HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 5 - 19-00735 - The Grove at Thomson FarmsInspection Date
05/25/2021
File Name
20001CP05252021YK
Inspector's Signature Inspector's Name
Yannick kabwika
Reviewer's Signature Reviewer's Name
E. Vai
Reviewed Date
05/27/2021
345b909c5362d83b-1621952728690 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
The Grove
Time Start
06:00 AM
Client
Stillwater Equity Partners
Contractor
Headwater's Construction
Time End
09:30 AM
Inspection Type(s)
Concrete Placement
Location(s)
South sidewalk of building #7, east sidewalk of
building # 4, and west sidewalk of building # 5.
Observations/ Remarks
I arrived on the site at 6:00 am. Then I started testing at 6:20 am. I reported to contractor and to the
truck driver.
I observed that the truck driver added some water after the sample was taken. I spoke to the
contractor about it. He told me that it's okay to add some water when the slump drops below 3.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
New Multi Photo
Inspection Date
05/25/2021
File Name
20001CP05252021YK
Inspector's Signature Inspector's Name
Yannick kabwika
Reviewer's Signature Reviewer's Name
E. Vai
Reviewed Date
05/27/2021
345b909c5362d83b-1621952728690 2