Loading...
HomeMy WebLinkAboutINSPECTION TICKETS - 05-00042 - 625 S 4th E - New SFRINSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By _Date 7-1f— d� Req. By / —elp ri Phone No. Project -Pe La lZu4A�5 Permit No. 0-5— z vyG Address !o S Inspection Type Day crime Req. rGSSLt�G / tii�tG. Jl2e�f%1 �� Inspector's Report -- / , ❑ Res. ❑ /l: i5- Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPEC)QWS ACTION �,/IAAPPPROVED []DISAPPROVED ll C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: ❑Y ❑ N ❑ N/A []FINAL ❑ DID NOT INSPECT Signed Insoeclot Rec'I Acknowledged While - Otfwe Copy F-FIR C000 Yellow Job Copy Pink - Inspxlorl Copt INSPECTION TICKET IM Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By bc, Date 2Z S Req. By1�E Nf YL%S1No % Phone No. Wa1 -Rq+- Project Permit No. 05 ^6001A2 Address Lp2s L4&6 Inspection Type FAaniN Day /Time Req. I' zs @ 3 -oD@myktx, ,. Inspector's Report ,lJ Res. ❑ Comm. U INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECTOR'S ACTION APPROVED ❑ DISAPPROVED ❑C.O.(FINAL) ❑NOTAPPLICABLE ACTION REQUIRED: ❑Y ❑N ❑N/A ❑ FINAL ❑ DID NOT INSPECT Rec'I Acknowledged WINe Office Copy F-FIR COD Yellow Job Copy Pink - InWoclor's Copy INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'''11d By Date �-3� —°5 2o Req. By viY\ HVAV\2 S Phone No. CoSco 9797 Project bglle&*M4 Pennit No. 65--0aa q P Address 6,;o� -s Inspection Type wa ✓la h I n Day /rime Req. 9-1 I a 4 Inspector's Report Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE ACTION APPROVED L7 C.O. (FINAL) ACTION REQUIRED: ❑ DISAPPROVED ❑ NOT APPLICABLE [] Y [IN ❑ N/A O FINAL ❑ DID NOT INSPECT ReCt Acknowledged WhRe - Otke Copy F FIR-CO03 *Mow Job Copy P" - Inspeckv s Copy INSPECTION TICKET �%Wi Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection t' n R �✓ ' � C5-� Request: Rec d By Date Req. By V\ `r Phone No. '2-0 L9 J L4 I Project Pennit No. DG " 06 O L(Z Address (_0 25 S . �� Inspection Type , Day /Time Req. 3 13 65 P2 Inspector's Report Res. ❑ Comm. ML �v _FmAlc INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE9WS ACTION APPROVED Cj DISAPPROVED (] C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: (] Y ❑ N 0 NIA t] FINAL ❑ DID NOT INSPECT Signed Rec't Acknowledged White - Office Copy *Now • .fob Copy F-FIR-CO03 Inspector Ph* - tmedor's Copy 1%wv INSPECTION TICKET � Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fine Inspection Request: Rec'd By LO Date a� Req. By Phone No. Prujcd Pennit No.D CM 149 Address 1-, a A., Inspection Type �y �- Day /Time Req. Z ' fl ln.Wctor's Report jd Res. ❑ Comm. 45,cur INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE OR'S ACTION APPROVED Ej- DISAPPROVED 0 C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: Signed 6-y" Rec't Acknowledged White . Offke Copy F•FIA•CO03 [] Y ❑ N 0 N/A L] FINAL ❑ DID NOT INSPECT Yam • Job Copy Pir* - MRM dor's rAW INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By J Date 3�2� Req. By T,'-t,V U t-1 -N,4' Phone Noy Z(u - j q -1 (o 1-11 Project Permit Nol f) `-) Address Inspection Type C� 1� Day Time Req.' ^ Inspector's Report Or Res He, I1 yyrc-t IjvA ❑ Comm. tylll C, 'j�i r�a) Qom. (140641jr-ai )5 �+rL INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECTOR'S ACTION yJAPPROVED✓/E%� []DISAPPROVED 2 0.(FINAL) ❑NOT APPLICABLE ACTION REQUIRED: Rec'I Acknowledged WINe - Onke Copy F FIR C003 E1Y EIN ON/A ❑ FINAL Q DID NOT INSPECT Ye#" Job CM PYi - IrspedmS Copy INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. 4 Mech. ❑ Fire y � Inspection Request: Rec'd By 1 1 Date Req. By b U (`YA tI Oi -)t Phone No. c-%O, Project Permit No. Address C C5 �, Inspection Type 1: M o c Day /Time Req. pInspector's Report lam`` �la�i/ae/15 ❑ Res. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECTOR'S ACTION LIAPPROV ED ❑ CO. (FINAL) ACTION REQUIRED: DISAPPROVED ❑ NOT APPLICABLE �! L:I 11^:Let lk ❑ Comm. 1 �, J ❑Y ON ❑N/A ❑ FINAL ❑ DID NOT INSPECT Rec'I Acknowledged WIMIe - OHKe Copy Veeow Job Copy Pink - Inyeylm's Copy F FIR C003 INSPECTION TICKET A Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fa Inspection Request: Rec'd By tG Date +1 a_ Req. By !Dev[xt mNIVUS Phone No. WU-94•T--(e Projccl Permit No. 6S—0013LA 2 Address lo'2,5 cS L01L Inspection Type \YISuAaEi Day /Time Req. _-�-zq OD_n Inspector's Report Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A INSPEC R'S ACTION APPROVED ❑DISAPPROVED ❑FINAL ❑ C.O. (FINAL) ❑ NOTAPPLICABLE ❑ DID NOT INSPECT ACTION REQUIRED- Rec'I Acknowledged WAde - Onke Copy F-FIR COOJ *How Job Copy Pir* - Irmoclors Copy � INSPECTION TICKET � ❑ Bldg. Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By lft-4Date Req. By 6one No. Project Permit No. r A;- 000 Z— Address Z Inspection Type r Day /Time Req. Inspector's Report INSPECTED ITE 01 INSPECTO ' ACTION PROVED (] C.O. (FINAL) ACTION REQUIRED: Res. ❑ Comm. TO APPROVED DWGS D Y ❑ N El N/A [j DISAPPROVED [A FINAL ❑ NOT APPLICABLE ❑ DID NOT INSPECT Yellow -.lob Copy Pi* - fnWecWls Copy White - Office Copy F-FIR•CO03 FRAMING/MECH. CHECKLIST Date Project: Job Address: Building Permit Number: The following comments based on the 2003 edition of the International Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the International Residential Code or any federal, state or local regulations. Exterior i Concrete Slabs (3 1/2 " min. thickness & 4" gravel base min.) R606.1 -ZBraced Wall Panels (sheathing) (nail or staple - 6" o. c. at edges & 12" o. c. in field) Table 602.3(1) Adequate uplift control at floor line (sheathing split on plate or 1 '/: X 36" straps 4' o. c. mudsill to studs) Seismic hold-downs at garage panels <4' wide (APA narrow panel design if <2'8"), hold-downs must be on double stud or 3X with all nail holes filled. R602.10.4 /Foundation waterproofing to finish gradeR406.1 ?'Crawl space ventilation 1 sf per 150sf (w/ vapor barrier 1 sf per 1500sf) within 3' of comer R408.1-2 =ripple Walls (over 4' sized as 2 story, under 14" must be solidly sheathed one side) R602.9 Mud Sill (bolts in proper location, nuts tightened, 2"x2"x3/16" washers (conditional), pressure treated or redwood, joints blocked or under studs at wall and gaps grouted or shimmed) R403.1.6.1 / R602.11.1 Frame c/raFloor Sheathing and nailing Typ. 3/4" T&G - 6" on edges & 12" in field (perpendicular to joist) Zist Spacing and Size (as per plans) �B aring (1-1/2" min.) & La in (3" min. where joists lap over wall or beam) tching (depth-1/6 max., length-1/3 depth max., not in middle 1/3, ends- 1/4 depth max.) TJI-NO 1Boring (1/3 "d" max, >2" of top or bottom or another hole or notch) TJI see chart /cantilevers- Blocking, reinforcement, span and spacing as per plans. _zioists Under Load Bearing Partitions (shall be doubled as per Section 502.3.3, if plumbing space needed, the joists shall be blocked 4' o. c.) _Z�Irders and Beams (as per plans, nailed or mechanically connected to frame and proper bearing) 2oist Hangers (check location & nailed properly) Draft Stop (required for over 1000 sq ft. of unusable space at floor/ceiling) LB sement Walls (pressure treated or redwood sill plate properly fastened to slab) Stair Opening (as per plan & properly supported with hangers or walls) Stairs (check rise- 7 3/4" max., run-10" min., vari: 3/8" max, width-3' min. & headroom- 6-8") Wall Layout (as per plans) Zerior Wall Stud Spacing (load bearing is same as exterior), 24" o.c. max.) ` Bearing Wall Window and Door Headers Nailing (edge /ends) LExterior Bearing Wall Stud Spacing - walls carrying roof load only: 2x4-16" o.c. 12' max 2x4-24" o.c. 10' max,- 2 A U' o.c. 18' max.- 2x6-24" o.c. 16' max, one floor & roof: - 2x4 16" o.c. 10'max., two floors & roof: 2x4-12" max 10' (Fig 602.3.2.(1-3)) /uble Top Plate (joints lapped min. 2') or Single Top Plate (bearing Win 1" & adequately tied at joints by 3"x6" steel plates w/ 6 8d on nails each side) R602.3.2 Stud Notching (bearing 25% max.) Boring 40% max, 5/8" min. to edges (60% if doubled) Fire Blocking (roof space line at wall, concealed spaces & at studs over 10') Firewalls (between duplexes & garage/home) , firewall penetrations - elec. boxes- rated, ducts — 26 gauge & not open to garage, door-20 minute rated min. Roof _Truss details (35# snow load and 90 mph winds) See truss details _Roof Trusses (spaced and braced as per manufacturer) /fter and Truss Tie -Downs and hangers "—Rafters Lateral Support (block at bearing when exceeding 5 to 1 rule (2x12) l Roof Sheathing: Nailing ("H" clips w/ 7/16"), edges-6" o.c., field-12" o.c. Attic Access (provide 22" x 30" min. access where clear height > 30") _Roof Ventilation (standard 1/150 or 1/300 if 50 - 80% is T above eaves) Mechanical (Rough Plumbing Insp. Done?4 Manufacturer's installation instructions are with the appliance (IRC 106.1.2/M1307.1) Equipment gas shutoff valves in same room (FP exception) and within 6' of appliance (IFGC 409.5) Sediment Traps (if not built into appliance) at Furnace & W.H. (IFGC 408.4) ZLD ct Supports and sealed metal - < 10' spacing & Flexible — < 4' max — (2" sag in 4') Clothes Dryer Ducts (solid metal ducts, no screws extending into duct & vent directly to outside) Zuct insulation (insulation in non -conditioned Space) _ZRoom access 24" min width /Attic access clear opening 20x30 min (Underfloor is 22x30)(IMC 306) Pressure Regulators (access, vented, tee fitting each side) (IFGC 410) Gas pipes not in ventilating or circulating air duct (IFGC 404.1) LMetallic gas pipe bends are smooth & free from buckling, cracks, or other damage (IFGC 405.2) Pressure Test: Gas Pipe Material: Branch Lines: Length psi min duration CSST Sch40 Copper rn ft ft ft ft ft ft To POD ft ft ft ft ft ft ft _lb pressure drop Main Line _ft Diameter Diameter Appliance/BTU's (if known)