Daily Field Report
Project Name
The Grove
Time Start
05:45 AM
Client
Stillwater Equity Partners
Contractor
Headwater's Construction
Time End
11:00 AM
Inspection Type(s)
Concrete Placement
Location(s)
East sidewalk of building #7
Observations/ Remarks
I arrived at the at 6:10 am. The contractor was waiting for the second concrete truck to arrive on the
site because the first concrete truck was too wet (low slump), the truck driver told him. They wanted
to let it dry while the second truck was coming to start with.
I decided to test the concrete from that first truck after the second truck left. I then tested and
reported the results to both the contractor and to truck driver.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
New Multi Photo
Inspection Date
05/27/2021
File Name
20001CP05272021YK
Inspector's Signature Inspector's Name
Yannick Kabwika
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
06/01/2021
345b909c5362d83b-1622130810626 2