Loading...
HomeMy WebLinkAboutINFRASTRUCTURE PLANS Rev. (3) 4.5.2021 - 21-00177 - Teton River Flats - 280 Lorene St - PUD Plat-Reviewed-Corrections-Required (4)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Tawnya Grover Tawnya.Grover@rexburg.org 208-372-2167 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Description : Teton River Flats - 280 Lorene St - PUD Plat Address : 280 Lorene St Application Type : Document Filename : INFRASTRUCTURE PLANS - 21-00177 - Revised Teton River Flats 4-2-2021.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 3 HORIZONTAL CONTROL Callout Joel Gray : PW Open 3 Power must be underground. 3 HORIZONTAL CONTROL Free text Joel Gray : PW Open 3 Where is snow storage? 3 HORIZONTAL CONTROL Callout Joel Gray : PW Open 3 Must be out of ROW. 3 HORIZONTAL CONTROL Callout Joel Gray : PW Open 3 Move sidewalk so that back of walk is at future ROW Line. 4 PHASING MAP Callout Joel Gray : PW Open 4 If this is built in Phase 4, where will prior phase water be stored? 4 PHASING MAP Free text Joel Gray : PW Open 4 Additional water valves and/or manholes will be necessary for Phasing as shown. 6 LORENE STREET STA 1+00 TO 4+00 Free text Joel Gray : PW Open 5 Also here # 21-00177 Plat Report Date: 04.19.2021 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) Date: Connect Engineering APPROVAL SIGNATURES: of DEVELOPMENT DRAWINGS FOR: STATE MAP SHEET NO. PLOT DATE: 4/2/2021 10:28 AM Date: The Civil Connection 1150 Hollipark Dr. Idaho Falls, ID 83401 208.881.0081 Date:Department of Environmental Quality 1 16 TETON RIVER FLATS REXBURG, ID REXBURG, ID PRELIMINARY FOR REVIEW ONLY SITE MAP VICINITY MAP Sheet List Table Sheet Number Sheet Title 1 COVER 2 NOTES 3 HORIZONTAL CONTROL 4 PHASING MAP 6 LORENE STREET STA 1+00 TO 4+00 7 LORENE STREET STA 4+00 TO 8+50 8 DRIVE 1 0+75 TO 2+50 9 DRIVE 1 2+50 TO 7+20 10 DRIVE 2 0+75 TO 4+50 11 DRIVE 2 4+50 TO 6+25 12 STORM TECH CHAMBERS 13 STORM TECH DETAILS 14 CITY OF REXBURG STORM TECH DETAILS 15 BEST MANAGEMENT PRACTICES 16 BEST MANAGEMENT PRACTICES DETAILS REXBURG, ID S89° 31' 34"W 315.15' N0 ° 1 2 ' 2 5 " W 14 0 . 0 0 ' N89° 31' 34"E 645.01' N0 ° 1 1 ' 4 3 " W 19 9 . 7 9 ' S89° 33' 55"W 329.89' S0 ° 1 2 ' 2 5 " E 37 0 . 0 1 ' N89° 31' 34"E 122.43' S2 ° 0 2 ' 5 2 " E 14 0 . 6 0 ' S89° 46' 18"W 126.94' 0+ 7 8 1+ 0 0 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+19 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+ 0 0 8+ 4 2 0+ 7 8 1+ 0 0 2+ 0 0 3+ 0 0 4+ 0 0 4+ 7 0 L1 L2 C1 L3 L4 L5 Lorene St Number L1 C1 L2 Begin Station 1+00.00 7+16.74 7+94.09 End Station 7+16.74 7+94.09 8+42.31 Radius 49.50 Length 616.74 77.35 48.23 Line/Chord Direction N89° 31' 34.07"E N44° 45' 47.04"E N0° 00' 00.00"E Begin Point N: 791812.64, E: 759370.84 N: 791817.74, E: 759987.56 N: 791867.24, E: 760036.65 End Point N: 791817.74, E: 759987.56 N: 791867.24, E: 760036.65 N: 791915.47, E: 760036.65 DRIVE 1 Number L3 L4 Begin Station 0+78.00 2+36.50 End Station 2+36.50 7+19.25 Radius Length 158.50 482.75 Line/Chord Direction S0° 20' 55.41"E N89° 31' 47.79"E Begin Point N: 791834.41, E: 759400.08 N: 791675.91, E: 759401.05 End Point N: 791675.91, E: 759401.05 N: 791679.87, E: 759883.78 DRIVE 2 Number L5 Begin Station 0+78.00 End Station 4+70.04 Radius Length 392.04 Line/Chord Direction S0° 32' 16.31"E Begin Point N: 791838.77, E: 759852.78 End Point N: 791446.75, E: 759856.46 6" R = 1/2" 6" 1" 4" R = 1" 1' 1/2" 6"1" 6" 24" Control Point Table Point # 500 508 501 509 502 510 Elevation 4872.76 4871.17 4872.73 4872.69 4871.59 4872.92 Northing 791645.24 791782.62 791445.41 791642.66 791447.90 791787.81 Easting 759691.24 759375.50 759691.91 759376.06 760021.80 760020.46 Description FND 1/2"IR CAPMELTED 106-SET 1/2" IRLS12222 FND 1/2"IR CAPMARRED 105-SET 1/2"IR LS12222 FND 1/2"IR 107-SET 1/2"IR LS12222 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 3 16 TE T O N R I V E R F L A T S HO R I Z O N T A L C O N T R O L RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG LORENE STREET DRIVE 1 DR I V E 2 4.00' 22.00'2.50'5.50' 30.00' LORENE ROAD PUBLIC IMPROVEMENTS SCALE: 1"=5' ROWCENTERLINE 2% 3" OF PLANT MIX ASPHALT PAVEMENT 4" OF 3/4" AGGREGATE BASE 20" OF STANDARD PIT RUN MATERIAL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS 2% LANDSCAPE STRIP WITH TREES AND SHRUBS PER CITY OF REXBURG STANDARDS LEGEND EXIST. CATCH BASIN PROPOSED CATCH BASIN EXIST. FIRE HYDRANT PROPOSED FIRE HYDRANT EXIST. LIGHT POLE PROPOSED STREET LIGHT PROPOSED WATER VALVE PROPOSED SANITARY SEWER MANHOLE EXIST. CURB & GUTTER PROPERTY LINE GRADE BREAK SAW CUT STREET RIGHT-OF-WAY (ROW) EASEMENT LINE EXIST. FENCE LINE PROPOSED UNDERGROUND POWER EXIST. SANITARY SEWER LINE PROPOSED SANITARY SEWER LINE PROPOSED WATER LINE EXIST. WATERLINE PROPOSED SANITARY SEWER SERVICE PPROPOSED WATER SERVICE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED CONCRETE SIDEWALK PROPOSED ASPHALT PROPOSED LANDSCAPING PROPOSED BUILDINGS EXISTING ASPHALT TO BE PROTECTED PROPOSED STORM DRAIN MANHOLE PROPOSED CURB & GUTTER EXIST. STORM DRAINLINE PROPOSED STORM DRAINLINE EXIST. POWER POLE SITE INFORMATION: AREA: 156,242 SQ FT (3.59 ACRES) BUILDINGS: 29 (116 UNITS) UNITS/ACRE: 32 PARKING: 196 PARKING STALLS (6 ADA STALLS) LANDSCAPE: 55,013 SQ FT (35%) STORM TECH AREA VOLUME CALC.156,242 0.9 1.5 AREA (sq.ft.)PRECIPITATION FACTOR INTENSITY (in) 8,469 CU. FT. REQ VOLUME STORM TECH VOLUME VOLUME (cu ft) 9,163 INFILTRATION AREA 1111 sq ft RETENTION TIME 3 HRS CITY STORM TECH (SEE SHEET 14 FOR DETAILS) VOLUME CALC.19,872 0.9 1.5 AREA (sq.ft.)PRECIPITATION FACTOR INTENSITY (in) 2,236 CU FT REQ VOLUME STORM TECH VOLUME VOLUME (cu ft) 2,247 INFILTRATION MATERIAL PIT RUN BASE INFILTRATION AREA 992 sq ft 74.9 CU FT VOLUME PER INFILTRATOR NO. OF INFILTRATORS 30 STORM TECH AREA (SEE SHEET 11-13 FOR DETAILS) 4" DEPTH CRUSHED 3 4" MINUS AGGREGATE LEVELING COURSE COMPACTED TO 95% ASTM D698 12" DEPTH UNCRUSHED AGGREGATE SUBBASE COURSE COMPACTED TO 95% ASTM D698 SUBGRADE EARTH COMPACTED TO 95% ASTM D698 3" DEPTH ASPHALT PLANT MIX TYPICAL ASPHALT PARKING LOT CITY STORM TECH SYSTEM BUILDING NOTES: THERE IS AN ASSUMED 0.5' REVEAL FROM FINISH FLOOR TO FINISH GRADE. UNLESS OTHERWISE SHOWN ON PLANS. ASSUMED THAT FF IS THE TOP OF THE STEM WALL. 6" LIP DOWN CURB DETAIL SCALE: 1"=1' POWER NOTE: SEE ROCKY MOUNTAIN POWER CONTRACTOR'S MAP FOR PROPOSED POWER FACILITIES. FIRE CODE NOTE: 1.D103.6.1 ROADS ARE 20 TO 26 FEET IN WIDTH. FIRE LANE SIGNS ARE SPECIFIED IN SECTION D103.6 APPARATUS ACCESS ROADS THAT ARE 20 TO 26 FEET WIDE. 2.CURBS SHALL BE PAINTED RED FOUR FEET ON EACH SIDE OF THE EVERY FIRE HYDRANT. 24.00' 18.00' TYP 9.00' TYP 16.00' TYP 9.00' TYP 26.00' 16.00' 9.00' 10.52' LANDSCAPE NOTE: FINAL LANDSCAPE SHOULD SLOPE AWAY FROM BUILDINGS SANITARY SEWER SERVICE NOTE: CLEANOUTS REQUIRED FOR CURRENT PLUMBING CODE NOT SHOWN ON PLANS. CONTRACTOR IS RESPONSIBLE TO VERIFY SEWER CLEANOUT LOCATIONS. 13.57' 26.00' DR I V E 1 GEOTEXTILE FABRIC SEAL COAT 29.87' 29.27' 7.50' 15.00' INSTALL STREET LIGHT PER CITY OF REXBURG STANDARDS SPACED EVERY 400' 4.00' FUTURE RIGHT OF WAY 15.48' 19.50'19.27'19.40'19.85' 11.74'12.19'12.12' 18.92'19.39' 9.56'9.09' 8.97'8.86' 19.75'19.67' 32.18' PROJECT BENCH MARK POINT #500 CONTROL POINT #509 CONTROL POINT #508 CONTROL POINT #510 CONTROL POINT #502 CONTROL POINT #501 15.0000' FUTURE PUE Power must be underground. Where is snow storage? Must be out of ROW. Move sidewalk so that back of walk is at future ROW Line. S89° 31' 34"W 315.15' N0 ° 1 2 ' 2 5 " W 14 0 . 0 0 ' N89° 31' 34"E 645.01' N0 ° 1 1 ' 4 3 " W 19 9 . 7 9 ' S89° 33' 55"W 329.89' S0 ° 1 2 ' 2 5 " E 37 0 . 0 1 ' N89° 31' 34"E 122.43' S2 ° 0 2 ' 5 2 " E 14 0 . 6 0 ' S89° 46' 18"W 126.94' 4872 4871 4872 4872 487 3 48 7 2 4873 4 8 7 3 4872 4 8 7 2 4872 4873 48 7 1 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 4 16 TE T O N R I V E R F L A T S PH A S I N G M A P RE X B U R G , I D LORENE STREET PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASING INFORMATION: PHASE 1: 1.ALL STORM INFRASTRUCTURE UP TO AND INCLUDING STORM TECH CHAMBER AREA 1 MUST BE INSTALLED AS PART OF PHASE 1. 2.TEMPORARY SURFACE FIRE TRUCK TURN AROUND MUST BE INSTALLED AT THE END OF PHASE 1. PHASE 2: REMAINDER OF STORM INFRASTRUCTURE MUST BE INSTALLED AS PART OF PHASE 2. INCLUDING STORM TECH CHAMBER AREA 2. PHASE 3: 1.SIDEWALK ADJACENT TO FUTURE RIGHT OF WAY ON EAST PROPERTY LINE MUST BE INSTALLED AS PART OF THIS PHASE. 2.TEMPORARY SURFACE FIRE TRUCK TURN AROUND MUST BE INSTALLED AT THE END OF PHASE 3 3.REMAINDER OF UTILITY SERVICES CONNECTED TO PORTIONS OF THE MAINLINE IN THIS PHASE MUST BE INSTALLED. STORM TECH CHAMBER AREA If this is built in Phase 4, where will prior phase water be stored? Additional water valves and/or manholes will be necessary for Phasing as shown. DATUM ELEV 4860.00 4864 4868 4872 1+00 48 7 0 . 7 48 7 0 . 6 6 48 7 0 . 7 48 7 0 . 7 2 2+00 48 7 1 . 2 48 7 1 . 2 3 48 7 1 . 3 48 7 1 . 3 1 3+00 48 7 1 . 2 48 7 1 . 2 3 48 7 1 . 4 48 7 1 . 3 5 4+00 48 7 1 . 4 48 7 1 . 3 5 -0.40% 1.23% 0.60% PV I S t a . = 1 + 0 0 . 0 0 El e v . = 4 8 7 0 . 6 5 8 PV I S t a . = 1 + 6 7 . 7 3 El e v . = 4 8 7 1 . 4 9 0 PV I S t a . = 2 + 8 4 . 4 6 El e v . = 4 8 7 2 . 1 9 0 -0.40% 1.23% 0.60% PV I S t a . = 1 + 0 0 . 0 0 El e v . = 4 8 7 0 . 6 5 8 PV I S t a . = 1 + 6 7 . 7 3 El e v . = 4 8 7 1 . 4 9 0 PV I S t a . = 2 + 8 4 . 4 6 El e v . = 4 8 7 2 . 1 9 0 SSMH 1 Sta:1+35.41 OFF:-16.09L Rim:4871.10 S INV IN:4861.99 E INV IN:4861.99 W INV OUT:4861.86 Install 142' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % Install Hydrant Flange: 4872.09' STA: 3+86.59 OFF: 27.50 SSMH 3 Sta:2+76.94 OFF:-14.96L GRATE:4871.85 E INV IN:4862.66 W INV OUT:4862.56 Install 20' of 8" C50 DI Pipe @ 5' Min Cover Install 15' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 29' of 8" C50 DI Pipe @ 5' Min Cover Install 51' of 8" C50 DI Pipe @ 5' Min Cover Install 313' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % 0+ 7 8 1+ 0 0 1+00 2+00 3+00 4+00 0101-01 0501.4.1.B.1-08 0501.4.1.B.1-08 L1 L3 4872 4872 4872 -2.00% SSMH 1 SD MH 1 SD CB 2 SD CB 1 SD CB 3 0502.4.1.A.1-01 SSMH 3 0401.4.1.B.1-886 1+92.99 11.32 R 0401.4.1.B.1-886 2+47.33 11.77 R 0401.4.1.B.1-888 1+45.37 4.006 R 0401.4.1.B.1-886 1+37.80 3.99 R 0401.4.1.B.1-886 1+45.06 55.58 R 0401.4.1.B.1-886 3+55.99 12.67 R 0401.4.1.B.1-906 1+44.71 112.42 R 0401.4.1.B.1-8-6 0401.4.1.B.1-888 1+25.34 10.757 R 0401.4.1.B.1-886 3+01.71 12.22 R 0401.4.1.B.1-886 3+86.59 12.92 R 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0403.4.1.A.1-01 STA:3+86.59 OFF: 27.50R 0403.4.1.A.1-01 STA:1+37.76 OFF: 20.88R 4871.94 TBC-PI 4871.11 TBC-PC 4870.63 EO-MATCH 4870.74 TBC-MATCH 4871.30 TBC-PC 4871.23 TBC 4871.67 TBC-LP 4872.17 TBC-HP 4870.76 TBC 4872.50 FG 4872.50 FG 4871.05 FG 4872.00 FG 4872.50 FG 4872.50 FG 4871.20 FG 4872.00 FG 4872.75 FG 4872.75 FG 4873.00 FG 4872.75 FG4872.75 FG 4873.00 FG 4873.00 FG 4873.00 FG 4873.25 FG 4873.25 FG 4873.25 FG 4873.25 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG4873.50 FG 4873.50 FG 4870.88 TBC-PI-LP 4870.88 BSW-PI 4870.90 BSW-PI 4871.59 BSW-PI 4870.86 TBC-PC 4871.90 TBC-PC 4871.66 BSW-PI 4872.89 4872.94 4873.07 4873.11 4873.25 BSW-PI 4873.30 BSW-PI 4873.43 BSW-PI 4873.48 BSW-PI 4873.60 BSW-PI BUILDING: AREA: 1,819 SQ FT FF: 4873.25 BUILDING: AREA: 1,819 SQ FT FF: 4873.50 BUILDING: AREA: 1,819 SQ FT FF: 4873.75 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4873.00 BUILDING: AREA: 1,819 SQ FT FF: 4872.50 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 -2.20% 48 7 1 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 6 16 TE T O N R I V E R F L A T S LO R E N E S T R E E T S T A 1 + 0 0 T O 4 + 0 0 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG LORENE STREET PROFILE VIEW LORENE STREET PLAN VIEW 0101-01 RETAIN AND PROTECT EXISTING UTILITY NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0101-02 RETAIN AND PROTECT EXISTING ASPHALT AND CONCRETE 0201.4.1.E.1-01 SAW-CUT LINE AND ASPHALT REMOVAL 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.A.5-03 INSTALL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS DESIGN PROFILE @ CL EXISTING SURFACE 0601.4.1.A.17-12 0401.4.1.A.1-08 CITY OF REXBURG INFILTRATOR SYSTEM SEE SHEET 13 0201.4.1.E.1-01 0101-02 0101-02 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.A.5-01 0706.4.1.A.5-02 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 ROAD 1 SHEET 7 LO R E N E S T R E E T SH E E T 6 0401.4.1.A.1-06 0401.4.1.A.1-06 0401.4.1.A.1-06 0402.4.1.A.1-08 0706.4.1.A.5-03 1105.4.1.A.1-01 1105.4.1.A.1-01 INSTALL STOP SIGN AND STREET SIGNS PER MUTCD STD. ENSURE 18" MINIMUM VERTICAL CLEARANCE 0706.4.1.A.3-04 0706.4.1.B.3-04 INSTALL COMMERCIAL APPROACH PER CITY OF REXBURG ENGINEERING STANDARDS 0402.4.1.A.1-08 0504.4.1.B.1-04 0602.4.1.F.1-01 INSTALL MH WITH BOLTED LID INSTALL WITH TOP 1' AS GRADE RINGS/RISERS TO BE REMOVED WHEN THE REMAINDER OF THE ROAD IS INSTALLED Also here