Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00735 - The Grove at Thomson FarmsInspection Date 05/26/2021 File Name 20001DFR05262021YK Inspector's Signature Inspector's Name Yannick kabwika Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/27/2021 345b909c5362d83b-1622038437299 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 05:45 AM Client Stillwater Equity Partners Contractor Headwater's Construction Time End 10:00 AM Inspection Type(s) Concrete Placement Location(s) From Northwest coner of building 5 to Northwest coner of building 6. Observations/ Remarks I got at the site at 6:05 am. Before getting my sample, the contractor told the driver to add some water to get the slump at 4.5. I tested and reported the results to both the contractor and the truck driver. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 05/26/2021 File Name 20001DFR05262021YK Inspector's Signature Inspector's Name Yannick kabwika Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 05/27/2021 345b909c5362d83b-1622038437299 2