Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
INSPECTION TICKETS - 05-00041 - 587 Johnson St - New SFR
INSPECTION TICKET 14 Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Q!.,W Date :;�-1 a3 Req. By Phone No.�- Projcct Pennit No. Address g Inspection Type Day (rime Req. Inspector's Report JGI Res. ❑ Comm. f-ewoV f-r in e-e_4,dvt wL S u elr im i41c FP MesJ=LJQ l Ar- T.: ti eAS&&' �il�aC� ��SSGs G�5 Gi r��t. &Mi- Ah-m- � -xor 15#0 INSPECTED ITEMS CONFORM TO APPROVED DWGS 0 Y ❑ N O N/A INSPECTOR'S ACTION r I APPROVED DISAPPROVED L] FINAL {] C.O. (FINAL) El NOT APPLICABLE ❑ DID NOT INSPECT �A7CTION REQUIRED: " G corner aF AW Signed Rec't Acknowledged WhRe . Oltice Copy F-FIR-CO03 Yellow - Job copy Pink - Irdpecwft copy INSPECTION TICKET ❑ Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fa Inspection Re uest: Rec'd By nlE Date `P�a Req. By wY IS Phone No. 4;t ' 7-+ Projccl Permit No. D5 000z' Address Inspectic Day /rime Req. Inspector's Report Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A INSPECTOR'S ACTION /APPROVED El DISAPPROVED ❑FINAL C.O. (FINAL) ❑ NOT"A�PPLICABLE ❑ DID NOT INSPECT ACTION REQUIRED: rP/i QMOVe-� Recl Acknowledged WM9.Ofte Copy F FIH-0007 NeHow Job Copy PHi - Irepatlor's Copy ho `w INSPECTION •TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection \Request: Rec'd By _Date Req. By Phone No. �5a1 — % R-�1 Project Permit No. 05 -mog k Address Inspectic Day /fin Inspector's Report X Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECT S ACTION APPROVED [J DISAPPROVED ❑C.O.(FINAL) ❑NOTAPPLICABLE ACTION REQUIRED: ❑Y ❑N ❑N/A Ll FINAL ❑ DID NOT INSPECT Recl Acknowh While - 01ke Copy F FIR-CO03 *ftw - Job Copy Pnk - Inspecim's Copy INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By CW Date Req. By ZPhone No. Project Permit No. Wjmn i6 41 Address Inspecti( Day rrin Inspector's Report Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECTOR'S ACTION APPROVED Cj DISAPPROVED 13 C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: Rec't Acknowledged We - Office Copy F-FIR-CO03 r] Y ❑ N El N/A Ll FINAL ❑ DID NOT INSPECT YeUow - Sob Copy PM - InsWor's copy INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fine Inspection Request: Rec'd B Date 2-1Z S G } � � y Req. By ii.� P,dl ?X e �s Phone No. Project Pennit No. 0 Address 1'(1 crr Ayk Inspection Type 'Efda�� Cn Y S-0 . Day fi'ime Req. Inspector's Report JU Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECT R'S ACTION APPROVED U DISAPPROVED (] C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: Signed,l�_.� ReCt Acknowledged White • office Copy F-FIR-CO03 D Y ❑ N El NIA Lj FINAL ❑ DID NOT INSPECT YOow - ,fob Copy Pink - tnspedwls Copy a.� INSPECTION'TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Date `l41ds Req. B 44.-CPhone No. 3sy - 7 8 s 7 Projcct Permit No. 6;'00'�11 Address S * '7 JoOf S-f— Inspection Type Day (rime Req. Inspector's Reporte . ❑ Comm. a' V-- L66 u.l Main F-lazr AWI5 lea. a✓ INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECTOR'S ACTION ZAPPROVED 0 C.O. (FINAL) ACTION REQUIRED: Signed Recl Acknowledges! White - office Copp F-FIR•CO03 [] DISAPPROVED ❑ NOT APPLICABLE D Y ❑ N El N/A FINAL ❑ DID NOT INSPECT Yellow - .fob Copp PNc . Irtsp OW-3 copy INSPECTION TICKET Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By % Dale Mao Req. By�v Phone No. 35� - l 85`7 Permit No. oS 00 a f/ Address 5-t1 d'�r5ov� Inspection Type s ^^�` v-tA �e Day /Time Req. Inspector's Report Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECjOR'S ACTION 7 C.O. ((FINAL) ACTION REQUIRED: O DISAPPROVED O NOT APPLICABLE OY El ON/A O FINAL ❑ DID NOT INSPECT ReCt Acknowledged WING -puce Copy Yeeow . Job Copy PrA - Impeam's Copy F-FIR-0003 INSPECTION TICKET ❑ Bldg. 0 Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Cjz Date Req. By Phone No. 3 Prujcct Permit No. 65 twof Address,,?Z�) Inspection Type ,Igo 40 Day /Time Req. Inspector's Report / �--Res. ❑ Comm. ,NSPtGTEd(�'+�1Aq Sew-er' &AtL`( — +KENCN WAS UNSTR4LF -2;; 0WCTE0 r1g0n4 Q&T 1D4' l&*A(O T Ta &M'Ae -C7YOW I1/A/i O&T iCusGe on/tY — OK TD c'oVEC INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPE R-S ACTION PPROVED ❑ DISAPPROVED ❑C.O.(FINAL) ❑NOTAPPLICABLE ACTION REQUIRED: ❑Y ❑N ❑N/A ❑ FINAL ❑ DID NOT INSPECT ReCt AcknmpleAeed —/(�if�{'1 WING - 01ke Copy Yeeow Job Copy PHc - IMpeck"s Copy F FIPoC000 lftw � INSPECTIONTICKET 11,00 ❑ BWg. 51, Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By 9>(-, Date 31 y IbS Req. By D fie. - G m `Pl k.c,-,b;na Phone No. �� � - 0 `I U% Projeel Pennit No. 65--COQ1L Address `7S SAI CSG1'1 KVC, Inspection Type wl Day /time Req. Inspector's Report Res. ❑ Comm. INSPECTED MS CONFORM TO APPROVED DWGS INSPEC R'S ACTION APPROVED El DISAPPROVED 0 C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: D Y ❑ N ❑ NIA L] FINAL ❑ DID NOT INSPECT While - Of ke Copy F•FIR•CO03 YeRow . Job Copy Pink - hup.CW S C" �, INSPECTION TICKET ❑ Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Req est: Rec'd By Datea o l' Req. By Phone No. d Z Project Pennit No. Address 7 �Ja �� ••./ Inspection Type Day Time Req. Inspector's Report es. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS INSPECT S ACTION 61"APPROVED Ej DISAPPROVED 0 C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: Y ❑ N ❑ NIA 0 FINAL ❑ DID NOT INSPECT ReCt44erowledged White - Office Copy Yeti • sob 04 Pk* - tnspedw's Copy F-FIR-CO03 INSPECTION TICKET • ; Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire Inspection Request: Rec'd By Date Req. By _ Phone No. ! Project Permit No. bs o00�� Address Aug Inspection Type Day Time Req. Inspector's Report ,,d Res. ❑ Comm. INSPECTED ITEMS CONFORM TO APPROVED DWGS [: j Y ❑ N 0 N/A INSPECTO 'S ACTION PPROVED 0 C.O. (FINAL) ACTION REQUIRED: Rec't Acknowledged White - Office Copy F•FIR-CO03 [j DISAPPROVED (_j FINAL ❑ NOT APPLICABLE ❑ DID NOT INSPECT Yeffow • .Job Copy P * - fns WW-S copy INSPECTION TICKET ❑ Bldg. Plumb. ❑ Elect. ❑ Mech. ❑ Fire --�Q Inspection Request: Rec'd By Date 2 os Req. By Phone No. II Project Permit No. Address S �°� - J J. r-- Inspection Type _ f� Day (Time Req. Inspector's Report Res. ❑ Comm. 0• X� .0 9 o INSPECTED I S CONFORM TO APPROVED DWGS INSPE 'S ACTION APPROVED [j DISAPPROVED (] C.O. (FINAL) ❑ NOT APPLICABLE ACTION REQUIRED: D Y D N O N/A L] FINAL ❑ DID NOT INSPECT White • ottke Copy F-FIR•CO03 *ftw - Job Copy Pink - tnsp dw1s Copy FRAMING/MECH. CHECKLIST Date p5-- Project: Te,111� Job Address: 5787 .4rX KSzrkt Building Permit Number: ASS ovoy/ The following comments based on the 2000 edition of the International Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the Intemational Residential Code or any federal, state or local regulations. DiC. P- fix) uvtAB(' Cslir�e!' lru55r�i 5L OC-V— 77 W C/. �jrac� II`�SSeS �� G�G�tt.l�SJ �� $,',p � „Gr�� 11.`0 � 2p,5"'p17 Exterior Concrete Slabs (31 /2 " min. thickness & 4" gravel base min.) Braced Wall Panels(sheathing) (nail or staple - 6" o. c. at edges & 12" o. c. in field) dequate uplift control at floor line (sheathing split on plate or 1 1/2 X 36" straps 4' o. c. mudsill to studs) M`� Seismic hold-downs at garage corners <4' wide (alternate braced wall panels 24" min - panel both sides bb� �Q hold downs must be on double stud or 3X with all nail holes filled) Foundation Water -proofing .Crawl space ventilation 1 sf per 150sf (w/ vapor barrier 1 sf per 1500sf) within 3' of corner r" Cripple Walls (over 4' sized as 2 story, under 14" must be solidly sheathed one side Mud Sill (bolts in proper location, nuts tightened, 2"x2"x3/16" washers, pressure treated or redwood, joints blocked or under studs at wall and gaps grouted or shimmed) Frame Floor Sheathing and nailing Typ. 3/4" T&G - 6" on edges & 12" in field) perpendicular to joist) Hoist Spacing and Size (as per plans) Bearing (1-1 /2" min.) & Lapping (3" min. where joists lap over wall or beam) �lotching de th-1/6 max., length 1/3 depth max., not in middle 1/3, ends-1/4 depth m TJI-NO _ZBoring (1/3 "d" max, >2" of top or bottom or another hole or notch) TJI see chart antilevers- Blocking, reinforcement, span and spacing as per plans. Joists Under Load Bearing Partitions (shall be doubled as per Section 502.3.3, if plumbing space needed, 0,55 the joists shall be blocked 4' o. c.) X, ,6,r�jGirders and Beams (as per plans, nailed or mechanically connected to frame and proper bearing) Zioist Hangers (check location & nailed properly) Draft Stop (required for over 1000 sq ft. of unusable space at floor/ceiling) ZBasement Walls (pressure treated or redwood sill plate properly fastened to slab) Stair Opening (as per plan & properly supported with hangers or walls) Stairs (check rise- 7 3/4" max., run-10" min., vari.- 3/8" max, width-3' min. & headroom- 6'-8") _wall Layout (as per plans) interior Wall Stud Spacing (load bearing is same as exterior), 24" o.c. max.) Bearing Wall Window and Door Headers Nailing (edge lends) ZExterior Bearing Wall Stud Spacing - walls carrying roof load only; 2x4-16" o.c. 12' max 2x4-24" o.c. 10' max,- 2x6-16" o.c. 18' max,- 2x6-24" o.c. 16' max, one floor & roof: - 2x416" o.c. 10'max., two floors & roof; 2x4-12" max 10' (Fig 602.3.2.(1-3)) c Double Top Plate (joints lapped min;r -i-Single Top Plate (direct bearing & adequately tied at joints with steel plates) _zstud Notching (bearing 25% max.) Boring 40% max, 5/8" min. to edges (60% if doubled) ZFire Blocking (roof space line at wall, concealed spaces & at studs over 10') ZFirewans (between duplexes & garage/home) , firewall penetrations - elec. boxes- rated, ducts — 26 gauge & not open to garage, door —20 minute rated min. TR f Truss details (35# snow load and 85 mph winds) See truss details Roof Trusses (spaced and braced as per manufacturer) ` Rafter and Truss Tie -Downs and hangers Rafters Lateral Support (block at bearing when exceeding 5 to 1 rule (2x12) ZRoof Sheathing: Nailing ("H" clips w/ 7/16"), edges-6" o.c., field-12" o.c. /Attic Access (provide 22" x 30" min. access where clear height > 30") © Roof Ventilation (standard 1 /150 or 1 /300 if 50 - 80% is 3' above eaves) Kr�#_Mechan!C81 Rough Plumbing Insp. Done? Equipment gas shutoff valves in same room (FP exception) and within 6' of appliance (IFGC 409.5) Sediment Traps (if not built into appliance) at Furnace & W.H. (IFGC 408.4) Duct Supports and sealed metal - < 10' spacing & Flexible — < 4' max — (2" sag in 4') Clothes Dryer Ducts (solid metal ducts, no screws extending into duct & vent directly to outside) Duct insulation (insulation in non -conditioned Space) m access 24" min width / Attic access clear opening 20x30 min Under floor is 22x30 IMC 306 Roo cc p g ( )( ) Pressure Regulators (access, vented, tee fitting each side) (IFGC 410) Gas pipes not in ventilating or circulating air duct (IFGC 404.1) Metallic gas pipe bends are smooth & free from buckling, cracks, or other damage (IFGC 405.2) FINAL INSPECTION CHECKLIST Date: 7- /- tom" Project: J�arr s Job Address: S 87 Ak,,5,on Building Permit Number: Zoo 3 The following comments based on the2@®0cedition of the International Residential Code should be resolved before an occupancy permit is issued. This correction list is not a building permit. The approval of plans and specifications does not permit the violation of any section of the International Residential Code or any federal, state or local regulation. lOa CZ0 B-I z) F�-,t r nII 2 X vo cce� �U � )4 B" CII-6. ai'r 3-12-03 OUTSIDE ,ZHouse Numbers (visible from the street) �rade (yard is sloped away from foundation) Xdewalk & Landscape Strip 5' wide (W/ 6" of granular borrow (hill 12")) --7' LS strip lFront Setback Coverage 60% min green Windows - Covers and Screens (shall be releasable or removable from the inside for egress Window Wells min. 24" clear (out and above) well Exterior Steps (7 3/4 " max. rise & 10" min. tread) —6 � airway Handrails 4 or more risers or over 30" (<4" max. spacing of uprights) guardrails (provide if over 30" above floor/grade & 4" max sphere spacing for uprights) - ZZLandings (36" x 36" min., (not req. at the top of the stair if a door does not swing over stairs) thresholds 1 1/2" max. above floor or landing (7 3/4" max if door does not swing over landing) _ZPosts (required to be treated, redwood or cedar if in contact of concrete / earth) Roofing (no apparent leaks, installed properly and roofing as per plans) Masonry (lintels as per table 703.7. 1) /oof Ventilation (as per plans) INSIDE Egress Doors (all egress doors must be able to open from inside without use of keys or tools) /Window Energy calc's: match actual window _ZSafety Glazing provided in all doors, within 24" of door arc and below 60", & in tub enclosure /Bathroom Ventilation (either operable window or fan that vents directly to outside) nks, Bathtubs and Showers (check for caulking, operation and leaks) l Stairway Illumination (switch at top and bottom) -z �Sirs (7 3/4"max. riser, 10"' min. tread, (nosing 3/4" to 1 1/4" with solid risers) Handrails Cont (34" to 38", 1 1/2" to wall, and grip 1 1/4" to 2" dia. upright < 4",triangular space 6" max ) Guardrails 36" high and continuous, Req'd 30" or more above grade or floor(, uprights 4" sphere max spacing, triangular space 6" sphere max spacing) Garage (Dry walled and taped, firewall penetrations and electrical boxes, door to house 20 min. rated, ducts penetrating firewall must be 26 gauge min. & not open to garage) /Egress Windows (clear 20" width and 24" height, 5.7 sf min. opening with 44" max. sill height) Smoke Detectors (in each sleeping room, outside in immediate vicinity and on each story/basement- split levels (w/o doors), only on upper floor --all interconnected without a disconnecting switch) Foam Plastic (meets requirement of R318) / W/ater Heater Anchorage as over 4' with flex water conn. shall be anchored or strapped to building) .Water Heater Vent (check air flow with return in finished basement) / ,Clothes Dryer Ducts (solid metal ducts, no screws in duct & vent directly to outside) Duct Supports (metal ducts supported 10' min spacing & non metal as per manuf. installation instr.) 1uct Insulation (duct in non conditioned areas shall be insulated) Gas Line Supports spacing 10' for up to 3/4", 12' for over 1" and 6' for tubing up to 1 112"