HomeMy WebLinkAboutLETTER - Weststates formerly Jenks, Hawkins Properties - Rezone & Final PlatMay 6, 2002
Mr. Stan Rowlan
RE: Westates Subdivision
Dear Stan:
o P.O. Box 280
filly ��P��QQ1I°QJJ 12 North Center Street
Rexburg, Idaho 83440
STATE OF IDAHO Phone (208) 359-3020
Fax (208) 359-3022
e-mail rexburg@srv.net
At some point in the future I am sure you will request acceptance of the City of the work on your
development.
As per the Development Agreement and as per accepted city standards prior to the City accepting
any responsibility or long term maintenance for the roads, water or wastewater system certain
information and documentation must be provided to the City and to DEQ.
As a minimum DEQ requires that as built or record drawings for water and sewer systems be
completed by a registered engineer and copies of them submitted to DEQ. We also require a
copy of all utility drawings for the project.
Prior to the City accepting any responsibility for long term maintenance on the road or utilities we
need to see compaction tests on all trench work for the water and sewer lines and leakage tests on
the sewer line, pressure tests certification and biological cleanliness certification for the water
lines. We need to see that gradation certifications were met for the granular barrow and sub -base
and that compaction tests were taken and passed for the sub -base, base material and asphalt
material.
I am attempting to work with you on almost all issues but there are certain minimum items which
need to be done to certify to the City that the construction is being done in accordance with City
criteria so that long term maintenance problems will not develop.
It is our requirement that you provide on-site inspection services by qualified personnel during the
installation of utility lines and any paving that is done.
If you have any questions on these items or need further clarification please contact me at your
convenience.
JohA Millarr�P.E./7LM.S.
ublic Works Dire for/City Engineer