HomeMy WebLinkAboutMULT DOCS (2) - 05-00006 - BYUI Romney Building - AdditionL
i
j�
Fe
L
1 F
tf
0
C,
i
t-4
I
1
9
0
co
W4
00
0
U
FIRE WRAP THROUGH W
ALL DETAIL
SGALE: NONE
zlogve Building
730 Pacifiic Avenue
Salt Lake City
Utah 84104
801.S2T_6f 8fr tef
80T.539.1 915 fax
ROMNEY BUILDING
BYU-IDAHO
-505
MSD -003
i
L
i
j�
Fe
L
1 F
tf
0
C,
i
t-4
I
1
9
0
co
W4
00
0
U
FIRE WRAP THROUGH W
ALL DETAIL
SGALE: NONE
zlogve Building
730 Pacifiic Avenue
Salt Lake City
Utah 84104
801.S2T_6f 8fr tef
80T.539.1 915 fax
ROMNEY BUILDING
BYU-IDAHO
-505
MSD -003
f..
BLDG
WALL
6A5: UNDILUTED PROPANE
DEVELOPED LEN6TH = 330'
INLET PRESSURE = 11.0 INCH WG
TOTAL BTUH = 603,000
TOTAL GSH - 603
PIPE SIZE = 2"
(BASED ON TABLE 402A.2005 JF6G)
J• � �� L ifs �- r �4
F---� SERVES 6
6A5 TURRETS
@ 3000 E3TUH EA.
/+- )::2 .. 11'
= 18,000 BTUH
1,5 GFH
SERVES 5Q
6A5 TURRETS
@ 3000 BTUH EA.
= I77,000 L3TUH
= Ill GFH
GAS FLOW DIAGRAM
SCALE: NONE
NEN I V4 11
SERVES 84
6A5 TURRETS
@ 3000 f3TUH EA.
= 252,000 BTUH
= 252 GFH
X
OKLAND CONSTRUCTION COMPANY, INC.
B0
Y 1� 1 1 � 1 I' i 1 1g Remodel
MEETING AGENDA
Meeting:
Job #;
Meet'Ing Location:
Weekly OAC Meeting 9 Date: 06-30-05
678
Okland office - Romney Sciences Building
2 Denotes Attendance d6-30-05
List
Lloyd Benson
Brett Laird
Barry Q. Becker
Mark Wilson
Mike Bryant
Mike Shr
Kent Naylor
Doug Robins
Jon Bern'
SCD Review
Com
BYU-1daho
BYU-1daho
FFK
FFKR
.bora Ci
qnv M
benson1 ui.
LI1 b -1ou
Schedule Status and Percent Complete;
Level 1.
bbeckerra Mr.com
Mwi1sonQffkr.com
rncLQ.ok1and,com
1. c o r
knayloraokland.com
do u 9 &2t1 d. com
Lonb rexbum.ora
MN 09
Time: 1:00 pm.
o Ceiling grid will be finished next week
• Level 2.
o Classroom platforms starting next week
o Cabinet installatians in PrOgress — Countertops rt next Saturday
Phone
08-496-2460
208-351
801-910-5319
801-5216186
RFI Status
Fi#2- Corricior 1 B and2A Light Fixture it — Lloyd
Waiting for response from Payne Engineering.
F1#2 — Owner Provided Amplifier
Okiand Construction, I978 South
West Temple, UT 84115 (801)486-0144 FAX (801) 486-7570
11
New, Active and Old Items (Cur'r'ent as of 6130)
QLD ITEMS
IItem# I ActionBy Priori
Noes; i
Status
8.1FFKRIBYU-4 Routine
On his 6/1/05 observation report Leon Tanner listed several exterior
DPen
brick veneer concerns that he had. What is to be done about this
dist?
B1ifU-I will look into this and decide what action they would
like taken,
8.2 BYU-UFFKR FFRoutine
Tech. Room 280 has data cables entering the room from the ceiling
Open
and exiling the room through the floor directly in front of the
double doors. These cables service the newer side of the building
and are currently in use; furthermore, there is no mention of these
cables in the contract documents. What is to be done with them?
Bll'U-1 will continue to work with their IT department and
provide direction,
8.3 13YU-1 Routine
There was a data location in the Corridor 1-15 display case and
Closed
above the ceiling in Corridor 2-A. We believe that the one in the
display case serviced the Weather Station and Seismograph, and
the one in Corridor 2-A was for the wireless router. There is no
direction on the plans to re-pull cables to hese locations. is this
correct?
BYU-I world like to have cables re -pulled to these locations.
8.4 gYU-I/FF R Routine
PR#2 requested a 24" cable tray, after looking at this with System
Closed
Tech we recommend installing a 12 inch cable tray..
Lloyd gave direction to change to 12" cable tray.
8.5 BYu-I Routine
Are there assembly instructions for the fume hoods and cabinets?
Closed
The instructions are with the fume hods.
8.6 FFKR18YU-1 Routine
Is the nate for tile in the AQP► Rist Room 136 to patch the existing
Closed
the or completely replace the tile A?
Patch the existing file — the west wall will receive new dile the other
wails with be patched.
8.7 BYIJ-I Urgent
What texture is desired on the walls in Rooms 150 and 152?
Closed
Mate tete texture found on the adjacent walls.,
'
8.8 FFKR1BYU-I Routine
Per the 6-15-05 conversation with Barry Becker Storage Raarn 216
Closed
will receive a hard lid.
This will be done at no additional cost.
Acknowledged, b Lto d Benson and Jim Lewis.
7.7 FFKR Expedite
Wvr selection for wood doors,
Closed
Red yak —iasis OA02 selected.
Oklland Construction 1978 South West Tempe, UT 8 115 (801)486-0144 FAX (841) 486-757 }
di
OD. 2
kol
7,2 FFKR
Routine Note 61 on sheet A-403.1 calls dor contiguous plug mold on the 3`d
Closed
rise of the platforms in Rooms 277, 2*9, 297, and 299; some
clarification is needed on what is desired.
The ping mold is to be installed along seating area only. No plug
mold at walk—way.
7.3 BYU-I
Routine Arco Electric will need access to the offices and classrooms in the
Closed
new side of the building to install the new fire alarm system.
BYU-I will provide schedules for the classrooms and Arco will
coordinate the installation of the system in a manner that minimizes
disruptions to the classes. New devices installed on masonry walls
will be surface mounted.
7.4 BYU-I
Expedite We need the packing list for the fume hoods that were discussed in
Closed
the 6-3-05 entail from Dave Glaesel and Mike Thuesan.
BYU-i will provide the packin2 list.
7.5 1 BYU-I
Routine I Status on parking permits.
Closed
Okland can use the fenced area in the harking lot south of the
Snow building anti} utility excavation begins. Lloyd to provide
advanced notice of when this work will start.
7.6. FFKR
Routine Please confirm that the boards shown on C11A-403.1 are 4'x6' cholic
Closed
boards to be provided by Oktand.
Confirmed.,
7.7 BYU-I
Routine Status on custodian's computers.
Closed
BYU-I will provide an invoice for the equipment to Akland.
7.8 FFKR
Routine The following 4 plumbing risers are not sown an the plumbing
Closed
sheets to be rerouted but must be rerouted.
-Roof dram south east of grid Fi-1
-Veit south of grid 0-11
-Vent north east of grid S-3
-Vent north of grid E-3
Okland to issue RFI.
6-15-05 Qkiand to issue RCO_
7.9 13YU-I
Routine There were 2 platforms that had to be removed to facilitate
Closed
asbestos abatement in Room 172. Do these platforms need to be
replaced?
Yes.
7,10 FFKRIBYu-I
Routine Do the beams in Rooms 176,177, and 179 need to be fireprao#ed.
Closed
Bary expressed the opinion that these beams do not need to be
fireproofed.
Jon will investigate and give direction regarding the requirements of
the city.
6-10-05 Jan reported that fireproofing is not required because the
building is fire sprinkled.
7.11 FFKR
Expedite The aid sink in Roam 179 did not have a vent; there is no provision
Closed.
for installing a vent for the new sink.
Okland to investigate and issue an RFI.
The plumbing subcontractor is working with the inspector to
determine if we can tie into the existing vent in the walk between
Rooms 79 and 177.
7F"12 NYU -1
-1
Routine Will there be additional IT work added to the contract?
Closed
Lloyd will investigate and give direction.
IT contractor to follow division 17 in the specifications.
x.13 gYIJ-I
expedite ASI has expressed concern about the specified wail texture.
Closed
BYU-1 has made selections concerning the color and texture of the
wails. Lloyd will follow up and return the information to (]kland
7.14 FFKRlBYU-1
Routine Ceramic fife color selection.
Closed
American Olean — 46 Buckwheat selected. fi"xfi" file will be ordered
and cut to 6"x4" then installed with the radius edge up where
passible.
46 buckwheat is no longer manufactured.
Lloyd selected United States Ceramic Tile Company calarN-883
Flaxseed_
7.15 FFKRIBYl1-
Routine The next OAC meeting will be held on 6116/05; meetings wil! be
Closed
114kiand
held biweekly thereafter.
KIli Okland Construction, 1978 South 'West Temple, UT 84115 (801)486-0144 FAX (801) 4$6-7570
PCO Status
'hese meeting notes h Nre been provided as a courtesy to the participants., and are considered part of the official project record. If errors or
inconsistencies are discovered r n r r rifcations to the notes are needed b�? any party tt n ik the meeting, tease should b -
mled to Ok-land Construction,,° 1 I£tt/: i E1t2 (! ():1 n.com'th. 4 hot,rs fr ce' j it' . If no changesr received
within this -hour period, the initial dry shall be considered as accepted by the participants.
The next O/A/C meeting is scheduled for (07-tepi 1*000pm MDT) in the Okland Office.,
Iq
C]kland Construction, 1978 South West 'T'emple, UT 84115 (801)486-0144 FAX (801) 486-7570
4
PCO #
2
3
PR#1
PR#2
PR#3
Description
Asbestos Abatement
Miscellaneous Electn4cal Items --Send to Todd Payne
Additional Fluorin 1 Asbestos Abatement
Closer..'
Pending
Closed
Approval
Status
Cost
In contract
$2,65D.00
In contract
$(21500.00)
4 RR#4
Revise Apt Rail C0#1
5
PR#5
Stam 2H Ceiling — Ci Plan Review
C0#1
$31598.00
6
PR#B
Planetarium Fire Protection — City Plan Review —Send to
Heath Engineering.
C0#1
$2,168.00
i
PR#7
Mechanical Changes — City Plan Review —Send to Heath
Emineering.
C0#1
$19,254.00
S
PR#8
Floor Sink for StockRvom ice Machine —Send fo Heath
En ineenn .
CO#1
$2,274
9
PR#9
Resource Room 152 Ceiling —Send to Tadd Payne
C0#1
$(592:00)
10
RFI #5
fume Hood Monitor Installation
C0#1
$1,520.00
11
PFt#1 fl
Door Number 150 Clarification
G0#1
$327.00
12
PR#1'!
his laY Case Windows in Room 156
C0#1
$1 ,053.00
13113.1
PR#12
office Coat Hooks
G0#1
$11363-00/
$840.00
14
PR#'[ 3
Demolish "zee" Wall and Display Case at Room 297
C0#1$3131.00
15
PR#14
Firs Sprinkler Protection Claifficatian
Approved
$4,645400
16 RFI#16
1hJa11 Width Chane
C0#1
$249.00
$4;776-00
17 PR#15
ModiN Existing Duct Work at Rooms 126A & 128 Pending Approval
18
PR#1 fi
Demolish Wall Between Roams 128 & 126A
Approved
$1,926.00
19 RFI #18
Relocate Plumbing Supply
20 RFl#14
Ductwork Conflicts
_-Open
Pending
A
ro►►al
$52255.00
21 RF!#20
L2 Fire Sprinkler Conflicts
Pending
Approval
$5,076.00
22 RFi#22
P-1 C Sink
Pending
Approval
$350.00
23
Additional Electric[ Work
G0#1
$3173TOO
24
PR#1 7
Abate and Fireproof Beams at L2 and Roof
Pending
Approval
$13,534.00
$(1 16. 0
$3,590.0U
25 PR#18
Room 150 & 152 door changes Pending Approval
26PR#1 9
Addit�onai wood display cases Pending Approval
27
PR#20
Room 172 Abatement and Fumishin s
Pending
Approval
$3,397.a0
28
PR#21
Toilet & Bath Aocessor}es
Oen
2J
PR#22
Additional L'� Data Goblin
Pendia
A
roual
$28,285.0D
30
RFi#25
Plumbing,Riser
Relocation
Pending
Approval
$3,304.0Q
'hese meeting notes h Nre been provided as a courtesy to the participants., and are considered part of the official project record. If errors or
inconsistencies are discovered r n r r rifcations to the notes are needed b�? any party tt n ik the meeting, tease should b -
mled to Ok-land Construction,,° 1 I£tt/: i E1t2 (! ():1 n.com'th. 4 hot,rs fr ce' j it' . If no changesr received
within this -hour period, the initial dry shall be considered as accepted by the participants.
The next O/A/C meeting is scheduled for (07-tepi 1*000pm MDT) in the Okland Office.,
Iq
C]kland Construction, 1978 South West 'T'emple, UT 84115 (801)486-0144 FAX (801) 486-7570
4
0
OKLAND CONSTRUCTION COMPANY, INC.
BYU IRoim-neyBUilding -Remodel
MEETING AGENDA
MN 07
Meeting: Weekly OAC Meeting Date: 06-09-05 Time: 7:00 pm.
Job #: 678
Meeting Location: Okland office -- Romney Sciences Building
Denotes Attendance 06-09-05
PCO Review
Schedule Status and Percept Complete;
• The Ramp an past side of building. and funnel excavation should start mid next week,
• SOFP on L1 and L2 beams will start today.
• Level 1.
o Walls ready to start drywall.
o Ceiling grid in progress,
0 Level 2.
o Drywall an south half starting
o Paint on the north end should stark mid next week.
% Complete Lewis Bingham Arco ASI 3-Q ASI Sys Tech
RI RI RI D/W lu Grid L141
Last Week6/2127% 15% 25% -_. 2% 30%
LThis Week 40% 8fli% 65°Ip 1 Cj% 5Q%fl St�€'ked Started
Akland Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX (801) 486-7570
i
List Company
Email
Phone
Lloyd d Benson BY U -1d a ho
ben l ul . edu
208-4 96-2460
Brett Laird BYU-Idaho
1 i 1002 i,
208-351-4-919
Barry,Q. Becker FFKR
b b -kr ffkr.com
801-910-531
Mark Wilson FFK
it nfir.
801-5216186
Mike Bryant Okland
mcbgokland.com
801-842-3359
Mike Shatzer Okland
mgs@okland.com208!521-9963
Kent Naylor Okland
Doug Robins OklanddouggOklandcom
Jon Berry_F r
knaylorpoklandcom
jonbErexbuLg.
801-486-0144
801-486-0144
PCO Review
Schedule Status and Percept Complete;
• The Ramp an past side of building. and funnel excavation should start mid next week,
• SOFP on L1 and L2 beams will start today.
• Level 1.
o Walls ready to start drywall.
o Ceiling grid in progress,
0 Level 2.
o Drywall an south half starting
o Paint on the north end should stark mid next week.
% Complete Lewis Bingham Arco ASI 3-Q ASI Sys Tech
RI RI RI D/W lu Grid L141
Last Week6/2127% 15% 25% -_. 2% 30%
LThis Week 40% 8fli% 65°Ip 1 Cj% 5Q%fl St�€'ked Started
Akland Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX (801) 486-7570
i
RF{ Status
RFI #15 — Level 1Data Widng: Answer. —Payne Engineering to develop drawings, PR to follow Closed. 612105 — PR
Pending
Now, Active and Old Items {Current as of 5118)
Okland construction, 1978 South West Tempe, UT 84115 (801)486-0144 FAX (801) 486-7570
'� 2
NEW ITEMS
OLD ITEMS
Bern#
Action By
Pr�ari
Notes: status
7.1
FFKR
Expeame
color selection for wood doors.
7.2
FFKR
Routine
Note 51 on sheet A-403.1 calfs for contiguous plug mold on the 3"d
X79, Z9?, and 299; the only mention of handrails that can be found
rise of the platforms in Roams 277, 279, 297. and X99; some
clarification is needed on what is desired.
7.3
BYU-i
Routine
Arm electric will geed access to the offices and classrooms in the
Jon Berry indicated that a handrail will not be required by the city
new side of the buildin to instal{ the new firs alarm system.
7.4
BYU-!
ExpediteVile
need the packing list that is discussed in the 6-3-05 email from
separate levels and not a series of stairs.
]ave Gfaesel and Mike Thueson.
7.5
BYU-4
Routine
Status on parkinrrnits..
7.6
FFKR
Routine
Please confirm that the boards shown on Cl/A-40-3.1 ars 6'x4' chalk
future handrail.
boards to be provided by aktand.
7.T
BYU-I
Routine
Status on custodians computers.
7.8
FFKR
Routine
The foElorrving 4 plumbing risers are not shown on the plumbing
6.2
FFKR
Rome
sheets to be rerouted but must be.
dosed
-Roof drain south past of grid H-17
between gridlines E and H. How is the exposed section of this
-Vent south of grid d-1 1
beam to be finished?
-Vent north east of grid S-3
Wrap the beam keepipg_as dose to the beam as possible.
-Vent north of grid E-3
7.9
BYU-I
Routine
There were 2 platforms that had to be removed to facilitate
asbestos abatement in Room 172.. Do (hese platforms need to be
re laced?
7.10
FFKRJBYU-I
Routine
Do ' the beams �n dooms 176, 77, and 179 need to be fireproofed.
7,11
FFKR
Expedite
The odd sink in Roam 179 did not have a vent; here is no provision
display rase in room 156
for installing a Herat for the new sink.
7.12
13YU-1
Approved _
Routine
Will
there
be additional
IT work added
to the contract?
Okland construction, 1978 South West Tempe, UT 84115 (801)486-0144 FAX (801) 486-7570
'� 2
OLD ITEMS
Item
Action B
Priori
Nates:
status
5.I
FFKRfBYU-I
Routine
Sheer A-102,. A--403, and A-403.1 show handrails in Rcaoms 277
Closed
X79, Z9?, and 299; the only mention of handrails that can be found
in the Specification is for steel handrails on the roof.
Jon Berry indicated that a handrail will not be required by the city
because the rise and run of the platforms will be considered as
separate levels and not a series of stairs.
Lloyd directed that no handrail would be installed only backing for a
future handrail.
fi" handrail backing is to be installed at 36' above the nose of each
platform.
6.2
FFKR
Rome
The beam on gridline 3 "df be exposed in rooms 279 and 277
dosed
between gridlines E and H. How is the exposed section of this
beam to be finished?
Wrap the beam keepipg_as dose to the beam as possible.
Closed
6.3
BYU-1
Routine
Okland needs the toilet accessories indicated on Sheet A-404 by the
end of July.
Akland is to furnish the rob -bars and mirror. FFKR will issue a PR.
6.4
FFKR
Urgent
What is the status on the approrrai for the cabinet detail under the
Closed
display rase in room 156
Approved _
Epxresin submittals also approved. The approvals have been
Okland construction, 1978 South West Tempe, UT 84115 (801)486-0144 FAX (801) 486-7570
'� 2
sent to the office.
6,5 FFKRI'BY'U-1 Routine The electrical sheets indicate that the conduit on the first floor is to Closed
be reused. The existing conduit was not up to carie and the
electrical inspector required Arco to rework much of the conduit.
Arco has requested a change order for the additional work.
Okland will issue a PCO for the additional work.
6.6
FFKR Routine H.M. doors in moms 150 & 152 are to be charged to wood. FFKR Closed
will issue PR.
5.1
FFKR Expedite Mechanical Submittals dated 5/6j45 contained an RFI from Lewis Closed
Mecharticai regarding MAW and VAVR Reheat fails. The answer
could not be found in the response to the submittals dated S/17105.
Lewis Mechanical to talk directly with Heath Engineering.
5.2
FFKRIB`fU-i Normal Need specific locations of Fume Hood Monitors. Closed
Center side-to-side 6"above the bottom of the lintel. Subject to
field verification and a rvval.
5.3
FFKRIBYU-1 Urgent Additional steel beam found'in roam 172. This beam is dire proofed
Closed
like the beam upstairs the fire proofing is suspected of being
asbestos containing. Lloyd has given the direction to abate this
beam. Written direction is needed.
Concerns of water damage to floor and chairs and potentially
required ADA com liance.
5.4
BYU-1 Normal BYU-Idaho has request that we control the cooling during the
Closed
summer in the new half of the building. Lewis, Johnson Controls,
and Argo ars currently determining the best way to accomplish this..
6YU-T needs a couple of days advanced notice dor shutdown.
5.5
FFKRIBYi3-1 Normal As discussed with Barry the ceiling in Tech. Room 280 has been
Closed
removed. Will a new ceiling be required?
No, per,U9yd.
5.6
FFKR Normal The second floor sprinkJer vale has corroded and will not
Closed
completely shutoff. We have directed 3-D Fire Proton to replace
the vale.
Owner concurs -- Pit} to follow.
5.7
BYU-I Expedite Arco EEecWc needs rough in boxes forclocks.
Closed
BYU-I will work on this-
6-2-05 _ Clkland has directed Arco to purchase the rough in boxes
per direction given by 6YU-f and Payne Engineering,,
5.8
8YU-I Semi- Arca needs location on outlets in Tech. Rooms.
Closed
Expedite Arco needs amperage and location of outlets in Room 213_ (Note 9
Sheet E-203)
BYU-t will determine,
6-2-05 - SYU-t Identified locations of outlets in LZ Tech. Room.
Arco is to bring conduit to Roam 213 and wait to install outlets unfit
further direction is given by, BYU-i.
Closed
5.9
FFKR Normal What is the rating on the lid in the triangle chase next to the
Planetarium?
1-hour fire rating.
5.10
FFKR Normal The wall between 127 and Go.rridor 1 B is not fire rated and does not
Closed
extend is the ceiling; however, the new wall is to be fire raked. How
do we proceed?
Pease seg A-'I D'# note 6.
5.11
FFKR Normal Sink in cabinet in Storage Room 133 is identified as stainless steel;
Closed
the countertop is epoxy resin. Is this correct-
orrect_Chan
Change
e sink to eeoxy
5.12
BYU-I Normal 1lVe need more area for supplies and lay dawn.
Closed
Acknowledged
5.13
FFKR Normal No specification given on Sink Pl-C an sheet P-902 please advice.
Closed
Okfand to seed RFI to Heath.
Akland Constructions 1978 South West Temple, UT 84115 (801)486-0144 FAX (801) 486-7570
These meeting notes have been provided as a courtesy to the participants, and are considered part of the cial prod e t recd , If errors.r
inconsistencies are discovered, or if changes and/or clarifications to the notes are needed by wiy party attending the meeting} these should be e-
mailed to Oklmd on t do ,1ke Shatzer at ni -sCiTo l nd.coin within 48 hours of receipt of the initial draft. If no chwigesare received
within this -hour period, the initial draft hall be considered as accepted by the rti ipan .
The neat O/AJC meeting is scheduled for (06-1.6 J'Opoopm MDT) in the Okland Office.
Okland Construction, 1.978 South West Temple, UT 84115 (80.1)486-0144 FAX (801) 486-7570
_ 4
1
PR#1
Asbestos Abatement
Closed
in contract
2PR#2
Miscellaneous Electrical Items -send to Todd Payne
Pending Approval
$1,319.00
3
PR#3
Additional Floorin J Asbestos Abatement
Closed
!n contract
4
PR#4
Revise Art Rail
Approved by Lloyd and Barry
$.(21500.00)
5
PR#5
Stair 2H Ceiling__— at Plan Review
Approved by Lloyd and Bar
$3,598.00
6
PR#6
Planetarium Fire Protection - City Plan Review -Send to
Heath Engineering.
Approved
$21168.00
7
PR#7
Mechan'lcal Changes -City Plan Review -Send to Heath
Approved
$19,5254,00
8
PR#$
_--Engineering.
Floor Sink for Stock Room Ice Machine fiend to Heath
Engineering.
Approved
$x,274
9
PR#9
Resource Room 152 Geilinfiend to Todd Payne
[Approved
$(592.0 0
10
RFS #5
Fume Hood Monitor Installation
-Approved bv Lloyd and Ba
$1,520.00
11
PR#'#fl
Door Number 150 Clarification
Approved by Lloyd and Ba
$327.00
12
PR#11
Display Case Windows in Room 156
Ap2roved
$1,053.00
13i13.1
PR#12
Office Coat Hooks
13.1 Approved by Lloyd and
Bar
$1,363.01
$840.00
14
PR#13
Demolish zee" Wall and Display Case at Roam 297
Approved
$3,'i31 _Q0
15
PR#14
Fire Spn"nkler Protection Clarification
Pending Approval
$43645.00
16
RF1#16
Wal! Width Change.
Approved
$249.00
17
PR#1 5
Mod'(fy
Existing.Duct Work at Rooms 126A & 128
Open
18
PR#1 fi
Demolish Wal( Between Rooms 128 &12fiA
Pendin A royal
$11926.00
19
RFI #18
Relocate PiumbinSu
I
Oen
20
RF1#14
Ductwork Conflicts
Open
21
RFI#ZO
L2 Fire Sprinkler Conflicts
D en
22
RFI#22
P-1 C Sink
Open
23
Additional Electrical Work
Approved
$3,737.00
24
PR#17
Abate and Fireproof Beams at L2 and Roof
Open
25
PR#18
Room 150 & 152 door changes
Den
26
PR#19
Additional wood diplay cases
Oen
27
28
PR#20
PR#21
doom 172 Abatement and Fumishin s
Toilet & Bath Accessories
Open
Open
These meeting notes have been provided as a courtesy to the participants, and are considered part of the cial prod e t recd , If errors.r
inconsistencies are discovered, or if changes and/or clarifications to the notes are needed by wiy party attending the meeting} these should be e-
mailed to Oklmd on t do ,1ke Shatzer at ni -sCiTo l nd.coin within 48 hours of receipt of the initial draft. If no chwigesare received
within this -hour period, the initial draft hall be considered as accepted by the rti ipan .
The neat O/AJC meeting is scheduled for (06-1.6 J'Opoopm MDT) in the Okland Office.
Okland Construction, 1.978 South West Temple, UT 84115 (80.1)486-0144 FAX (801) 486-7570
_ 4
Ili.EOKLAND CONSTRUCTION COMPANY, INC.
BYU I .0 1
R 1 1ciences0 iuilding R ( (
'7L]4;19I�CrlLr7��1 T1
Meeting:
Job #:
Meeting Location:
Weekly OAC Meeting Date: 06-02-05
Okland Office — Romney Sciences Building
M Denotes Attendance 06-02-05
MN 06
Time: 1:00 pro.
PCU Review
Schedule Status and Percent Complete;
• Level 1.
o Walls framed today.
o Room 172 abatement
• Lepel 2.
o Drywall will start an north gide this week,
o Asbestos abatement to start Monday.
COMPLETEJ.aE1VlO
List
Compapy
E m a 5H
Phone
FRAME
LII
-1
r s.? 4
208-496-2460
15%
Brett Laird
-1 d h
L i 002 u 1.
208-351-4519
99%
Barry 0. Becker
FFK .
bbeckerQffkr.com
801-910-5319
20°/a
Mark Wilson
FFK
i1 r r.
801-5216186
C 5
Mike Bryant
Oklandm
I I nd. m
801-842-3359
Mike Shatzer
Okland
mgspokland..com-208-521-9963
Kent Naylor
Okland
n I r I n.com
801-486-01
Doug Robins
Okland
douland.com801-486-0144
PCU Review
Schedule Status and Percent Complete;
• Level 1.
o Walls framed today.
o Room 172 abatement
• Lepel 2.
o Drywall will start an north gide this week,
o Asbestos abatement to start Monday.
COMPLETEJ.aE1VlO
I ARCA I
LEWIS
BINGHAM
FRAME
3-D
5118
85°Io
Started
15%
Started
Started
Started
List Week (5/26)
99%
17%
20°r'o
12%.-
90°Io
20°/a
This Week (612}
C 5
4
30
RFI Status
F FI #15 — Level 1 Data Wiring: Answer — Payne Engineering to develop draVings, PR to follow -Closed.
�Okland Construction', 1978 South West Temple, T 84115 (801)486-0144 FAX 1) 48.6-75
New, Active and did Items ktrurrent as of 5/18)
Okland Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX ($O1) 4$6-7570
NEIN ITEMS
COLD ITEMS
Item#
ActionPriority
Action B
Notes:
Status
1 fi.'f
FFKRIBYU-I I
Routine
Sheet A -102.r A -403r and A-403.1 show handrails in Rooms 277,
Mechanical Submittals doled 5/6/05 contained an RE from Lewis
Goosed
279, 297., and 299; the only mention of handrails that can be found
Mechanical regarding MAV and 1lAVR Reheat Coils. The answer
in the Spe c"fication is for steel handrails on the roof.
could not be found in the response to the submittals dated 5/17x05.
6.2
FFKR
Routine
The beam an gridline 3 will be exposed in rooms X79 and z77
Lewis Mechanical to talk directly with Heath En ineerig.
5.2
0
FFKRIBYU-1
between gridlines E and H. How is the exposed section of this
Need specific locations of Fume Hand Manitors.,
Closed
beam to be fnished?
Center side-to-side 6"" above the bottom of the lintel. Subject to
6.3
BYU-I
Routine
Okfand needs the toilet accessories indicated on Sheet A-404 by the
field verification and approval.
5.3
FFKRBYU-1
end of July.
Additional steel beam found in room 172. This beam is fire 'proofed
6.4
FFKR
Urgent
What is the status on the approval for the cabinet detail under the
like the beam upstairs the fire proofing is suspected of being
display case in roam 156
asbestos containing. Lloyd has given the direction to abate this
6.5
FFKRt6YU-1
Routine
The electrical sheets indigte that the conduit on the first floor is to
beam.. Written direction is needed.
be reused. The existing conduit,was not up to code and the
Concerns of water damage to floor and chain and potentially
electrical inspector required Arco to rework much of the conduit.
Lequired ADA com fiance.
5.4
BYU-1
Arco has requested a than e order for the additional work.
BYU-Idaho has request that we control the coming during the
Closed
sumer in the new half of the building. Lewis, Johnson Controls,
and Arco are currently determining the fest way to accomplish this.
Okland Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX ($O1) 4$6-7570
COLD ITEMS
Item#
Action B
Priori
Notes:
Status
5.1
FFKR
Expedite
Mechanical Submittals doled 5/6/05 contained an RE from Lewis
Goosed
Mechanical regarding MAV and 1lAVR Reheat Coils. The answer
could not be found in the response to the submittals dated 5/17x05.
Lewis Mechanical to talk directly with Heath En ineerig.
5.2
0
FFKRIBYU-1
Normal
Need specific locations of Fume Hand Manitors.,
Closed
Center side-to-side 6"" above the bottom of the lintel. Subject to
field verification and approval.
5.3
FFKRBYU-1
Urgent
Additional steel beam found in room 172. This beam is fire 'proofed
Closed
like the beam upstairs the fire proofing is suspected of being
asbestos containing. Lloyd has given the direction to abate this
beam.. Written direction is needed.
Concerns of water damage to floor and chain and potentially
Lequired ADA com fiance.
5.4
BYU-1
Normal
BYU-Idaho has request that we control the coming during the
Closed
sumer in the new half of the building. Lewis, Johnson Controls,
and Arco are currently determining the fest way to accomplish this.
BYIJ-I needs a couple of days advanced notice for shutdown.
5.5
FFKR/BYUTI
Normal
As discussed with Barry the ceiling in Tech. Room 280 has been
Closed
removed. U11ifl a new ceiling he required?
No per Uoyd,,
SINGFFKR
Normal
The second floor sprinkler valve has corroded and will not
Closed
completely shutoff. We have directed 3-D Fire Protection to replace
the valve.
BYU-i
Expedite
Owner concurs —PCD to follow.
Arco Electric needs rough in boxes for clocks.
Closed
5.7
BYU-I will work on this.
6-2-05 — nkland has directed Arco to purchase the rough in
boxes per direction -Riven by BYU-1 and Payne En �ineerin .
5.8
BYUvI
Semi-
Arco needs location on outlets in Tech. Rooms.
Open
Expedite
Arco needs amperage and location of outlets in Room 213. (Note S
Sheet E-203)
BYU-I will determine.
5.9
FFKR
Normal
What is the raking an the lid in the Mangle chase next to the
Closed
Planetarium?
1 -hoer fire rating.
5.14
FFKR
Normal
The wall between 127 and Corridor 18 is not ire rated and does not
Closed
Okland Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX ($O1) 4$6-7570
A
19
extend to the ceiling; however, the new wall . _ .o be fire rated. How
da we proceed?
Please see A-101 nate fi.
5,11 FFKR Normal Sisk in cabinet in Storage Room 133 is identified as stainless steel; Closed
the countertop is epoxy resin. Is this correct.
Chan e sink to eRo�y-_
5,12 BYU-I Normal We need more area for supplies and fay down. Closed
Acknowledged
5A3 FFKR Normal No specification given on Sink P 1 -C on sheet i'-1 02 please advice. Closed
Akland to send RF1 to Heath.
4.4 FFKR Expedite Potential conflict with cabinets in rooms 243A with new ceiling Closed
heights per the response to RF! #14.
Per Barry's direction the upper cabinets in 2a3A will be changed
from 48" to 42" keeping the same number of adjustably shelves
and to be installed tight -to the suspended ceiling. FFKR will fallow
U'R with a written direction,
4.2 FFKRlBYU-1 Expedite Potential conflict with cabinets in room 213 and owner provided Closed
Flammable Storage Cabinet. Cabinet shown an drawings is not the
actual size of the cabinet that will be used; Lloyd v►ril{ determine the
size of the actual cabinet and return the information.
5-26-05 BYU-I to verify size,. Newcraft to proceed with cabinets as
designed
4.3 FFKR Ceiling height on the easy end of room 131 will need to be lowered Closed
because of conflicts with the new fire darnper. Confirmed.
4.4 FFKR Normal Bemuse of restricted access to the planetarium and in an effort to Closed
prevent damage to the planetarium dome Okland would IEfce to
abandon in place the plumbing and ductwork to be demoed. It is
okay to abandon the duck and pipe as long as it does not conflict
with new installations.
4.5 FFKR Normal The sham between the Planetarium and room 127 now has a hole in Closed
the Planetarium wall because of the demoed ductwork. Will this
hole need patched? Do the "shifts" in the remodel area reed to be
fire rated? Okland is �o send an RFI addressin the issue.
4.6 FFKR Normal The pians call for the new wads for the shaft En roam 126A to be Closed
fire rated. The two existing walls are not fire rated. Is this -shaft to
fi
have. a re rating ? Akland is to send an RFS addressing,the �ssue.
4,7 BYU-I has requested that old fire extinguisher cabinets not remain open
in the walls. FFKR and BYU4 will determine what to da with the
old fire extin wisher cabinets and FFKR will issue a PR.
4.8 Qktar+d to demo waft between room 128A and 126. FFKR will issue Closed
PR.
4.9 The v+►all that was demo'd between office 182 and 184 had plumbing Closed
pipes servicing a have bib. The new veall will not be in the same
location, leaving the plumbing exposed. Okland to issue RFI
addressing.,issue.
PCO Status
PCO #
Description
Status
Cast
1
PR#1
Asbestos Abatement
Closed
In contract
2
PR#2
Miscellaneous Electrical Items fiend to Tadd Payne
Pending Approval
$'E ,319.0
3
PR#3
Additional Flooring 1 Asbestos Abatement
Closed
In contract
4
PR#4
Revise Art Reil
Approved by Lloyd and Bir
$(2,500.00)..
5
PR#5
Stair 2H Ceiling — City Plan Review
Approved by Lloyd and Bary
$3,J598.00
fi
PR#6
Planetarium Fire Protection — City Plan Review —Send to
Heath Engineering.
Approved
$21168 P 00
7
PR#7
Mechanical Changes — City Pian Review —Send to Heath
En ineerin ,
Approved
$19,254.00
8
PR#8
Floor Sink for Stock Room lie Machine --Send to Heath
Engineering.,
Approved
$27274
9
PR#9
Resource Roam 152 Ceiling
—Send
to
Todd
Payne
Pending Approval
$(592.00)
Oklan,d Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX (801) 486-7570
I- oj--
3
10
RFS #5
Fume Hood Munitor Installation
Approved by
L!v d and Barry
$1,520.00
11
PR#1 D
Door Number 150 Clarification
Approved by
Lloyd and Bar
$327.00
12
PR#1 1
Display Case Windows in Room 155
Office Coat Hooks
Pending Approval
13.1 Approved by Lloyd and
Ba
$1) 053. 00
13/13.1 PR#12
$1,363.00/
$84G.00
14
PR#13
Demolish "zee" Wall and Dis la Case at Roam 297
Pending Approva.1
$3,131.D0
15
PR#14
dire Spinkler Protection G{arfficaiion
Open
16
RFI#1 6
Wall Width Change
Pending Approval
$249.00
17
PR#15
Modify,Existing Dict Work at Rooms 126A & 128
Open
1$
PR#1 6
Demolish Vlfali Between Roams 128 & 126A
Open
19
RFI #18
Relocate P-lumbing Supply.Open
20
RF!#14
Ductwork Conflicts
C} en
21
RF[#2D
L2 Fire Sprinkler Convicts
Open
22
RFI#22
p-1
G Sink
O erg
These meeting notes bave been provided as a courtesy to the participants, and are considered paft of the official project record. It errors or
inconsistencies are discovefed. discovered.or if change and/or clarifications to the notes are needed by any paw attending the meeting, these spool b
e-
mailed t l nd Constniction, Mike Shatzer at nicls,�F�'okdand.com within 48 lours of receipt of the initial draft. If no changes are. received
within this 48-hour period, the initial draft shall be consideredas accepted by the participallts
The next O/A/C meeting is scheduled for (06-U2 1:00nm MDT) in the Okland Office.
C)kland. Construction, 1978 South 'West Temple, UT 84115(501)4$6-4144 FAX (SUI) 486-7570
[A I
(I .OKLAND CONSTRUCTION COMPANY, INC.
B,YU Idaho — Romney Sciences Building Remodel
MEETING AGENDA
Meeting:
Job #:
Weekly OAC Meeting Date: 05-05-05
678
Meeting Location: Okland Office — Romney Sciences Building
,M Denotes. Attendance 05-05-05
MN 01
Time: 1:0-0 pm.
Schedule Status and Percent Complete;
• Level i..
fl Demo almost complete
o HVAC has received VAVs and started OH ductwork
• Level 2.
Q Asbestos
List
Company
Email
Phone
north end mostly dons
Loyd Benson
BYU-1daho
b n sore i u i. a
208-496-2460
Only
r tt Laird
-Idaho
Lit 002 b i. u
208-351-451
Dema 4n1
Bar Q. Becker
FFKR
bbeker2ftr.com801-910-5319
'darkWilson
FFKR
Mwi1Son@ffkrc0M801-5216186
Mike ant
Okland
mcb2okiand.com
801-842-3359
Mike Shatter
Okland
kl + .
208-521-9963
E nt
Naylor
Okland
k
I(
k1a
. o.801-486-0144
Schedule Status and Percent Complete;
• Level i..
fl Demo almost complete
o HVAC has received VAVs and started OH ductwork
• Level 2.
Q Asbestos
abatement expected to
finish
Friday.
o Dery on
north end mostly dons
tray.
Restart south area Monday
% COMPLETE1
ABATEMENT
I DEMOLITION
I ELECTRICAL
T LEWES
BINGHAM �
Last Week {412$}
30°/fl
10%
Demi 0!11y.Dema
Only
Dema Only'.
Today (515)
100°/0
45°fo
Dema 4n1
5%
Demo Onl
RFI Status
RFI 10 and 12 outstanding — see attached RFI Log dated 5-5-05
Okland Construction,, 1978 South West Tempe, UT 84115 (801)486a0144 FAX (8-01) 486-7570
tri
New�, Active and Old Items (c:urrent as of 4128)
NEW ITEMS
Item#
Action By
Date
Notes:
Status
Due
2.1
Todd Payne
ED / 1 0
Arco called the electrical engineer and received specific instructions
on splicing wires that enter a main distribution panel in the
mechanical room —written direction pending.
2.2
FFKR
5/6
Room 150 plan appears to show 2 side -lights beside the door but
not shown on the schedule.
2.3
FFKR
5/5
Room 156, note 58 on A212 ca'
Ils for steel frame. Is this a HMF
with glass? Need size. Note existing outlets on room side and
picture rail on hall side.
2.4
BYU-Idhao
5/5
Can BYU separate the east building fire alarm from the west
building during construction?
2.5
FFKR
5/5
New door into room 182 conflicts with existing display cabinet
in mason [y wall.
-recessed
2.6
Steel Erector
5/12
May need to remove north wall of room 177 in order to install
structural steel. This wall also has existing cabinets mounted that
will need to be removed,,
2.7
FFKR/BYU.1
5/5
Copies and distribution of payment applications.
2.8
FFKR/,BYUI
5/5
Division 11 Sinks
PREVIOUS ITEMS
Item#
Action By
Date
Notes:
Status
Due
Okland
N/A
City inspector Jon Barry said he, will be on campus 2 or 3 times
Closed
each week.
1.2
BYU] -*—�N/A
Invite Jon Barry to weekly meetings
Closed
1.3
Okland
N/A
MS submitted and approved are 3 518",spec is 4". HMF are 6
Closed
Y4 X] which retlects a C Ms.
1E4
Okiand
N/A
Doors submitted were seamed — Seamless required by Spec.
Old
1.5
Okland
N/A
16 ga. HMF has been verbally approved by Barry. 14 gauge
Closed
submitted but material will take 4 weeks to get frames on site.
16 gauge is standard and available. Frames can be fabricated
and on site by 5-1.0 which will meet the schedule.
1.6
Okland
4/29
L2 platform framing sketch v011 be submitted for review.
Closed
1.7
N/A
All dark green chalk boards are Transite ('E4 total) and mastic.
Old
1.8
Byull, FFKR
4/28
Are we to abate stairway 1E down to lower level. and down to,
Open
mechanical room?
Upon further investigation PTI has determined that the VCT in
the stairways does not contain asbestos. We have removed the
VCT at each floor level and landing between floors but not down
to lower levels.
1.9
BYUl, FFKR
4128
Room 152 verify ceiling demo entire room or just to new wall. —
Closed
Bar. to 9enerate a PR giving_ direction.
1.10
BYU1, FFKR
4/28
Gas 'in building is off, is gas needed for West rooms Lloyd to
Open
check and give direction.
1'1 1
N/A
Cary Okland continue to use room 156 as an office through -out
Closed
-
the.project?
Pco$ Pending
Akland Construction, 1978 South West Temple, UT 84115 (801)486-0144 FAX (801) 486-7570
2
lio
Description
Cost
PCO No.
These meetina notes have been provIded as a courtesy to the participants, and are considered part of the official prqie-ct record. If effors or
inconsistencies are discovered, or if c.hamand/or ctarifications to the of are needed by any parte.' attending the meefing, these should be e.-
mailed to Oklaiid Construction. Mike Shatzer at mgsCwok1and.com within 48 hours of receipt of the I Inittal draft. If no changes are received
withm' this 48-hour period., the nut ial draft shall be considered as accepted by the participants.
The next O/A/C meeting is scheduled for (05-12 1:00 -nm MDT) in the Okland Office.
Okland Construction, 1978 South West Temple, UT 8411.5 (801)486-0144 FAX (801) 486-7570
3
Contractor's Material and Test Certificate for A' bove round Piping_PROCEDURE
Upon completion of work, inspects'an and tests shall be made by the contractor's representative and witnessed by the owner's representat�ve. Aid dafec#s
shall be corrected and system iei� Ery service before contractor's personnel finally leave the job.
A certificate shaft be filled out and signed by both representatives. Copies shWl be prepared for approving authorities, owners, and contractor. It is
understood the owner's represen#afive `s signature to no way preJudirss any claim against contractor for faulty material, poor workmanship, or failure to
comply with approving authoriiy's requirements or local ordinances.
PROPERTY NAME gyu_Idaho Roney Building Remodel
DATE 6/6/05
PROPERTY ADDRESS Rexburg, Idaho $344Q
ACCEPTED BY APPROVING AUTHORITIES (.NAMES) Fire Marshal
PLANSaDoflEss Rexburg . I'd'aho
INSTALLATION CONFORMS TO ACCEPTED PLANS
EQUIPMENT USED i5 APPROVED
IF NO, EXPLAIN- DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF
CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEIN EQUIPMENT?
IF NO, EXPLAIN
INSTRUCTiDNS HAVE COPIES OF THE FC3lA-0W#NG BEEN .EFT C]N THE PREMISES:
1. SYSTEM COMPONENTS INSTRUCTIONS
2, CARE AND MAINTENANCE INSTRUCTIONS
3.- NFPA 25
LOCATION
OF SYSTEM SUPPLIES BUILDINGS remodel
SPRINKLERS
PIPE AND
FITTINGS
.LAR
VALVE
OR FLOW
INDICATOR
DRY PIPE
DERATING.
TEST
DELUGE
P REACTION
VALVES
1
MAKE
Reliable
Reliable
_Re I i able
TYPE OF PIPE
TYPE OFFITTINGS
TYPE
existing
MAKE
NA ',
MODEL
I FR Pend .
FIFR U
FIFR Up,*
YEAR OF
MANUFACTURE
2005
2005
ed. 40
ALARM DEVICE
MAKE
DAY VALVE
MODEL
SERIAL
TIME TO TRIP
THROUGH TEST WATER
CC3NNECTlOW PRESSURE
"--F_ MIN. I SEC. PSI
''WITHOUT O.O.
WITHQ.O.D. i
IF NO, EXPLAIN
NA
OPERATION
NA _0 PNEUMATIC
PIPE SUPERVISED YES 0 N
6
MODEL
� YES Na
L�
YES p No
YES
No
YES
C� YES NA
NO
[�
NO
r
Q NO
6
MODEL
� YES Na
L�
YES p No
YES
No
YES
C� YES NA
NO
[�
NO
YES
Q NO
TEMPERATURE
RATING__
155
200
MAXIM UM TIME TO OVERATE
T TEST CO'
MIN. I SEC.
AIR TRIP PAINT
PRESSURE --iA!A PRESSURE
PSI PSI
O.O.D.
MODEL
WATER.
KACHED
BESTOUTLET*
MIN SEC.
0 E LECTR I C] HYDRAULIC
DETECTING MEDIA SUPERVISED YES
t MUM I ►-it MAN UAL TRIP FIND /OR REMOTE CONTROL STATlC]WS; F'I YFq
IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT
FOR TESTING
El YES LJ NO
ODES EACH CIRCUIT OPERATE
MAKE MODEL SUPERVISION LQ55 ALARM
YES - NO
N
7
IF No, EXPLAIN
DOES EACH CIRCUIT
OPERATE VALVE RELEASE
YES Nn
SERIAL
ALARM
OPERATED
PROPERLY
YES 1. NO
D NO
EJ No
MAXIMUM TIME T
OPERATE RELEASE
N. SEC.
PRESSURE
REDUCING
VALVE TEST
LOCATION
& FLOOR
NA
MAKE
MODEL
SETTING STATIC PRESSURE
INLET {PSI), 10UTLET (PS' 1)
RESIDUAL PRESSURE
(FLUW1NG) I FLOW RATE
INLET (PSI) 7OUTLET (PSI) FLOW (GPM)
NYDROSTATiC: Hydrostafic tests shall be made at not Tess than 200 psi (13.6 bars) for two hours or 5fl psi (3.4 bars) a�gve s�t��c
pressure in excess of 150 psi ��U.2 bars} for two hours. Differen#ia# dry -pipe vale clappers shah be left aper during test to prevent
TEST damage. All aboveground piping leakage shaEl be stopped.
DESCRIPTION PNEUMATIC: Establish 40 psi (2.7 bars) air pressure and measure drop, which sha[i not exceed 1-1I2 psi (0.1 bars)in 24 hours.
Test pressure tanks at normal water IeveI and air pressure and measuse air p re s su re dro p, which shall not- exceed 9-1 !2 psi (p. 1
bars) in 24hours.
PIPING HYDRO
S
T
A
TICALLY TESTED AT PSI FOR �-'` HRS. IF NO, STATE REASON
JD� �,. DRY PIPING PNEUMATICALLY TESTED [] YES NQ ,
JJS� Et�tJiPIVI�NT OPERATES PROPERLY YES NO
DO YOU CERTIFY AS THE SPRINKLER -CON ACTOR THAT ADDITIVES AND CORROSIVE
CHEMICALS, SODIUM SILICATE OR DERIVATIVES OF SODIUM SiUCATE, BRINE, OR OTHER
CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? KI YES NO
TENS DRAIN READING OF GAUGE LOCATED NEAR W TEI� RESIDUAL PRESSURE WITH VALVE IN TEST
TEST SUPPLY TEST CONNECTION: P51 CONNECTION OPEN WIDE PSI
UNDERGROUND MAINS AND BEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHEDBEFORE CONNECTION MADE 7Q
SPRINKLER PIPING.
VERIFIED BY COPY OF THE U FORM No. 858 �� � YES Q No OTHER EXPLAIN
FLUSHES BY INSTALLER OF UNDERGROUND SPRINKLER PIPING YES ❑ NO mixisting system -suppjl
IF POWDER DRIVEN FASTENERS ARE USED IN CONCRETE, HAS REPRESENTATIVE 1F NO, EXPLAIN
SAMPLE TESTING BEEN SATISFACTORILY COMPLETED? NA ED YES ❑ Np NA
BLANK TESTING -NUMBER USED LtoTIONS NUMNA ER REMOVEDGASKETS none
. WELDED PIPING E] YES X] No
IF YES.. .
OD YOU CEATIFY�AS THE SPRINKLER CONTRACTOR T14AT WELDING PRC7CEE]URES COMPLY
WITH THE REQUIREMENTS OF AT LEAST AWS D1 0-9, LEVEL AR -3? Q YES ❑ NO
WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS Ctl1AUF[ED IN NA
COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AllVg D7 0_9, LEVEL AR -3? YES Qi NO
0Q YOU CERTlFYTHAT THE WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED,
THAT C?PENINGS IN PlP1NG ASE SMOOTH, THAT 5LAG ANS? OTHER WELDING RE5lC?UE ARE NA
REMOVED, AND THAT THE lNTERNAl. DIAMETERS OF PIPING ARE. NOT PENETRATED? Ej YES ❑ NO
CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
(DISCS)
CUTOUTS (DISCS) ARE RETRIEVED? � YES ❑ Nfl
HYDRAULIC DATA NAMEPLATE PROVIDED �YES El NO IF NO, �i�
XPLA�
NAMEPLATE.
REMARKS DATE LEFTiN SERVICE WITH A. LL G - NTRC3L VANES OPEN:
NAME OF SPR INKLEA CONT ACfi R
3--D Fi" re Protection Inc..
TESTS WITNESSED BY
SIGNATURESFORPROPERTY OWNER (SIQNED) TITLE � DATE
JA 0
FOR 9PRINKLER CON ACTOR (SIGNED) TITLE DATE
w
ADQiTIONAi, EXPLANATIONS AND NOTES
K w2�6
'54 FC
LIN
Transmitter:
08/18I2005
Q8/1812D05
0811812005
ogilsl2ao5
o8/18/2ao5
os/18/zoa5
D8/1H/2005
a8f12/2005
08/18/2605
08/18/20D5
08I18I2OG5
08/i8/2005
L8/1812OC
Q8/18/2005
08/1$/2J05
08118/2005
08/ 1$/2005
D8/18A2005
08/18/200
08/18f2005
08/1812005
os1?8120a5
08/18/2oD5
o8I1s12a05
08/18/2005
08I18/20Q5
G8/18/2Q05
08/18/2QJ5
08/'18/2005
fl8I18I2QD5
08/1-8/2005
d8/18/2D05
08/18/2005
08118/2L05
Q8I18/2005
0$/18/2005
G8/18/2005
G8/18/2QQ5
08/18/200�
D8118f2DD5
08/1_�Q! 12QQ5
ae/ I R, 'el 2 -0,a5
o8r18l2o05
08/18/2005
08/18/2dC5
LS/18/20C35
DS/18/20Q5
fl8/18/2005
08/18/2045
08/a8/20x5
asIi8l2oas
08/18//2005
Q9/18/205
Time
Romney
:10:08
0 9- :4 9
::1
:11:1
: 11: 4
:11: �
09: 12:00
09:12: 02
: 1 : 05
: 12:
":16:31
16: 31
:1
: 4 1
09 22 4 4
22:44
09:23:1
09:23:15
: 2 3:1.
: 24 t07
:4tV
4
4 * 1
09 24:12
09:24:-33
:24:6
:. :27
}25:27
i 2 5s
x°9:25*
: : 25
: 2 6 :
9:26..28
C9: 26: 28
9:: 1
*: 1
09 :.42
:32:24
:32:27
09 :32.30
:32:33
0-9:32:36
:
:32:41
:32.44
:32:47
09x32■
a ;
53
09:32:
09:32:55
09:32:55
:33.17
09:33-620
I .r." N L REPORT
Romney Testing 18/2005
8/18/2005 00.00 - 8/18/2005 14;15
Area Signal
(0005)
Periodic
Fire Alar
,rhe Nerit H r1
Te 991
m 002
Fire Alarm 002
Fire T rout l 000
Fire T rout l 000
Fire Tr u l 000
Fire Tr ubl 000
F.ire'larm 002
Fire Trl 000
delay fail 000
Fire Alarm 006
Fire Alarm 006
Fi re All a r.Tn 006
Fire Alarm 006
Fire Alarm 006
Fire .l rte. 006
ate Valve
Fire Alarm 006
Fire Alarm 006
Fire l rm 002
Fire Alam. 002
Gate Valve 003
Fire Alarm 006
Fire Alarm 006
Gate Valve 003
Gate Valve 003
Fire Aiarm 002
Fire Alarm 002
Fire Alarm 006
Fire Al a rm 006
Fire Al 3a.rm 006
Fire Alarm 006
Fire Alarm 001
Fire o a rr.. 001
Fire M
iroub-'000
Fire Alarm 006
Fire l rm 006
Fire Alarm 006
Fire Alarm 006
Fire Alarm 002
Fire Alarm
Fire Alarm 002
Fire Alr
Fire A.Iarm 006
Fire Alarm 001
Fire Tr u 1 000
Fire Tr ubi 000
Fire Alarm 1
Fire Alarm 001
Fire Alarm 002
Firldrju 002
delay rail 000
delay fail 000
MARKER RECORD
MARKER RE R
MARKER RECORD
YARKER RECORD
YiARKE
KT'iKER
HARKER
R
M.REr
MARKER
MRIER
MARKER
IRIEr
HARKER
MARKER
MARKER
MARKER
MARKER
MARKER
MlkREr
MARKER
SFE
MARKER
SIR N R
MARKER
MARKER
ER
HAR ER
MARK E
1.1 A R E R
. �F K E ;
MARKER.
IE
MRER
M 1"IR K ER
LRE:.
MARKER
NIARKER
MARKER
MARKER
AR=E R
AR -ER
MARKER
iME R
MRE R
MARKER
MARKER
MARKER
ARE
MARKER
MARKER
MARKER
ER
MI-IiRl<ER
MARKER
E
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECO-RD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
R�.R
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RERD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
RECORD
Page 1 of 6
http-,,/,/firesecuri.tymoni-tor/`Phoen*lx/spoo1/77csf,html 8/18/2005
. (null)
Ip
08/18/200514:28:48
SIGNAL EF T
m� r* 'I� tin 8/18/2005
8/18/2005 : - 8/18/2005 14:15
Date
.
�— _ — — — ate.
ws.- — - — a08/18/2005
Time
TimeL-,�
— �- — — i —
— — — —
1_'-a
— s —
Signal
Zone
armDrj
— — —
— — ---iv — —
— — �t — — - air
— — - — — _
_e. — — — - was —
— — : — — — — — — — — — — — —
02/19/2005
09:13"3:46
:00
Fire
Troubl
000
MARKER
PEC-IORD
0 8 / 1- r 2 0 0 5
09:33:49Fire
Alarm
001
MARKER
RECORD
0'8/18/200-5
# 3:
2
Fire
Alarm
002
KARKER
RECORD
08/18/2005
1
: 0
:
Periodic Te
991
NU\- R K E R
P E .
OIB/18/2005
10:00:36
Fire
°Tr ubl
000
MARKED
PECORD
1
Fire
'Tr u l
000
MARKERRECORD
08/18/2005
10:01:06
l fail
000
MARKER
RECORD
08/18/2005
10:01-:09
:00
delay i 1
000
MARKER
RECORD
D
08/18/2005
1
: 4■,1
Fire
Alarm
011
MARKED
RECORD
08/18/2005
10:04:18
:00
Fire
Alarm
Oil
RECORD
08/18/2,30510:0'7-:06
-000
Fire
Alarm
086
-MARKER
East Elevator
08/18/2005
10:05:06
:00
Fire
Alarm
086
MARKER
RECORD
/18/2005
10:05-1-09
: 0 0
Fire
Alarm
411
MARKER
RECORD
/18/2005
10:05:09
:00
Fire
Alarm
411
MARKER
RECORD
08/18/2005
1,::7
:00
Fire
T ul
000
MARKER
RECORD
08/18/2005
1
:
:1
:00
Fire
Tr u l
000
MARKED.
RECORD
08/18/2005
1
:
:1
Fir E
A 1 a
Oil
MARKE R
RECORD
08/18/200510:06:16
Fire
Alarm
086
I ER
RECORD
08/18/2005
1 +
:
: 1
Fire
y arm
411
MARKER
RECORD
08/1 /
10:06:21
Fire
Alarm
411
MARKER
RECORD
08/18/2005
1
:
: 0 0
Firs
.1arm
011
IRR K ER
RECORD
08/18/2005
1
:0
:
Fire
Alarm
011
MARKER
RECORD
08/18/2005
101:12:08
:00
Fire
Alarm
011
MA ER
RECORD
08/18/2005
1
:1
:
■0 0
Fire
Alarm
011
MARKER
RECORD
08/18/2005
1
:1
:11
0 0
F're
Tr !
000
r . R K E R
RECORD
RI
08/18/2005
10:12:`4
Fire
Trui
000
MARKER
RECORD
08/18/2005
10:12:41
:
delay fall
0,00
SER
RECORD
08/18/2005
10:12:44
:00
delay fail
000
MARKER
RECORD
08/18/2005
1
:1
:27
■
Fare
Alarm
East Elevator
09/18/2005
1
:1
: 7
:00
Fire
Alarm
086
MARKER
RECORD
:
08/18/2005
10:180-02
:00
Fire
'Tr u l.
0 F..+ARKE
�' F D
08/18/2005
10:1
.
Fare
Tr u l
000
MA E1
RECORD
08/18/2005
10:18:08
0 0
Fire
l a r
011
MR E R
RECORD
08/1-8/2005
10:18:11
Fire
Alarm -
MAR E R
RECORD
08/18/2005
10:18:14
:00
F.Ire
`I'rul
000
SER
RECORD
03/18/2005
1:1
:16
--100
Fire
Troubl
000
MARKER
RECORD
D
08/18/2005
1
:1
:
delay fail
000
I'vI EF
RECORD
08/18/2005
1
■ 18
f4 6
0 0
i4r lay fail
000
MARKS R
F E 1
08/18/2005
1
■2
0 0
Periodic
'fie
991
MIS R ER
RECORD
08/18/2005
10 2 0
3 0
-.00
Fi-r
Trou. 1
000
MARKER
RECORD
ii l it 2 +a.F 5
10:20:33
■ °4£
Fire
T i l
000
E
RECORD
08/18/2005
1*1}
delay full
000
..- L ti.
MARKER
RECORD
08/18/2005
1 ■ 1,
delay fail
000
�iARNER
RECORD
08/18/2005
1 ■
Fire
Alarm
086
East E1 to.L Detector
08/18/2005
10:28:43
Fire
Alarm
086
MARKER
RECORD
08/18/2005
1 ,
:00
Fare
Tr ubl
000
MARKER
RECORD
08/18/2005
1:
:00
Fire
Tr u l
000
MARKER
RECORD
D
08/12/20051:
:00
Fire
Alarm
086
MF
RECORD
/18/2005
10:32:42
-.00
Fir- c
Tri
000
44
RECORD
08/18/2005
1 : :
Fire
Troubi
000
MARKER
PECORD
08/18/2005 /2005
1 :
33 : 1
:00
cielay
fail
000
DARKER
RE 0 R 3.
http: Hfi securitynzon�iorlphoenixispoo1/77csf.htmi
Page 2 of 6
8/18/2005'
_(null) Page 3 of 6
• ii
UdJ1U/2J05
08/1812005
08/18120D5
08i1s/2ao5
08/18/2005
08/18/2p05
08/18/20p5
0sr18/z0a5
08I18I20,05
o8118I2ca5
o8/18r2oo5
08/18/2005
aal1al2ao5
08I1gl2oa5
o8l1sl2ao5
08/18./2005
08/18/2D05
08/18/2005
08/i8/2005
08I18/2005
asJlgl2o05
08118r20J5
d8/18/2fld5
08/1.$/2005
08/18/2005
08/18/205
D8I18/20a5
X8/18/2005
D8/18/20D5
08118/2Q05
08118/2005
a8/18/2aa5
08I-18I2aaS
08/18f2Q05
08I18I2GD5
0 B / 18 / 2 0 0 5
09/16/2005
08��8�2aa�
os/18r2oa5
08/18I2oo5
a$/1812005
(]8118/2005
G8%18/20Q5
'8/18/2005
08/18/2005
08/18 /2005
f78/Z8/2D0
ag/18/zoa5
G8/18/2005
/1 /2.005 1 : 33 : 15 0 0 delay E, -!1 , s RECORD
08/18 � -'0-36
: r�`,�rifi
08/IS/2005 10:46:10 :00 Fire Tr ubl 000 MARKER RECORD
08/18/2005 14:28:48 Page
SIGNAL REPORT
Romney Test_ng 8/18/2005
8/18I2005 OO:OC -- 8/18/2aQ5 14.15
M
Area signal
Zone Namer tion
------------------------------------------------------------------------------------
10: 4 6: 1
10:48+44 0 +
10:49:1
10 : 4 : 4 : 0
10::1 :00
1::0
10:5-7:46 :00
10-:58:25
1::2 :00
11:18:45
11:18:45 :
11:19:44 400
11:19.47 :00
11:19■ .0.0
11:20:17 :
11:: -00
11:20:37 -WOO
11:20:3 :00
11:21: :00
11:21: :00
11.21.38
11:21.41
1-1:21:44
11:211-:4-6 :00
11■22.14
11 ;1
11-423:21 :00
11:23:21 :00
11.: 2 5:1
11::1� :00
11*25:17
11:2x:20
11:25-* :00
11:: 5 0 :
11:25:54 :00
1-1:36:18
11: 3 6: 2 1 :00
11 * : 4 :00
11:36:7 :00
11:36:27 :00
11:37:1
11:31:1
11:38:30 :00
11+ ■00
I1::1
11.39:22 {
11--39:49
11-0,39:52 :00
11:40:13 -000
Eire
Fire
1a
Fire
delay
Fire
Fire
Fire.
Fire
Fire
Fir
Fire
F i r
Fire
a
1 a v
Tr ubl
Tri
ail
Tri
fJ-1
Tr ubl
Tr o u .1
Tr ubl
Troul
A 1, a r m,
Al a rim
arm
rubi
T.rl
ail
fail
Fire Trul
Fire Tr]l
deiay fail
delay fail
Fire l arm
aoa
060
ago
150
150
la4
060
OCD
OQO
066
066
065
OGS
0{7Q
OQO
000
066
066
000
ooa
000
066
oao
aoa
cao
000
076
076
aoo
000
076
000
000
cao
aoa
oao
ooa
aao
152
152
152
152
152
152
ODO
000
000
000
066
http,--//firesecuritymon'l'tor/P'hoen'lx/spool/77csf.htmi
MARKER
MAEF
MARKER
14AE
MARKER
MAKER
MR rE R
E
RECORD
RECORD
RECORD
RECORD
R� C 0 RE)
RECORD
MPiRKER RECORD
MAR ER RECORD
West Elevator
MARKER RECORD
MARKER RECORD
�%IARE R RECORD
AR ER RECORD
NL R EF RECORD
MARKER RECORD
West Eleva-Eor
MARKERRECORD
MARKER RECORD
MARKER RECORD
MARKER RECORD
E
RE
MARKS
MARKE
E
RE 1 iD
RECORD
ELS
RECORD
RECORD
-7�ir
Detector
West Elevator Detector
MARKER
1.RE
MARKER
�IARKE
YiPiRKER
MARKER
MARKER
MARKER
YU iR E
MARKER
MARIKEIR
_RECORD
tiEl
RED
RECORD
RECORD
RECORD
�D
RECORD
RECORD
RECORD
RECORD
MARNER RECORD
MARKER RECORD
Y-LkRKER
MARKER
MARKER
MA RE..
'IR.ER
MARKER
MARNER
RECORD
RECORD
EPL)
RECORD
RECORD
RECORD
RECORD
MARKER RECORD
West Elevator Detector
.-lire
1 r m
it
Alarm
Fire
Tru]]
Fire
Tri
Fire
Tr ub
Fire
Alarm
Fire
Tr1 ]
Fire
Troubl
clay fail
a -':ail
F're
Alarm
Fire
Alarm
Fire
Trul
Fire
Trl
F r
Alarm
Fire
Tri
Ei
Tu1
delay fail
delay fail
Pericclic T
Fire
T: ` u 1
Fire
Tr ul
Fire
Alarm
Fire
Alarm
Fir
1 a r,
Fire
Al rm
Fire
Alarm
Fire
Alarm
Fire Trul
Fire Tr]l
deiay fail
delay fail
Fire l arm
aoa
060
ago
150
150
la4
060
OCD
OQO
066
066
065
OGS
0{7Q
OQO
000
066
066
000
ooa
000
066
oao
aoa
cao
000
076
076
aoo
000
076
000
000
cao
aoa
oao
ooa
aao
152
152
152
152
152
152
ODO
000
000
000
066
http,--//firesecuritymon'l'tor/P'hoen'lx/spool/77csf.htmi
MARKER
MAEF
MARKER
14AE
MARKER
MAKER
MR rE R
E
RECORD
RECORD
RECORD
RECORD
R� C 0 RE)
RECORD
MPiRKER RECORD
MAR ER RECORD
West Elevator
MARKER RECORD
MARKER RECORD
�%IARE R RECORD
AR ER RECORD
NL R EF RECORD
MARKER RECORD
West Eleva-Eor
MARKERRECORD
MARKER RECORD
MARKER RECORD
MARKER RECORD
E
RE
MARKS
MARKE
E
RE 1 iD
RECORD
ELS
RECORD
RECORD
-7�ir
Detector
West Elevator Detector
MARKER
1.RE
MARKER
�IARKE
YiPiRKER
MARKER
MARKER
MARKER
YU iR E
MARKER
MARIKEIR
_RECORD
tiEl
RED
RECORD
RECORD
RECORD
�D
RECORD
RECORD
RECORD
RECORD
MARNER RECORD
MARKER RECORD
Y-LkRKER
MARKER
MARKER
MA RE..
'IR.ER
MARKER
MARNER
RECORD
RECORD
EPL)
RECORD
RECORD
RECORD
RECORD
MARKER RECORD
West Elevator Detector
(null)
08/18/200':-)
1-1:40:13
4:
:00
Fire
Alarm
066
08/18/2005
0.00
E
11:41:27
08/18/2005
:
Fire
'Tru1
000
08
//18/2005
11:41:30
000
RECORD
' it
'Tr u l
000
08//18/2005
1_1:41i:33
Fire
:00
Fire
Alarm
066
08
/18/2005
1111
11:41.
Q
F�
�'� � �
000
//18/2005
RECORD
11:41:
l":44:04
Fire
Trou l
000
MARK E
MARKER
MA
MARKER
RECORD
RECORD
RECORD
RECORD
MARKER RECORD
MARKER RECORD
Page 4 of 6
08/118/2005 14:28:48
IL REQ1.2ORT
mn.-e `besting 9/19/2005
8/18/2005 00:0 8/18/2005 14:15
Date Time Area Signal Zone
---------- ----------------------------------
Name/Description
-------_-------- _---1---------
08/18/2005
11.:
4:
0 6
:
00
clelayf ail
0.00
E
RECORD
08/18/2005
11:
42:
delay fail
000
MARE(ER
RECORD
18/2005
11:4
Fire
Alarm
066
east Elevator
08/18/2005.
1111
:43:02
-.00
Fire
Alarm
KER
RECORD
08/'18/2005
l":44:04
Fire
Troub.1
000
MARKER
RECORD
08/18/2005
1 _
:4-4:07
Fire
Troubl
000
MARKER
E !
08/18/2005
11:44:10
:00
Fire
Alarm
0 6 6ITA
E
RECORD
08/18/2005
11:44:13
-600
Flee
Troubl
000
MARKER
RECORD
08/18/2003
11:44:16
:00
F -ire
T r u l
000
M -k E
RECORD
08/18/2005
11:44:43
:00
delay fail
000
MARKER
RECORD
08/'18/2005
11:44:
:00
delay fail
000
MARNE
ECORD
08/18/2005
11-050:10
:
Fire
Alarm
096
East Elevator
08/18/2005
11:50:10
:00
Fire
Alarm
096
MARKER
RECORD
08/'18/2005
11
:
�
:
Fire
Troubl
000
MA EF
RECORD
/1
11:57:
:00
Fire
Troubl
000
MARKER
RECORD
08/18/2005
11:,57:10
:00
F're
.1arm
096
NIARKER
RECORD
08/18/2005
11
:
'7
:
1
:00
Fire
Troubi
000
MARKER
RECORD
08/1-8/2005
-1!
7:1
FIre
Tr ubi
000
MARKER
RECORD
08/'18/2005
11:
:4
delay fail
000
MARKER
.E D
08/18/2005
11:57:46
:00
delay fail
000
I L7_;1
RECORD
09/'18/2005
1:
-POO
Fire
Alarm
096
East El ii - t r
08/'18/2005
12:02:57
Fire
Alarm
096
MARKER
E .
08/18/2003
12:08:45
:00
Fire
Tr '
000
MARKER
RECOPD
08/18/2005
12:08:47
Fin -2
Troubl
000
MARNE
RECORD
O
08/12/200_F_-)
1■0:
:00
Fire
l r
MARKER
J 'ate' R D
08118120051
1:
-000
Fire
Troup
000
MA E
R� D
18/2005
12:
-_ire
Tr ubl
000
�v E
L I
08/18/2005
12:09:23
:00
ela fail
000
MARIKER
RECORD
08/18/20-05
1:
delay fail
000
MAR__,�ER
RECORD
08/18/2005
12:16:26
:00
Fire
Alarm
096
East E� v of r
08/18/2005
12-16-26
-000
Fire:
l a E
096
iMARI_�ER
RECORD
08/18/2005
12:17:35
:COFire
Troubl
MP--,% ERECORD
08/18/2005
12-017:38
:00
F ire
T�`- b1
000
ME
ECORD
080/18/2005
12#01-1.4-L
WOO
Fire
Alarm
096
MARKER
RECORD
Oe/18/200S1:17:44
:00
Fire
Tru1
000
MARKER
RECORD
08/18/2005
12:17:47
:00
FJ re
T r ub l
000
MARKER
RECORD
08/18/2005
121:18:14
:0
0
delayfail
000
MA_ E
RECORD
08/18/2005
12:18:17
0 0
delay
fail
000
_%1 E,
E 0 D
08/13/2005
12:19:40
:00
Fire
A!( -arm
106
East Ele-tr
`1
1
:1
:4
:00
Fire
Alarm
106
MARKER
RECORD
08/18/2005
1
:
2 0
:
52
:0
0
Fire
Trl
0 0 0
MA.IKE
FEr.._`ti
08/18/2005
12:20.05
:00
Fire
'Tr ul l
000
MARKER
P.Er.-`F
08/-~8/2005
12:20:58
-400
Fire
Alarm
1
MARKER E
RECORD
08/18/2005
1■1■
i
Fire
1 r b l
000
1 1A1 l 'E
RECORD
08/
.
Fire
Trc lhL,l
000
,�� R �
E �/ �08/18/2005
12-021:30
:00
de'ay
fail
000
MARKER
RECORD
t e c for
Detector
Detector
Detector
http://'firesecuritymonitor/phoenix/spool`/77csf-.h-tm1, 8/18/200:5-
I
(null)
08/18/2005
delay
12:21:33
000
08/18/2005
08/18/2005
08/18/2005
08/18/2005
08/18/2005
13:45:36
13:45:38
l
1
1-:
. •_,
:
08/18/2005
08/18/2005
000
1
13:55:26
: 5
Troubl
08/18/200513:55:26
:00
Fire
Troubl
000
:00
delay
fail
000
Fire
Trus
000
.00
Fare
Trul
000
:00
Fire
Troubl
000
:00
Fire
Troubl
000
:00
delay
fail
000
00
delay
fail
000
.0 0
Fire
Alarrr..
096
:00
Fire
096
MARKER RECORD
MAE R RECORD
MARKER RECORD
MARKER RECORD
DARKER.
MARKER
MARKER
RECORD
RECORD
RECORD
East El - at r Detector
MARKEiR RECORD
08/1-8/2005 14:28:48
IG L REPORT
Romney Testing 8/18/2005
8/18/2005 0: - 18/2005 14:15
Da t Ee T ime Area inal
riName/Description
08/18/20055
13:55:53
:.00
Fire
Tr ou l
000
08/18/2005
13:55:56
:00
Fire
Trout!
000
08/18,/2005
13:55:59
Fire
Alarm
096
08/18/2005
13:56:01
Fire
Troubl
000
08/18/2005
1
:
:
!
:00
Fire
Lrubl
000
08/18/2005
1
:
:
1
:00
delay fail
000
08/18/2005
13:56:35
:00
delayail
000
08/18/2005
1
:
�
:
1
Fire
Alarm
106
08/18/200513:57:19
:00
Fire
Aiarm
106
/18/2005
13:57:40
:00
Fire
Troubl
000
08/18/2005
1
.
�
:
Fire
Tr ubl
000
08/18/2005
13:57:45
Fire
Alarm
106
08/18/200513:57:48
:00
Fire
Tr u l
000
08/18/2005
1
.
7:51
:00
Fire
Troubl.
000
08/18/2005
13:58:18
:00
deiay
fail
000
08/18/2005
1
:
:
1
:00
delay
fail
000
08/18/2005
14:1
:
-
:00
Fire
Troubi
000
02/18/2005
1
:1
:08
:00
Fire
Trul
000
http://firesecurityiiionitor/phoenix/spool/77csf.html
MARKER
MARKER
lR.ER
MARKER
MARKER
MARKER
M RE R
RECORD
RECORD
R�'CRD
RECORD
RECORD
RECORD
RECORD
East Elevator Detector
MARKER FSE CORD
MARKER RECORD
?RER RIS.
MARKER RECORD
MARKER RE RD
MARKER RECORD
MARKER RECORD
MARKER RECORD
MARKER RECORD
MARKER RECORD
Pale 5 of 6
8/18/2005
(null) Page 6 of 6
08/18/2005 14:28:48
gage
http://firesecuritymon-itor/p1-ioenl'.x/spoo1/77csf.html 8/18/2005