Loading...
HomeMy WebLinkAboutINFRASTRUCTURE PLANS Rev. (3) 4.5.2021 - 21-00177 - Teton River Flats - 280 Lorene St - PUD Plat (23 BLDGS)Date: Connect Engineering APPROVAL SIGNATURES: of DEVELOPMENT DRAWINGS FOR: STATE MAP SHEET NO. PLOT DATE: 4/2/2021 10:28 AM Date: The Civil Connection 1150 Hollipark Dr. Idaho Falls, ID 83401 208.881.0081 Date:Department of Environmental Quality 1 16 TETON RIVER FLATS REXBURG, ID REXBURG, ID PRELIMINARY FOR REVIEW ONLY SITE MAP VICINITY MAP Sheet List Table Sheet Number Sheet Title 1 COVER 2 NOTES 3 HORIZONTAL CONTROL 4 PHASING MAP 6 LORENE STREET STA 1+00 TO 4+00 7 LORENE STREET STA 4+00 TO 8+50 8 DRIVE 1 0+75 TO 2+50 9 DRIVE 1 2+50 TO 7+20 10 DRIVE 2 0+75 TO 4+50 11 DRIVE 2 4+50 TO 6+25 12 STORM TECH CHAMBERS 13 STORM TECH DETAILS 14 CITY OF REXBURG STORM TECH DETAILS 15 BEST MANAGEMENT PRACTICES 16 BEST MANAGEMENT PRACTICES DETAILS REXBURG, ID CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 2 16 TE T O N R I V E R F L A T S NO T E S RE X B U R G , I D DEPARTMENT OF ENVIRONMENTAL QUALITY 900 N SKYLINE, SUITE B IDAHO FALLS, IDAHO 83402 (208) 528-2650 CONTACTS INTERMOUNTIAN GAS COMPANY 1527 HOLLIPARK DR IDAHO FALLS IDAHO, IDAHO 83401 (208) 542-6632 ROCKY MOUNTAIN POWER 170 W 2ND N REXBURG, ID 83440 (888) 221-7070 CITY OF REXBURG 35 N 1ST E, REXBURG, ID 83440 (208) 359-3020 APPROVED BY ________________________DATE:____________ City of REXBURG CABLE ONE 1525 SHERRY DR. IDAHO FALLS, ID 83403 (208) 523-4567 GENERAL NOTES 1. All materials, workmanship, and construction of site improvements shall meet or exceed the work standards and specifications set forth by the CITY OF REXBURG standard specifications and drawings, and and requirements of the Idaho Standards for Public Works Construction, (ISPWC) current edition. 2. All material furnished on or for the project must meet the minimum requirements of the approving agencies or as set forth herein, whichever is more restrictive. 3. The Contractor is cautioned that the location and/or elevation of existing utilities, as shown on these plans, is based on records of the various utility companies and where possible, measurements taken in the field. The Contractor must call the local utility location center at least 48 hours before any excavation to request exact field locations of the utilities. 4. A Pre-Construction Conference shall be held a minimum of three (3) working days prior to start of work. All Contractors, Subcontractors and/or Utility Contractors shall be present. 5. All lot dimensions and easements are to be taken from the Final Plat of the recorded subdivision plat. 6. The Contractor shall maintain all existing drainage and sanitary sewer facilities within the construction area until the drainage improvements are in place and functioning. 7. All Contractors working within the project boundaries are responsible for compliance with all applicable safety laws of any jurisdictional body including but not limited to, barricades, safety devices, control of traffic, excavation, trenching, shoring, and security within and around the construction area. 8. Contractors must furnish proof that all materials installed on this project meet the requirements of Note # 2 above at the request of the agency and/or Engineer. 9. CONNECT ENGINEERING must give approval prior to (a) backfilling trenches for pipe; (b) placing of aggregate base; (c) placing of concrete; (d) placing of asphalt pavement. Work done without such approval shall not relieve the Contractor from the responsibility of performing the work in an acceptable manner. Contract work will not be accepted by the CITY OF REXBURG without the approval of the Project Engineer. 10. Developmental drawings must be submitted to the CITY OF REXBURG Public Works Dept. prior to final approval. 11. Only plan sets marked "Approved for Construction" shall be used by the project contractor(s). Use of any plans on the job without the "Approved of Construction" stamp shall be grounds for the issuance of a stop work order. Contractor must also maintain a set of plans stamped with approval by the Department of Environmental Quality on site. 12. Contractor is responsible for property corner protection. The cost of $30 per corner will be held as retainage until all interior corners are verified to be in place. 13. Each Contractor shall be responsible for acquiring any necessary NPDES permits, filing any NOI's or NOT's, and preparing a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the Environmental Protection Agency. Contact the EPA at 208.378.5776 for the required information. Said permit shall be presented to the Engineer at least forty-eight (48) hours prior to the beginning of construction. 14. The Contractor shall be responsible for keeping roadways free and clear of all construction debris and dirt tracked in from the site. 15. All measures possible shall be taken to ensure erosion control with Best Management Practices. 16. Quantities shown are estimates by the Engineer. The Contractor must verify all quantities. If there is a large discrepancy contact the Engineer. 17. All work must meet standards set forth by the American Disabilities Act (ADA) inside public rights of way. 18. Trench backfill Type 2A compaction "Water Settling" will not be an acceptable method of trench backfill compaction. 19. All water valves, blow-offs and manholes will be placed so as not to conflict with any concrete curb, gutter, valley gutter, and sidewalk improvements. 20. CONNECT ENGINEERING and/or Inspector shall make periodic visits to the project location to ensure that the site improvements meet or exceed standards and design as per the approved construction drawings. 21. To receive final acceptance, Contractor must submit copy of field plans complete with construction notes and As-Built information, corrections, changes, etc. 22. Contractor must have ISPWC manual (current edition) on-site during all phases of construction. Failure to do so may result in non-acceptance of the site by DEQ, Engineer, City etc. 23. A copy of the Quality Control Signature sheet (with all applicable signatures) shall be delivered to CONNECT ENGINEERING prior to the walk-thru. 24. A Right-of-Way Construction Permit from the CITY OF REXBURG Public Works is required for any construction in the road right-of-way not shown on these improvement drawings. 25. Contractors shall provide a one (1) year warranty on all roads from the date of formal acceptance by the CITY OF REXBURG. 26. Lot corners and centerline intersection monuments have been staked as shown on the recorded plat of this subdivision. Should any of these monuments be lost or disturbed during construction Idaho Code 55-1613 requires said monuments will be reestablished by a professional land surveyor at the expense of the agency or person causing the loss or disturbance. STREET CONSTRUCTION 1. All construction within public right-of-way shall conform to the current edition of the ISPWC and the CITY OF REXBURG standards. No exceptions to Policy Standards and the ISPWC will be allowed unless specifically and previously approved in writing by the CITY OF REXBURG. 2. No construction shall begin before the Pre-Construction meeting, which the Contractor is required to attend. 3. Sanitary sewer and storm drain manholes, cones and structures shall be set to specified elevation by their respective contractors. All remaining manhole materials, except concrete collars, necessary to construct manhole to finished grade in pavement areas shall be furnished by the Contractor for placement at finished grade. For manholes not within pavement areas, the manhole rings shall be set to finished grade by their respective contractor. Contractor shall contact the CITY OF REXBURG twenty-four (24) hours prior to pouring concrete collars. 4. Contractor shall construct four inches (4") of asphalt pavement thickness at joint locations for all pavement matches. 5. All reinforced concrete pipe shall conform to ASTM C-76 Specifications for the class of pipe indicated, and shall be installed watertight. 6. All work will be inspected by CONNECT ENGINEERING and monitored by the CITY OF REXBURG in accordance with the latest edition of the "REXBURG STANDARD DRAWINGS AND SPECIFICATIONS". 7. Borrow shall be obtained from sources designated or approved in writing by the Engineer. 8. Clearing and grubbing shall consist of removing all natural and artificial objectionable materials. Under no circumstances shall roadways be placed on frozen or objectionable material. 9. The subgrade shall be excavated and bladed to remove all uneven areas and to secure a uniform surface true to grade and line. The subgrade material shall then be scarified to a depth of eight inches (8"), adjusted to within approximately 2% of optimum moisture content and compacted to the minimum density required as stated in ISPWC. 10. All concrete used shall be Class 4 and have a strength of four thousand (4000) PSI in twenty-eight (28) days. The concrete mix shall include Fly Ash for ASR mitigation. The mix design shall be approved by the engineer. All concrete shall be cured by a liquid membrane-forming curing compound method,unless otherwise specified in writing by the Engineer. 11. The plant mix should be a 12-inch SP3 PG 58-28, 1 to 10 million design ESALs superpave hot mix asphalt design. 12. All road stripping and excess topsoil shall be stockpiled out of the right-of-way and stored at Contractor's expense. 13. A traffic control plan based on the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) shall be approved by the CITY OF REXBURG Public Works Department prior to construction. 14. Parked equipment and stored materials shall be kept as far away from the travelway as feasible. Items left overnight within 30 feet of the travel way shall be marked and/or protected. STREET SIGNING 1.All road striping and traffic signing shall be designed, constructed, and placed according to the current Manual of Uniform Traffic Control Devices (MUTCD) with the following exceptions: 1.1.All Stop and Yield signs used in any subdivision shall be a minimum 30" X 30", engineer grade sheeting is not allowed. 1.2.All Road Name and Street signs shall have a minimum 4" legend. Both background and legend shall be retro-reflective. Standard colors are white legend and green background except private roads, which will have a blue background. 1.3.Substrate material shall be aluminum; no fiberglass or plastic will be accepted. 1.4.The minimum size for Speed Limit Signs shall be 24"W X 30"L with black legend on white background. 1.5.Posts shall be metal and shall be anchored with a "soil type" anchor. No concrete shall be used as an anchor. Posts shall be 2" X 2" square and must meet break-a-way standards of the State of Idaho. No U-channel shall be used. 1.6.The minimum height of signs shall be 6' from the road surface to the bottom of the sign. 1.7.Maintenance of all street and traffic signs will be the responsibility of the developer until the streets are officially accepted for maintenance by the CITY OF REXBURG. WATER NOTES 1. The water system shall be constructed to conform with the standards set forth in the "Idaho Regulations for Public Drinking Water Systems" and the current CITY OF REXBURG standard drawings and specifications. 2. The pipe shall be installed in a workmanlike manner by persons properly qualified to perform said work and shall be in conformance with the manufacturer's recommendations as approved by the City Engineer. All work and materials must conform to current requirements of the CITY OF REXBURG. Water distribution mains shall be constructed with class 50 DI pipe, AWWA C-900, DR 18 PVC or Pressure Class 250 DIP. 3. All water services shall be 1" DR7 (200 psi) PE IPS pipe and have a minimum cover of 5 feet . Cap lines 5' from building for connection. The trenches shall be compacted to 95% of maximum density to prevent further settlement. All mains shall be leak-tested, disinfected, flushed and bacteria tested before connecting to the municipal system. Mueller thermal coil meter pit, or equivalent, required for all water services. 4. Where it is necessary for sewer and water to cross each other and the sewer line is above or less than 18 inches below the water main, the sewer line crossing shall be either: a. Non-Potable pipeline construction with potable water class pie for a minimum of ten (10) feet either side of potable pipeline with a single twenty (20) feet section of potable water class pipe centered on the crossing; or b. Sleeve non-potable or potable pipeline with potable water class pipe ten (10) feet either side of crossing. Use of hydraulic cementitous materials such as concrete, controlled density fill, and concrete slurry encasement is not allowed as a substitute for sleeving. If potable pipeline is below non-potable pipeline, the non-potable pipeline must also be supported through the crossing to prevent settling. 5. All tees, plugs, caps and bends, and at other locations where unbalanced forces exist, shall be secured and anchored by concrete thrust blocks . 6. CONNECT ENGINEERING will provide one (1) set of construction stakes for each of the following items: water main lines, fire hydrants, and service connections. 7. Contractor to field verify all valve box lid elevations to assure that said lid elevations match final street grade. 8. The paving contractor shall be responsible for constructing concrete collars and final adjustments of water valves to grade. 9. Pipes laid on a curve: the maximum joint deflection shall be 5 percent or the manufacturer's recommendation, whichever is less. 10. The developer will test the compaction of the water pipeline bedding in accordance with the ISPWC specifications construction inspection policy. Testing will be done by an outside testing laboratory. The cost of this service shall be paid by the developer. However, if the test fails, the cost of the test and any retesting shall be paid by the water contractor. The contractor shall coordinate with the developer's engineer and testing laboratory to schedule the tests, his backfilling, and pipe laying operation. 11. The developer's engineer shall be present during all testing of the water line. 12. The horizontal separation of the water and sanitary sewer, or storm drain shall be a minimum of ten (10) feet. 13. The water line construction shall conform to the depth of public health and welfare regulations of public drinking. A minimum of 5-foot cover for water lines water systems and disinfection specifications shall be kept. 14. Fire hydrants or temporary blow-offs shall be installed on dead-end water lines. 15. Water lines shall not exceed 8' in depth from finished grade. 16. At all times, when laying pipe is not in progress, open ends of the pipe shall be closed by a watertight plug or other approved means. At the close of the day's work, or whenever workmen are absent from the job, the end of the last laid section shall be plugged, capped, or tightly closed to prevent entry of foreign material. 17. All water main fittings to be mechanical joint; no flanged fittings. 18. A minimum of 18" vertical clearance must exist between potable and non-potable lines. 19. Fire hydrants shall be Clow Medallion or Waterous Pacer. Any other type shall be up to the CITY OF REXBURG to approve or reject. All fire hydrants shall be painted red. 20. Install No. 12AWG copper locating wire with insulation on all water pipe and water service lines. Utilize epoxy splice kits. SEWER NOTES 1. Prior to construction, it shall be the responsibility of the contractor to inform all the utility companies of the construction schedule. 2 All existing utility locations and depths are approximate and shall be verified by the contractor. 3. All elevations are based on the USED DATUM. 4. Manhole rim elevations as shown on the Construction Drawings are approximate. The manhole frames and covers shall be constructed in accordance with the CITY OF REXBURG Standard Drawings. Rim elevations shall be determined by the engineer in the field during construction. 5. Contractor shall repave any existing paved streets disturbed during construction. 6. Retain and protect all irrigation and drainage crossings. The contractor shall coordinate with the owner and the Rexburg Irrigation Company (208-356-5251) for the inspection of the exposed irrigation and/or drainage pipe crossings. If existing pipes are damaged, the affected pipe will be replaced by the contractor. 7. The developer's engineer shall be present during all testing of the sewer construction. 8. Retain and protect existing curb, gutter and sidewalk. if removal is necessary, replacement shall be incidental to project. 9. The following type and class of pipe will be permitted: gravity pipe shall conform to ASTM D-3034, PVC, SDR 35, or other pipe approved in the CITY OF REXBURG Standards. 10. All work shall be constructed to the CITY OF REXBURG Standards. All work shall be approved by the CITY OF REXBURG. 11. Sanitary sewer manhole cones shall be set a maximum of one (1) foot below specified ring elevations by sewer contractor. All remaining manhole materials, other than concrete collars necessary to construct manhole to finished grade, shall be furnished by the sewer contractor for placement at finished grade by street paving contractor. All materials for concrete around manhole rings shall be supplied and constructed to finished grade by street contractor. The owner's engineer shall be contacted 24 hours prior to placing concrete collars. 12. The trench backfill above the pipe zone will be inspected by the owner's engineer in accordance with the latest edition of the Idaho Standards for Public Works Construction Specifications and the CITY OF REXBURG Standards and Specifications. 13. Where PVC is utilized, a rubber ring or approved equivalent is to be installed where the pipe is in contact with manhole base and/or manhole channel in order to insure a watertight seal. 14. Where it is necessary for sewer and water to cross each other and the sewer line is above or less than 18 inches below the water main, the sewer line crossing shall be either: a. Non-Potable pipeline construction with potable water class pie for a minimum of ten (10) feet either side of potable pipeline with a single twenty (20) feet section of potable water class pipe centered on the crossing; or b. Sleeve non-potable or potable pipeline with potable water class pipe ten (10) feet either side of crossing. Use of hydraulic cementitous materials such as concrete, controlled density fill, and concrete slurry encasement is not allowed as a substitute for sleeving. If potable pipeline is below non-potable pipeline the non-potable pipeline must also be supported through the crossing to prevent settling. 15. Where the sewer main depth will allow, all sewer service lines shall be constructed to a depth of 9.5' at property line. The contractor shall use 4" diameter PVC pipe or approved equivalent for all service lines. All sewer service lines shall be constructed at a minimum grade of 2% unless otherwise specified. 16. Sewer service lines shall be 4" PVC and constructed to a point 15' inside the front lot line as shown. Except where otherwise located, the sewer service lines shall be constructed as shown on plan. 17. The horizontal separation of the water and sewer mains shall be a minimum of ten (10) feet. 18. Contractor shall notify the CITY OF REXBURG City Engineer and the developer's engineer 48 hours in advance of construction. 19. Water levels shall be maintained below the trench bottom during the pipe laying and joining operation. The dewatering method shall be discussed with the engineer and approved prior to construction. Ditches and storm drain facilities that are silted up due to the contractor's dewatering shall be cleaned and restored to their original state. 20. Contractor shall locate and protect all underground utilities during construction. 21. The developer shall test the compaction of the sewer pipeline bedding in accordance with the the ISPWC specifications, and will be done by an outside testing laboratory. The cost of this service shall be paid by the developer. However, if the test fails, the cost of the test and any retesting shall be paid by the contractor. The contractor shall coordinate with the developer's engineer and the testing laboratory to schedule the tests, backfilling, and pipe laying operation. 22. After all utilities are constructed and just prior to paving, the contractor shall perform an air test on the sewer system. The developer's engineer shall be present to witness the test. The contractor shall contact the engineer 24 hours prior to testing. City of REXBURG requires low pressure air or hydrostatic testing, mandrel, and CCTV inspection of the completed sewer. 23. The contractor shall leave the excavation for the upstream end of all service lines open for field verification of the invert elevation by the engineer's inspector. The contractor shall not backfill the ends of service lines until he has obtained approval from the engineer's inspector or made other arrangements for verification of service line invert elevations. 24. Service and main piping shall be in accordance with ASTM 3034 and shall be SDR 35 or greater plastic pipe or approved equal. 25. Service wyes shall be installed per the CITY OF REXBURG Standards. 26. Backfill compaction of drop manholes shall not be accepted without full time inspection by developer's engineer during compaction work. 27. At all times, when laying pipe is not in progress, open ends of the pipe shall be closed by a watertight plug or other approved means. At the close of the day's work, or whenever workmen are absent from the job, the end of the last laid section shall be plugged, capped, or tightly closed to prevent entry of foreign material. 28. All visible leaks shall be repaired - even if the leakage is below allowable limits. 29. The developer's engineer shall be present during all testing of the sewer line. 30. A minimum of 18" vertical clearance must exist between potable and non-potable lines. ELECTRICAL NOTES 1. All new electrical facilities shall be constructed in accordance with the current Rocky Mountain Power Service Policy. Each utility shall be constructed to its own policy. 2. Electrical sectionalizing cabinets and bases (when required) will be provided by Rocky Mountain Power but shall be installed by the Developer/Contractor. 3. All primary and secondary conduits shall be provided and installed by the Developer/Contractor. All electrical conduits and 36" radius elbows shall be schedule 40 pvc. 4. The minimum power trench depth shall be 54" below finished grade. (Conduit to be installed 48" below finish grade). Including 6" of sand bedding below and above top of conduits. 5. Primary and secondary conduit depths can be reduced to 18" of cover below finished grade with approval by Rocky Mountain Power. Rigid galvanized steel conduit must be provided and installed by the Developer/Contractor in a trench that is less than 48" deep. 6. The Contractor shall retain and protect all existing City power poles and electrical facilities during construction except those facilities shown to be relocated or moved per Rocky Mountain Power contractors map. 7. Coordinate all electrical construction with Rocky Mountain Power. 8. Owner shall bear all costs to relocate or remove existing power poles, light poles, anchor guys, and miscellaneous electrical facilities, except those facilities inside city rights of way. 9. The Owner/Developer shall provide all trenching, conduit and concrete light pole foundations for street illumination along all Public Right of Way as per Rocky Mountain Power current service policy. In addition, Owner/Developer shall purchase street light assembly provided and installed by Rocky Mountain Power. 10. If applicable, see Rocky Mountain Power Electrical site plan for off-site electrical and fiber optic facilities, layout, and installation details. 11. With exception of conduit crossing, contractor shall install curb and gutter prior to power trench and conduit installation. or (with Rocky Mountain Power approval) centerline of trench may be staked with cut/fill to bottom of trench at all grade breaks and hubs at 25' intervals and offset stakes at all transformers, switch cabinets, secondary pedestals etc. 12. Contact Rocky Mountain Power prior to construction. S89° 31' 34"W 315.15' N0 ° 1 2 ' 2 5 " W 14 0 . 0 0 ' N89° 31' 34"E 645.01' N0 ° 1 1 ' 4 3 " W 19 9 . 7 9 ' S89° 33' 55"W 329.89' S0 ° 1 2 ' 2 5 " E 37 0 . 0 1 ' N89° 31' 34"E 122.43' S2 ° 0 2 ' 5 2 " E 14 0 . 6 0 ' S89° 46' 18"W 126.94' 0+ 7 8 1+ 0 0 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+19 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+ 0 0 8+ 4 2 0+ 7 8 1+ 0 0 2+ 0 0 3+ 0 0 4+ 0 0 4+ 7 0 L1 L2 C1 L3 L4 L5 Lorene St Number L1 C1 L2 Begin Station 1+00.00 7+16.74 7+94.09 End Station 7+16.74 7+94.09 8+42.31 Radius 49.50 Length 616.74 77.35 48.23 Line/Chord Direction N89° 31' 34.07"E N44° 45' 47.04"E N0° 00' 00.00"E Begin Point N: 791812.64, E: 759370.84 N: 791817.74, E: 759987.56 N: 791867.24, E: 760036.65 End Point N: 791817.74, E: 759987.56 N: 791867.24, E: 760036.65 N: 791915.47, E: 760036.65 DRIVE 1 Number L3 L4 Begin Station 0+78.00 2+36.50 End Station 2+36.50 7+19.25 Radius Length 158.50 482.75 Line/Chord Direction S0° 20' 55.41"E N89° 31' 47.79"E Begin Point N: 791834.41, E: 759400.08 N: 791675.91, E: 759401.05 End Point N: 791675.91, E: 759401.05 N: 791679.87, E: 759883.78 DRIVE 2 Number L5 Begin Station 0+78.00 End Station 4+70.04 Radius Length 392.04 Line/Chord Direction S0° 32' 16.31"E Begin Point N: 791838.77, E: 759852.78 End Point N: 791446.75, E: 759856.46 6" R = 1/2" 6" 1" 4" R = 1" 1' 1/2" 6"1" 6" 24" Control Point Table Point # 500 508 501 509 502 510 Elevation 4872.76 4871.17 4872.73 4872.69 4871.59 4872.92 Northing 791645.24 791782.62 791445.41 791642.66 791447.90 791787.81 Easting 759691.24 759375.50 759691.91 759376.06 760021.80 760020.46 Description FND 1/2"IR CAPMELTED 106-SET 1/2" IRLS12222 FND 1/2"IR CAPMARRED 105-SET 1/2"IR LS12222 FND 1/2"IR 107-SET 1/2"IR LS12222 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 3 16 TE T O N R I V E R F L A T S HO R I Z O N T A L C O N T R O L RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG LORENE STREET DRIVE 1 DR I V E 2 4.00' 22.00'2.50'5.50' 30.00' LORENE ROAD PUBLIC IMPROVEMENTS SCALE: 1"=5' ROWCENTERLINE 2% 3" OF PLANT MIX ASPHALT PAVEMENT 4" OF 3/4" AGGREGATE BASE 20" OF STANDARD PIT RUN MATERIAL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS 2% LANDSCAPE STRIP WITH TREES AND SHRUBS PER CITY OF REXBURG STANDARDS LEGEND EXIST. CATCH BASIN PROPOSED CATCH BASIN EXIST. FIRE HYDRANT PROPOSED FIRE HYDRANT EXIST. LIGHT POLE PROPOSED STREET LIGHT PROPOSED WATER VALVE PROPOSED SANITARY SEWER MANHOLE EXIST. CURB & GUTTER PROPERTY LINE GRADE BREAK SAW CUT STREET RIGHT-OF-WAY (ROW) EASEMENT LINE EXIST. FENCE LINE PROPOSED UNDERGROUND POWER EXIST. SANITARY SEWER LINE PROPOSED SANITARY SEWER LINE PROPOSED WATER LINE EXIST. WATERLINE PROPOSED SANITARY SEWER SERVICE PPROPOSED WATER SERVICE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED CONCRETE SIDEWALK PROPOSED ASPHALT PROPOSED LANDSCAPING PROPOSED BUILDINGS EXISTING ASPHALT TO BE PROTECTED PROPOSED STORM DRAIN MANHOLE PROPOSED CURB & GUTTER EXIST. STORM DRAINLINE PROPOSED STORM DRAINLINE EXIST. POWER POLE SITE INFORMATION: AREA: 156,242 SQ FT (3.59 ACRES) BUILDINGS: 29 (116 UNITS) UNITS/ACRE: 32 PARKING: 196 PARKING STALLS (6 ADA STALLS) LANDSCAPE: 55,013 SQ FT (35%) STORM TECH AREA VOLUME CALC.156,242 0.9 1.5 AREA (sq.ft.)PRECIPITATION FACTOR INTENSITY (in) 8,469 CU. FT. REQ VOLUME STORM TECH VOLUME VOLUME (cu ft) 9,163 INFILTRATION AREA 1111 sq ft RETENTION TIME 3 HRS CITY STORM TECH (SEE SHEET 14 FOR DETAILS) VOLUME CALC.19,872 0.9 1.5 AREA (sq.ft.)PRECIPITATION FACTOR INTENSITY (in) 2,236 CU FT REQ VOLUME STORM TECH VOLUME VOLUME (cu ft) 2,247 INFILTRATION MATERIAL PIT RUN BASE INFILTRATION AREA 992 sq ft 74.9 CU FT VOLUME PER INFILTRATOR NO. OF INFILTRATORS 30 STORM TECH AREA (SEE SHEET 11-13 FOR DETAILS) 4" DEPTH CRUSHED 3 4" MINUS AGGREGATE LEVELING COURSE COMPACTED TO 95% ASTM D698 12" DEPTH UNCRUSHED AGGREGATE SUBBASE COURSE COMPACTED TO 95% ASTM D698 SUBGRADE EARTH COMPACTED TO 95% ASTM D698 3" DEPTH ASPHALT PLANT MIX TYPICAL ASPHALT PARKING LOT CITY STORM TECH SYSTEM BUILDING NOTES: THERE IS AN ASSUMED 0.5' REVEAL FROM FINISH FLOOR TO FINISH GRADE. UNLESS OTHERWISE SHOWN ON PLANS. ASSUMED THAT FF IS THE TOP OF THE STEM WALL. 6" LIP DOWN CURB DETAIL SCALE: 1"=1' POWER NOTE: SEE ROCKY MOUNTAIN POWER CONTRACTOR'S MAP FOR PROPOSED POWER FACILITIES. FIRE CODE NOTE: 1.D103.6.1 ROADS ARE 20 TO 26 FEET IN WIDTH. FIRE LANE SIGNS ARE SPECIFIED IN SECTION D103.6 APPARATUS ACCESS ROADS THAT ARE 20 TO 26 FEET WIDE. 2.CURBS SHALL BE PAINTED RED FOUR FEET ON EACH SIDE OF THE EVERY FIRE HYDRANT. 24.00' 18.00' TYP 9.00' TYP 16.00' TYP 9.00' TYP 26.00' 16.00' 9.00' 10.52' LANDSCAPE NOTE: FINAL LANDSCAPE SHOULD SLOPE AWAY FROM BUILDINGS SANITARY SEWER SERVICE NOTE: CLEANOUTS REQUIRED FOR CURRENT PLUMBING CODE NOT SHOWN ON PLANS. CONTRACTOR IS RESPONSIBLE TO VERIFY SEWER CLEANOUT LOCATIONS. 13.57' 26.00' DR I V E 1 GEOTEXTILE FABRIC SEAL COAT 29.87' 29.27' 7.50' 15.00' INSTALL STREET LIGHT PER CITY OF REXBURG STANDARDS SPACED EVERY 400' 4.00' FUTURE RIGHT OF WAY 15.48' 19.50'19.27'19.40'19.85' 11.74'12.19'12.12' 18.92'19.39' 9.56'9.09' 8.97'8.86' 19.75'19.67' 32.18' PROJECT BENCH MARK POINT #500 CONTROL POINT #509 CONTROL POINT #508 CONTROL POINT #510 CONTROL POINT #502 CONTROL POINT #501 15.0000' FUTURE PUE S89° 31' 34"W 315.15' N0 ° 1 2 ' 2 5 " W 14 0 . 0 0 ' N89° 31' 34"E 645.01' N0 ° 1 1 ' 4 3 " W 19 9 . 7 9 ' S89° 33' 55"W 329.89' S0 ° 1 2 ' 2 5 " E 37 0 . 0 1 ' N89° 31' 34"E 122.43' S2 ° 0 2 ' 5 2 " E 14 0 . 6 0 ' S89° 46' 18"W 126.94' 4872 4871 4872 4872 487 3 48 7 2 4873 4 8 7 3 4872 4 8 7 2 4872 4873 48 7 1 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 4 16 TE T O N R I V E R F L A T S PH A S I N G M A P RE X B U R G , I D LORENE STREET PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASING INFORMATION: PHASE 1: 1.ALL STORM INFRASTRUCTURE UP TO AND INCLUDING STORM TECH CHAMBER AREA 1 MUST BE INSTALLED AS PART OF PHASE 1. 2.TEMPORARY SURFACE FIRE TRUCK TURN AROUND MUST BE INSTALLED AT THE END OF PHASE 1. PHASE 2: REMAINDER OF STORM INFRASTRUCTURE MUST BE INSTALLED AS PART OF PHASE 2. INCLUDING STORM TECH CHAMBER AREA 2. PHASE 3: 1.SIDEWALK ADJACENT TO FUTURE RIGHT OF WAY ON EAST PROPERTY LINE MUST BE INSTALLED AS PART OF THIS PHASE. 2.TEMPORARY SURFACE FIRE TRUCK TURN AROUND MUST BE INSTALLED AT THE END OF PHASE 3 3.REMAINDER OF UTILITY SERVICES CONNECTED TO PORTIONS OF THE MAINLINE IN THIS PHASE MUST BE INSTALLED. STORM TECH CHAMBER AREA DATUM ELEV 4860.00 4864 4868 4872 1+00 48 7 0 . 7 48 7 0 . 6 6 48 7 0 . 7 48 7 0 . 7 2 2+00 48 7 1 . 2 48 7 1 . 2 3 48 7 1 . 3 48 7 1 . 3 1 3+00 48 7 1 . 2 48 7 1 . 2 3 48 7 1 . 4 48 7 1 . 3 5 4+00 48 7 1 . 4 48 7 1 . 3 5 -0.40% 1.23% 0.60% PV I S t a . = 1 + 0 0 . 0 0 El e v . = 4 8 7 0 . 6 5 8 PV I S t a . = 1 + 6 7 . 7 3 El e v . = 4 8 7 1 . 4 9 0 PV I S t a . = 2 + 8 4 . 4 6 El e v . = 4 8 7 2 . 1 9 0 -0.40% 1.23% 0.60% PV I S t a . = 1 + 0 0 . 0 0 El e v . = 4 8 7 0 . 6 5 8 PV I S t a . = 1 + 6 7 . 7 3 El e v . = 4 8 7 1 . 4 9 0 PV I S t a . = 2 + 8 4 . 4 6 El e v . = 4 8 7 2 . 1 9 0 SSMH 1 Sta:1+35.41 OFF:-16.09L Rim:4871.10 S INV IN:4861.99 E INV IN:4861.99 W INV OUT:4861.86 Install 142' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % Install Hydrant Flange: 4872.09' STA: 3+86.59 OFF: 27.50 SSMH 3 Sta:2+76.94 OFF:-14.96L GRATE:4871.85 E INV IN:4862.66 W INV OUT:4862.56 Install 20' of 8" C50 DI Pipe @ 5' Min Cover Install 15' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 29' of 8" C50 DI Pipe @ 5' Min Cover Install 51' of 8" C50 DI Pipe @ 5' Min Cover Install 313' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % 0+ 7 8 1+ 0 0 1+00 2+00 3+00 4+00 0101-01 0501.4.1.B.1-08 0501.4.1.B.1-08 L1 L3 4872 4872 4872 -2.00% SSMH 1 SD MH 1 SD CB 2 SD CB 1 SD CB 3 0502.4.1.A.1-01 SSMH 3 0401.4.1.B.1-886 1+92.99 11.32 R 0401.4.1.B.1-886 2+47.33 11.77 R 0401.4.1.B.1-888 1+45.37 4.006 R 0401.4.1.B.1-886 1+37.80 3.99 R 0401.4.1.B.1-886 1+45.06 55.58 R 0401.4.1.B.1-886 3+55.99 12.67 R 0401.4.1.B.1-906 1+44.71 112.42 R 0401.4.1.B.1-8-6 0401.4.1.B.1-888 1+25.34 10.757 R 0401.4.1.B.1-886 3+01.71 12.22 R 0401.4.1.B.1-886 3+86.59 12.92 R 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0403.4.1.A.1-01 STA:3+86.59 OFF: 27.50R 0403.4.1.A.1-01 STA:1+37.76 OFF: 20.88R 4871.94 TBC-PI 4871.11 TBC-PC 4870.63 EO-MATCH 4870.74 TBC-MATCH 4871.30 TBC-PC 4871.23 TBC 4871.67 TBC-LP 4872.17 TBC-HP 4870.76 TBC 4872.50 FG 4872.50 FG 4871.05 FG 4872.00 FG 4872.50 FG 4872.50 FG 4871.20 FG 4872.00 FG 4872.75 FG 4872.75 FG 4873.00 FG 4872.75 FG4872.75 FG 4873.00 FG 4873.00 FG 4873.00 FG 4873.25 FG 4873.25 FG 4873.25 FG 4873.25 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG4873.50 FG 4873.50 FG 4870.88 TBC-PI-LP 4870.88 BSW-PI 4870.90 BSW-PI 4871.59 BSW-PI 4870.86 TBC-PC 4871.90 TBC-PC 4871.66 BSW-PI 4872.89 4872.94 4873.07 4873.11 4873.25 BSW-PI 4873.30 BSW-PI 4873.43 BSW-PI 4873.48 BSW-PI 4873.60 BSW-PI BUILDING: AREA: 1,819 SQ FT FF: 4873.25 BUILDING: AREA: 1,819 SQ FT FF: 4873.50 BUILDING: AREA: 1,819 SQ FT FF: 4873.75 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4873.00 BUILDING: AREA: 1,819 SQ FT FF: 4872.50 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 -2.20% 48 7 1 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 6 16 TE T O N R I V E R F L A T S LO R E N E S T R E E T S T A 1 + 0 0 T O 4 + 0 0 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG LORENE STREET PROFILE VIEW LORENE STREET PLAN VIEW 0101-01 RETAIN AND PROTECT EXISTING UTILITY NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0101-02 RETAIN AND PROTECT EXISTING ASPHALT AND CONCRETE 0201.4.1.E.1-01 SAW-CUT LINE AND ASPHALT REMOVAL 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.A.5-03 INSTALL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS DESIGN PROFILE @ CL EXISTING SURFACE 0601.4.1.A.17-12 0401.4.1.A.1-08 CITY OF REXBURG INFILTRATOR SYSTEM SEE SHEET 13 0201.4.1.E.1-01 0101-02 0101-02 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.A.5-01 0706.4.1.A.5-02 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 ROAD 1 SHEET 7 LO R E N E S T R E E T SH E E T 6 0401.4.1.A.1-06 0401.4.1.A.1-06 0401.4.1.A.1-06 0402.4.1.A.1-08 0706.4.1.A.5-03 1105.4.1.A.1-01 1105.4.1.A.1-01 INSTALL STOP SIGN AND STREET SIGNS PER MUTCD STD. ENSURE 18" MINIMUM VERTICAL CLEARANCE 0706.4.1.A.3-04 0706.4.1.B.3-04 INSTALL COMMERCIAL APPROACH PER CITY OF REXBURG ENGINEERING STANDARDS 0402.4.1.A.1-08 0504.4.1.B.1-04 0602.4.1.F.1-01 INSTALL MH WITH BOLTED LID INSTALL WITH TOP 1' AS GRADE RINGS/RISERS TO BE REMOVED WHEN THE REMAINDER OF THE ROAD IS INSTALLED DATUM ELEV 4860.00 4864 4868 4872 4876 4+00 48 7 1 . 4 48 7 1 . 3 5 48 7 1 . 5 48 7 1 . 4 8 5+00 48 7 1 . 6 48 7 1 . 5 9 48 7 2 . 5 48 7 2 . 5 0 6+00 48 7 2 . 3 48 7 2 . 2 6 48 7 2 . 8 48 7 2 . 7 7 7+00 48 7 2 . 9 48 7 2 . 8 6 48 7 0 . 7 48 7 0 . 6 6 8+00 48 7 3 . 5 48 7 3 . 5 4 8+50 SSMH 4 Sta:5+89.46 OFF:-12.46L Rim:4873.25 S INV IN:4864.01 E INV IN:4864.01 W INV OUT:4863.91 SD CB 2 Sta:4+09.85 OFF:-24.00L GRATE:4871.26 S INV IN:4868.16 N INV OUT:4868.06 0.60% -0.40% 0.45%PV I S t a . = 4 + 0 9 . 8 5 El e v . = 4 8 7 1 . 6 8 9 PV I S t a . = 6 + 3 2 . 3 7 El e v . = 4 8 7 2 . 6 9 3 PV I S t a . = 7 + 6 4 . 8 3 El e v . = 4 8 7 3 . 4 8 7 PV I S t a . = 8 + 3 4 . 6 0 El e v . = 4 8 7 3 . 2 0 8 SD MH 1 Rim:4871.98 S INV IN:4868.05 E INV OUT:4867.95 W INV OUT:4867.95 Install Hydrant Flange: 4873.56' STA: 7+24.87 OFF: 27.49 Install 164' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % SSMH 5 Sta:7+54.14 OFF:3.32R GRATE:4873.36 N INV IN:4864.76 S INV IN:4864.76 W INV OUT:4864.66 Install 40' of 8" C5 0 D I P i p e @ 5 ' M i n C o v e r Install 56' of 8" C50 DI Pipe @ 5' Min Co v e r Install 49' of 8" C50 DI Pipe @ 5' Min Cover Install 6' of 8" C50 DI Pipe @ 5' Min Cover Install 7' of 8" C50 DI Pipe @ 5' Min Cover Install 49' of 8" C50 DI Pipe @ 5' Min Cover Install 36' of 8" C50 DI Pipe @ 5' Min Cover Install 54' of 8" C50 DI Pipe @ 5' Min Cover Install 53' of 8" C50 DI Pipe @ 5' Min Cover Install 33' of 8" C50 DI Pipe @ 5' Min Cover Install 5' of 8" C50 DI Pipe @ 5' Min Cover Install 98' of 8" C50 DI Pipe @ 5' Min Cover Install 313' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % 4+00 5+00 6+00 7+00 8+ 0 0 8+ 4 2 0+ 7 8 1+ 0 0 L2 C1 4872 487 3 0401.4.1.B.1-888 7+54.59 41.502 R-2 . 0 0 % -0.45% 0502.4.1.A.1-01 SSMH 4 0602.4.1.F.1-01 0602.4.1.F.1-01 SD MH 1 SD CB 2 SD CB 1 SD CB 7 0602.4.1.A.1-01 SSMH 5 0401.4.1.B.1-886 1+15.23 -58.71 L 0401.4.1.B.1-886 4+23.32 13.22 R 0401.4.1.B.1-886 5+21.45 14.03 R 0401.4.1.B.1-888 5+79.12 14.510 R 0401.4.1.B.1-886 7+26.23 16.97 R 0401.4.1.B.1-886 4+64.60 13.56 R 0402.4.1.A.1-06 0402.4.1.A.1-060402.4.1.A.1-060402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0403.4.1.A.1-01 STA:7+24.87 OFF: 27.49R 4872.80 TBC-PI 4872.84 BSW-PI 4873.07 TBC-PC 4872.57 TBC-PC 4873.73 TBC-PC 4873.18 TBC-PC 4873.36 TBC-PC 4873.29 EO-PC 4873.23 TBC-MATCH 4873.09 EO-MATCH 4873.12 EO-PC 4871.67 TBC-LP 4872.99 TBC-PC 4872.35 TBC-CC 4872.35 BSW-PI 4872.45 BSW-PI 4873.50 FG 4873.75 FG 4873.75 FG 4874.00 FG 4874.00 FG 4874.75 FG 4874.74 FG 4875.24 FG4875.75 FG 4873.50 FG 4873.50 FG 4873.50 FG 4874.02 TBC-PI 4872.53 TBC-CC BUILDING: AREA: 1,819 SQ FT FF: 4874.50 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4874.25 BUILDING: AREA: 1,819 SQ FT FF: 4875.25 BUILDING: AREA: 1,819 SQ FT FF: 4875.75 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-06 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 7 16 TE T O N R I V E R F L A T S LO R E N E S T R E E T S T A 4 + 0 0 T O 8 + 5 0 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG LOREN STREET PROFILE VIEW LORENE STREET PLAN VIEW 0101-01 RETAIN AND PROTECT EXISTING UTILITY NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0101-02 RETAIN AND PROTECT EXISTING ASPHALT AND CONCRETE 0201.4.1.E.1-01 SAW-CUT LINE AND ASPHALT REMOVAL 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.A.5-03 INSTALL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS DESIGN PROFILE @CL EXISTING SURFACE CITY OF REXBURG INFILTRATOR SYSTEM SEE SHEET 13 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0401.4.1.A.1-06 LO R E N E S T R E E T SH E E T 5 ROAD 2 SHEET 9 0401.4.1.A.1-06 0401.4.1.A.1-06 0401.4.1.A.1-06 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0201.4.1.E.1-01 0706.4.1.A.5-03 0706.4.1.A.5-03 0706.4.1.E.1-04 0706.4.1.E.1-04 0402.4.1.A.1-08 0402.4.1.A.1-08 0404.4.1.A.1-01 1105.4.1.A.1-01 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 1105.4.1.A.1-01 INSTALL STOP SIGN AND STREET SIGNS PER MUTCD STD. 0602.4.1.F.1-01 0101-02 0101-01 ENSURE 18" MINIMUM VERTICAL CLEARANCE 0402.4.1.A.1-08 0706.4.1.H.1-01 INSTALL ADA PEDESTRIAN RAMP W/DETECTABLE WARNING DOMES PER ISPWC SD-712 0706.4.1.B.3-04 0401.4.1.B.1-906 0401.4.1.B.1-906 INSTALL WITH TOP 1' AS GRADE RINGS/RISERS TO BE REMOVED WHEN THE REMAINDER OF THE ROAD IS INSTALLED 0402.4.1.A.1-08 0402.4.1.A.1-08 0502.4.1.A.1-01 DATUM ELEV 4861.00 4864 4868 4872 DATUM ELEV 0+75 1+00 48 7 1 . 0 48 7 1 . 0 1 48 7 1 . 0 48 7 1 . 0 4 2+00 48 7 1 . 2 48 7 1 . 2 3 2+50 48 7 1 . 5 48 7 1 . 4 6 Install Hydrant Flange: 4871.30' STA: 1+37.76 OFF: 20.88 SSMH 1 Sta:1+35.41 OFF:-16.09L Rim:4871.10 S INV IN:4861.99 E INV IN:4861.99 W INV OUT:4861.86 SSMH 2 Sta:2+29.73 OFF:-6.00L Rim:4871.46 N INV OUT:4863.33 SD CB 3 Sta:1+41.40 OFF:27.62R GRATE:4870.38 S INV OUT:4867.37 SD CB 4 Sta:2+36.50 OFF:31.82R GRATE:4870.54 N INV IN:4867.09 E INV OUT:4866.99 Install 126' of 12" ADS N 12 Storm Pipe @ 0.22% Install 146' of 8" PV C S D R 3 5 S a n . P i p e @ 0 . 9 2 % Install 6' of 8" C50 DI Pipe @ 5' Min Cover Install 6' of 8" C50 DI Pipe @ 5' Min Cover Install 93' of 8" C50 DI Pipe @ 5' Min Cover Install 20' of 8" C50 DI Pipe @ 5' Min Cover 0+78 1+00 2+00 1+ 0 0 0101-01 0501.4.1.B.1-08 0501.4.1.B.1-08 L3 48 7 1 4872 4 8 7 2 0401.4.1.B.1-908 -2 . 0 0 % -2.75% -1 . 6 3 % SSMH 1 0602.4.1.F.1-01 SD CB 4 SD CB 3 0502.4.1.A.1-01 SSMH 2 0502.4.1.A.1-01 0401.4.1.B.1-888 1+45.37 4.006 R 0401.4.1.B.1-888 0401.4.1.B.1-886 1+37.80 3.99 R 0401.4.1.B.1-886 1+45.06 55.58 R 0401.4.1.B.1-886 0401.4.1.B.1-908 0401.4.1.B.1-8-6 0401.4.1.B.1-906 0401.4.1.B.1-906 1+44.71 112.42 R 0401.4.1.B.1-8-6 0401.4.1.B.1-888 1+25.34 10.757 R 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0403.4.1.A.1-01 STA:1+37.76 OFF: 20.88R 4871.94 TBC-PI 4872.79 TBC-PI 4871.28 TBC-PC 4871.11 TBC-PC 4870.63 EO-MATCH 4870.74 TBC-MATCH 4871.30 TBC-PC 4871.49 TBC-PC 4872.49 TBC-PC 4872.43 TBC-PC 4872.43 TBC-PC 4871.23 TBC 4871.04 TBC-PI-LP 4870.76 TBC 4871.69 BSW-PI 4872.50 FG 4872.50 FG 4871.05 FG 4872.00 FG 4872.50 FG 4872.50 FG 4871.20 FG 4872.00 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.00 FG 4871.30 FG 4871.75 FG 4872.00 FG 4872.75 FG 4872.75 FG 4871.30 TBC-PI 4870.88 TBC-PI-LP4870.88 BSW-PI 4870.90 BSW-PI 4871.59 BSW-PI 4870.86 TBC-PC 4871.90 TBC-PC 4871.66 BSW-PI 4871.75 BSW-PI 4871.76 BSW-PI 4871.48 BSW-PI 4871.50 BSW-PI 4871.25 BSW-PI 4871.23 BSW-PI 4871.40 BSW-PI 4872.50 BSW-PI 4872.50 BSW-PI 4872.76 BSW-PI 4872.48 BSW-PI 4872.41 BSW-PI 4872.89 BSW-PI 4872.49 BSW-PI AR E A : 1 , 8 1 9 S Q F T BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 3 . 0 0 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 2 . 5 0 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 3 . 0 0 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 2 . 5 0 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0402.4.1.A.1-08 0402.4.1.A.1-06 0402.4.1.A.1-06 - 2 . 2 0 % 4871 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 8 16 TE T O N R I V E R F L A T S DR I V E 1 0 + 7 5 T O 2 + 5 0 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG DRIVE 1 PROFILE VIEW DRIVE 1 PLAN VIEW 0101-01 RETAIN AND PROTECT EXISTING UTILITY NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0101-02 RETAIN AND PROTECT EXISTING ASPHALT AND CONCRETE 0201.4.1.E.1-01 SAW-CUT LINE AND ASPHALT REMOVAL 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.A.5-03 INSTALL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS DESIGN PROFILE @ CL EXISTING SURFACE DOUBLE DUMPSTER PAD AS PER CITY OF REXBURG STANDARDS 0504.4.1.B.1-04 LORENE STREET SHEET 5 ROAD 1 SHEET 8 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0502.4.1.A.1-01 0201.4.1.E.1-01 0402.4.1.A.1-08 0402.4.1.A.1-08 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.A.5-01 0706.4.1.A.5-01 0706.4.1.A.5-02 0706.4.1.A.5-02 1105.4.1.A.1-01 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 1105.4.1.A.1-01 INSTALL STOP SIGN AND STREET SIGNS PER MUTCD STD. ENSURE 18" MINIMUM VERTICAL CLEARANCE 0402.4.1.A.1-080706.4.1.B.3-04 0706.4.1.B.3-04 INSTALL COMMERCIAL APPROACH PER CITY OF REXBURG ENGINEERING STANDARDS ENSURE 18" MINIMUM VERTICAL CLEARANCE 0401.4.1.B.1-908 INSTALL MH WITH BOLTED LID 0402.4.1.A.1-08 DATUM ELEV 4862.00 4864 4868 4872 4876 2+50 48 7 1 . 5 48 7 1 . 4 6 3+00 48 7 1 . 6 48 7 1 . 6 4 4+00 48 7 2 . 0 48 7 1 . 9 7 48 7 2 . 1 48 7 2 . 1 5 5+00 48 7 2 . 3 48 7 2 . 3 3 48 7 2 . 5 48 7 2 . 5 1 6+00 48 7 2 . 7 48 7 2 . 6 9 48 7 2 . 9 48 7 2 . 8 9 7+00 48 7 3 . 7 48 7 3 . 7 3 7+20 Install Hydrant Flange: 4873.54' STA: 6+49.87 OFF: 14.98 Install 164' of 12" ADS N 12 Storm Pipe @ 0.22% Install 21' of 12" ADS N 12 Storm Pipe @ 0.22% SD CB 6 Sta:5+52.58 OFF:30.01R GRATE:4871.85 W INV IN:4866.17 S INV OUT:4866.07 SD MH 2 Sta:5+52.63 OFF:50.84R GRATE:4872.46 N INV IN:4866.03 E INV OUT:4865.93 S INV OUT:4865.93 Install 163' of 12" ADS N 12 Storm Pipe @ 0.22% SD CB 5 Sta:3+89.68 OFF:30.02R GRATE:4871.19 W INV IN:4866.63 E INV OUT:4866.53 Install 29' of 8" C50 DI Pipe @ 5' Min Cover Install 5' of 8" C50 DI Pipe @ 5' Min Cover Install 416' of 8" C50 DI Pipe @ 5' Min Cover S89° 31' 34"W 315.15' 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+19 2+ 0 0 0501.4.1.B.1-08 L3 L4 4872 4871 487 3 4 8 7 3 4873 0401.4.1.B.1-908 -2 . 3 7 % -2.00% -1 . 5 6 % -0.40% -5.27% -2 . 7 5 % -2 . 2 2 % -0.40% SD CB 6 SD CB 5 SSMH 2 0502.4.1.A.1-01 0401.4.1.B.1-888 2+44.81 4.849 R 0401.4.1.B.1-888 1+45.37 4.006 R 0401.4.1.B.1-888 1+37.80 3.99 R 0401.4.1.B.1-886 6+49.95 7.32 R 0403.4.1.A.1-01 STA:6+49.87 OFF: 14.98R 4872.79 TBC-PI 4873.72 TBC-PC 4873.60 TBC-PC4873.66 TBC-PC 4873.15 TBC-PC 4873.23 TBC-PC 4873.43 TBC-PC 4871.28 TBC-PC 4872.49 TBC-PC 4872.43 TBC-PC 4872.43 TBC-PC 4872.60 TBC-PC 4873.15 TBC-PC 4874.69 TBC-HP 4873.66 TBC-PC 4872.68 TBC-PI 4874.81 BSW-PI 4874.83 BSW-PI 4872.75 4873.21 BSW-PI 4873.36 BSW-PI 4873.00 BSW-PI 4873.50 FG 4873.75 FG 4873.75 FG 4874.00 FG 4874.00 FG 4874.75 FG 4872.75 FG 4872.75 FG 4873.00 FG 4872.75 FG4872.75 FG 4873.00 FG 4873.00 FG 4873.00 FG FG 4873.25 FG 4873.25 FG 4873.25 FG FG 4873.50 FG 4873.50 FG 4873.50 FG4873.50 FG 4873.75 FG 4873.50 FG 4873.75 FG 4874.00 FG 4874.00 FG 4874.75 FG 4874.75 FG 4874.75 FG 4873.50 FG 4872.76 BSW-PI 4872.48 BSW-PI 4872.41 BSW-PI 4872.89 BSW-PI 4872.49 BSW-PI 4872.94 BSW-PI 4873.07 BSW-PI 4873.11 BSW-PI 4873.25 BSW-PI 4873.30 BSW-PI 4873.43 BSW-PI 4873.48 BSW-PI 4873.60 BSW-PI 4873.65 BSW-PI 4873.78 BSW-PI 4873.83 BSW-PI 4873.96 BSW-PI 4874.01 BSW-PI 4873.55 BSW-PI 4873.89 BSW-PI 4873.58 BSW-PI 4873.48 BSW-PI 4873.91 TBC-PI-HP 4874.75 TBC-PI4874.46 TBC-PC BUILDING: AREA: 1,819 SQ FT FF: 4874.50 BUILDING: AREA: 1,819 SQ FT FF: 4873.25 BUILDING: AREA: 1,819 SQ FT FF: 4873.50 BUILDING: AREA: 1,819 SQ FT FF: 4873.75 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4874.00 BUILDING: AREA: 1,819 SQ FT FF: 4874.25 AREA: 1,819 SQ FT AREA: 1,819 SQ FT 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0402.4.1.A.1-06 L5 0401.4.1.B.1-666 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 9 16 TE T O N R I V E R F L A T S DR I V E 1 2 + 5 0 T O 7 + 2 0 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG DRIVE 1 PROFILE VIEW DRIVE 1 PLAN VIEW NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 DESIGN PROFILE @ CL EXISTING SURFACE DOUBLE DUMPSTER PAD AS PER CITY OF REXBURG STANDARD 0602.4.1.F.1-01 0504.4.1.B.1-04 ROAD 2 SHEET 9 ROAD 1 SHEET 7 ROAD 2 SHEET 9 STORM TECH SYSTEM 1 SEE SHEET 11 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.H.1-01 0706.4.1.H.1-01 INSTALL ADA PEDESTRIAN RAMP W/DETECTABLE WARNING DOMES PER ISPWC SD-712 0706.4.1.H.1-01 0706.4.1.A.5-02 0706.4.1.A.5-01 0706.4.1.A.5-02 1105.4.1.A.1-01 1105.4.1.A.1-01 INSTALL STOP SIGN AND STREET SIGNS PER MUTCD STD. 0504.4.1.B.1-04 0601.4.1.A.17-12 DOUBLE DUMPSTER PAD AS PER CITY OF REXBURG STANDARDS RETAIN AND PROTECT EXISTING TRANSFORMER 0101-01 RETAIN AND PROTECT EXISTING UTILITY ENSURE 18" MINIMUM VERTICAL CLEARANCE DATUM ELEV 4862.00 4864 4868 4872 4876 0+78 1+00 48 7 2 . 5 48 7 2 . 4 6 48 7 2 . 9 48 7 2 . 8 7 2+00 48 7 3 . 6 48 7 3 . 5 7 48 7 3 . 5 48 7 3 . 4 7 3+00 48 7 2 . 9 48 7 2 . 8 5 48 7 2 . 1 48 7 2 . 1 0 4+00 48 7 2 . 2 48 7 2 . 2 2 4+50 48 7 2 . 5 48 7 2 . 4 7 SSMH 4 Sta:5+89.46 OFF:-12.46L Rim:4873.25 S INV IN:4864.01 E INV IN:4864.01 W INV OUT:4863.91 SSMH 6 Sta:3+64.20 OFF:-3.51L Rim:4872.18 S INV IN:4865.22 N INV OUT:4865.12 SSMH 7 Sta:4+31.65 OFF:-2.59L Rim:4872.42 N INV OUT:4865.62 Install 277' of 8" PVC SDR 35 San. Pipe @ 0 . 4 0 % Install 67' of 8" PVC SDR 35 San. Pipe @ 0.60% SD CB 7 Sta:1+42.01 OFF:29.01R GRATE:4872.30 S INV OUT:4869.30 Install 192' of 12" ADS N 12 Stor m P i p e @ 0 . 5 1 % SD CB 8 Sta:3+33.90 OFF:28.97R GRATE:4871.33 N INV IN:4868.32 S INV IN:4868.32 E INV IN:4868.32 W INV OUT:4866.67 Install 3' of 8" C50 DI Pipe @ 5' Min Cover Install 20' of 8" C50 DI Pipe @ 5' Min Cover Install 93' of 8" C50 DI Pipe @ 5' Min Cover Install 130' of 8" C50 DI Pipe @ 5' Min Cov e r Install 31' of 8" C50 DI Pipe @ 5' Min Cover 7+ 0 0 7+ 1 9 6+ 0 0 7+ 0 0 0+78 1+00 2+00 3+00 4+00 4+70 C 1 4 8 7 3 4873 0401.4.1.B.1-886 4+58.67 7.78 R -1.56%-2.00% -0 . 4 5 % -5 . 2 7 % 0502.4.1.A.1-01 SSMH 4 0602.4.1.F.1-01 SD CB 8 SD CB 7 SSMH 6 SSMH 7 SSMH 5 0502.4.1.A.1-01 0502.4.1.A.1-01 0401.4.1.B.1-888 2+44.81 4.849 R 0401.4.1.B.1-886 0401.4.1.B.1-886 1+15.23 -58.71 L 0401.4.1.B.1-888 5+79.12 14.510 R 0401.4.1.B.1-8-6 0401.4.1.B.1-906 0401.4.1.B.1-886 7+26.23 16.97 R 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0402.4.1.A.1-06 0403.4.1.A.1-01 FLANGE: 4872.99' 0403.4.1.A.1-01 STA:7+24.87 OFF: 27.49R 4872.80 TBC-PI 4872.84 BSW-PI 4873.07 TBC-PC 4872.57 TBC-PC 4873.73 TBC-PC 4873.60 TBC-PC 4873.23 TBC-PC 4873.43 TBC-PC 4873.18 TBC-PC 4873.12 EO-PC 4873.75 TBC-PI-HP 4873.22 TBC-PC4873.34 TBC-PC 4873.28 TBC-PI 4872.99 TBC-PC 4874.69 TBC-HP 4873.66 TBC-PC 4873.57 BSW-PI 4873.78 BSW-PI 4873.81 BSW-PI 4873.81 BSW-PI 4873.17 BSW-PI 4873.23 BSW-PI 4873.38 BSW-PI 4874.85 BSW-PI 4874.81 BSW-PI 4874.94 BSW-PI 4875.06 BSW-PI 4874.75 BSW-PI 4874.76 BSW-PI 4874.83 BSW-PI 4872.35 TBC-CC 4872.35 BSW-PI 4872.45 BSW-PI 4872.12 BSW-PI 4873.21 BSW-PI 4873.36 BSW-PI 4872.57 TBC-PC 4874.75 FG 4874.74 FG 4875.24 FG 4875.75 FG 4874.75 FG 4874.75 FG 4875.75 FG 4875.25 FG 4874.75 FG 4874.75 FG 4874.75 FG 4874.75 FG 4874.75 FG 4874.75 FG 4874.75 FG 4874.75 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG 4873.50 FG 4874.00 FG 4874.00 FG 4874.00 FG 4874.00 FG 4874.00 FG 4874.00 FG 4874.00 FG 4874.00 FG 4873.55 BSW-PI 4873.89 4873.58 BSW-PI4873.48 BSW-PI 4874.75 TBC-PI 4874.66 TBC-PI 4874.46 TBC-PC 4874.16 TBC-PC 4874.10 TBC-PC 4873.95 TBC-PC 4874.17 TBC-PC 4874.43 TBC-PC 4873.18 TBC-PC 4873.24 TBC-PC 4873.15 TBC-PC 4873.00 TBC-PC 4872.90 TBC-PC 4872.97 TBC-PC 4872.99 TBC-PI-LP 4873.06 TBC-PI 4874.96 TBC-PI 4874.34 TBC-PI 4873.75 TBC-PI 4873.41 TBC-PI 4874.38 TBC-PC 4874.30 TBC-PC 4873.77 TBC-PC 4873.63 TBC-PC 4872.72 TBC-PC 4872.70 TBC-PI 4874.02 TBC-PI 4872.53 TBC-CC 4873.70 BSW-PI 4873.54 BSW-PI 4872.35 TBC-PI4872.44 BSW-PI 4872.10 BSW-PI BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 5 . 2 5 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 5 . 7 5 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 5 . 2 5 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 5 . 2 5 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 4 . 0 0 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 4 . 0 0 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 4 . 5 0 BU I L D I N G : AR E A : 1 , 8 1 9 S Q F T FF : 4 8 7 4 . 5 0 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 SD CB 9 0402.4.1.A.1-06 0402.4.1.A.1-06 L5 0402.4.1.A.1-06 0401.4.1.B.1-906 0402.4.1.A.1-06 0401.4.1.B.1-666 Install 63' of 12" ADS N 12 Storm Pipe @ 1.88% CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 10 16 TE T O N R I V E R F L A T S DR I V E 2 0 + 7 5 T O 4 + 5 0 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG DRIVE 2 PROFILE VIEW DRIVE 2 PLAN VIEW NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 DESIGN PROFILE @ CL EXISTING SURFACE 0404.4.1.A.1-01 0404.4.1.A.1-01 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0504.4.1.B.1-04 0404.4.1.A.1-01 0401.4.1.A.1-06 0402.4.1.A.1-06 0404.4.1.A.1-01 0404.4.1.A.1-01 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.E.1-04 0706.4.1.A.5-03 0706.4.1.A.5-02 0706.4.1.A.5-02 DRIVE 1 SHEET 8 DRIVE 2 SHEET 10 LORENE STREET SHEET 6 0401.4.1.A.1-06 0706.4.1.H.1-01 0706.4.1.H.1-01 0706.4.1.H.1-01 INSTALL ADA PEDESTRIAN RAMP W/DETECTABLE WARNING DOMES PER ISPWC SD-712 0706.4.1.A.5-03 INSTALL 6" HIGH BACK CURB PER REXBURG CITY STANDARDS 0402.4.1.A.1-08 0402.4.1.A.1-08 1105.4.1.A.1-01 0402.4.1.A.1-08 1105.4.1.A.1-01 INSTALL STOP SIGN AND STREET SIGNS PER MUTCD STD. 0602.4.1.F.1-01 0706.4.1.H.1-01 0706.4.1.H.1-01 0402.4.1.A.1-08 0706.4.1.B.3-04 0706.4.1.B.3-04 INSTALL COMMERCIAL APPROACH PER CITY OF REXBURG ENGINEERING STANDARDS ENSURE 18" MINIMUM VERTICAL CLEARANCE 0501.4.1.A.1-08 SLEAVE WATER AND SEWER LINE PER NOTE 4 SHEET 2 401.4.1.B.1-886 0402.4.1.A.1-08 401.4.1.B.1-886 401.4.1.B.1-888 0401.4.1.A.1-06 401.4.1.B.1-886 ENSURE 18" MINIMUM VERTICAL CLEARANCE 3+ 0 0 4+ 0 0 4+ 7 0 48 7 2 4873 4 8 7 3 0401.4.1.B.1-886 4+58.67 7.78 R 0401.4.1.B.1-908 ??? -0.40% 0602.4.1.F.1-01 SD MH 2 Rim:4872.46 N INV IN:4866.03 E INV OUT:4865.93 S INV OUT:4865.93 SD CB 6 SD CB 8 SSMH 7 0502.4.1.A.1-01 SD MH 3 Rim:4872.18 E INV IN:4866.03 N INV OUT:4865.93 W INV OUT:4865.93 0401.4.1.B.1-906 5+31.22 138.39 R 0403.4.1.A.1-01 STA:6+49.87 OFF: 14.98R 0402.4.1.A.1-06 4872.68 TBC-PI 4872.50 BSW-PI 4872.50 BSW-PI 4872.50 BSW-PI 4872.12 BSW-PI 4872.33 BSW-PI 4872.75 BSW-PI 4873.21 BSW-PI 4872.57 TBC-PC 4872.50 FG4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4872.50 FG 4874.16 TBC-PC 4874.10 TBC-PC 4873.00 TBC-PC 4872.90 TBC-PC 4872.72 TBC-PC 4872.70 TBC-PI 4872.35 TBC-PI 4872.44 BSW-PI 4872.50 BSW-PI 4872.50 BSW-PI 4872.50 BSW-PI 4872.10 BSW-PI 4872.50 BSW-PI 4872.50 BSW-PI BUILDING: AREA: 1,819 SQ FT FF: 4873.00 BUILDING: AREA: 1,819 SQ FT FF: 4873.00 BUILDING: AREA: 1,819 SQ FT FF: 4873.00 BUILDING: AREA: 1,819 SQ FT FF: 4873.00 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 0401.4.1.A.1-08 SD CB 9 0402.4.1.A.1-06 0402.4.1.A.1-06 Install 63' of 12" ADS N 12 Storm Pipe @ 1.88% CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 11 16 TE T O N R I V E R F L A T S DR I V E 2 4 + 5 0 T O 6 + 2 5 RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG DRIVE 2 PROFILE VIEW NOTE: 1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION AND COORDINATE WITH EACH UTILITY LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS. 3.ENSURE 18'' MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS 4.SLEEVE POTABLE WATER LINE 10' EITHER SIDE OF CROSSING WITH NON-POTABLE WATER LINE WHERE 18" VERTICAL CLEARANCE IS NOT MET. 0401.4.1.A.1-06 INSTALL 6" WATER PIPE DI C-50 @ 5' MINIMUM COVER 0401.4.1.A.1-08 INSTALL 8" PIPE DI C-50 @ 5' MIN COVER 0401.4.1.B.1-886 INSTALL 8"x8"x6" TEE 0401.4.1.B.1-888 INSTALL 8"x8"x8" TEE 0401.4.1.B.1-906 INSTALL 6" 90° BEND DI C50 0402.4.1.A.1-06 INSTALL 6" WATER VALVE 0402.4.1.A.1-08 INSTALL 8" WATER VALVE 0403.4.1.A.1-01 INSTALL FH ASSEMBLY 0404.4.1.A.1-01 INSTALL 1.25" WATER SERVICE WITH INTERIOR METER AND 1.25" VALVE 0501.4.1.B.1-08 INSTALL 8" SDR 35 SANITARY SEWER PIPE @ 0.4% MIN SLOPE 0502.4.1.A.1-01 INSTALL 4' SS MH PER ISPWC SD-501 0504.4.1.B.1-04 INSTALL 4" SDR 35 SANITARY SEWER SERVICE @ 2% MIN 0601.4.1.A.17-12 INSTALL 12" ADS N 12 STORM PIPE @ 0.22% MIN. SLOPE 0602.4.1.A.1-01 INSTALL SD MANHOLE PER ISPWC SD-611 0602.4.1.F.1-01 INSTALL CATCH BASIN TYPE I PER ISPWC SD-601 0706.4.1.A.5-01 INSTALL 6" CURB AND GUTTER PER ISPWC SD-701 0706.4.1.A.5-02 INSTALL 6" LIP DOWN CURB AND GUTTER PER DETAIL SHEET 3 0706.4.1.E.1-04 INSTALL 4" CONCRETE SIDEWALK PER ISPWC SD-709 0101-01 0504.4.1.B.1-04 RO A D 2 SH E E T 9 0706.4.1.H.1-01 INSTALL ADA PEDESTRIAN RAMP W/DETECTABLE WARNING DOMES PER ISPWC SD-712 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0404.4.1.A.1-01 0504.4.1.B.1-04 CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 12 16 TE T O N R I V E R F L A T S ST O R M T E C H C H A M B E R S RE X B U R G , I D IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-740 SYSTEM 1.STORMTECH SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. 2.STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3.CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: ·STONESHOOTER LOCATED OFF THE CHAMBER BED. ·BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. ·BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4.THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5.JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6.MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7.EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). 8.THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9.ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1.STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2.THE USE OF CONSTRUCTION EQUIPMENT OVER SC-740 CHAMBERS IS LIMITED: ·NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. ·NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". ·WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3.FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-740 STORMTECH CHAMBER SPECIFICATIONS 1.CHAMBERS SHALL BE STORMTECH SC-740. 2.CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE COPOLYMERS. 3.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 4.CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5.THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6.CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8.ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: ·THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. ·THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. ·THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9.CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. NOTES •MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH NOTE #6.32 FOR MANIFOLD SIZING GUIDANCE. •DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. •THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. •THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. •NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE. 47.77' 96 . 5 0 ' 37.18' 94 . 5 0 ' ' A C ISOLATOR ROW PLUS (SEE DETAIL/TYP 2 PLACES) PLACE MINIMUM 12.50' OF ADSPLUS125 WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS PERIMETER DESCRIPTIONITEM ON LAYOUTPART TYPE A 12" TOP PREFABRICATED END CAP, PART#: SC740EPE18T / TYP OF ALL 18" TOP CONNECTIONS B PREFABRICATED END CAP 12" x 12" TOP MANIFOLD, ADS N-12 C MANIFOLD D 30" DIAMETER (24.00" SUMP MIN) 4" SEE DETAIL (TYP 2 PLACES)INSPECTION PORT CONCRETE MANHOLE B A CONCEPTUAL ELEVATIONS MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):11.25 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):5.25 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):4.75 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):4.75 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):4.75 TOP OF STONE:3.75 TOP OF SC-740 CHAMBER:3.25 18" x 18" TOP MANIFOLD INVERT:1.17 18" x 18" TOP MANIFOLD INVERT:1.17 24" ISOLATOR ROW PLUS INVERT:0.76 24" ISOLATOR ROW PLUS INVERT:0.76 BOTTOM OF SC-740 CHAMBER:0.75 BOTTOM OF STONE:0.00 PROPOSED LAYOUT 100 STORMTECH SC-740 CHAMBERS 40 STORMTECH SC-740 END CAPS 6 STONE ABOVE (in) 9 STONE BELOW (in) 40 STONE VOID 9163 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 4271 SYSTEM AREA (SF) 288.6 SYSTEM PERIMETER (ft) D B CD CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 13 16 TE T O N R I V E R F L A T S ST O R M T E C H D E T A I L S RE X B U R G , I D ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS PLEASE NOTE: 1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. NOTES: 1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2.SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER. ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 18" (450 mm) MIN* 8' (2.4 m) MAX 6" (150 mm) MIN D C B A 12" (300 mm) MIN 12" (300 mm) TYP51" (1295 mm)6" (150 mm) MIN 30" (760 mm) DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) SC-740 END CAP EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) PERIMETER STONE (SEE NOTE 5) SUBGRADE SOILS (SEE NOTE 4) ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS INSPECTION & MAINTENANCE STEP 1)INSPECT ISOLATOR ROW FOR SEDIMENT A.INSPECTION PORTS (IF PRESENT) A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4.LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B.ALL ISOLATOR ROWS B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2)CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C.VACUUM STRUCTURE SUMP AS REQUIRED STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. CATCH BASIN OR MANHOLE SC-740 ISOLATOR ROW PLUS DETAIL NTS STORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES COVER ENTIRE ISOLATOR ROW PLUS WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE 8' (2.4 m) MIN WIDE SC-740 CHAMBER OPTIONAL INSPECTION PORT SC-740 END CAP 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-FABRICATED END CAP WITH FLAMP PART #: SC740EPE24BR ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) NOTE: INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST. STORMTECH CHAMBER 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS 4" PVC INSPECTION PORT DETAIL (SC SERIES CHAMBER) NTS CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON CORRUGATION CREST NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m³) MINIMUM INSTALLED STORAGE*74.9 CUBIC FEET (2.12 m³) WEIGHT 75.0 lbs.(33.6 kg) *ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS SC-740 TECHNICAL SPECIFICATION NTS BUILD ROW IN THIS DIRECTION OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) START END 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH A A C B 51.0" (1295 mm) 30.0" (762 mm) 45.9" (1166 mm)12.2" (310 mm) 29.3" (744 mm) PART #STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm)10.9" (277 mm)18.5" (470 mm)--- SC740EPE06B / SC740EPE06BPC ---0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm)12.2" (310 mm)16.5" (419 mm)--- SC740EPE08B / SC740EPE08BPC ---0.6" (15 mm) SC740EPE10T / SC740EPE10TPC 10" (250 mm)13.4" (340 mm)14.5" (368 mm)--- SC740EPE10B / SC740EPE10BPC ---0.7" (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm)14.7" (373 mm)12.5" (318 mm)--- SC740EPE12B / SC740EPE12BPC ---1.2" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm)18.4" (467 mm)9.0" (229 mm)--- SC740EPE15B / SC740EPE15BPC ---1.3" (33 mm) SC740EPE18T / SC740EPE18TPC 18" (450 mm)19.7" (500 mm)5.0" (127 mm)--- SC740EPE18B / SC740EPE18BPC ---1.6" (41 mm) SC740EPE24B*24" (600 mm)18.5" (470 mm)---0.1" (3 mm) SC740EPE24BR*24" (600 mm)18.5" (470 mm)---0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B/SC740EPE24BR ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC740EPE24B/SC740EPE24BR THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE-CORED END CAPS END WITH "PC" SEE DETAILSEE DETAIL CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 14 16 TE T O N R I V E R F L A T S CI T Y O F R E X B U R G S T O R M T E C H D E T A I L S RE X B U R G , I D APPROVED BY ________________________DATE:____________ City of REXBURG CROSS SECTION VIEW DRAIN NTS CROSS SECTION INFILTRATOR DRAIN NTS GRATE & SECTION NTS S89° 31' 34"W 315.15' N0 ° 1 2 ' 2 5 " W 14 0 . 0 0 ' N89° 31' 34"E 645.01' N0 ° 1 1 ' 4 3 " W 19 9 . 7 9 ' S89° 33' 55"W 329.89' S0 ° 1 2 ' 2 5 " E 37 0 . 0 1 ' N89° 31' 34"E 122.43' S2 ° 0 2 ' 5 2 " E 14 0 . 6 0 ' S89° 46' 18"W 126.94' CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 15 16 TE T O N R I V E R F L A T S BE S T M A N A G E M E N T P R A C T I C E S RE X B U R G , I D POTENTIAL POLLUTANTS CHEMICAL MSDS #LOCATION TO BE FILLED OUT BY CONTRACTOR TO BE FILLED OUT BY CONTRACTOR OFFSITE OPERATONS START DATE END DATE TO BE FILLED OUT BY CONTRACTOR AREA TO BE DISTURBED STABILIZE CONSTRUCTION ENTRANCE/EXIT COMBINATION STAGING AREA & VEHICLE EQUIPMENT CLEANING, FUELING AND MAIN. MATERIALS STORAGE AREA & STOCKPILE MANAGEMENT SILT FENCE OR EROSION EEL STORM WATER DRAINAGE SEQUENCE OF MAJOR ACTIVITIES ACTIVITY START DATE END DATE POTENTIAL POLLUTANTS CHEMICAL MSDS #LOCATION TO BE FILLED OUT BY CONTRACTOR TO BE FILLED OUT BY CONTRACTOR OFFSITE OPERATONS START DATE END DATE TO BE FILLED OUT BY CONTRACTOR BEST MANAGEMENT PRACTICES NOTES 1. This plan should be revised and updated to address changes in site conditions, new or revised government regulations, and additional on-site storm water pollution. Additional erosion control measures may be required. 2. All revisions to this plan must be documented on the SWPPP Revision Documentation Form. 3. Current versions of the SWPPP, the NOI, and the NOC will be kept on site for the duration of the project. These items will be available for the use of all operators and site personal involved with erosion and sediment controls, and be available to EPA visiting the site. A notice will be posted near the construction entrance during construction, containing the SWPPP, the NOI and the NOC. 4. Fugitive dust blowing from the site shall be controlled by spraying water and dust control polymers as needed on dry areas of the site. 5. The contractor will be responsible for supervision and inspection of all erosion and sedimentation controls and for ensuring the SWPPP is implemented. 6. Prior to beginning earth-moving activities, including clearing and grubbing, all clearing limits, easements, setbacks, sensitive areas and their buffers will be clearly marked to prevent environmental damage both on and off the site. 7. If sediment is accidentally transported on to the street it will be removed from the street surface on a daily basis. 8. All off-site construction shall be stabilized at the end of the working day. 9. All waste material will be collected and stored in a securely lidded dumpster. The dumpster will meet all local and state solid water management regulations. 10. Portable sanitary units will be provided for use by all workers for the entire project. Sanitary waste will be collected regularly for the portable units by an approved sanitary waste management contractor. 11. All exposed soils will be stabilized with vegetation or covered no more than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. 12. Existing and new vegetation will be maintained to the maximum extent practicable to prevent the contamination of storm water with sediment. 13. The contractor shall be responsible for adjusting the erosion control measure; due to grade changes during the development of the project. 14. Maintain on the site or have readily available sufficient oil and grease absorbing materials to contain and clean up fuel or chemical spills and leaks. 15. Adequate energy dissipation, erosion control, and soil stabilization measures will be provided for all point source discharges of storm water, including run-on discharges and outlets for onsite discharges. 16. Temporary and permanent swells and small detention ponds will be used as necessary to reduce the velocity of runoff and enhance particle settling. 17. Consistent with the general permit requirements, all potential pollutants other than sediment will be handled and disposed of in a manner that does not affect contamination of stormwater. 18. Materials used during construction with the potential to impact storm water, will be stored, managed, used, and disposed of in a manner that minimizes the potential for releases to the environment and especially in the storm water. 19. If a spill of pollutants threatens storm water at the site, the spill response procedures must be implemented in a timley manner to prevent the release of pollutants. 20. All temporary and permanent erosion and sediment control BMPs will be maintained and repaired as needed to assure continued performance of their intended use. 21. All temporary erosion control and sediment control BMPs will be removed within 30 days after final site stabilization is achieved or after the temporary BMPs are no longer needed. 22. Regardless of recommended maintenance schedule, all control measures and inspections shall be performed within 24 hours following any storm of 0.5 inches or greater. An inspection report shall be kept at all times and should be retained for at least three (3) years from the date the site is stabilized. 23. All contractors providing services on the project which may cause storm water pollution will be given a copy of the SWPPP and appropriate training regarding stormwater pollution prevention. NOTE: 1.AFTER ASPHALT PAVING HAS TAKEN PLACE STORM WATER DEVELOPED WILL BE DIRECTED TO RETENTION BASINS AND PIPING PER THE APPROVED SITE PLAN AND PERCOLATE IN DESIGNATED AREAS 2.SILT CATCH BASIN PROTECTION TO BE PLACED ON THE NEAREST EXISTING INLET BOXES THAT COULD SEE SEDIMENT AND ALL NEW INLET BOXES. THEY MUST BE MAINTAINED AND PROTECTED THROUGH THE DURATION OF THE PROJECT. LEGEND Concrete Washout SEDIMENTATION AREA CONCRETE WASHOUT CATCH BASIN PROTECTION APPROVED BY ________________________DATE:____________ City of REXBURG STAGING AREA MATERIAL STOCKPILE SEDIMENTATION AREA CONCRETE WASHOUT CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCE EROSION EEL ***THIS IS NOT A FULL SWPPP. A FULL SWPPP MUST BE SUBMITTED BY THE CONTRACTOR PRIOR TO CONSTRUCTION ***THIS IS NOT A FULL SWPPP. A FULL SWPPP MUST BE SUBMITTED BY THE CONTRACTOR PRIOR TO CONSTRUCTION CHECK BY SHEETS DRAWN BY JOB NO: DATE: OF SHEET BDJTKP SH E E T N A M E : PR O J E C T : LO C A T I O N : 2020-083 DATE:DATE: April 2, 2021 DA T E RE V I S I O N S CL I E N T : Th e C i v i l C o n n e c t i o n 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 8 8 1 . 0 0 8 8 PRELIMINARY FOR REVIEW ONLY 16 16 TE T O N R I V E R F L A T S BE S T M A N A G E M E N T P R A C T I C E S DE T A I L S RE X B U R G , I D NOTES: TRENCH SHALL BE A MINIMUM OF 4" WIDE AND 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC. FOLD MATERIAL TO FIT TRENCH & BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL. WOOD POSTS SHALL BE A MINIMUM SIZE OF 1 1/8" X 1 1/8" OAK OR HICKORY. 100' M I N I M U M E X C E P T 5 0 ' M I N I M U M F O R PROJ E C T S I T E S O F L E S S T H A N 1 A C R E PROPOSED SIDEWALK 3"-4" TOP DRESSING OF 2" STONE 6"-8" COMPACTED. FRACTURED STONE. 3' MAX. 2-3 4" BOLTS COMPACTED BACK FILL AROUND POST NOTES: 1. MAILBOX SHALL CONTAIN AT ALL TIMES: A) CITY APPROVED CONSTRUCTION PLANS B) DEQ APPROVED CONSTRUCTION PLANS C) ANY SITE INSPECTON FORMS 2. MAILBOX SHALL BE LOCKED AT ALL TIMES PRESSURE TREATED 2 x 6 4 x 4 POST 4 x 4 POST POST "NPDES" PERMIT 1112" 1312" 2312" 4' 24" MIN. 4' 24" MIN. 12" MIN. 12" 6" EROSION EEL EROSION EEL EROSION EEL SILT FENCE TRUCK WASHOUT MAIL BOX STABILIZED CONSTRUCTION ENTRANCE CURB CUT TO BE INSTALLED FOR NEW SITE ENTRANCE CURB CUT TO BE INSTALLED FOR NEW SITE ENTRANCE TOTAL 9"-12" OF COMPACTED STONE SANDBAG SHALL BE INSTALLED IN FLOW LINE DOWNSTREAM OF CONSTRUCTION ENTRANCE WOOD POSTS 4'-0" MIN. LENGTH 2'-0" MIN. DEPTH IN GROUND GEOTEXTILE FABRIC ONLY BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL. ATTACH THE FABRIC TO THE POSTS WITH WIRE STAPLES OR WOODEN LATH AND NAILS. NOT TO SCALE FLO W DIRE C T I O N SEE BALLAST DETAIL NOT TO SCALE BALLAST DETAIL NOT TO SCALE SLOPE ENTRANCE TO WASHOUT AREA FOR CONTAINMENT PURPOSES WASHOUT AREA MUST BE ENCLOSED W/ SILT FENCE PROVIDE BERM AROUND WASHOUT AREA EXCAVATE BOTTOM 1' TO PROVIDE LOWERED BOWL-LIKE AREA WASHOUT TO BE LINED WITH CLEAN ROCK OR RIP-RAP TO ACT AS FILTER AND EROSION CONTROL NOT TO SCALE APPROVED BY ________________________DATE:____________ City of REXBURG ***THIS IS NOT A FULL SWPPP. A FULL SWPPP MUST BE SUBMITTED BY THE CONTRACTOR PRIOR TO CONSTRUCTION