Loading...
HomeMy WebLinkAboutREVIEW COMMENTS CHART (Rev. 3) 4.28.21 - Teton River Flats - 280 Lorene St - PUD PlatProject Name: Teton River Flats Review: City Project Number: Engr. Project Number: 20-083 Reviewer Name City Comments Engr. Response Power must be underground. Joel Gray (pg.3) I'm sure it's underground; our line type is wrong. We are going to take off the power from our plans; refer to power contractorplans. Joel Gray (pg.3) Where is snow storage?Note added stating snow storage in park area. Joel Gray (pg.4) If this is built in Phase 4, where will prior phase water be stored? Phase info will be updated to require storm the to be built in Phase 1. Joel Gray (pg.4) Additional water valves and/or manholes will be necessary for Phasing as shown. Note added that water or sewer must be installed to next manhole or valve outside of Plat. Joel Gray (pg.3) Must be out of ROW.im sure it is out of ROW our block is just biger than it needs to be. We are going to take off. Joel Gray (pg.3)Move sidewalk so that back of walk is at future ROW line. Adjusted.