Loading...
HomeMy WebLinkAboutLETTERS - 05-00006 - BYUI Romney Building - Addition<Ork-z -: -: wA* P609BOX � 3 Rexburg, D 83440 208wP757m9172 ^ BYU Idaho. George��� S■ R .eyu■�,■� in - ecia . @. 1 Inspection . s 1. Reinforcing Steel 2. Reinforced Concrete 3. High Strength Bolts 4■ Anchor Bolts 5P, Epoxy A Bolts & Dowels 6. Structural Steel & Welding _ 49b r■ l r i! 4'T e e i 1 ®Tei 7 e l l i y T e l el e�* i e F e e i i � r e 4 7 e r l e 4 T■ e T e e i e 'fe T7er �•eefeae.i+f�ki Ila *.� a'eefeesM i■e■i{tST■evil !efee +}�e eT i eLY 0 Tl l7Ee 1•}bqT■rife}Tlrq■iih'Ti rel ie rirf T'�eiit Te!llFr:l RT7!reFiiTei LiJ rl1:■rree3i T!eFeei 1e Teel iY4Tee+eel14 eeleeR-EeT eeifef Yee PaOs Box .143 RexburIgs, ID 208.-4/6/05 ,"13-1866 Christensen Building Official City of Rexburg 12 North Center Rexburg, ID 8344D RE: BYU Idaho Special Inspections 2005 Projects Dear Val, Attached are copies of the required special morons that T2M Consulting,will be performing Idaho's 2005 projects. If you have any questions please contact me at 208-757-9172. Thank you. Sincerely., Bret L. McCowan TZM Consulting REXB UR G - MADISON COUNTY EM -ER GENCY SER VICES 2 6 NORTH CENT- ER STREET REXBURG, IDA H -O 83440 208-w35.9-3010 Nelson Fire Systems 1481 South Major Street Salt Lake City, Utah 84115 Dear Nelson Fire Systems, May 12, 2005 4n the above date I have reviewed the dire warm, plans for the BYU1 Romney and Clarke Buildings located in Rexburg.,. Idaho with David Burns of your company. Both sets of plan have been approved with minor changes as noted on the drawings. If you have any questions please feel. free to contact me. Sihcerelv Chris Huskinson Fire Inspector 208-705-1312 (cell) BRIGHAM YOUNG UI�TIVFRSITY IDAHO April 22, 2045 Val Christensen Building Offici.al City of Rexburg PO Box 2S4 Rexburg, ID 83440 Subject,* Review Comments for the Clarke and Romney Dear Val, Here are the res-ponses to review comments that T we9s-. .rric�; 4 addition and remodel. Accessibility Revi-ewe Provide wheel chair spaces at fixed seating classrooms. In this remodel there will be no fixed seating - P rovide acc=essible kitchens. ned for the Clarke BuIldin In This remodel we are not modifying the Home Making kitchens. If at future date a student requires accommodation, we will make appropriate modifications to the units. Asper Chapter 34, the toilet rooms should he made accessihle unless "technically infeasible", In the Clarke Building, the existing toilet rooms are of such a size and configuration that compllance would reduce a toilet room u7ith 4 fixtures to a room with Two fixtures or Lix women toilet roflms, one fixture. T'he remncielir,a xuni,irl ;)Io� privacv issue inside the Toilet rooms. (S) accessible toilet rooms dispersed t accessibility. Here are the responses that I was assi Accessibil'ty Review* AccessibilityReview: The accessible There are many wars that haeme Wp are adding fjive hro. ghout the building to address the need dor ed forthe Romney Building Remodel. DC'S 1?Dt Y�'deE� t1-7erP-"uirP7,"1.-)Ttv .��tL,., ,-.�,.,7„ LQCd'fP_!1 IYl t1?O F1�i')r7irrxn.�.-.I-..,,. �1.,,..-----�- - - -- - - - .: � r �� �•T`►•�ct-.s of 6ILG L' U, The sink as ----�ur.1 cG�. L.Geur�unce rec�utretx in A1VS1.�117, 1, Section 604.3. 1. The architect has mailed a response as of April 22, 2005. 'Vrxke Provisionsfor accessible toilet room on the second floor. In the Romney Building, the exisirng toilet rooms in the west wing were constructed to the code of the day. At the time of construction, these provided the accessible toilets for the building. The toilet rooms in the east part of the building are of a size and configuration that if they were to be accessible, they would be one or two fixture rooms. Modification of the existing tol*letrooms is technically infeasible. If you have any quest -ions, please calf me. Respectfully, CC: Lloyd Benson Charley Andersen ■ 1 X11 U�. James Smyth Barry Becker, FFKR Arch.itects Randy Hayes, JHS Architects June 29,2005 Mr. Barry Becker FFKR ARCHITECTS 730 Pacific Avenue Salt Lake City, UT 84104 .RE: BYU-IDAHO ROMNEY BUILDING FIRE SPRINKLER PROTECTION SYSTEM MODIFICATION wm� The existing observatory area is not protected by the existing fire protection system and the new plans do not show sprinklers extending into this area. It is our understanding that the fire authority is requiring that 'L;y this area be protected. The following describes the requirements for protecting this area. Please instruct the contractor to extend an anti -freeze SYACM to, protect the observatory area., including the observatory space and adjacent water treatment and/or storage rooms. The stairway g sta ant'1-freeze loop is to be installed per �+IFPA 1.3 requirements. We suggest that the existing y leading to the observatory and roof (near gads L.5 and 4.5) as a possible location for the anti' -freeze loop valves and fill station. A W proposed Iayaut is requested for review prior to insta lat'lon., Please call if there are any questions. Sincerely yours, REATH ENGINEERING COMPANY Robert J. Kesler, P.E. RJ K/rk J:\WorkVobs\38:08\VV-P\CorrespondenceTire Sp ' rinkler ModI'fication 29 Jun Mr. Lloyd Benson BYU-Idaho Rexburg, Idaho 83440 Dear Lloyd, 6 June 2005 While doing an inspection at the -Romney B j1ding lash week I noticed the railings on the second Boor of the, main entrance only had an intermediate horizontal raifing. While this may have been according to cede at the time the building was built and the stairs are not bein, 9 rem+�d� aft � this time I tho!jnh.t it would be advisable to inform you that there is a safety risk of falling through the railings to the floor/stairs below for little children who might be visiting the bu'llding. Some kind of woad, metal or plastic cold be installed easily and at minimal post to alleviate the situation. There is no requirement in the cede to make this change but. as � 9 �afety precaution something should be done to remove the situation. Thanks for your Seip and consideration. If I can be of any assistance please feed free to call me. Jon Bern Building Inspecto r BRIG-HAXI YOUNG U N I V E R S I T Y Apri113 , 2 0 0 5 City (3f Rexburg Val Christensen, Building Official Chris Huskinson, Fire Marshall PCS Box 28Q Rexburg, ID 83440 Subject: Romney Building Planetarium Gentlemen, We reviewed the planetarlum last weep for access and structure. We feel that the best solution to the entire issue is to install sprinklers in the attic spice and also in the dome. have reviewed the options and the longi term considerations and feed that the best approach is the long term approach. Room 172, a fired seating lecture hall, is scheduled to have the ceiling replaced as we I 1l16Lau Ln.e new rise ;sprinkler. I wanted to let you know that the sloped floor dies not meet current code requirements. I am assuming that since vve ars not doing other work in the lecture hall that the sloped floor w;1l trtnt havrx to hP ,a;f;o.a I I I kJ . U. If you have any questions on this matter, please calf me. Respee ..r:Rvoti q�w.a.9 GLH I`lsa...._ Rulon Manager, Planning and Constructilorl Cc: Lloyd Benson Charles Andersen dent Naylor., Akland Construction Barry Becker, FFKR Architects Rulotz Nielsell Manager, Focility planl7ing a"d Construction 450 S. Physical Plant Way Rexburg, ID 83460-8205 Phone; (208) 496-1.138 Fax (208) 496-2490 ` nay : ie s r r � � Page I of I Cathy WA From: Taylor, Mary [taylorM@byui.eduj Sent: Tuesday, May 17, 2005 11:56 AM To: Cathy Winters Subject: Romney Building 7/5/2005 Date: 04/26/05 To: Fire Department Co: City of Rexburg Phone: Fax-, 19 East Main Rexburg, Id. 83440 Brad Johnson 1-208-359-3020 1-208-359-3024 irk TRANSMITTAL SHEET Project: Romney Building Remodel BYU - ID Location.L Rexburg, Ind. Copies 2 2 1 1 Section 16721 16721 For Approval Fair Four Use As Requested Remarks: Description From Connie Ricks Co:Arco Electric P.O. Box 50429 Phone: Fax: 625 West 25TH. Street Idaho Falls, Id. 83405 1-208-522-2185 1-208-529-3423 Enciosed: Plans QefiVered by. Qur Truck sire Alarm Insfallation Drawings Fire Alarm equipment submittals�_ Letier yr intent from Electrical Gvntractor Letter of intent from Fire Alam Suqolier Please check and return one set with your Letters of intent were previously faxed. Thank You , Approved as Submitted Approved as plated returned for Correction Specs UPS approval and 1 or any comments. Mail - --"q =r4a d T April 26, 2005 To.- BYU-IDAHO Re: BYU-IDAHO ROMNEY SCIENCE BUILDING Arca Electric is providing the installation of dire alarm sysiem equipment and will submit dxawings to the City of Rexburg fire inspector Chris Huskinson foirann-rovA arca Electric, Inc,, 0: 41 Ne 1 son Fire Nelson Systems _ --�vYl ■ a s.�vR. All? 1. rcumENTS 0 GAMEWELL • RADIp?WiCS April 25, 2005 To: Amoco electric Re: BY -U - Idaho Romney ,4al Lauth Major Street Salt Lake, City, Ut;ah 84115 (801) 468-8300 FARC (SDI) 468-5305 Science Building Nelson Fire Systems is through Arco Electric Rexburg f �.re inspector Steve Child Nelson Fire systems providing fire and will submit Chris Huskinsor, alarm system eq-�.i,�pm��t drawings to the pity of dor abproval. 4M 1