Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SHORT FORM - 05-00062 - 1182 Pleasant View - New SFR
Rexburg, ID 83440 Job H rward Dlc 22 March 06 B Y.E Nephi For: Bart Stevens Construction Rexburg ID., 8344Q Htg Clg Outside db (OF) -6 gg Inside db ('17) 70 75 Design TU (OF) 76 14 Daily range - H Inside humidity 50 Moisture difference (grflb) - -31 HEATING EQUIPMENT Make Trade Model Method Construction quality Fireplaces Make Trade Gond Coil Infiltration Simplified Average 0 COOLING EQUIPMENT Efficiency 80 AFU E Efficiency DEER Heating input 0 Btuh Sensible cooling D Btuh Heating output 0 Btuh Latent Cooling p gtuh Temperature rise D OF Total cooling 0 Btuh Actual air flow 2376 cfm Actual air how 2376 cpm lo-►ir flow factor 0.024 cfmlBtuh Air flow factor 0.048 cfmlBtuh Static pressure 0.00 in H2O Static pressure 0.00 in H2O Space thermostat Load sensible heat rano 1.00 ROOM NAME Area Htg Toad Cog load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (Cfm) (Cfm) Room1 272 8635 7069 207 338 Rovm3 X72 5899 2924 141 140 Room4 122 2807 X39 67 35 Room1 '[ 105 3232 1241 77 59 Room12 84 822 144 20 ? Room 13 285 4555 1419 1 68 Room14 304 9735 5437 233 26U Room 1 5 342 X890 3308 165 158 Room16 100 2283 1719 55 82 Roam 17 136 4435 247 106 118 Rooml 8 117 2 680 65 33 Room'I 9 65 231 137 6 7 Room20 160 5596 4357 X34 2Q8 Room2l 224 5946 3128 142 149 Roorn22 165 5334 2010 128 96 Rooms � 105 3631 2395 $7 114 Room6 8.4 45? 2Q8 11 10 Printout certified by RCCA to meet all requirements of Manual J 8th fid. ,,j, � � �' Right-SuiteResidential6-0.08 RSR40897 2005 -Mar -22 16,45,21 X)Ck CAW Document Wright ft I ' lT mplat rtt n 1Harwardm u Calc = Mia Onentation _ Printout certified by ACCA to meet all requirements of Manual J 8th Ed. Rexburg, I D 83440 Project Summary Job; Harward Entire House Date: 22 March 05 By: Nephi Bart Stevens For: Bart Stevens Construction Rexburg ll], 83440 Notes: Weather.- Winter Design Conditions Odds b: - '3F Inside db 70 OF Design TD 76 c>i` Heating Summary Structure Ducts Central vent (102 cfm) Humidificabon Piping Equipment load Infiltration Method Construction quality Fireplaces Area (W) Volume (fF) Air changes/hour Equiv. AVF (cfm) 67896 31334 1191 0D 106422 He4040 30716 0.28 143 Idaho Falls, ID, US Summer Design Conditions OLAside db 89 ° F Inside db Design TD 14 OF Daily range H Relative humidity 50 % Moisture difference -31 gr/lb Sensible Cooling Equipment Loyd Sizing Btuh structure 2$312 Btuh cfm Ducts 21401 Btuh Btuh Cenral vent (1 02Gfm) 1325 Btuh Btuh Blower Q Btuh Btuh Btuh Use manufacturer's data n Rate/svOng multiplier 0.94 Equipment sensible load 47976 Btuh Sim. 11fied Average D Ct>vlin 4040�� 30716 0.15 77 Heating Equipment Summary Make Trades Model Efficiency Hating input Heating output Temperature nse Actual air how Air flow factor Static pressure Space thermostat so AFUE o Btuh 0 Btuh a OF 236 cfm 0.024 cfm/Btuh 0.00 in H20 Latent Cooling equipment Lead Sizing Stru.cture Ducts Centrad vent 1 D2 cfm)Equipmentla, ent load -1387 Btuh -723 Btuh w1841 Btuh a Btuh Equipment total load G Btuh Req. total capacity at a.70 SHR 5.7 #pan Cooling Equipment Summary Make Trade Cond C0,11 Efficiency 0 EER Sensible cooling p Btuh Latent COQrng o Btuh Total cooling D Btuh Actual air flow 2376 cfm Air flow factor 0.048 cfmlBtuh Static pressure 0.00 in H20 Load sensible heat ratio 1.00 Printout certified by ACCA #v meet all requirements of Manual J 8th Ed_ Right—Suite r identi [ -0.08 CAMy DocumentsWrightsoft HVAMTernpiatelGart Stevens\Hard. rrp Calc J �r����ti�r= 2005 -Mar -22 16.45:21 qp! at Rexburg, ID 83440 Duct System Summary Jab: Harwaref Date: 22 March 06 Entire House By: Nephi Bart Stevens For. Bait Stevens Construction Rexburg ID, 83440 External static pressure Pressurelosses Available static pressure Supply f return available pressure Lowest friction rate Actual sir flow Fatal effective length (TEL) Heating 0.40 in H20 0.00 in H20 0.00 in H20 0.0010.00 in H20 0.000 in/1 Daft 2376 cfm AMU Gooding 0.00 in H20 0.00 in H20 n.D❑ in H20 0.00/0-00 in H20 0.000 ini100ft 2376 cfm Design Htg Clg Design Diam Rect Duct Actual Ftg.Eq►► Name (Btuh) (cfm) (cfm) FR (in) Size (in) Mati, Ln (ft) Ln (ft) Trunk Rooml-A C 3534 103 169 Q.fJOQ Q Ox 0 ShMt 0.0 0.0 ROOMI c 3534 103 169 0.000 0 (1x Q ShMt 0.0 0.0 Rc3am3 h 2924 141 140 0A00 0 Ops Q ShMt 0.0 0.0 Room4 h 739 fii 35 0.000 0 Ox D ShMt 0.0 0,0 Raam'f1 h 1249 77 59 0.000 0 (3x d ShMt 0.0 0.0 Roami2 h 144 20 7 (}.DaQ 0 Ox 0 ShMt D.0 0.0 Rdom13 n 710 55 34 0.000 o OX o ShMt 0.0 0.0 Roam13-A n 710' 55 34 0.000 Q ax a ShMt 0.0 0.0 Roam14-A G 1812 7$ $7 0.000 Q Ox 0 ShMt 0_Q 0.0 RoamU c 1812 78 87 0.0(}0 0 Ox Q ShMt 0.0 0.0 Roam14-B G 1812 78 87 0.000 D (hc D ShMt 0.Q 0.0 R°=15 h 330$. 165 158 0.000 0 Ox d ShMt 0.0 0.0 Roamls G 1719 55 $2 0.000 4 Ox Q ShMt 0.0 0.0 Rodmi7 c 2467 106 118 0.000 D (ix U ShMt 4.0 0.0 R°°m18 h 680 65" 33 0.000 0 Ox D ShMt 17.0 0.0 Raarnls c 137 6 7 0.000 U Ox 0 ShMt 0.0 4.D R°°mzo-A c 2178 67 104 0.000 D ax 0 ShMt a_D 0.0 RQ=zo c 2178 67 104 0.000 D Qac D ShMt 0.0 0.0 Room2l c 3125 142 149 0.00.00 ax fl ShMt 0.0 0_0 R��,2z h 2010 128 96 0.000 D (3x 0 ShMt 0.0 0.4 �oa�n� c 2395 $7 114 0.000 0 Ox 0 ShMt 0.0 0.0 �aams h 208 11 14 0.000 0 Ox D ShMt 0.0 0.0 R°°��-� h 2307' 1 110 o.000 oax o ShMt -0.0 o.0 R°°m$ h 23a7 112 1 0.000 o o� a ShMt 0.0 0.0 Room 10 h 222 3� � � 0.000 o Ox o ShMt 0.0 o_o Ro=9 n zs� �. � �� � za a.00a o mea ShMt 0.0 o.a Ro=7 n 1 771 122 ss 0.000 o oxo ShMt o_o o.o ��m� n 1208 95 ss 0.0001 a ax v snnnt o_o 0 VNlrJqhtSpft RightSuite Residerrtl-al 6.4_[l8 RSR4(1897 ACCk C:1My Doc umentslWrightsoft HL+AGiTemplatelBact StevensiHarward.rrp CaEc = MJ8 Orientatian = N mar- 16-45--21 Fuge I -F* Tj vvrvght!sc3ft Right-Sufte Residential 6.0-08 RSR40897 J4CFCk CAMy [hoc umentsWrightsoft HVAMTem plated rt stevensXHarward-rrp Cale MJ8 Ori entatlore = N 2005 -Mar -22 16--45-,21