Daily Field Report
Project Name
The Grove
Time Start
05:45 AM
Client
Stillwater Equity Partners
Contractor
Headwater's Construction
Time End
10:00 AM
Inspection Type(s)
Concrete Placement
Location(s)
From Northwest coner of building 5 to Northwest
coner of building 6.
Observations/ Remarks
I got at the site at 6:05 am. Before getting my sample, the contractor told the driver to add some
water to get the slump at 4.5. I tested and reported the results to both the contractor and the truck
driver.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
New Multi Photo
Inspection Date
05/26/2021
File Name
20001DFR05262021YK
Inspector's Signature Inspector's Name
Yannick kabwika
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
05/27/2021
345b909c5362d83b-1622038437299 2