HomeMy WebLinkAboutINSPECTION TICKETS - 05-00042 - 625 S 4th E - New SFRINSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By _Date 7-1f— d�
Req. By / —elp ri Phone No.
Project -Pe La lZu4A�5 Permit No. 0-5— z vyG
Address !o S
Inspection Type
Day crime Req.
rGSSLt�G /
tii�tG.
Jl2e�f%1 ��
Inspector's Report
-- / ,
❑ Res. ❑
/l: i5-
Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPEC)QWS ACTION
�,/IAAPPPROVED []DISAPPROVED
ll C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
❑Y ❑ N ❑ N/A
[]FINAL
❑ DID NOT INSPECT
Signed
Insoeclot
Rec'I Acknowledged
While - Otfwe Copy
F-FIR C000
Yellow Job Copy
Pink - Inspxlorl Copt
INSPECTION TICKET
IM Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By bc, Date 2Z S
Req. By1�E Nf YL%S1No % Phone No. Wa1 -Rq+-
Project Permit No. 05 ^6001A2
Address Lp2s L4&6
Inspection Type FAaniN
Day /Time Req. I' zs @ 3 -oD@myktx, ,.
Inspector's Report ,lJ Res. ❑ Comm.
U
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
APPROVED ❑ DISAPPROVED
❑C.O.(FINAL) ❑NOTAPPLICABLE
ACTION REQUIRED:
❑Y ❑N ❑N/A
❑ FINAL
❑ DID NOT INSPECT
Rec'I Acknowledged
WINe Office Copy
F-FIR COD
Yellow Job Copy Pink - InWoclor's Copy
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'''11d By Date �-3� —°5
2o Req. By viY\ HVAV\2 S Phone No. CoSco 9797
Project bglle&*M4 Pennit No. 65--0aa q P
Address 6,;o� -s
Inspection Type wa ✓la h I n
Day /rime Req. 9-1 I a 4
Inspector's Report Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPE ACTION
APPROVED
L7 C.O. (FINAL)
ACTION REQUIRED:
❑ DISAPPROVED
❑ NOT APPLICABLE
[] Y [IN ❑ N/A
O FINAL
❑ DID NOT INSPECT
ReCt Acknowledged
WhRe - Otke Copy
F FIR-CO03
*Mow Job Copy P" - Inspeckv s Copy
INSPECTION TICKET �%Wi
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection t' n R �✓ ' � C5-�
Request: Rec d By Date
Req. By V\ `r Phone No. '2-0 L9 J L4 I
Project Pennit No. DG " 06 O L(Z
Address (_0 25 S . ��
Inspection Type ,
Day /Time Req. 3 13 65 P2
Inspector's Report Res. ❑
Comm.
ML �v _FmAlc
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPE9WS ACTION
APPROVED Cj DISAPPROVED
(] C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
(] Y ❑ N 0 NIA
t] FINAL
❑ DID NOT INSPECT
Signed
Rec't Acknowledged
White - Office Copy *Now • .fob Copy
F-FIR-CO03
Inspector
Ph* - tmedor's Copy
1%wv INSPECTION TICKET �
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fine
Inspection Request: Rec'd By LO Date a�
Req. By Phone No.
Prujcd Pennit No.D CM 149
Address 1-, a
A.,
Inspection Type �y �-
Day /Time Req. Z ' fl
ln.Wctor's Report jd Res. ❑ Comm.
45,cur
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPE OR'S ACTION
APPROVED Ej- DISAPPROVED
0 C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed 6-y"
Rec't Acknowledged
White . Offke Copy
F•FIA•CO03
[] Y ❑ N 0 N/A
L] FINAL
❑ DID NOT INSPECT
Yam • Job Copy Pir* - MRM dor's rAW
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By J Date 3�2�
Req. By T,'-t,V U t-1 -N,4' Phone Noy Z(u - j q -1 (o 1-11
Project Permit Nol f) `-)
Address
Inspection Type C� 1�
Day Time Req.' ^
Inspector's Report Or Res
He, I1 yyrc-t IjvA
❑ Comm. tylll C,
'j�i r�a) Qom. (140641jr-ai )5 �+rL
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
yJAPPROVED✓/E%� []DISAPPROVED
2 0.(FINAL) ❑NOT APPLICABLE
ACTION REQUIRED:
Rec'I Acknowledged
WINe - Onke Copy
F FIR C003
E1Y EIN ON/A
❑ FINAL
Q DID NOT INSPECT
Ye#" Job CM PYi - IrspedmS Copy
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. 4 Mech. ❑ Fire
y �
Inspection Request: Rec'd By 1 1 Date
Req. By b U (`YA tI Oi -)t Phone No. c-%O,
Project Permit No.
Address C C5 �,
Inspection Type 1: M o c
Day /Time Req.
pInspector's Report
lam`` �la�i/ae/15
❑ Res.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
LIAPPROV ED
❑ CO. (FINAL)
ACTION REQUIRED:
DISAPPROVED
❑ NOT APPLICABLE
�! L:I 11^:Let lk
❑ Comm. 1 �, J
❑Y ON ❑N/A
❑ FINAL
❑ DID NOT INSPECT
Rec'I Acknowledged
WIMIe - OHKe Copy Veeow Job Copy Pink - Inyeylm's Copy
F FIR C003
INSPECTION TICKET
A Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fa
Inspection Request: Rec'd By tG Date +1 a_
Req. By !Dev[xt mNIVUS Phone No. WU-94•T--(e
Projccl Permit No. 6S—0013LA 2
Address lo'2,5 cS L01L
Inspection Type \YISuAaEi
Day /Time Req. _-�-zq OD_n
Inspector's Report Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A
INSPEC R'S ACTION
APPROVED ❑DISAPPROVED ❑FINAL
❑ C.O. (FINAL) ❑ NOTAPPLICABLE ❑ DID NOT INSPECT
ACTION REQUIRED-
Rec'I Acknowledged
WAde - Onke Copy
F-FIR COOJ
*How Job Copy Pir* - Irmoclors Copy
� INSPECTION TICKET �
❑ Bldg. Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By lft-4Date
Req. By 6one No.
Project Permit No. r A;- 000 Z—
Address Z
Inspection Type r
Day /Time Req.
Inspector's Report
INSPECTED ITE 01
INSPECTO ' ACTION
PROVED
(] C.O. (FINAL)
ACTION REQUIRED:
Res. ❑ Comm.
TO APPROVED DWGS D Y ❑ N El N/A
[j DISAPPROVED [A FINAL
❑ NOT APPLICABLE ❑ DID NOT INSPECT
Yellow -.lob Copy Pi* - fnWecWls Copy
White - Office Copy
F-FIR•CO03
FRAMING/MECH. CHECKLIST
Date
Project:
Job Address:
Building Permit Number:
The following comments based on the 2003 edition of the International Residential Code should be
resolved before an occupancy permit is issued. This correction list is not a building permit. The approval
of plans and specifications does not permit the violation of any section of the International Residential
Code or any federal, state or local regulations.
Exterior
i
Concrete Slabs (3 1/2 " min. thickness & 4" gravel base min.) R606.1
-ZBraced Wall Panels (sheathing) (nail or staple - 6" o. c. at edges & 12" o. c. in field) Table 602.3(1)
Adequate uplift control at floor line (sheathing split on plate or 1 '/: X 36" straps 4' o. c. mudsill to studs)
Seismic hold-downs at garage panels <4' wide (APA narrow panel design if <2'8"), hold-downs must be on
double stud or 3X with all nail holes filled. R602.10.4
/Foundation waterproofing to finish gradeR406.1
?'Crawl space ventilation 1 sf per 150sf (w/ vapor barrier 1 sf per 1500sf) within 3' of comer R408.1-2
=ripple Walls (over 4' sized as 2 story, under 14" must be solidly sheathed one side) R602.9
Mud Sill (bolts in proper location, nuts tightened, 2"x2"x3/16" washers (conditional), pressure treated or
redwood, joints blocked or under studs at wall and gaps grouted or shimmed) R403.1.6.1 / R602.11.1
Frame
c/raFloor Sheathing and nailing Typ. 3/4" T&G - 6" on edges & 12" in field (perpendicular to joist)
Zist Spacing and Size (as per plans)
�B aring (1-1/2" min.) & La in (3" min. where joists lap over wall or beam)
tching (depth-1/6 max., length-1/3 depth max., not in middle 1/3, ends- 1/4 depth max.) TJI-NO
1Boring (1/3 "d" max, >2" of top or bottom or another hole or notch) TJI see chart
/cantilevers- Blocking, reinforcement, span and spacing as per plans.
_zioists Under Load Bearing Partitions (shall be doubled as per Section 502.3.3, if plumbing space needed,
the joists shall be blocked 4' o. c.)
_Z�Irders and Beams (as per plans, nailed or mechanically connected to frame and proper bearing)
2oist Hangers (check location & nailed properly)
Draft Stop (required for over 1000 sq ft. of unusable space at floor/ceiling)
LB sement Walls (pressure treated or redwood sill plate properly fastened to slab)
Stair Opening (as per plan & properly supported with hangers or walls)
Stairs (check rise- 7 3/4" max., run-10" min., vari: 3/8" max, width-3' min. & headroom- 6-8")
Wall Layout (as per plans)
Zerior Wall Stud Spacing (load bearing is same as exterior), 24" o.c. max.)
` Bearing Wall Window and Door Headers Nailing (edge /ends)
LExterior Bearing Wall Stud Spacing - walls carrying roof load only: 2x4-16" o.c. 12' max
2x4-24" o.c. 10' max,- 2 A U' o.c. 18' max.- 2x6-24" o.c. 16' max, one floor & roof: - 2x4 16" o.c.
10'max., two floors & roof: 2x4-12" max 10' (Fig 602.3.2.(1-3))
/uble Top Plate (joints lapped min. 2') or Single Top Plate (bearing Win 1" & adequately tied at joints by
3"x6" steel plates w/ 6 8d on nails each side) R602.3.2
Stud Notching (bearing 25% max.) Boring 40% max, 5/8" min. to edges (60% if doubled)
Fire Blocking (roof space line at wall, concealed spaces & at studs over 10')
Firewalls (between duplexes & garage/home) , firewall penetrations - elec. boxes- rated, ducts —
26 gauge & not open to garage, door-20 minute rated min.
Roof
_Truss details (35# snow load and 90 mph winds) See truss details
_Roof Trusses (spaced and braced as per manufacturer)
/fter and Truss Tie -Downs and hangers
"—Rafters Lateral Support (block at bearing when exceeding 5 to 1 rule (2x12)
l Roof Sheathing: Nailing ("H" clips w/ 7/16"), edges-6" o.c., field-12" o.c.
Attic Access (provide 22" x 30" min. access where clear height > 30")
_Roof Ventilation (standard 1/150 or 1/300 if 50 - 80% is T above eaves)
Mechanical (Rough Plumbing Insp. Done?4
Manufacturer's installation instructions are with the appliance (IRC 106.1.2/M1307.1)
Equipment gas shutoff valves in same room (FP exception) and within 6' of appliance (IFGC 409.5)
Sediment Traps (if not built into appliance) at Furnace & W.H. (IFGC 408.4)
ZLD ct Supports and sealed metal - < 10' spacing & Flexible — < 4' max — (2" sag in 4')
Clothes Dryer Ducts (solid metal ducts, no screws extending into duct & vent directly to outside)
Zuct insulation (insulation in non -conditioned Space)
_ZRoom access 24" min width /Attic access clear opening 20x30 min (Underfloor is 22x30)(IMC 306)
Pressure Regulators (access, vented, tee fitting each side) (IFGC 410)
Gas pipes not in ventilating or circulating air duct (IFGC 404.1)
LMetallic gas pipe bends are smooth & free from buckling, cracks, or other damage (IFGC 405.2)
Pressure Test:
Gas Pipe Material:
Branch Lines: Length
psi min duration
CSST Sch40 Copper
rn
ft
ft
ft
ft
ft
ft
To POD
ft
ft
ft
ft
ft
ft
ft
_lb pressure drop
Main Line _ft Diameter
Diameter Appliance/BTU's (if known)