Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 5 - 19-00735 - The Grove at Thomson FarmsInspection Date 05/25/2021 File Name 20001CP05252021YK Inspector's Signature Inspector's Name Yannick kabwika Reviewer's Signature Reviewer's Name E. Vai Reviewed Date 05/27/2021 345b909c5362d83b-1621952728690 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 06:00 AM Client Stillwater Equity Partners Contractor Headwater's Construction Time End 09:30 AM Inspection Type(s) Concrete Placement Location(s) South sidewalk of building #7, east sidewalk of building # 4, and west sidewalk of building # 5. Observations/ Remarks I arrived on the site at 6:00 am. Then I started testing at 6:20 am. I reported to contractor and to the truck driver. I observed that the truck driver added some water after the sample was taken. I spoke to the contractor about it. He told me that it's okay to add some water when the slump drops below 3. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 05/25/2021 File Name 20001CP05252021YK Inspector's Signature Inspector's Name Yannick kabwika Reviewer's Signature Reviewer's Name E. Vai Reviewed Date 05/27/2021 345b909c5362d83b-1621952728690 2