Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 6 - 19-00736 - The Grove at Thomson Farms PH2 - Linden - 30 Unit Bldg 7Inspection Date 05/27/2021 File Name 20001CP05272021YK Inspector's Signature Inspector's Name Yannick Kabwika Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 06/01/2021 345b909c5362d83b-1622130810626 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 05:45 AM Client Stillwater Equity Partners Contractor Headwater's Construction Time End 11:00 AM Inspection Type(s) Concrete Placement Location(s) East sidewalk of building #7 Observations/ Remarks I arrived at the at 6:10 am. The contractor was waiting for the second concrete truck to arrive on the site because the first concrete truck was too wet (low slump), the truck driver told him. They wanted to let it dry while the second truck was coming to start with. I decided to test the concrete from that first truck after the second truck left. I then tested and reported the results to both the contractor and to truck driver. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 05/27/2021 File Name 20001CP05272021YK Inspector's Signature Inspector's Name Yannick Kabwika Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 06/01/2021 345b909c5362d83b-1622130810626 2