HomeMy WebLinkAboutRESCHECK - 06-00547 - 252 Jill Dr - New SFRREScheck Software Version 3.7.3
Compliance Certificate
Report Date: 11/29/06
Data fli n : :1 r o r m Fi1es\Chack\REScheckkBasic-rck
Energy Code:
Location:
Construction Type:
Glazing Area Percentage:
Heating Degree Days:
nstruct ri Site:
2003 IECC
Rexburg, Idaho
Single Family
16%
8693
Owner/Agent,
a4e Ovl2q7
Permit #
ZJ0
Permit Date
Desjgner/Contractor.
t.
Ceiling 1: Flat Ceiling or Scissor True:
1316 38.0
VV1I 1; Wood Frame, 16" o.c.: 1440 19.0
Window 1: Vinyl Frame: Double Fane with Low -E: 139
Door 1: Solid- 4
Door 2. Glass
Basement "Fall 1: Solid Concrete or masonry: 1248 11.
Window 2: Vinyl Fr m e Do ublPane: 80
Furnace 1: Forced Hot Air, 90 AFUE
0.0 39
0.0 74
0.350 49
0.350 14
0.500 10
0.0 174
0.500 40
Compliance Statement,- The proposed building design described here is consistent with the building: specifications,
�I�� � a n d other
calculations ubmitt d with the permit appli atr r . The proposed building has been designed
RE check Vetsion 3.7.3 and to comply with the mandatory requirements listed in the l E Che
ck Inspection Checklist.
Builder/Designer Company Name
4
Page I of 4
Date: 11/29/06
Ceilings:
REScheck Software Version 3.7.3
Inspection Checklist
I j Ceiling 1: Flat Celling or Scissor Truss, R-38.0 cavity insulation
Comments:
Above^Grade 'alis:
C] Wall 1: Wood Frame, 16 " 0. kms,, R-1 9.0 cavity insulation
Comments:
Basement malls:
❑ Basement Wa11 1; Solid Concxete or I f asonry, 8. ' ht/7.0' b /8 . ' insuII -11.o cavity in sulation
Comments:
'windows:
F] Window 1: Vinyl Frame -Double Fane with Low -E, u -factor: 0.350
For windows
without
labeled
U -factors, describe features:
Wanes .
Frame
Type
Thermal Bre Yes o
ornment :
I1 Window 2: Vinyl Frame -.Double Pane, -fa tor: 0.500
For windows without labeled -factors, describe features:
#Panes Frame Type Thermal Br Yes No
Comments:
Coors:
L] Door 'f :Solid, U -factor: 0.350
Comments'
Ll Door .: Glass, -factor: 0.500
Comments:
Heating and Cooling Equipment:
Ll Furnace 1: Forced Hot Air: 90 AFUE or higher
Make and Model lumber:
Air Leakage:
penetrations,Lj Joints, ll other such openings in the building envelope that are sources of air leakage must be sealed.
Cj Recessed lights must be 1 Type IC rated, or installed [nside an appropriate air -tight assemb[y with a 0.5 " clearance from
combustible materials. If non -IC rated, the fixture rust be installed with a 3" e[e r n e from insulation.
Skylights:
Lj Minimum insulation requirement for skylight shafts equal to or greater than 12 inches is R-19.
Vapor Retarder:
Required on the warm -in -winter side of all non -vented framed ceilings, walls, and floors..
Materials Identification:
Materials i and equipment must be installed in accordance with the manufacturer's installation instructions.
Lj Materials and equipment rust be identified so that compliance can be determined.
.,.r,Q,�..eryyr��x_},n-._Y,_..,..,F..w.vatv-: ra�,v.+r�w-Ynr.. � .-...,.�-...�-s.M1a,.,�..,,�b�a.�...,..eaaatw�tu•w,�•.�.:...�,'..a..°.,•rra°rd��c-xtio..y,,�..�•..,.w...,..,y.���
.:..,s_,._, �,.w.,.o....,.�s.-,�r,•..+�-Y. -,�.�..J.•,.�.-.W.�,.R�•.�,..,�..•:.,._vv_,..,._,,,.w.,�.....,..,�v.-..,�,..,...P�,•�,.A.-„�ti„�.-h.., � rdx�o- -�-----..._...__ ....,. y.,v*�t Kr.�o-,.,y..,P.�,�a.,a
Page of 4
LJ Manufacturer manuals for all installed heating and cooling equipment and service water h � T
tin ��,�pmnt mut be prccded.
L Insulation i -values, glazing -factors, and heating equipment effic[ency must be I rl
marked on the building plans or
specifications.
Duct Insulation:
L1
Supply
ducts in
unconditioned
attics or outside
the building must be insulated to R-11.
LJ
Return
ducts in
unconditioned
attics or outside
the but lding must be insulated to R-6.
.
LJ
Supply
ducts in
unconditioned
spaces rust be
insulated to R-1
IL
return
ducts in
unconditioned
spaces (except
basements) mut be insulated t R-2,
LJ
Where
exterior walls are used
as plenums, the
wall must be insulated to .-11.
Ll
Insulation
is not
required an return
ducts ire basements.
Duct Construction:
0 Duct mnnections to flanges of air distribution system equipment must be sealed and mechanlcal`ly fasten
L All joints, seams, and connections must be securely fastened with welds, gaskets, mastics adhesive
),
mastic-plus-embedded=fabric, or tapes. Tapes and mastics must be rated UL I 81A or UL 181 B,
Exception: Continuously welded and locking -type longitudinal joints and seams on ducts
operatirat less than 2 in. � 00P).
LJ The HVAC system must provide a means for balancing air and water systerns.
Temperature Controls:
Thermostats are required for each separate HVAC system. A manual or automatic means to partially restrict or shut off the
heating and/or cooling input to each zone or floor shall be provided.
Service Water Heati rig:
0' Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water" heater his an integral
heat trap or is part of a circulatingt ren.
LJ Insulate circulating hot water pipes to the revels in Table 1.
Circulating Foot 'mater Systems:
[j Insulate circulating hot water pipes to the levels in Table 1.
Swimming Pools:
All heated swimming pools must have an on/off heater switch and require a cover unless over % of
the heating energy is from
nor -d pl t ble sources. Pool pumps require a time clock.
Heating and Cooling Piping Insulation:
LJ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees Frust be insulated to the levels in Table
.
" ..... .. ' awka`^w's^^�4n.', fY'i.�dY ASF'L�...,sw��n+^+w•'1•r?-Yidn1":nnti �sa�wvwM....: ?%p+}p.ryy
_ -' S�1.i. wc-.xM1tix_+nv_•. L•...e•_•.Y r�.•..r.'rvervti1•.^.Lvr.n�h73'. V a�+'sr-ti.�+n�}v-]-e �et�.'�mww�aw.M1
- .."""u_'^��+'�'�Y�'.YnYi11eM1(wAct§.W��a+.y+•+tr9h8GA161+C - .. 'Y'.�a•.x•_v,
Page 3 of
: u insulation Thickness for Circulating Hot Water Pipes
Headed Water
Temperature (°F)
Insulation This n in Inches by Pipe Sizes
Non -Circulating Runout
Up to 1 IT
Up to 1 ,"
Circulating Mains and Runouts
1.5" to . 0 "
170-180
0.5
1,0
1.5
140-169
0.5
0.5
1.0
100-139
M
0.5
0.
Table : Minimum insulation Thickness for HVAG Pipes
Over 2PI
Insulation Thi.rkness in Inches by Pipe Sizes
Fluid Temp.
Piping System Types, Range,("F) " Runouts 1" and Less 1. "' to .0" " to "
Heating Systems
Low PressurelTemperature
Low Te m pratu r
t.-a.arn Condensate (for feed water)
Cooling Systems
Chilled later, refrigerant and
Brine
201-250
1.0
1.
1.
106-200
0.5
1.0
1.0
1.
Any
1.0
1.0
1.
40-55
a
0.5
0.75
1,
Below 40
1.0
1.0
1.5
1.
NOTES TO FIELD: (Building Department Use [only)
1r{-yyv_v.•M v.waw�iYSY fi+�..m�Lev'�e4'4'v`A,1�:-tvu.•uv.v�vs•.vssssve.��e:.ui"•ti�Cv'�^^h��l`v�tivwti �" . Ya I..' .. +w.m�b15G"iati�ii Pi'iii`�v?!-Y*+^-a:+•%•+'•�^-+�evna'i'ia[r'B�aYY•}�+-Y-v-v.'.xmvv_u-ni��vr�dve�-.ii.iLl ih'n'siw.u•.=n.vvuvmuiwwswawi` - .'v+i}'�T"ML"^^wysviv`S`s`.Yi .. ..
..mow .. .....
Page 4 of
2 1- 3`5 20045040
PAYS RACING LLC
P"E 01
252 J0'
ill -Heart B
REScheck, Software Version 3.7.3
Compliance Certificate
Project Title: Heart B Construction Spec #6, Plan #1
Data filename- C.-lPrograrn FifeslCheckiRESr,.heck�A2ln.i.p PIER #1,rck
Enry Code,
l s t r ion Type;
Glazing r-:��a Pgr onto
Heating D a re C)a s,
2000 IECC
Rexbuqg, Idaho
Singfin. Fl
21,10
x693
or tru a n S its :
252 Jill Drive; C� e n rursr S ubdi i Mon
Rexburg, IQ 53,440
Owner/Agent:
Shane Balrap
Kuart B Ccnstruction
PO Ftvx X08
Rexburg, ID LS -40
7D9-1462
hf) Ln 8,n1n@P
H cart B Congtruction
Rexburg, IQ,
709-1462
F1v t Ceiling r cisaor Truss;
Wall Il Wood Frame, 2-4" a . . ; I Col LLD
Window 1; Vinyl l Fram , Doubl Flano with Low -E:
Door 1: Solis':
.Saserneiit Wall 1: Solid Concrete or Ma-Enonr , � #
Pura o I , Forced Hut Air, 02 AFUa
L
�` -M1 I M
13 1Zo38,0 0.0 39
tw 19.0 0.0 45
0.350 74
6.350 7
1�7��gr
11-0 0.0 77
Compliance $f 9 GM.' The papa n cJ buildlrg design zQri bid hero. Is con f F-,( n t with tiro bui-IdIng plans,qer a tUon-f.- and other
al ul lti n ubrrittod with the p rr�lii appli nUon. The pray std buklng has been de5igned to meet the 2000 IP - r �..�Ireme t in
�J
R E!S check Vorslon 3, 7. 3 9nd to cc reply with the ma nd tory raq a fu ents I i 0ed i n 1h 0 RESche ck I ntsp ecticn Chocklist,
Ri IId r'D � npr
Heart E Cop5tructlDn Spec j76. plan pi
Company NErne,
... .. 11 1... .. ....n .a .. ..... ..... .i. 1...'... .
. .. .+i 4 . ... .... ... .. ! 1 i . . .. .. .....l i I .. • ..... a ..7 11
e. . ...!7 67 Y7 ....... 1!7 71 •YY eh ..... ......i 1 tl Y i d . ... . I k i •....... ......I" "
Page I of I
Il
a
I
0
PL
i
R.
S
A■ v
_ SRW I'm i p Iz r
i
1 y- L
16
J-
i
96
w
31
V 1�
1
r
b
Ift
Y
+
1-1 LL
�L r ;
al
Y
I AL'
In
0
I
,r
P IL "1
it w
.i -
w
ON
For
r
"Im
w IN w '= r
-3*
R III 1. a
` I I■
;p Fro
Ll 43
I L �C.
r_ ■
MO
w Q E w
LI
I. # qg a.
h
TL
�I
■1 M
C.
r,
v
-5
I
6w
Yj
19
a
I
RM
Il
m
4'i