HomeMy WebLinkAboutLETTERS - 05-00006 - BYUI Romney Building - Addition<Ork-z -: -: wA*
P609BOX
�
3
Rexburg, D 83440
208wP757m9172
^
BYU Idaho. George��� S■ R .eyu■�,■� in -
ecia
. @. 1 Inspection .
s
1. Reinforcing Steel
2. Reinforced Concrete
3. High Strength Bolts
4■ Anchor Bolts
5P, Epoxy A Bolts & Dowels
6. Structural Steel & Welding
_ 49b
r■ l r i! 4'T e e i 1 ®Tei 7 e l l i y T e l el e�* i e F e e i i � r e 4 7 e r l e 4 T■ e T e e i e
'fe T7er �•eefeae.i+f�ki Ila *.� a'eefeesM i■e■i{tST■evil !efee +}�e eT i eLY 0 Tl l7Ee 1•}bqT■rife}Tlrq■iih'Ti rel ie rirf T'�eiit Te!llFr:l RT7!reFiiTei LiJ rl1:■rree3i T!eFeei 1e Teel iY4Tee+eel14 eeleeR-EeT eeifef Yee
PaOs Box .143
RexburIgs, ID
208.-4/6/05
,"13-1866
Christensen
Building Official
City of Rexburg
12 North Center
Rexburg, ID 8344D
RE: BYU Idaho Special Inspections 2005 Projects
Dear Val,
Attached are copies of the required special morons that T2M Consulting,will be performing
Idaho's 2005 projects. If you have any questions please contact me at 208-757-9172. Thank you.
Sincerely.,
Bret L. McCowan
TZM Consulting
REXB UR G - MADISON COUNTY
EM -ER GENCY SER VICES
2 6 NORTH CENT- ER STREET
REXBURG, IDA H -O 83440
208-w35.9-3010
Nelson Fire Systems
1481 South Major Street
Salt Lake City, Utah 84115
Dear Nelson Fire Systems,
May 12, 2005
4n the above date I have reviewed the dire warm, plans for the BYU1 Romney and
Clarke Buildings located in Rexburg.,. Idaho with David Burns of your company. Both
sets of plan have been approved with minor changes as noted on the drawings.
If you have any questions please feel. free to contact me.
Sihcerelv
Chris Huskinson
Fire Inspector
208-705-1312 (cell)
BRIGHAM YOUNG
UI�TIVFRSITY
IDAHO
April 22, 2045
Val Christensen
Building Offici.al
City of Rexburg
PO Box 2S4
Rexburg, ID 83440
Subject,* Review Comments for the Clarke and Romney
Dear Val,
Here are the res-ponses to review comments that T we9s-. .rric�;
4
addition and remodel.
Accessibility
Revi-ewe
Provide wheel chair spaces at fixed seating classrooms.
In this remodel there will be no fixed seating -
P
rovide acc=essible kitchens.
ned for the Clarke BuIldin
In This remodel we are not modifying the Home Making kitchens. If at future date a
student requires accommodation, we will make appropriate modifications to the units.
Asper Chapter 34, the toilet rooms should he made accessihle unless "technically
infeasible",
In the Clarke Building, the existing toilet rooms are of such a size and configuration
that compllance would reduce a toilet room u7ith 4 fixtures to a room with Two fixtures or
Lix women toilet roflms, one fixture. T'he remncielir,a xuni,irl ;)Io�
privacv issue inside the Toilet rooms.
(S) accessible toilet rooms dispersed t
accessibility.
Here are the responses that I was assi
Accessibil'ty Review*
AccessibilityReview:
The accessible
There are many wars that haeme Wp are adding fjive
hro. ghout the building to address the need dor
ed forthe Romney Building Remodel.
DC'S 1?Dt Y�'deE� t1-7erP-"uirP7,"1.-)Ttv .��tL,., ,-.�,.,7„
LQCd'fP_!1 IYl t1?O F1�i')r7irrxn.�.-.I-..,,. �1.,,..-----�- - - -- - - - .: � r �� �•T`►•�ct-.s of 6ILG L' U,
The sink as
----�ur.1 cG�. L.Geur�unce rec�utretx in A1VS1.�117, 1, Section 604.3. 1.
The architect has mailed a response as of April 22, 2005.
'Vrxke Provisionsfor accessible toilet room on the second floor.
In the Romney Building, the exisirng toilet rooms in the west wing were constructed
to the code of the day. At the time of construction, these provided the accessible toilets
for the building. The toilet rooms in the east part of the building are of a size and
configuration that if they were to be accessible, they would be one or two fixture rooms.
Modification of the existing tol*letrooms is technically infeasible.
If you have any quest -ions, please calf me.
Respectfully,
CC: Lloyd Benson
Charley Andersen
■
1 X11 U�.
James Smyth
Barry Becker, FFKR Arch.itects
Randy Hayes, JHS Architects
June 29,2005
Mr. Barry Becker
FFKR ARCHITECTS
730 Pacific Avenue
Salt Lake City, UT 84104
.RE: BYU-IDAHO ROMNEY BUILDING
FIRE SPRINKLER PROTECTION SYSTEM MODIFICATION
wm�
The existing observatory area is not protected by the existing fire protection system and the new plans do
not show sprinklers extending into this area. It is our understanding that the fire authority is requiring that
'L;y
this area be protected. The following describes the requirements for protecting this area.
Please instruct the contractor to extend an anti -freeze SYACM to, protect the observatory area., including the
observatory space and adjacent water treatment and/or storage rooms. The stairway g sta ant'1-freeze loop is to be
installed per �+IFPA 1.3 requirements. We suggest that the existing y leading to the observatory and
roof (near gads L.5 and 4.5) as a possible location for the anti' -freeze loop valves and fill station. A
W
proposed Iayaut is requested for review prior to insta lat'lon.,
Please call if there are any questions.
Sincerely yours,
REATH ENGINEERING COMPANY
Robert J. Kesler, P.E.
RJ K/rk
J:\WorkVobs\38:08\VV-P\CorrespondenceTire Sp '
rinkler ModI'fication 29 Jun
Mr. Lloyd Benson
BYU-Idaho
Rexburg, Idaho 83440
Dear Lloyd,
6 June 2005
While doing an inspection at the -Romney B j1ding lash week I noticed the railings on the
second Boor of the, main entrance only had an intermediate horizontal raifing. While this may
have been according to cede at the time the building was built and the stairs are not bein,
9
rem+�d� aft � this time I tho!jnh.t it would be advisable to inform you that there is a safety risk of
falling through the railings to the floor/stairs below for little children who might be visiting the
bu'llding. Some kind of woad, metal or plastic cold be installed easily and at minimal post to
alleviate the situation. There is no requirement in the cede to make this change but. as �
9 �afety
precaution something should be done to remove the situation. Thanks for your Seip and
consideration. If I can be of any assistance please feed free to call me.
Jon Bern
Building Inspecto
r
BRIG-HAXI YOUNG
U N I V E R S I T Y
Apri113 , 2 0 0 5
City (3f Rexburg
Val Christensen, Building Official
Chris Huskinson, Fire Marshall
PCS Box 28Q
Rexburg, ID 83440
Subject: Romney Building Planetarium
Gentlemen,
We reviewed the planetarlum last weep for access and structure. We feel that the best
solution to the entire issue is to install sprinklers in the attic spice and also in the dome.
have reviewed the options and the longi term considerations and feed that the best
approach is the long term approach.
Room 172, a fired seating lecture hall, is scheduled to have the ceiling replaced as we
I
1l16Lau Ln.e new rise ;sprinkler. I wanted to let you know that the sloped floor dies not
meet current code requirements. I am assuming that since vve ars not doing other work in
the lecture hall that the sloped floor w;1l trtnt havrx to hP ,a;f;o.a
I I I kJ . U.
If you have any questions on this matter, please calf me.
Respee
..r:Rvoti q�w.a.9 GLH I`lsa...._
Rulon
Manager,
Planning and Constructilorl
Cc: Lloyd Benson
Charles Andersen
dent Naylor., Akland Construction
Barry Becker, FFKR Architects
Rulotz Nielsell Manager, Focility planl7ing a"d Construction 450 S. Physical Plant Way Rexburg, ID 83460-8205
Phone; (208) 496-1.138 Fax (208) 496-2490 ` nay : ie s r r
� � Page I of I
Cathy WA
From: Taylor, Mary [taylorM@byui.eduj
Sent: Tuesday, May 17, 2005 11:56 AM
To: Cathy Winters
Subject: Romney Building
7/5/2005
Date: 04/26/05
To: Fire Department
Co: City of Rexburg
Phone:
Fax-,
19 East Main
Rexburg, Id. 83440
Brad Johnson
1-208-359-3020
1-208-359-3024
irk
TRANSMITTAL SHEET
Project: Romney Building Remodel
BYU - ID
Location.L Rexburg, Ind.
Copies
2
2
1
1
Section
16721
16721
For Approval
Fair Four Use
As Requested
Remarks:
Description
From
Connie Ricks
Co:Arco Electric
P.O. Box 50429
Phone:
Fax:
625 West 25TH. Street
Idaho Falls, Id. 83405
1-208-522-2185
1-208-529-3423
Enciosed:
Plans
QefiVered by.
Qur Truck
sire Alarm Insfallation Drawings
Fire Alarm equipment submittals�_
Letier yr intent from Electrical Gvntractor
Letter of intent from Fire Alam Suqolier
Please check and return one set with your
Letters of intent were previously faxed.
Thank You
,
Approved as Submitted
Approved as plated
returned for Correction
Specs
UPS
approval and 1 or any comments.
Mail
- --"q
=r4a d T
April 26, 2005
To.- BYU-IDAHO
Re: BYU-IDAHO ROMNEY SCIENCE BUILDING
Arca Electric is providing the installation of dire alarm sysiem equipment and will submit
dxawings to the City of Rexburg fire inspector Chris Huskinson foirann-rovA
arca Electric, Inc,,
0: 41
Ne 1 son
Fire
Nelson
Systems
_ --�vYl ■ a s.�vR. All? 1. rcumENTS 0 GAMEWELL • RADIp?WiCS
April 25, 2005
To: Amoco electric
Re: BY -U - Idaho Romney
,4al Lauth Major Street
Salt Lake, City, Ut;ah 84115
(801) 468-8300
FARC (SDI) 468-5305
Science Building
Nelson Fire Systems is
through Arco Electric
Rexburg f �.re inspector
Steve
Child
Nelson Fire systems
providing fire
and will submit
Chris Huskinsor,
alarm system eq-�.i,�pm��t
drawings to the pity of
dor abproval.
4M 1