-054
HRDS-05/10-09(3M)E