Loading...
HomeMy WebLinkAboutJOIST - 05-00022 - 144 Star View Dr - New SFRMANGER LIST - Simpson Strong 'Tie Company, Ince I Plot ID Qty Product Label Top Nails Face Nails Member Net: H1 10 MIT 10-NlO 2-N10 Ranger Notes: BMC Plot ID G li 11 0IN G -WEST___ Al ATERIAL S MANGER LIST - Simpson Strong 'Tie Company, Ince I Plot ID Qty Product Label Top Nails Face Nails Member Net: H1 10 MIT 10-NlO 2-N10 Ranger Notes: LEVEL NOTES File Name: 60 -Anthony Nerrill.JOB Level Name: Main Floor Plotted: 1/28/2005 12:45 Design Status: Main Floor ... 1/28/2005 12:36 NOTE: Level design times indicated above provide assurance for proper level stacking. Design Methodology: ASD Floor Area Loading Is: 4 Graf Live Load and. 15 psf Dead Load Maximum Joist Deflection: L/480 Live Load L/240 Total Load TJ -Pro Rating Information: Weighted Average: 51 Lowest Rating: 46 Highest Rating: 55 Glued 6 Nailed Decking is Required Direct Applied Ceiling of 5/e" Gypsum is Required Floor Decking: 23/32" Panels (24' Span Rating) Normal O.C. Spacing - 16— *Unless noted otherwise Layout Scale: 1/4" = V DO NOT allow workers to walk on joists until braced. lt A complete TJ -%pert framinq plan requires the Trus ,_e fi ., joist Framer's Pocket Guide for Product i Framer's Information WARNING Joists are unstable until braced laterally Bracing Includes: • Blocking • Sheathing • Hangers • Rim Board • Strut Lines • Rim Joist WARNING NOTES: Is DO NOT stack building materials on unsheathed joists. Lack of proper bracing during construction can result in serious accidents. Under normal conditions if the following guidelines are observed, accidents will be avoided. 1. Install all blocking, hangers, rim boards and nm joists at TJI 0 joist end supports. 2. Establish a permanent deck (sheathing), nailed to the first feet of joists Blithe end of the bay or braced end wall. 3. Safety strut lines of 10 (minimum) must be nailed fee braced end wall or sheathed area. 4. sheathing must be properly nailed to each TJI ®joist before additional loads can be placed on the system. 5. Ends of cantilevers require strut fines on both the top and bottom flanges. 6. TJle joist flanges must remain straight within a tolerance of J¢" from true alignment. NAILING REQUIREMENTS TJI4Djoists at bearings: Two 8d (V22") box nails (1 each side), 1Y2" minimum from end. Blocking panels, rim joist or rim board to bearing plate: Tile blocking panels or rim joist: 10d (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d (3Y2") box nails at 12" o.c. Shear transfer Connections equivalent to decking nail schedule Rim board, rim joist or closure to TJI ® -o/ ist: 13Y4" width or less: Two 10d (3") box nails, one each at top and bottom flange. 2%6"thru 212" widths: Two 16d (3Y2") box nails, one each at top and bottom flange. 3Y2" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 20 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. The layout and the associated materials list has been prepared based on project plans and/or information provided to BMC WEST. I t remains the responsibility of the builder, architect, desiqner or other responsible persons to review this information to assure that it is appropriate, accurate and complete. APPROVED BY DATE : 4n_TJAXPqrt. e71471 w�A CREA'T'ED BY BNC NEST 202 NEST MAIN ST REXBORG, ID 83440 1208)35b-9292 FAX: (2081356-3299 JOB COMMENTS L60-Mthanv Merrill Rexburg TO. LEVEL COMMENTS Main Floor Joist Placement I SYMBOL LEGEND I RNote from Operator Point Load Line Load Area Load 0 retail fallout Label �/ (See Framer's Pocket Guide) Required Bearing Length in inches b (Adequate bearing has been provided if bearing length is not indicated.) 1 of 1 FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE TJ-Xpen 6.35 (11689) 06.35 06.35 S6.35 P6.35 11 JOIST AND REAR LIST Plot ID Length Product A M1 See Layout 8' 11 7/8" TJI 110 ioist 1 3/4" x 11 7/8" 1.9E Microllam LVL ACCESSORIES LIST Full 16' Rm2 16' Sm, Rim Board 1 1/4' x 11 7/6" 1.3E TimberStrand LSL 1 1/4" x it 7/8" 0.8E TJ -Strand Rim Board LEVEL NOTES File Name: 60 -Anthony Nerrill.JOB Level Name: Main Floor Plotted: 1/28/2005 12:45 Design Status: Main Floor ... 1/28/2005 12:36 NOTE: Level design times indicated above provide assurance for proper level stacking. Design Methodology: ASD Floor Area Loading Is: 4 Graf Live Load and. 15 psf Dead Load Maximum Joist Deflection: L/480 Live Load L/240 Total Load TJ -Pro Rating Information: Weighted Average: 51 Lowest Rating: 46 Highest Rating: 55 Glued 6 Nailed Decking is Required Direct Applied Ceiling of 5/e" Gypsum is Required Floor Decking: 23/32" Panels (24' Span Rating) Normal O.C. Spacing - 16— *Unless noted otherwise Layout Scale: 1/4" = V DO NOT allow workers to walk on joists until braced. lt A complete TJ -%pert framinq plan requires the Trus ,_e fi ., joist Framer's Pocket Guide for Product i Framer's Information WARNING Joists are unstable until braced laterally Bracing Includes: • Blocking • Sheathing • Hangers • Rim Board • Strut Lines • Rim Joist WARNING NOTES: Is DO NOT stack building materials on unsheathed joists. Lack of proper bracing during construction can result in serious accidents. Under normal conditions if the following guidelines are observed, accidents will be avoided. 1. Install all blocking, hangers, rim boards and nm joists at TJI 0 joist end supports. 2. Establish a permanent deck (sheathing), nailed to the first feet of joists Blithe end of the bay or braced end wall. 3. Safety strut lines of 10 (minimum) must be nailed fee braced end wall or sheathed area. 4. sheathing must be properly nailed to each TJI ®joist before additional loads can be placed on the system. 5. Ends of cantilevers require strut fines on both the top and bottom flanges. 6. TJle joist flanges must remain straight within a tolerance of J¢" from true alignment. NAILING REQUIREMENTS TJI4Djoists at bearings: Two 8d (V22") box nails (1 each side), 1Y2" minimum from end. Blocking panels, rim joist or rim board to bearing plate: Tile blocking panels or rim joist: 10d (3") box nails at 6" o.c. Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d (3Y2") box nails at 12" o.c. Shear transfer Connections equivalent to decking nail schedule Rim board, rim joist or closure to TJI ® -o/ ist: 13Y4" width or less: Two 10d (3") box nails, one each at top and bottom flange. 2%6"thru 212" widths: Two 16d (3Y2") box nails, one each at top and bottom flange. 3Y2" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 20 minimum squash blocks: Two 10d (3") box nails, one each at top and bottom flange. The layout and the associated materials list has been prepared based on project plans and/or information provided to BMC WEST. I t remains the responsibility of the builder, architect, desiqner or other responsible persons to review this information to assure that it is appropriate, accurate and complete. APPROVED BY DATE : 4n_TJAXPqrt. e71471 w�A CREA'T'ED BY BNC NEST 202 NEST MAIN ST REXBORG, ID 83440 1208)35b-9292 FAX: (2081356-3299 JOB COMMENTS L60-Mthanv Merrill Rexburg TO. LEVEL COMMENTS Main Floor Joist Placement I SYMBOL LEGEND I RNote from Operator Point Load Line Load Area Load 0 retail fallout Label �/ (See Framer's Pocket Guide) Required Bearing Length in inches b (Adequate bearing has been provided if bearing length is not indicated.) 1 of 1 FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE TJ-Xpen 6.35 (11689) 06.35 06.35 S6.35 P6.35 11